Exhibit 99.2

Unified Gas - to - Nuclear Energy Platform with Near - term Deployment Timeline Investor Presentation – November 2026

Notes and Important Disclosures This presentation (together with oral statements made in connection herewith, the “Presentation”) has been prepared solely for the purpose of furnishing information to interested parties to assist them in making their own evaluation with respect to the proposed business combination transaction (the “Business Combination”) among AMPERA, Inc. (“AMPERA” or the “Company”), a Delaware corporation, and Berto Acquisition Corp. (“Berto”, and together with AMPERA, the “Parties”), a special purpose acquisition company incorporated as a Cayman Islands exempted company, and the contemplated financing and related transactions (together with the Business Combination, the “Transactions”). This Presentation is being delivered solely to recipients that are “qualified institutional buyers” as defined in Rule 144A under the Securities Act of 1933, as amended (the “Securities Act”), institutional “accredited investors” within the meaning of Rule 501(a)(1), (2), (3) or (7) under the Securities Act, or “accredited investors” within the meaning of Rule 501(a)(5) or (6) of Regulation D under the Securities Act, by Needham & Company, LLC (“Needham”), as financial advisor to the Company and placement agent to Berto in connection with the Transactions. Past performance by AMPERA, its management team, and by Berto and its management team and sponsor is not a guarantee of future performance. Therefore, you should not place undue reliance on the historical record of the performance of AMPERA, its management team, or by Berto and its management team and sponsor, or businesses associated with them as indicative of future performance of an investment or the returns that AMPERA will, or is likely to, generate going forward. No Representations and Warranties No representations or warranties, express or implied are given in, or in respect of, this Presentation or with respect to the accuracy, completeness or reliability of the information contained in this Presentation. Nothing contained herein shall be relied upon as a promise or representation, whether as to the past or future performance of any of the Parties. The information contained in this Presentation is provided as of the date hereof and may change, and none of the Parties, Needham, or any of their respective representatives undertakes any obligation to update such information, including in the event that such information becomes inaccurate or incomplete. To the fullest extent permitted by law, in no circumstances will the Parties, Needham, or any of their respective subsidiaries, affiliates, representatives, partners, directors, officers, employees, advisers, or agents be responsible or liable for any direct, indirect, or consequential loss or loss of profit arising from the use of this Presentation, its contents, its omissions, reliance on the information contained within it, or on opinions communicated in relation thereto or otherwise arising in connection therewith. In addition, this Presentation does not purport to be all - inclusive or to contain all of the information that may be required to make a full analysis of the Parties or the Transactions. Recipients of this Presentation should make their own evaluation of the Parties and the Transactions and of the relevance and adequacy of the information and should make such other investigations as they deem necessary. Nothing herein should be construed as legal, financial, tax, or other advice. The general explanations included in this Presentation cannot address, nor are intended to address, your specific investment objectives, financial situations, or financial needs. Notwithstanding anything contained herein, there can be no assurance that the Transactions will be consummated on the terms described herein, within the time periods contemplated hereby, or at all. This Presentation shall not be taken as any form of commitment on the part of the Parties to proceed with any negotiations of the Business Combination or any other Transaction, and each of the Parties reserves the right to discontinue discussions or negotiations regarding the Transactions at any time for any reason or no reason. No Offer or Solicitation This Presentation does not constitute a solicitation of a proxy, consent, or authorization with respect to any securities. This Presentation also does not constitute an offer to sell, or solicitation of an offer to buy any securities, nor will there be any sale of securities in any states or jurisdictions in which such offer, solicitation, or sale would be unlawful prior to registration or qualification under the securities laws of any such jurisdiction. No offering of securities will be made except by means of a prospectus meeting the requirements of Section 10 of the Securities Act or an exemption therefrom. Neither the U.S. Securities and Exchange Commission (the “SEC”) nor any securities commission of any other U.S. or non - U.S. jurisdiction has approved, disapproved, or determined that this Presentation is truthful or complete. Any representation to the contrary is a criminal offense. Financial Information; Non - GAAP Measures The independent auditor of AMPERA has not examined or compiled the financial information and data contained in the Presentation; accordingly, no such independent auditor provides any assurance with respect to any financial information included herein. Such information and data may not be included in, may be adjusted in, or may be presented differently in, any registration statement, prospectus, proxy statement or other report or document to be filed or furnished by AMPERA, or any other report of document to be filed with the SEC. Any pro forma financial information, capitalization, ownership percentages or other post - Transactions information included herein is presented for illustrative purposes only, is based on assumptions and estimates deemed reasonable by management as of the date hereof, and is subject to change, which may be material. Some of the forward - looking financial information and data contained in this Presentation, such as Levelized Cost of Energy (LCOE), has not been prepared in accordance with United States generally accepted accounting principles (“GAAP”). LCOE is defined as the average cost to generate 1 MWh over a project’s life, including capital, operations, maintenance, and fuel. The Company believes that forward - looking LCOE provides useful information to management and investors because it reflects management’s estimate of the average lifecycle cost of electricity generation and provides a useful metric for evaluating projected unit economics and comparing generation technologies. The Company’s method of determining LCOE may be different from other companies’ methods and, therefore, may not be comparable to the same metric used by other companies. Management does not consider non - GAAP measures in isolation or as an alternative to financial measures determined in accordance with GAAP. Non - GAAP measures are subject to inherent limitations as they reflect the exercise of judgments by management about projected capital, operating, maintenance and fuel costs, capacity and utilization assumptions, and other factors affecting projected LCOE. A reconciliation for forward - looking LCOE is not provided because, as a forward - looking statement, such reconciliation is not available without unreasonable effort due to the high variability, complexity, and difficulty of estimation.

Industry and Market Data This Presentation has been prepared by the Parties and includes market data and other statistical information from third - party industry publications and sources as well as from research reports prepared for other purposes. Although the Parties believe that these third - party sources are reliable as of their respective dates, none of the Parties, Needham, or any of their respective representatives or affiliates have independently verified the accuracy or completeness of this information and cannot assure you of (and make no representation or warranty, express or implied with respect to) the accuracy or completeness of such data or statistical information. The Parties, Needham, and each of their respective affiliates, directors, officers, employees, members, partners, shareholders or agents do not make any representation or warranty with respect to the accuracy of such information. Trademarks This Presentation contains trademarks, service marks, trade names, and copyrights of the Parties and other companies which are the property of their respective owners. The use or display of third parties’ trademarks, service marks, trade name or products in this Presentation is not intended to, and does not imply, a relationship with AMPERA or Berto, or any endorsement or sponsorship by or of AMPERA or Berto. Solely for convenience, the trademarks, service marks and trade names referred to in this Presentation may appear with the TM or SM symbols, but such references are not intended to indicate, in any way, that the Parties will not assert, to the fullest extent permitted under applicable law, their rights or the right of the applicable licensor to these trademarks and trade names. Forward Looking Statements This communication includes “forward - looking statements” with respect to the Parties. The expectations, estimates, and projections of the business of AMPERA and the combined company may differ from its actual results and consequently, you should not rely on these forward - looking statements as predictions of future events. Words such as “expect,” “estimate,” “anticipate,” “intend,” “may,” “will,” “could,” “should,” “potential,” “plan” and similar expressions are intended to identify such forward - looking statements. These forward - looking statements include, without limitation, expectations related to future financial performance, operating results, and technology of AMPERA as well as larger trends in the nuclear industry. These forward - looking statements involve significant risks and uncertainties that could cause the actual results to differ materially from the expected results and are subject to, without limitation, uncertainties as to the timing of the Transactions; the risk that the Transactions may not be completed in a timely manner or at all; the risk that the Transactions may not be completed by Berto’s business combination deadline of May 1, 2027; the failure by the Parties to satisfy the conditions to the consummation of the Transactions, including the approval of Berto’s shareholders; the occurrence of any event, change, or other circumstance that could give rise to the termination of the negotiations or definitive agreements related to the Transactions; changes to the proposed structure of the Transactions that may be required or appropriate as a result of applicable laws or regulations; the effect of the announcement or pendency of the Transactions on AMPERA’s business; and those risk factors discussed in Berto's Annual Report on Form 10 - K for the year ended December 31, 2025, filed with the SEC on March 30, 2026 (“Berto's Annual Report”), a registration statement on Form S - 4 that the Parties intend to file in connection with the Transactions (the “Registration Statement”), and other documents filed or to be filed by the Parties with the SEC, along with (i) known and unknown risks, including the risks and uncertainties set forth in this Presentation under the heading “Risk Factors”, (ii) uncertainties, (iii) assumptions, and (iv) other factors beyond the Parties’ control that are difficult to predict because they relate to events and depend on circumstances that will occur in the future. These forward - looking statements are provided for illustrative purposes only and are not intended to serve as and must not be relied on by an investor as a guarantee, an assurance, a prediction, or a definitive statement of fact or probability . They are neither statements of historical fact nor promises or guarantees of future performance . Therefore, actual results may differ materially and adversely from those expressed or implied in any forward - looking statements and the Parties therefore caution against placing undue reliance on any of these forward - looking statements. The Parties do not undertake or accept any obligation to release publicly any updates or revisions to any forward - looking statements to reflect any change in its expectations or any change in events, conditions, or circumstances on which any such statement is based, except as required by applicable securities laws. You should carefully consider the foregoing factors and the other risks and uncertainties described in the “Risk Factors section of this Presentation, the “Risk Factors” section of Berto’s Annual Report and the Registration Statement (when available). Important Information and Where to Find It In connection with the Transactions, the Parties intend to file relevant materials with the SEC, including the Registration Statement, and after the Registration Statement is declared effective, Berto will mail the proxy statement included therein to holders of Berto’s ordinary shares in connection with Berto’s solicitation of proxies for the vote of Berto’s shareholders with respect to the Transactions. This Presentation is not a substitute for the Registration Statement or any other document that may be filed by the Parties with the SEC. INVESTORS AND SHAREHOLDERS OF BERTO ARE URGED TO READ ALL RELEVANT DOCUMENTS FILED BY EACH OF THE PARTIES WITH THE SEC IN CONNECTION WITH THE TRANSACTIONS, INCLUDING THE REGISTRATION STATEMENT (WHEN THEY ARE AVAILABLE), BECAUSE THEY WILL CONTAIN IMPORTANT INFORMATION ABOUT THE PARTIES AND THE TRANSACTIONS AND RELATED MATTERS. Investors and shareholders are or will be able to obtain these documents (when they are available) free of charge from the SEC's website at www.sec.gov. Participants in Solicitation The Parties and their respective directors, managers, and executive officers may be deemed under SEC rules to be participants in the solicitation of proxies of Berto’s shareholders in connection with the Transactions. Investors and security holders may obtain more detailed information regarding the names and interests of Berto’s directors and officers in Berto’s filings with the SEC, including Berto’s Annual Report under the headings “Directors, Executive Officers and Corporate Governance,” “Executive Compensation,” “Security Ownership of Certain Beneficial Owners and Management and Related Shareholder Matters,” and “Certain Relationships and Related Transactions, and Director Independence,” which is available at https:// www.sec.gov/Archives/edgar/data/2033122/000182912626002856/bertoacquisition_10k.htm. Information regarding the persons who may, under SEC rules, be deemed participants in the solicitation of proxies of Berto’s shareholders in connection with the Transactions will be set forth in the Registration Statement, when available. Investors, shareholders, and other interested persons are urged to read the Registration Statement, the proxy statement/prospectus included therein, and other relevant documents that will be filed with the SEC carefully and in their entirety when they become available because they will contain important information about the Transactions.

Participants in Solicitation (continued) Investors, shareholders, and other interested persons will be able to obtain free copies of the proxy statement/prospectus and other documents containing important information about the Parties through the website maintained by the SEC at www.sec.gov. Risk Factors Certain Risks Related to AMPERA, Inc. All references to the “Company,” “AMPERA,” “we,” “us” or “our” in this presentation refer to the business of AMPERA, Inc. The risks presented below are certain of the general risks related to the Company’s business, industry and ownership structure and are not exhaustive. The list below is qualified in its entirety by disclosures contained in future filings by the Company, or by third parties with respect to the Company, with the United States Securities and Exchange Commission (“SEC”). These risks speak only as of the date of this presentation and we make no commitment to update such disclosure. The risks disclosed in future filings with the SEC may differ significantly from and will be more extensive than those presented below. • AMPERA's use of AI - based technology may present new risks and challenges to AMPERA's business, including those related to privacy, data use, and security • AMPERA has a limited operating history, which makes it difficult to forecast our future results of operations. • AMPERA may not be able to scale its business quickly enough to meet its customers’ growing needs, and if it is not able to grow efficiently, its operating results could be harmed. • The nuclear energy industry is competitive on a global scale with many countries aspiring to successfully develop sustainable nuclear energy sources. If AMPERA is not able to compete successfully, its business, financial results and future prospects will be harmed. • The nuclear energy industry is in its early stages and is volatile, and if it does not develop, if it develops slower than AMPERA expects, if it develops in a manner that does not require use of AMPERA’s nuclear solutions, if it encounters negative publicity or if AMPERA’s solution does not drive commercial engagement, the growth of its business will be harmed. • Even if AMPERA is successful in developing nuclear solutions and executing its strategy, competitors in the industry may achieve technological breakthroughs which render AMPERA’s nuclear solutions obsolete or inferior to other products. • If AMPERA’s reactors fail to achieve a broad nuclear advantage, or it is delayed in doing so, its business, financial condition and future prospects may be harmed. • AMPERA’s operating and financial results forecast relies in large part upon assumptions and analyses developed by the Company . If these assumptions or analyses prove to be incorrect, AMPERA’s actual operating results may be materially different from its forecasted results . • AMPERA’s estimates of market opportunity and forecasts of market growth may prove to be inaccurate, and even if the market in which it competes achieves the forecasted growth, AMPERA’s business could fail to grow at similar rates, if at all. • AMPERA may be unable to successfully scale up manufacturing of its products in sufficient quantity and quality, in a timely or cost - effective manner, or at all. Unforeseen issues associated with scaling up and constructing nuclear technology at commercially viable levels could negatively impact AMPERA’s business, financial condition and results of operations. • Supply chain issues, including a shortage of adequate component supply or manufacturing capacity, or any political challenges between the United States and countries in which AMPERA suppliers are located could have an adverse impact on its business and operating results. • If AMPERA cannot successfully execute on its strategy, including in response to changing customer needs and new technologies and other market requirements, or achieve its objectives in a timely manner, its business, financial condition and results of operations could be harmed. • AMPERA is highly dependent on its co - founders, and its ability to attract and retain senior management and other key employees, such as nuclear engineers and other key technical employees is critical to its success. If AMPERA is unable to retain talented, highly - qualified senior management, engineers and other key employees or attract them when needed, it could negatively impact its business. • AMPERA's failure to effectively develop and expand its sales and marketing capabilities could harm its ability to increase its customer base and achieve broader market acceptance of its nuclear capabilities. • AMPERA’s reactor designs rely on specialized nuclear fuel and related materials, including thorium - based TRISO fuel manufactured to precise specifications. If AMPERA is unable to procure these materials, or to do so on a timely and cost - effective basis and in sufficient quantities, it may be required to delay development, qualification, or deployment of its reactors, incur higher than expected costs, or make design or operational changes, any of which could adversely affect its business, prospects, financial condition, and results of operations. • System security and data protection breaches, as well as cyber - attacks, could disrupt AMPERA's operations, which may damage AMPERA's reputation and adversely affect its business. • State, federal and foreign laws and regulations related to privacy, data use and security could adversely affect AMPERA. • AMPERA is subject to U.S. and foreign anti - corruption, anti - bribery and similar laws, and non - compliance with such laws can subject us to criminal or civil liability and harm our business. • AMPERA is subject to governmental export and import controls that could impair its ability to compete in international markets due to licensing requirements and be subject to liability if it is not in compliance with applicable laws. • Unfavorable conditions in AMPERA's industry or the global economy could limit the Company’s ability to grow its business and negatively affect its results of operations. • AMPERA is subject to requirements relating to environmental and safety regulations and environmental remediation matters which could adversely affect its business, results of operation and reputation. • AMPERA may need additional capital to pursue its business objectives and respond to business opportunities, challenges or unforeseen circumstances, and it cannot be sure that additional financing will be available. • Acquisitions, divestitures, strategic investments and strategic partnerships could disrupt AMPERA's business and harm its financial condition and operating results. • AMPERA's business is exposed to risks associated with litigation, investigations and regulatory proceedings. • AMPERA's ability to use net operating loss carryforwards and other tax attributes may be limited in connection with the business combination or other ownership changes.

Risk Factors (continued) • If AMPERA is unable to obtain and maintain patent protection for its products and technology, or if the scope of the patent protection obtained is not sufficiently broad or robust, its competitors could develop and commercialize products and technology similar or identical to AMPERA's, and its ability to successfully commercialize its product and technology may be adversely affected. Moreover, the secrecy of AMPERA’s trade secrets could be compromised, which could cause AMPERA to lose the competitive advantage resulting from these trade secrets. • AMPERA's patent applications may not result in issued patents or its patent rights may be contested, circumvented, invalidated or limited in scope, any of which could have a material adverse effect on AMPERA's ability to prevent others from interfering with its commercialization of its products. • AMPERA may face patent infringement and other intellectual property claims that could be costly to defend, result in injunctions and significant damage awards or other costs (including indemnification of third parties or costly licensing arrangements (if licenses are available at all)) and limit our ability to use certain key technologies in the future or require development of non - infringing products, services, or technologies which could result in a significant expenditure and otherwise harm our business. • Following the consummation of the business combination, the combined company will incur significant increased expenses and administrative burdens as a public company, which could negatively impact its business, financial condition and results of operations . • Our success could be impacted by the inability of the parties to successfully or timely consummate the proposed business combination, including the risk that any required regulatory approvals are not obtained, are delayed, or are subject to unanticipated conditions that could adversely affect the combined company or the expected benefits of the proposed business combination or that the approval of the stockholders is not obtained. • If the business combination’s benefits do not meet the expectations of investors or securities analysts, the market price of the public company’s securities or, following the closing, the combined entity’s securities, may decline Certain Risks Related to Berto and the Transactions • There is no assurance that the Transactions will be completed. • Berto’s sponsor and its directors and officers and their affiliates have interests in the Transactions that are different from, or in addition to and/or in conflict with, those of Berto’s shareholders generally, including the fact that Berto’s sponsor and its officers and directors hold a significant number of Berto’s ordinary shares and will lose their entire investment in Berto if an initial business combination is not completed. • The ability of Berto’s public shareholders to exercise redemption rights with respect to a large number of shares could deplete Berto’s trust account prior to the Transactions and thereby diminish the amount of working capital available to the combined company . • Berto’s public shareholders who do not redeem their shares will experience immediate dilution as a consequence of the Transactions. • There is no assurance that the contemplated private capital rise or any other additional financing will be completed. • Berto may be targeted by securities class action and derivative lawsuits that could result in substantial costs and may delay or prevent the Transactions from being completed. • The proposed financing will only be consummated if the Business Combination closes, and the closing of the Business Combination may be subject to a number of closing conditions, some of which may be outside of Berto’s and the Company’s control. • The securities to be issued in the proposed financing will not be registered with the SEC and, prior to such registration cannot be transferred or resold except in a transaction exempt from or not subject to the requirements of the Securities Act and applicable state securities laws. • An active trading market for the combined company’s securities may not be available to provide shareholders with adequate liquidity. The market price of the combined company’s securities may be volatile, and shareholders could lose all or a significant part of their investment. • Berto’s sponsor, officers and directors and others may purchase shares from public shareholders or take other actions, which may influence a vote on the Transactions and reduce the public “float” of Berto’s ordinary shares. • If the expected benefits of the Transactions do not materialize, or do not meet the expectations of investors or securities analysts, the market price of Berto’s securities or, following the closing, the combined company’s securities, may decline. • If Berto is unable to complete an initial business combination by May 1, 2027 (or such later date as may be approved by Berto’s shareholders in accordance with its organizational documents), Berto will cease all operations except for the purpose of winding up, redeem 100% of the outstanding public shares and, subject to the approval of the remaining shareholders and Berto’s board of directors, dissolve and liquidate. If the Transactions are not completed prior to such date, there can be no assurance that Berto will obtain shareholder approval to extend such date. • The combined company will have discretion in how it uses the proceeds of the Transactions and may not use these proceeds effectively, which could affect its results of operations and cause the market price of its securities to decline. • Certain AMPERA shareholders will hold shares of the combined company with supervoting rights following the closing of the Transactions, which will concentrate voting control in those shareholders and could limit the ability of other shareholders, including Berto’s public shareholders, to influence matters submitted to a shareholder vote, and could adversely affect the trading price of the combined company’s securities. • The combined company will have outstanding public warrants and private placement warrants exercisable at $11.50 per share, and the exercise of such warrants would increase the number of the combined company’s securities eligible for future resale, which could result in dilution to existing shareholders and adversely affect the market price of the combined company’s securities.

Factory - built, Modular Energy Systems Highly modular, gas - to - nuclear energy systems that enable future nuclear integration, supporting earlier path to customer engagement PowerNOW – NuclearNEXT Unified Energy Platform will deliver conventional power first and can transition to nuclear once available, first deliveries of conventional power as early as Q3 2027 Attractive Customer Economics Projecting lower cost unit economics for power delivery Vertical Integration Consolidating key elements of AMPERA’s reactor development provides greater control to derisk supply and support earlier commercial readiness Proprietary Technology Innovative, unique source - assisted subcritical architecture, core and fuel systems, sCO 2 power conversion platform, and proprietary manufacturing and fabrication processes (patents pending) Regulatory Tailwinds Early NRC pre - application engagement, a streamlined reactor design, and NPI testing processes support licensing; recent fuel recycling legislation could further support AMPERA’s vision for a closed thorium fuel cycle 1 Strategic Partners Across High - Value End Markets Developing key partnerships with leading companies in data centers, defense, maritime, and industrial markets Capital Efficient, Robust Financial Model deSPAC largely meets capital needs of core platform development and initial commercial scale - up 2 Note: Statements about AMPERA reactor design, operation, and performance are forward - looking and describe planned future capabilities rather than current, licensed reactors. Investment highlights shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied. 1) Nuclear REFUEL (Recycling Efficient Fuels Utilizing Expedited Licensing) Act, H.R. 3978; passed the U.S. House 397 – 2 on November 9, 2026; pending Senate action; 2) See footnote 1 on page 10.

Targeting to close deSPAC in Q1 2027 Business leader with 40+ years of unmatched deep management experience across technology broadly, creating significant shareholder value at Broadcom (Chairman, oversaw acquisition of VMware), IonQ (former Lead Independent Director), EMC (former EVP, Office of the Chairman, who structured Dell’s buyout of EMC), Oracle (former CFO), Accenture (former CFO), BearingPoint (former CEO) ✓ Deep transactional experience ✓ Played key role in structuring Dell’s $67B buyout of EMC and Broadcom’s $92B acquisition of VMware ✓ Has raised hundreds of billions in total capital • Leading franchise with dMY and Berto family of SPACs • Recent and relevant SPAC experience in disruptive tech including IonQ, Planet Labs, Horizon Quantum, Genius Sports and Rush Street Interactive (current average price of ~ $15/share ¹ and peak average price of ~$46/share ) • >$2B in common stock PIPE + trust capital raised since 2020 • Consistent participation from strategic investors in PIPE financings • < 15% average redemption rate for dMY franchise (~2% median) • 100% oversubscribed PIPE raises • Unrivaled market connectivity with leading investors • Focus on beating financial guidance out of the gate Strategic Relationships Operational Excellence Access to Capital Note: No assurances can be made that the proposed transaction will be consummated on the terms or timeframe currently contemplated, or at all. Any transaction would be subject to satisfaction of the conditions negotiated therein, board and equity holder approval, regulatory approvals, and other customary conditions. Past performance is not a guarantee of future performance. 1) Current average share price as of November 13, 2026

Transaction Summary H i g h l i g h ts Valuation • AMPERA valued at $900M pre - money equity value • AMPERA shareholders will roll 100% of their equity and retain ~68% ⁴ Anticipated Use of Proceeds Commercialization & Industrialization Commercialization of Unified Energy Platform and continuing development of nuclear technology Unified Energy Platform R&D Accelerate supercritical CO 2 power module and nuclear technology development Sales & Marketing, Regulatory Engage customers, build the sales force and advance regulatory compliance Strategic Acquisitions Key technology tuck - ins to accelerate the roadmap 1) Common stock PIPE priced at final trust redemption value. 2) Assumes 0% redemptions. Cash in trust as of 9/30/26. 3) Subject to early release after 12 months if stock is greater than $18/share for 30 consecutive trading days. 4) Certain AMPERA shareholders will receive shares with supervoting rights. Note: No assurances can be made that the proposed transaction will be consummated on the terms or timeframe currently contemplated, or at all. Any transaction would be subject to satisfaction of the conditions negotiated therein, board and equity holder approval, regulatory approvals, and other customary conditions. • Transaction includes approximately $30M of a committed common stock PIPE ¹ • In addition to the PIPE, AMPERA has received commitments or closed in excess of $10M of pre - transaction close equity and debt financing, bringing total capital commitments in excess of $40M to date • The PIPE financing and recent investments include several key strategic investors across diversified end markets in which AMPERA intends to sell into, including AI data centers, quantum computing, defense, maritime and industrial sectors • AMPERA to receive up to $347M of new gross cash proceeds at closing inclusive of PIPE and up to $317M of cash in trust ² • AMPERA may seek $50M - $100M of incremental PIPE capital • Certain AMPERA shareholders and Berto sponsor subject to 24 - month lock - up ³ • Transaction expected to close in Q1 2027

Illustrative Pro Forma Valuation ($M) Pro Forma Shares Outstanding 2, 3 1 2 5. 6 ( - ) Net Proceeds (322) Pro Forma Enterprise Value $1,004 Sources and Uses ($M) Uses Sources $322 Cash to Balance Sheet $3 17 Berto Cash in Trust 1, 2 25 Est. Transaction Expenses 5 30 Committed Common Stock PIPE 9 0 0 AMPERA Rollover Equity 4 9 0 0 AMPERA Rollover Equity 4 7 9 Berto Sponsor Rollover Equity 7 9 Berto Sponsor Rollover Equity $1, 3 2 6 Total Uses $1, 3 2 6 Total Sources 2 4 % Illustrative Ownership at Close (#M) 6% % Own # Shares 2% 2.8 PIPE Shareholders 6 2 4% 30.0 Berto Public Shareholders 2 2% 68% 6% 7.5 Berto Sponsor 100% 125.6 Total 3 Note: No assurances can be made that the proposed transaction will be consummated on the terms or timeframe currently contemplated, or at all. Any transaction would be subject to satisfaction of the conditions negotiated therein, board and equity holder approval, regulatory approvals, and other customary conditions. 5) Includes ~$12M of deferred underwriting fees subject to pro rata reduction based on final trust redemptions. 6) All shares issued and priced at the final trust redemption value per share. 1) Cash in trust as of 9/30/26. 2) Assumes 0% redemptions. 3) Excludes 15.0M public warrants and 7.3M private placement warrants with $11.50 strike price. 4) Certain AMPERA shareholders will receive shares with supervoting rights.

Robust Financial Model Projecting rapid growth • Bridge - to - Nuclear model enables earlier revenue generation • Early cash generation derisks investment model • Leveraging attractive unit economics, platform modularity and short deployment timeline to drive strong customer adoption • Target industry leading gross margin profile Capital - light platform development • deSPAC largely meets capital needs of core platform development and initial commercial scale - up 1 Deployment capital converts quickly • PPA unit economics support 1 – 2 year payback • Assumes approximately $9M and $25M unit cost for gas - powered systems and nuclear systems, respectively Self - funding cash flow profile • PPA structure creates long - duration contracted cash flows • Positive EBIT cash targeted in 2031 High Capital Efficiency PPA Model - 30 Year Operating Life Single Unit Economics Year 1 - 2 Year 3 Year 36 Projecting 30 Years Strong Cash Generation Note: Financial projections, payback periods, margins, and unit economics shown are illustrative management estimates based on current assumptions on pricing, costs, capital requirements, deployment timing, and customer adoption; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Assumes 0% redemptions and approximately $30M of committed common stock PIPE, reflecting $347M of gross proceeds at closing.

A compelling investment in nuclear with differentiated PowerNOW strategy targeting critical applications $ 7 ,4 0 0 $6 ,0 0 0 $2,6 0 0 $1 , 88 0 $1 , 5 4 1 $ 9 1 8 $1,004 ⁴ $ 8 , 000 $ 6 , 000 $ 4 , 000 $ 2 , 000 $0 Valuation ($M) Public Companies ¹ Private Companies ² Average ³: $3.3B Sources: FactSet Research Systems, SEC filings, Pitchbook, company investor presentations and press releases 1) Represents enterprise value figures as of November 13, 2026 2) Represents company post - money valuation figures of recent private capital raises 3) Average value represents all peer valuations; excludes AMPERA implied pro forma enterprise value of deSPAC 4) Represents implied pro forma enterprise value of deSPAC 5) Per company disclosures and announcements $2,6 9 5 PowerNOW Conventional Mobile gas System ⁵ turbine Subcritical Lead - cooled fast Liquid metal cooled, fast HTGR Sodium - cooled HTGR HTGR Reactor Type ⁵ 7.5 - 15 200 75 1 10 80 5 Power (MWe) ⁵ 2027 / 2029 2032 2 0 28 2028 2029 2030+ Est. FOAK ⁵ TRISO MOX TRISO TRISO Owned Fuel ⁵

Data Centers Firm, carbon - free baseload for hyperscale compute Defense Energy independence for bases and critical infrastructure Maritime Zero - emissions propulsion for naval and commercial fleets Industrial Reliable on - site power for reshoring and heavy industry Scalable modules to multi - GW AI campuses Deployable microgrids Scalable propulsion and onboard power supply Distributed industrial power Projected US electricity usage outpaces generation (TWh) 7,000 6 , 000 5 , 000 4 , 000 6,819 U s age 5,245 Generation 2024 2035 2035 Projected Shortfall ≈180 GW of new firm capacity needed 1 Usage +64% vs. generation +26%, 2024 – 2035 Deployable anywhere — no grid connection required Note: AMPERA estimates based on publicly available market data, including ICF and NextEra Energy investor presentations (September and December 2025) ; statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Assumes continuous operation of new capacity 2) Pictures depict illustrative AMPERA systems

TM One Unified Energy Platform. Deploy today — transition to advanced nuclear tomorrow Power Now. | Modular Gas - Powered System¹ Nuclear Next. | Modular Nuclear System¹ 01 Gas - powered modules deploy before nuclear licensing is complete 02 P One sCO 2 power block runs on gas or nuclear heat 03 du Nuclear module replaces the gas module Rapid Scaling Factory Production Factory production scales ahead of reactor deployment Leveraging the transition from conventional to nuclear through a standardized energy platform Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Pictures depict an illustrative AMPERA system

Note: Milestones shown are forward - looking and based on current planning assumptions. February 2026 NRC correspondence initiated formal pre - application engagement; the 2027 milestone refers to targeted application submission timing, not regulatory approval. Progress depends on staged regulatory engagement, engineering validation, fuel source availability, prototype testing, topical reports, government - site demonstration, and completion of planned nuclear, neutronic, and thermal analyses. 1) TRISO (TRi - structural ISOtropic fuel): Type of particle fuel where a small fuel kernel is encapsulated in multiple ceramic coating layers to contain fission products and enhance safety Unified Energy Platform accelerates time to nuclear production at scale 20 26 20 27 2 0 28 2 0 29 2 0 3 0 Modular Gas - Powered Systems Modular Nuclear S y s t e ms Q3 – Gas - Powered Pre - Prototype System Q1 – 7.5 MWe Prototype Q2 – Factory Production Q3 – First Gas System Delivery Q1 – Gas - Powered System Production Ramp e or - Targeted Manufacture of First Commercial Nuclear Power Deliveries Q1 – TRISO manu f a c t u r i ng (LLNL) Q3 – Irradiation testing (ORNL) Q3 – Targeted TRISO mass production line established at Tera1

Estimated LCOE of $50 (USD / MWh) • Leverages AMPERA’s proprietary, in - house additive manufacturing technologies Scalable factory model with modular energy systems supports earlier path to customer engagement and mass deployment Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Picture depicts an illustrative AMPERA system • Meet near - term power demand with modular, natural gas – fired PowerNOW systems • Convert industrial waste heat into additional electricity without burning additional fuel • Commencing in 2027, generate revenue from modular, gas - powered systems with AMPERA’s proprietary sCO 2 power conversion systems • ~ 2/3 of the deployed system is common between the gas and nuclear configurations

Conventional Modular Gas - Fired Burner • A modular gas - fired thermal block supplies high - temperature heat to the AMPERA sCO 2 power module • The integrated recuperator, heat exchanger, turbopump and generator are designed to convert this thermal energy into ~7.5 MWe in a compact, transportable architecture Aero - Derived Gas - Turbine Combined Cycle Power System • Intended collaboration with an aerospace consortium to convert jet engines into high efficiency gas turbines using s Power • Its hot exhaust supplies the AMPERA sCO 2 power block, which is expected to add ~15 MWe without additional fuel and targets >50% efficiency Targeted Commercial Availability AMPERA’s gas - fired sCO 2 system is designed to be highly differentiated from best - in - class gas - turbine & diesel generators Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Pictures depict an illustrative AMPERA system A M P - G7 . 5 AMP - G45 Targeted Commercial Availability

Designed to connect a high - temperature heat source to turbine generator, recuperation, cooling and grid - interface modules 200 years in the waiting to replace the traditional steam turbine Rankine cycle with a high - temperature, gas - based Brayton cycle Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Picture depicts an illustrative AMPERA system T U R B O P U M P , G E A R B OX A ND G E NE R A T OR

• Building on 20 years of R&D and 100s of hours of operating data from Echogen • Elevated operating temperatures and pressures relative to Rankine cycles • Accelerated lifetime testing for reliability • Leveraging additive manufacturing + nickel superalloys to operate at higher temperatures 36 î 11 î 12.5 ft Dimensions 115,000 lbs Weight 375 C TurboPump TIT 250 bar Compressor Outlet Improves system efficiency and reliability, and significantly reduces size through leveraging additive manufacturing Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Picture depicts a pre - production prototype of the sCO 2 system

The world’s first subcritical, solid - state, factory - built thorium nuclear reactor Modular Platform Compact deployment • Proprietary manufacturing and production processes • Fully containerized systems manufactured in parallel production lines Bridge - to - Nuclear PowerNOW NuclearNEXT • Early customer engagement supplying power conversion and transmission systems • Establish customer footprint then swap in nuclear reactor once in production Vertically Integrated Nearly all key elements • Prioritizing in - house fuel production, 3D printing of reactor core, and power conversion system • Seeking greater fuel supply chain and lifecycle control Core - for - Life Targeting up to 30 - year core life • No routine refueling cycles • Helium as primary coolant • Long - life sealed design enhances safety, security, and proliferation resistance Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Picture depicts an illustrative AMPERA reactor system

New enabling technologies make factory - produced thorium reactors a reality Sealed core for life MWe scalable output Efficiency target Core life, no refueling Unique Reactor Core Solid - state, sealed for life • World’s first 3D - printed reactor core • Compact 4.5 ft diameter with shielding • Proprietary gyroid structure with microchannels Accelerator - Driven Subcritical, source - assisted • Requires an external neutron source; cannot self - sustain • Instant on/off and designed to be passively safe • No control rods Thorium Fuel Abundant, low - waste fuel • ~3x more abundant than uranium • Smaller waste footprint than uranium • Lower projected fuel cost than HALEU • Liquid metal jet - printed TRISO kernels Process Innovations Advanced manufacturing • 3D - printed primary heat exchangers, micro - turbines and combustors • Superalloy deposition methods resistant to CO 2 corrosion and high temperatures Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Picture depicts an illustrative AMPERA reactor system 2) HALEU = High - Assay Low - Enriched Uranium

Vertical integration significantly reduces supply chain risk Coated Particle Technology • Partnering with Australian processor as well as other prospective mining companies • Creating long - term availability and supply flexibility • Eliminates enrichment needs for bulk fuel – small HALEU ¹ seed used for startup • Thorium - based fuel cycle and in - core breeding • In - house capability across fuel handling and lifecycle management reduces safeguard requirements and minimizes proliferation risk • Patented Liquid Metal Jetting (LMJ) technology will be used to produce metal powders and highly spherical particles with very high yield and precise size control, expected to lower the cost of TRISO fuel production ² • Plan to create additional recurring revenue stream by providing reactor fuel to other nuclear customers • Target customers include third - party SMR and microreactor companies • Lower dependence on enriched - uranium markets and concentrated suppliers, minimizing geopolitical risk and supply - chain disruption Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied. 1) HALEU = High - Assay Low - Enriched Uranium 2) Exclusive, perpetual license to 66 liquid metal jetting (LMJ) patents for nuclear field - of - use applications

Built with enhanced safety by design Core - for - life Modular Nuclear Systems • Targeting a long - life core of up to 30 years, eliminating routine on - site fuel handling and diversion risk, reducing operator intervention and system complexity • Helium, not water, as the primary coolant transfers heat from the reactor core to the heat exchanger • Power conversion via a high - efficiency closed - loop sCO 2 Brayton cycle Neutron Driver for Subcritical Operation • Integrated neutron driver providing the external neutron flux required to sustain subcritical operation • Reduces reliance on large mechanical control systems Safety is achieved through core design and physics characteristics Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Picture depicts AMPERA’s reactor module

Unique silicon carbide core for enhanced safety and thermal margins • Heat generation within the 3D - printed gyroid structure • Optimized for neutron efficiency, high thermal margin, and uniform heat distribution • Structural integrity and robustness under load and temperature • Orientation - independent performance • Compatible with scalable manufacturing approaches • Leverages proprietary in - house additive manufacturing technologies Complex gyroid geometry enables a monolithic SiC core with built - in cooling channels and high surface area Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Picture depicts a 3D rendering of AMPERA’s monolithic gyroid reactor core structure design

NeuralTwin TM Physics î Data î AI Design optimization Explore core configurations in hours, not weeks Eng i n e e r i ng evidence Every prediction traceable to its model and inputs Operational insight Predicted vs. measured performance, in real time Model r ef i n e m e n t Operating data feeds back into the physics models NeuralTwin TM — physics - grounded intelligence across the energy lifecycle Designed to connect reactor physics, engineering data and AI across the full plant lifecycle Physics first High - fidelity neutron transport and depletion models generate the reference data AI where it adds speed Surrogate models predict k - eff, power distribution and neutron - source demand across fuel burnup, but only within their validated range Traceable evidence Every result records its model version, inputs and uncertainty, building toward regulatory - grade evidence Learning from the fleet PowerNOW operating data trains and tests the twin before Nuclear Next deploys Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties.

Factory - built nuclear systems, delivered as modular infrastructure assets Modular Manufacturing Model Picture depicts illustrative reactor factory Begin Power Module Manufacturing 2027 Targeting 300 systems/year initial capacity Size of single system (footprint per MWe) ~10 m² Repeatable module - based production by design supports quality control and replication Parallel production lines for scalable throughput Modular factory expansion for rapid capacity growth Manufacturing - driven deployment unlocks nuclear energy at industrial scale True Compact Deployment Picture depicts illustrative reactor deployment No CRDM towers or large reactor vessels ¹ Minimal shutdown absorber system; no control - rod motion Reduced vessel height and penetrations enable smaller footprint Fully containerized, transportable system architecture No routine refueling logistics required Removing reliance on control - rod motion enables a fundamentally smaller, shippable reactor system Note: Projected milestone timing shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied. As a result, such milestones are subject to change and may not be achieved in the timeframes described, or at all. 1) CRDM = Control Rod Drive Mechanism

AMPERA’s modularized factory - built platform is designed to compress deployment timelines, support earlier commercial readiness, and accelerate market adoption 1 Factory - Built • Modular infrastructure assets compress time from order to commissioning 2 Bridge - to - Nuclear • Deploy proprietary modular power conversion systems ahead of nuclear deployment to establish customer footprint and recurring revenue 3 In - house Th Fuel Production • Prioritizing in - house production of TRISO fuel to support rapid deployment and scaling 4 Reduces Supply Chain Risk • Factory - built systems and in - house fuel capability reduce reliance on concentrated enriched - uranium supply chains, improving supply security and resilience 5 No Routine On - Site Refueling • Simplifies site operations, reduces fuel - handling complexity, and improves uptime for early customers 6 Innovative Modular Design • Easier to manufacture, transport, and install through a compact, low - complexity design with fewer moving parts 7 Subcritical • Source - assisted architecture design that may support a more streamlined regulatory pathway, accelerated R&D, and earlier deployment Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied.

Target long - term LCOE of ~$20 / MWh enabled by factory - built reactors and an in - house thorium fuel strategy ¹ $2 .1 Wind + Storage On Shore $4 4 $ 1 .5 Natural Gas Combined Cycle $4 8 $ 1 .4 Solar PV + Storage Utility Scale $50 $6 .0 N u c l ear U.S. $ 1 4 1 $ 1 5.0 Fusion $2 00 Sources: Non - company benchmarks based on publicly available third - party data, including Lazard LCOE+ 2025 (low end estimates), U.S. EIA AEO2025, DOE and OECD/NEA advanced nuclear and SMR studies, and peer - reviewed fusion economics; AMPERA values are internal target economics assuming scaled factory - built deployment and are not demonstrated commercial operating data. 1) Estimated from current assumptions: cost reflects Levelized Cost of Energy (LCOE), the average cost to generate 1 MWh over a project’s life, including capital, operations, maintenance, and fuel 2) Estimated, based on current assumptions: $M in capital expenditures investment required to produce 1 Megawatt of Electricity

AMPERA is positioned to lead with a framework that best fits the technology, derisks pre - application engagement, and stays closely aligned with evolving regulation Primary Licensing Strategy • Part 53 licensing strategy paired with a structured pre - application engagement program in 2026 • AMPERA plans to work closely with the NRC well ahead of a formal application • Proactive engagement and targeted submission of full license application projected in Q4 2027 Alternative Pathways • • Note: Projected milestone timing shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied. Pre - application engagement is exploratory and does not imply NRC acceptance, endorsement, or approval; pathway selection and timing remain subject to ongoing evaluation. As a result, such milestones are subject to change and may not be achieved in the timeframes described, or at all.

AMPERA expects to deliver the highest energy density AMPERA Modular Reactor (15 MWe) Small Modular Reactor (~300 MWe) Picture depicts a 3D rendering of AMPERA’s reactor design Picture depicts a 3D rendering of a Small Modular Reactor TIME TO FIRST POWER ¹ < 1 year 5 – 10 years CONSTRUCTION LEAD T I M E < 1 year 5 – 10 years MANUFACTURING M O DEL Factory - built, tested modules Plug - and - play on site On - site construction S C A L A B I L I T Y 15 MWe increments Add units as needed ~300 MWe increments C OO L I N G R E Q U I R E M E NT Air cooled No consumptive water Typically requires water DEPLOYMENT Transportable by trucks/rail/ship Built for speed and flexibility On - site construction Extensive infrastructure Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Represents time from start of construction to power generation

AMPERA compresses deployment timelines by shifting complexity from construction to manufacturing ¹ Time to Deployment ¹ < 1 Year • Factory - built modules with parallel production and site preparation • Minimal on - site construction, enabling rapid installation and commissioning SMRs 5 – 10 years • Only partial modularization, with significant work still completed on - site • Reduced footprint but still site - dependent • Limited production scalability and standardization Conventional Nuclear Reactors 10 – 15 years • Site - specific engineering and customization • Long permitting and construction timelines • Complex, sequential construction processes How AMPERA Differs Modular / Factory - Built Unified Energy Platform Unit Economics Fuel Security Safety and Waste Profile Operational Simplicity Capital Efficiency Proliferation Resistance Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Time to Deployment refers to estimated order - to - commissioning timing, assuming licensing approval and manufacturing readiness; excludes NRC licensing timelines

Founder, CEO and CTO • 30+ years of experience in nuclear engineering, reactor physics, safety analysis and regulatory strategy • Tenured nuclear and additive manufacturing CEO Chief Financial Officer • 30+ years as an accomplished finance executive and CFO • $18B of global operations oversight, M&A, strategy, and joint development Chief Legal Officer • 25+ years of experience providing corporate legal services • Supply chain and legal operations for large public manufacturing companies Chief Operating Officer • 30+ years of executive - level nuclear safety, development and engineering leadership • Ph.D. in nuclear engineering Chief Commercial Officer • 25+ years global experience as a hands - on investor and operator commercializing complex technologies & infrastructure • Ph.D. in Artificial Intelligence and Wharton Fellow VP, Marketing • 20+ years of corporate communications experience for Fortune 200 companies • Led marketing - communications for nuclear fleet across the US

Active discussions for over 20 initial PowerNOW units to address critical power needs of prospective data center, defense, maritime and industrial customers Product Evaluating Customer / Partner Application AMP - G7.5 Edge AI data centers with integrated AI rack cooling s P o w e r sCO 2 bottoming cycle for gas turbines at an LNG compression depot A M P - G 7 . 5 On - site power for a 1 GW data center s P o w e r sCO 2 bottoming cycle integration with gas turbines A M P - G 7 . 5 Off - grid AI data centers & community power for remote sites A M P - G 7 . 5 Market entry partner for Japan A M P - G 7 . 5 Off - grid port power for major US and EU ports A M P - G 7 . 5 Waste heat recovery and remote power for industrial, mining and refining operations s P o w e r Geothermal - powered data center application using sPower bottoming cycle Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. 1) Pipeline reflects active discussions with prospective customers and partners; none constitutes a binding order, and there is no assurance any discussion will result in one. Applications shown are illustrative of potential use cases.

Traditional Nuclear Reactor Scalable Modular Platform Long Deployment Cycles Immediate Deployment Pathway Single Technology Integrated Ecosystem Construction Projects Factory - built Reactors Energy Only Energy + Intelligence Forging a path to energy abundance Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties.

Note: Picture depicts a 3D rendering of AMPERA’s reactor design


Dual - Track Regulatory & Licensing Technical V alid at ion & Testing AMPERA’s licensing path is supported by staged analysis, subsystem testing, material qualification, and ongoing validation data generation before and during NRC review 2026 2027 2028 2029+ • NRC pre - application engagement • Targeted NRC license application submission • Submission of staged technical packages, safety analyses, modeling results, and supporting validation data • NRC review period with ongoing supplemental testing and confirmatory data generation • Pursue DOE authorization and/or government - site permitting pathway • sCO 2 power conversion subsystem and thermal systems testing • Pneumatic and structural subsystem testing • Non - fueled prototype manufacturing validation • Advanced neutronic, thermal - hydraulic, and structural modeling campaigns • AI - native multiphysics simulations and safety - case generation • Internal HPC infrastructure and simulation partners • Continued neutron source development and validation activities • Government - site fueled demonstrator / FOAK testing • Integrated operational validation and confirmatory empirical data generation during NRC review • Additive manufacturing material qualification and reactor material testing • Silicon carbide and structural component validation • Reactor geometry and thermal performance analysis • TRISO fuel development, characterization, coating - process development, and testing activities already underway with RIT and Michigan State University • Planned expansion of research agreements and independent laboratory testing capabilities to accelerate validation and qualification activities • Additional collaboration activities involving LLNL and related technical organizations for fuel characterization, neutron source evaluation, and supporting validation work Note: Milestones shown are forward - looking and based on current planning assumptions. February 2026 NRC correspondence initiated formal pre - application engagement; the 2027 - 2029 milestone refers to targeted application submission timing, not regulatory approval. Progress depends on staged regulatory engagement, engineering validation, fuel source availability, prototype testing, topical reports, government - site demonstration, and completion of planned nuclear, neutronic, and thermal analyses.

NeuralTwin TM development framework for reactor design Geometry and materials Fuel loading and neutron - source input Core performance changes as fuel evolves - the design model must capture both Core design Coupled physics Neutron transport Fuel depletion and thermal feedback Design decisions Power distribution and core lifetime Fuel use and neutron - source demand Faster design, without losing the physics Note: Statements about AMPERA shown are forward - looking, based on current planning assumptions, and prepared on the basis of certain technical, regulatory, financing, market and other assumptions, which may not be satisfied; actual results may differ materially due to regulatory approvals, technical development, manufacturing readiness, site conditions, and other risks and uncertainties. Iterate through the full irradiation history Neural physics AI surrogates Trust & validation

Breeding / thorium breeding – Process in which fertile thorium is converted into fissile uranium - 233 inside a reactor, creating new fuel as the reactor operates DOE – Department of Energy Criticality / critical reactor – State in which each fission event produces on average one more fission, so the nuclear chain reaction is self - sustaining External neutron source – Device or system that supplies neutrons from outside the reactor core to support or control fission in a subcritical reactor Fissile fuel – Nuclear material, such as uranium - 235, plutonium - 239, or uranium - 233, that readily undergoes fission when struck by low - energy neutrons Gen I – IV / Gen V – Labels for generations of nuclear reactors: Gen I – III are existing commercial designs, Gen IV are advanced designs in development, and Gen V refers to emerging next - generation concepts beyond Gen IV Gyroid – Complex, triply periodic 3D minimal surface with a repeating geometry, used here as a high - surface - area structural form inside reactor components HALEU (High - Assay Low - Enriched Uranium) – Uranium enriched to between 5 % and 20 % uranium - 235 , used in some advanced reactors for higher power density and longer core life HPC (high - performance computing) – Large - scale computing infrastructure using clusters of powerful processors to run complex simulations or data - intensive workloads such as AI and scientific modeling Integrated neutron driver – Neutron - producing device integrated with the reactor core to provide the external neutrons needed for source - assisted, subcritical operation LCOE (Levelized Cost of Energy) – Metric that spreads all capital, operating, and fuel costs over a project’s lifetime and divides by total energy produced to give the average cost per unit of electricity LMJ (Liquid Metal Jetting) – AMPERA’s patented manufacturing and cooling approach that uses precisely controlled jets of liquid metal within the reactor system This Glossary explains several terms used in the AMPERA Presentation. The Glossary, as prepared by AMPERA management, is not a comprehensive explanatory document. Shareholders and investors should not unduly rely on it to make investment decisions.

Megawatt electric (MWe) – Unit of electrical power equal to one megawatt (one million watts) of electricity delivered to the grid or load Modular reactor / modularity – Reactor design that uses factory - fabricated modules and standardized components so units can be built, shipped, and installed in a repeatable way Monolithic core – Reactor core built as one integrated structure or block rather than many separately assembled elements, simplifying geometry and interfaces Neutronics – Study and modeling of how neutrons are produced, move, and interact in a reactor, including flux, absorption, and fission behavior NeuralTwin TM – A physics - grounded AI digital twin platform for compact reactor design, validation, manufacture, and operation NPI testing processes – Design development processes and methodologies that will be included in AMPERA’s pre - application regulatory engagement plan with the NRC. Reactor design and testing processes will be submitted with the Final Safety Analysis Report (FSAR) for the manufacturing license, and the FSAR will describe testing and inspection NRC (U.S. Nuclear Regulatory Commission) – Independent U.S. agency that licenses and oversees civilian use of nuclear materials and commercial nuclear power plants Part 50 - 52 / Part 53 / Part 57 – Sections of U.S. nuclear regulations that define alternative licensing frameworks for reactors, including standardized and new risk - informed pathways PIPE (private investment in public equity) – Transaction where a public company sells shares or convertible securities directly to private investors, outside a traditional public offering sCO 2 (supercritical carbon dioxide) – Working fluid state where CO ₂ is held above its critical temperature and pressure and used in compact, high - efficiency power cycles Sealed core – Reactor core designed to operate for long periods without on - site refueling, with fuel sealed inside the unit for its service life SiC (silicon carbide) – Advanced ceramic material with very high temperature and radiation tolerance, used in nuclear applications such as fuel cladding and structural components This Glossary explains several terms used in the AMPERA Presentation. The Glossary, as prepared by AMPERA management, is not a comprehensive explanatory document. Shareholders and investors should not unduly rely on it to make investment decisions.

SMR (small modular reactor) – Nuclear reactor generally 300 MWe or less that uses modular, factory - built components for easier deployment and scalability Solid - state reactor – Reactor concept that eliminates moving core components such as control rods in normal operation, relying on static structures and materials for control and heat removal Source - assisted nuclear – Subcritical reactor approach where an external neutron source is used to initiate and sustain fission, so the core cannot operate without that source SPAC (Special Purpose Acquisition Company) – Publicly listed shell company formed to raise capital and acquire or merge with a private operating business Subcritical reactor / subcriticality – Reactor whose core remains below criticality and cannot sustain a chain reaction without an external neutron source Thorium fuel cycle – Nuclear fuel cycle that uses fertile thorium to breed fissile uranium - 233, enabling long - term use of thorium as a reactor fuel TRISO (TRi - structural ISOtropic fuel) – Type of particle fuel where a small fuel kernel is encapsulated in multiple ceramic coating layers to contain fission products and enhance safety Unified Energy Platform – AMPERA’s modular energy platform is designed to support both conventional and nuclear power generation, which allows customers to generate power from conventional sources before transitioning to nuclear This Glossary explains several terms used in the AMPERA Presentation. The Glossary, as prepared by AMPERA management, is not a comprehensive explanatory document. Shareholders and investors should not unduly rely on it to make investment decisions.