Exhibit 99.1

Grey Fox Project Prefeasibility Study
S-K 1300 Technical Report Summary
Document No. 25666-00000-PM-RPT-0002
Effective Date: June 8, 2026
Prepared for: | Contributing Firms: |
| |
| McEwen Inc. |
Report Date: | Stantec Consulting Ltd. |
November 9, 2026 | Arcadis |
| DRA Global Ltd. |
Project/File: | |
169525666 | |

| | |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Revision Record
Revision | Date | Description | Responsible |
A | Click or tap to enter a date. | Document Initiated | Marta Syvertsen |
A1 | Click or tap to enter a date. | Formatted/Edited by Stantec TE/DMDC | |
A1a | Click or tap to enter a date. | Author Incorporation of Changes | |
B | Click or tap to enter a date. | QP Review | |
B1 | Click or tap to enter a date. | Author Incorporation of Changes | |
B1a | Click or tap to enter a date. | Tech Edit/Cleanup for Client Review | |
C | Click or tap to enter a date. | Client Review | |
C1 | Click or tap to enter a date. | Author Incorporation of Changes | |
0 | Click or tap to enter a date. | Final | |
REVISION APPROVAL
Revision | Designation | Responsible | Date |
A | Originator | | Click or tap to enter a date. |
Ax | Document Compliance Reviewer | Marta Syvertsen | 24 July 2026 |
A2 | Quality Assurance Reviewer | Luke Willis | 07 August 2026 |
A2 | Independent Peer Reviewer | | Click or tap to enter a date. |
| | |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Important Notice
This notice is an integral component of the Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary (“TRS” or “Report”) and should be read in its entirety and must accompany every copy made of the Report. The Report has been prepared in accordance with the requirements of United States Securities and Exchange Commission (SEC) disclosure requirements under Sub-part 229.1300 of Regulation S-K.
This TRS has been prepared for McEwen Inc. with contributions from McEwen Inc., Stantec Consulting Ltd., DRA Global Ltd., and Arcadis. The quality of information, conclusions, and estimates contained herein are consistent with the level of effort involved in the services of Report contributors, based on: i) information available at the time of preparation of the Report, and ii) the assumptions, conditions, and qualifications set forth in this Report.
Each portion of the TRS is intended for use by McEwen, subject to the terms and conditions of its contract with Report contributors. Except for the purposes legislated under United States securities law, any other uses of the Report by any third party is at that party’s sole risk.
The results of the Report represent forward-looking information. The forward-looking information includes pricing assumptions, sales forecasts, projected capital and operating costs, mine life and production rates, and other assumptions. Readers are cautioned that actual results may vary from those presented. The factors and assumptions used to develop the forward-looking information, and the risks that could cause the actual results to differ materially are presented in the body of this Report.
The report authors have used their experience and industry expertise to produce the estimates in the Report. Where these estimates have been made, they are subject to qualifications and assumptions, and it should also be noted that all estimates contained in the Report may be prone to fluctuations with time and changing industry circumstances.
| | |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Dates and Signatures
Report Title: | Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary |
| |
Property: | Grey Fox Project |
| |
Location: | Timmins, Ontario, Canada |
| |
Effective Date of Technical Report: | November 9, 2026 |
| |
Qualified Persons: | |
| | 9 November 2026 |
Carson Cybolsky, P.Geo. | | |
| | |
| | 9 November 2026 |
Sean Bradley Farrell, P.Geo. | | |
| | |
| | 9 November 2026 |
William Luke Willis, P.Geo. | | |
| | |
| | 9 November 2026 |
Mark Hatton, P.Eng. | | |
| | |
| | 9 November 2026 |
Sheldon Smith, MES, P.Geo. | | |
| | |
| | 9 November 2026 |
Gerd Michael Wiatzka, P.Eng. | | |
| | |
| | 9 November 2026 |
Daniel Weich Morrison, P.Eng. | | |
See Table 2-1 for each Qualified Person’s area of responsibility within this TRS.
| | |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Table of Contents
Table of Contents
Acronyms / Abbreviations | xii | |
Glossary | | xvi |
| | |
1 | Executive Summary | 1-1 |
1.1 | Introduction | 1-1 |
1.2 | Property Description | 1-1 |
1.3 | Accessibility, Climate, Local Resources, Infrastructure and Physiography | 1-2 |
1.4 | History | 1-2 |
1.5 | Geological Setting, Mineralization, and Deposit | 1-3 |
1.6 | Exploration | 1-3 |
1.7 | Drilling | 1-4 |
1.8 | Sample Preparation, Analyses and Security | 1-4 |
1.9 | Data Verification | 1-4 |
1.10 | Mineral Processing and Metallurgical Testing | 1-5 |
1.11 | Mineral Resource Estimates | 1-7 |
1.12 | Mineral Reserve Estimates | 1-8 |
1.13 | Mining Methods | 1-9 |
1.14 | Processing and Recovery Methods | 1-10 |
1.15 | Infrastructure | 1-10 |
1.16 | Market Studies and Contracts | 1-11 |
1.17 | Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups | 1-11 |
1.18 | Capital and Operating Costs | 1-12 |
1.19 | Economic Analysis | 1-12 |
1.20 | Adjacent Properties | 1-13 |
1.21 | Interpretation and Conclusions | 1-13 |
1.22 | Recommendations | 1-14 |
| | |
2 | Introduction | 2-1 |
| | |
2.1 | Terms of Reference | 2-1 |
2.2 | Site Visits and Scope of Personal Inspection | 2-2 |
2.3 | Effective Dates | 2-3 |
2.4 | Information Sources and References | 2-3 |
2.5 | Units of Measure | 2-3 |
2.6 | Previous Technical Reports | 2-3 |
| | |
3 | Property Description | 3-1 |
| | |
3.1 | Mineral Tenure and Surface Rights | 3-2 |
3.2 | Royalties and Encumbrances | 3-9 |
3.3 | Agreements | 3-13 |
3.4 | Environmental Liabilities | 3-17 |
3.5 | Significant Risk Factors | 3-17 |
| | |
4 | Accessibility, Climate, Local Resources, Infrastructure, and Physiography | 4-1 |
| | |
4.1 | Accessibility | 4-1 |
4.2 | Local Resources and Infrastructure | 4-1 |
4.3 | Climate | 4-2 |
4.4 | Physiography | 4-2 |
| | |
5 | History | 5-1 |
| | |
5.1 | Grey Fox Project | 5-1 |
| Project: 169525666 | i |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Table of Contents
5.2 | Stroud Property | 5-4 |
5.3 | Eastern Properties | 5-4 |
5.4 | Stock Property | 5-8 |
5.5 | Western Properties | 5-11 |
| | |
6 | Geological Setting, Mineralization, and Deposit | 6-1 |
| | |
6.1 | Regional Stratigraphy | 6-1 |
6.2 | Mineral Occurrences & Mineralization Types | 6-2 |
6.3 | Stroud Property | 6-7 |
6.4 | Structural Geology | 6-14 |
6.5 | Property Geology | 6-17 |
6.6 | Deposit Types | 6-24 |
| | |
7 | Exploration and Drilling Programs | 7-1 |
| | |
7.1 | General Exploration | 7-1 |
7.2 | Drilling Programs | 7-1 |
7.3 | Drilling Methods | 7-10 |
7.4 | Logging Procedures | 7-12 |
7.5 | Core Recovery | 7-13 |
7.6 | Collar Surveys | 7-14 |
7.7 | Downhole Surveys | 7-15 |
7.8 | Geotechnical, Hydrological and Metallurgical Drilling | 7-16 |
7.9 | Sample Length and True Thickness | 7-16 |
7.10 | Drilling Completed Since Database Close-out Date | 7-17 |
7.11 | QP Comment on Exploration and Drilling Programs | 7-17 |
| | |
8 | Sample Preparation, Analyses and Security | 8-1 |
| | |
8.1 | Sampling Methods and Sample Preparation | 8-1 |
8.2 | Analytical Methods and Laboratories | 8-2 |
8.3 | Quality Assurance and Quality Control | 8-5 |
8.4 | Sample Security | 8-6 |
8.5 | QP Opinion | 8-8 |
| | |
9 | Data Verification | 9-1 |
| | |
9.2 | Property-Specific Verification | 9-2 |
9.3 | Geochemical and Water Analysis Verification | 9-3 |
9.4 | Tailings Storage Data Verification | 9-4 |
9.5 | Water Treatment | 9-5 |
9.6 | Metallurgical Testing and Analysis | 9-5 |
| | |
10 | Mineral Processing and Metallurgical Testing | 10-1 |
| | |
10.1 | Summary | 10-1 |
10.2 | Introduction | 10-4 |
10.3 | Test Work Completed to Date | 10-4 |
10.4 | Historical Metallurgical Testing Results | 10-5 |
10.5 | Recent Metallurgical Testing Results | 10-25 |
10.6 | Process Design Criteria Derived from Test Results | 10-41 |
10.7 | Recovery Model | 10-43 |
10.8 | Deleterious Elements | 10-44 |
10.9 | Interpretation and Conclusions | 10-44 |
10.10 | Recommendation for Future Work | 10-44 |
| | |
11 | Mineral Resource Estimates | 11-1 |
| | |
11.1 | Approach | 11-1 |
| Project: 169525666 | ii |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Table of Contents
11.2 | Resource Estimation | 11-1 |
11.3 | Grey Fox | 11-2 |
11.4 | Stroud | 11-14 |
11.5 | Black Fox | 11-22 |
11.6 | Froome | 11-29 |
11.7 | Stock Property – West and Main Zone | 11-38 |
11.8 | Stock Project – East Zone | 11-49 |
11.9 | Davidson-Tisdale | 11-56 |
| | |
12 | Mineral Reserve Estimates | 12-1 |
| | |
12.1 | Forward-Looking Statement | 12-1 |
12.2 | Risks | 12-1 |
12.3 | Mineral Reserve Estimate | 12-1 |
| | |
13 | Mining Methods | 13-1 |
| | |
13.1 | Geomechanical | 13-5 |
13.2 | Hydrogeological Considerations | 13-23 |
13.3 | Mine Design and Mining Methods | 13-25 |
13.4 | Productivities | 13-38 |
13.5 | Mine Production Schedule | 13-43 |
13.6 | Blasting | 13-47 |
13.7 | Mobile Equipment Selection | 13-47 |
13.8 | Ventilation | 13-51 |
13.9 | Ore and Waste Handling System | 13-59 |
13.10 | Mine Dewatering | 13-59 |
13.11 | Backfill Distribution | 13-60 |
13.12 | General Underground Infrastructure | 13-62 |
13.13 | General Underground Services | 13-65 |
13.14 | Underground Electrical and Power Distribution | 13-67 |
13.15 | Underground Communication and IT | 13-72 |
| | |
14 | Processing and Recovery Methods | 14-1 |
| | |
14.1 | Process Flowsheet | 14-2 |
14.2 | Process Design Criteria | 14-3 |
14.3 | Process Description | 14-4 |
14.4 | Conclusions | 14-8 |
| | |
15 | Infrastructure | 15-1 |
| | |
15.1 | Existing Infrastructure | 15-2 |
15.2 | Project Site Preparation | 15-4 |
15.3 | Project Access | 15-4 |
15.4 | Buildings and Ancillary Items | 15-6 |
15.5 | Ventilation Collars | 15-10 |
15.6 | Power Distribution | 15-11 |
15.7 | Communications and IT | 15-12 |
15.8 | Ore and Waste Rock Management | 15-13 |
15.9 | Water Management | 15-14 |
15.10 | Tailings Storage Facilities | 15-18 |
15.11 | Sitewide Water and Mass Balance Model | 15-25 |
15.12 | Water Treatment Plant Infrastructure | 15-29 |
| | |
16 | Market Studies and Contracts | 16-1 |
| | |
16.1 | Market Studies | 16-1 |
16.2 | Contracts | 16-1 |
| Project: 169525666 | iii |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Table of Contents
16.3 | QP Opinion on Markets and Contracts | 16-1 |
| | |
17 | Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups | 17-1 |
| | |
17.1 | Existing Environment | 17-1 |
17.2 | Site Water Quality and Geochemistry | 17-3 |
17.3 | Environmental Setting | 17-4 |
17.4 | Regulatory Framework | 17-4 |
17.5 | Environmental Aspects and Sensitivities | 17-7 |
17.6 | Social and Community | 17-8 |
17.7 | Mine Closure | 17-9 |
| | |
18 | Capital and Operating Costs | 18-1 |
| | |
18.1 | Methodology | 18-1 |
18.2 | Total Capital Cost Estimates | 18-1 |
18.3 | Total Operating Cost Estimates | 18-9 |
| | |
19 | Economic Analysis | 19-1 |
| | |
19.1 | Financial Results | 19-1 |
19.2 | Cautionary Statement | 19-2 |
19.3 | Assumptions | 19-3 |
19.4 | Economic Model Parameters | 19-3 |
19.5 | Sensitivity Analysis | 19-8 |
| | |
20 | Adjacent Properties | 20-1 |
| | |
20.1 | Hislop | 20-1 |
| | |
21 | Other Relevant Data and Information | 21-1 |
| | |
22 | Interpretation and Conclusions | 22-1 |
| | |
22.1 | Ownership | 22-1 |
22.2 | Mineral Tenure, Surface Rights, Water Rights, Royalties and Agreements | 22-1 |
22.3 | Geology and Mineralization | 22-1 |
22.4 | Exploration | 22-2 |
22.5 | Metallurgical Testwork | 22-3 |
22.6 | Mineral Resource Estimates | 22-3 |
22.7 | Mineral Reserve Estimate | 22-4 |
22.8 | Mining | 22-5 |
22.9 | Infrastructure | 22-5 |
22.10 | Tailings Storage | 22-5 |
22.11 | Water/Solute Mass Balance and Water Treatment | 22-6 |
22.12 | Market Studies and Contracts | 22-6 |
22.13 | Capital and Operating Cost Estimates | 22-6 |
22.14 | Economic Analysis | 22-7 |
22.15 | Risks | 22-7 |
| | |
23 | Recommendations | 23-1 |
| | |
23.1 | Recommended Work Programs | 23-1 |
23.2 | Estimated Costs | 23-3 |
| | |
24 | References | 24-1 |
| | |
25 | Reliance on Information Provided by the Registrant | 25-1 |
| | |
25.1 | Mineral Tenure, Surface Rights, and Encumbrances | 25-1 |
25.2 | Taxation | 25-1 |
| Project: 169525666 | iv |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Table of Contents
25.3 | Royalties | 25-1 |
List of Tables
Table 1-1: | Grey Fox Mineral Resource Estimate, April 2, 2026 | 1-7 |
Table 1-2: | Grey Fox Mineral Resource, Inclusive of Mineral Reserves, April 2, 2026 | 1-7 |
Table 1-3: | Grey Fox Mineral Reserve Estimate, March 27, 2026 | 1-8 |
Table 1-4: | Ore Tonnes by Mining Method | 1-9 |
Table 2-1: | Details of QPs and Site Visits | 2-2 |
Table 5-1: | Summary of Grey Fox Drilling | 5-3 |
Table 5-2: | Summary of Black Fox Drilling | 5-6 |
Table 5-3: | Production History (mined) of the Glimmer Mine from 1997 to 2001* | 5-6 |
Table 5-4: | Production History of the Black Fox & Froome Mine from 2009 to December 2025 | 5-6 |
Table 5-5: | Summary of Froome Drilling | 5-8 |
Table 5-6: | Summary of Stock Drilling | 5-10 |
Table 5-7: | Stock Mine Production History, St Andrew | 5-11 |
Table 5-8: | Production History of the Stock Mine from 2025 | 5-11 |
Table 5-9: | Summary of Buffalo Ankerite Drilling | 5-12 |
Table 5-10: | Summary of Davidson-Tisdale Drilling | 5-13 |
Table 7-1: | Eastern Properties Geophysical Surveys | 7-4 |
Table 7-2: | Summary of Grey Fox and Stroud Drilling Used in Mineral Resource Estimation | 7-1 |
Table 7-3: | Summary of Froome Drilling Used in Mineral Resource Estimation | 7-4 |
Table 7-4: | Summary of Black Fox Drilling Used in Mineral Resource Estimation | 7-4 |
Table 7-5: | Summary of Stock Drilling Used in Mineral Resource Estimation | 7-4 |
Table 7-6: | Summary of the Western Properties Drilling Used in the Mineral Resource Estimate | 7-7 |
Table 8-1: | Analysis Laboratories Used in Resource Estimation | 8-3 |
Table 10-1: | Orebody Breakdown by Zone and BWi | 10-1 |
Table 10-2: | Test work Programs | 10-4 |
Table 10-3: | Head Assays for 147 Zone and CZ Master Composites | 10-6 |
Table 10-4: | Pyrite Liberation Per Size Range for Three Composites | 10-7 |
Table 10-5: | Gravity Recovery for 147 Zone and CZ | 10-7 |
Table 10-6: | Flotation Results for 147 Zone and CZ | 10-8 |
Table 10-7: | Stage Recoveries after Carbon Pre-flotation Results for 147 and CZ Samples | 10-9 |
Table 10-8: | Bottle Roll Cyanidation Results for 147 and CZ MC Samples | 10-9 |
Table 10-9: | Dynamic Solid-Liquid Separation Tests Results | 10-10 |
Table 10-10: | JKTech Results | 10-10 |
Table 10-11: | Sample Compositing Matrix | 10-12 |
Table 10-12: | Head Assays of Composites | 10-12 |
Table 10-13: | Whole-Ore Cyanidation Results | 10-13 |
Table 10-14: | Composites Definitions | 10-15 |
Table 10-15: | Composite Head Assays | 10-15 |
Table 10-16: | Composite Head Assays | 10-15 |
Table 10-17: | Initial Flotation Results | 10-16 |
Table 10-18: | Extended Cyanidation Results | 10-17 |
Table 10-19: | Geomet Units Head Assay | 10-19 |
Table 10-20: | BWi Results by Zone | 10-20 |
Table 10-21: | Geomet Units Cyanidation Results | 10-21 |
Table 10-22: | Geomet Units Flotation Results | 10-21 |
Table 10-23: | Flotation Tailings Cyanidation Results | 10-21 |
Table 10-24: | Flotation Concentrate Cyanidation Results | 10-22 |
| Project: 169525666 | v |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Table of Contents
Table 10-25: | XPS Phase 4 Sample Selection | 10-23 |
Table 10-26: | XPS Phase 4 Flotation Results | 10-23 |
Table 10-27: | Grind-Cyanidation Results | 10-24 |
Table 10-28: | Grind vs Flotation Recovery Results | 10-24 |
Table 10-29: | Grind vs Flotation Concentrate Cyanidation Results | 10-25 |
Table 10-30: | ALS Composite Sample Head Assays | 10-26 |
Table 10-31: | ALS Grind-Whole Ore Cyanidation Results | 10-27 |
Table 10-32: | ALS Variability Cyanidation Results | 10-28 |
Table 10-33: | Underground Samples Head Assays | 10-28 |
Table 10-34: | Screen Metallics Gold Assay | 10-29 |
Table 10-35: | Minerals Composition of the Underground Samples | 10-30 |
Table 10-36: | Sulphide Minerals Proportions in the Underground Samples | 10-31 |
Table 10-37: | BWi Results | 10-31 |
Table 10-38: | Whole-Ore Cyanidation Results | 10-32 |
Table 10-39: | Gravity Concentration Results (2 kg tests) | 10-33 |
Table 10-40: | Gravity Concentration Results (10 kg bulk tests) | 10-33 |
Table 10-41: | Cyanidation of Gravity Tails Results | 10-34 |
Table 10-42: | Rougher Flotation of Gravity Tails Results | 10-35 |
Table 10-43: | Whole-ore Rougher Flotation | 10-36 |
Table 10-44: | Cyanidation of Rougher Flotation Tails | 10-38 |
Table 10-45: | Cyanidation of Rougher Flotation Concentrate | 10-39 |
Table 10-46: | Cyanidation of Rougher Flotation Concentrate | 10-41 |
Table 10-47: | Process Design Criteria | 10-42 |
Table 11-1: | Grey Fox Mineralized Domains | 11-5 |
Table 11-2: | Grey Fox – Metal Removed by Capping Composites | 11-5 |
Table 11-3: | Grey Fox – Density Values by Lithology | 11-6 |
Table 11-4: | Grey Fox Estimation Search Parameters | 11-7 |
Table 11-5: | Grey Fox Mineral Resource Cut-off Grade Parameters | 11-10 |
Table 11-6: | Grey Fox Mineral Resource Statement, April 2, 2026, exclusive of Reserves | 11-12 |
Table 11-7: | Grey Fox Mineral Resource Statement, April 2, 2026, inclusive of Reserves | 11-13 |
Table 11-8: | Stroud – Metal Removed by Capping Composites | 11-15 |
Table 11-9: | Stroud Mineral Resource Cut-off Grade Parameters | 11-19 |
Table 11-10: | Stroud Mineral Resource Statement, March 26, 2026 | 11-21 |
Table 11-11: | Black Fox – Metal Removed by Capping Composites | 11-24 |
Table 11-12: | Black Fox Estimation Search Parameters | 11-25 |
Table 11-13: | Black Fox Mineral Resource Cut-off Grade Parameters | 11-27 |
Table 11-14: | Black Fox Mineral Resource Statement, December 31, 2025 | 11-28 |
Table 11-15: | Froome – Metal Removed by Capping Composites | 11-31 |
Table 11-16: | Froome – Density Values by Mineralized Domain | 11-32 |
Table 11-17: | Froome Estimation Search Parameters | 11-33 |
Table 11-18: | Froome Mineral Resource Cut-off Grade Parameters | 11-35 |
Table 11-19: | Froome Mineral Resource Statement, December 31, 2025 | 11-37 |
Table 11-20: | Stock West & Main – Metal Removed by Capping Composites | 11-41 |
Table 11-21: | Stock West & Main – Density Values by Lithology | 11-42 |
Table 11-22: | Stock West and Main Mineral Resource Cut-off Grade Parameters | 11-46 |
Table 11-23: | Stock Project - West & Main Mineral Resource Statement, December 31, 2025 | 11-48 |
Table 11-24: | Stock East – Metal Removed by Capping Composites | 11-51 |
Table 11-25: | Stock Project – East Zone Density Averages for Host Lithologies | 11-52 |
Table 11-26: | Stock East Mineral Resource Cut-off Grade Parameters | 11-54 |
Table 11-27: | Stock Project – East Zone Mineral Resource Statement, December 31, 2025 | 11-55 |
Table 11-28: | Davidson-Tisdale – Metal Removed by Capping Composites | 11-60 |
Table 11-29: | Davidson-Tisdale Optimization Parameters | 11-63 |
| Project: 169525666 | vi |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Table of Contents
Table 11-30: | Davidson-Tisdale Mineral Resource Statement April 9, 2026 | 11-65 |
Table 12-1: | Mineral Reserve Estimate, March 27, 2026 | 12-2 |
Table 12-2: | Mineral Reserve Estimate by Mining Method | 12-2 |
Table 12-3: | Mineral Reserve Estimate by Zone | 12-2 |
Table 12-4: | Gold Revenue Assumptions, Modifiers, Unit Costs Used in cut-off grade Calculations | 12-4 |
Table 12-5: | Cut-off Grade Calculations | 12-4 |
Table 12-6: | Stope Dilution Methodology | 12-5 |
Table 12-7: | Mining Recovery Factors | 12-6 |
Table 13-1: | Grey Fox Stope HR | 13-8 |
Table 13-2: | Grey Fox “A” factors | 13-9 |
Table 13-3: | Crown Pillar Acceptable Risk Exposure Guidelines | 13-19 |
Table 13-4: | Ground Support Standards, Ramp and Level Development | 13-22 |
Table 13-5: | Ground Support Standards, Ore Development | 13-23 |
Table 13-6: | Predicted Groundwater Seepage into Open Pit and Underground Mine Workings | 13-24 |
Table 13-7: | Rock Densities | 13-26 |
Table 13-8: | Development Allowances | 13-26 |
Table 13-9: | Ramp Design Criteria | 13-27 |
Table 13-10: | Typical Level Development Drift Profiles and Criteria | 13-28 |
Table 13-11: | Lateral Development Quantities | 13-31 |
Table 13-12: | Vertical Development | 13-32 |
Table 13-13: | Vertical Development Quantities | 13-32 |
Table 13-14: | Primary Ground Support | 13-32 |
Table 13-15: | Intersection Ground Support | 13-33 |
Table 13-16: | Ore Tonnes by Mining Method | 13-33 |
Table 13-17: | Longhole Stope Design Criteria | 13-36 |
Table 13-18: | Cut-and-Fill Stope Design Criteria | 13-36 |
Table 13-19: | Working Days and Shift Schedule | 13-38 |
Table 13-20: | Effective Time Calculations | 13-38 |
Table 13-21: | Total On-site Labor | 13-40 |
Table 13-22: | Lateral Development Productivity | 13-41 |
Table 13-23: | Development Cycle for the Ramp (4.0 m W × 4.3 m H) | 13-41 |
Table 13-24: | Drop Raise Development Productivity | 13-42 |
Table 13-25: | Raise Bore Development Productivity | 13-42 |
Table 13-26: | Alimak Raise Development Productivity | 13-42 |
Table 13-27: | Longhole Stope Productivities | 13-43 |
Table 13-28: | Longhole Stope Average Cycle Times | 13-43 |
Table 13-29: | Summary of Annual Lateral Development Metres Profile | 13-44 |
Table 13-30: | Summary of Production Profile by Mining Method | 13-46 |
Table 13-31: | Grey Fox North Underground Mobile Equipment List | 13-48 |
Table 13-32: | Grey Fox South Underground Mobile Equipment List | 13-48 |
Table 13-33: | Total Operating Equipment by Year for Grey Fox Site | 13-50 |
Table 13-34: | Total Number of Rebuilds and Replacements by Equipment Type | 13-51 |
Table 13-35: | Whiskey Jack Full Production Ventilation Required | 13-52 |
Table 13-36: | Grey Fox North Full Production Ventilation Required | 13-53 |
Table 13-37: | Grey Fox South Full Production Ventilation Required | 13-53 |
Table 13-38: | Main Fan Ventilation Requirements | 13-57 |
Table 13-39: | Auxiliary Fan Ventilation Requirements | 13-58 |
Table 13-40: | Estimate Water Source Flows | 13-59 |
Table 13-41: | Cemented Rock Fill Backfill Factors | 13-61 |
Table 13-42: | Underground Backfill Schedule | 13-62 |
Table 13-43: | Underground Infrastructure Matrix | 13-62 |
Table 13-44: | Service Water required by Equipment Type | 13-66 |
| Project: 169525666 | vii |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Table of Contents
Table 13-45: | Grey Fox Mining Load Summary (for peak year – 2038) | 13-72 |
Table 13-46: | Power Schedule by Quarter | 13-72 |
Table 13-47: | Power Schedule by Year | 13-72 |
Table 14-1: | Process Design Criteria | 14-3 |
Table 15-1: | WEA Geometric Design Criteria | 15-23 |
Table 15-2: | WEA Storage Capacity and Operational Life | 15-24 |
Table 15-3: | Tailings Slurry Design Parameters | 15-24 |
Table 15-4: | Summary of Water Quality Geochemical Source Terms and Data Sources | 15-27 |
Table 15-5: | Holding Pond Water Quality during the Project Period | 15-29 |
Table 16-1: | Selling Costs for Gold Doré | 16-1 |
Table 17-1: | Existing Environmental Approvals | 17-5 |
Table 17-2: | Anticipated Provincial Approval/Amendment Requirements | 17-6 |
Table 17-3: | Closure Approaches | 17-9 |
Table 18-1: | Capital Cost Estimate ($ millions) | 18-2 |
Table 18-2: | Mining Preproduction Capital and Sustaining Costs ($ millions) | 18-3 |
Table 18-3: | Underground Construction and Excavation during Project Period | 18-4 |
Table 18-4: | Surface Construction During the Project Period | 18-5 |
Table 18-5: | Annual Sustaining Capital Costs ($ million) | 18-1 |
Table 18-6: | Surface Crusher Costs ($ millions) | 18-1 |
Table 18-7: | Water Treatment Plant Costs | 18-2 |
Table 18-8: | Total Operating Cost Estimate | 18-3 |
Table 18-9: | Summary of Mining OPEX | 18-4 |
Table 18-10: | Operating Development Unit Costs | 18-5 |
Table 18-11: | Stoping Unit Cost by Deposit | 18-5 |
Table 18-12: | Process Plant OPEX Summary ($ millions) | 18-7 |
Table 18-13: | Personnel Costs Summary | 18-8 |
Table 18-14: | Estimated Energy Consumption Costs | 18-9 |
Table 18-15: | Reagent Consumption and Costs | 18-10 |
Table 18-16: | Miscellaneous Consumables Costs | 18-10 |
Table 18-17: | Tailings Storage Costs for Stock Mill WEA | 18-12 |
Table 19-1: | Summary of Economic Metrics for the Project | 19-1 |
Table 19-2: | Calculation of After-tax Cash Flow | 19-1 |
Table 19-3: | Life of Mine Average Metallurgical Recoveries | 19-5 |
Table 19-4: | Metal Price Assumption | 19-5 |
Table 19-5: | Capital Cost Summary (US$ millions) | 19-5 |
Table 19-6: | Life of Mine Operating Cost Summary | 19-6 |
Table 19-7: | Life of Mine Cash Costs C1 & All-In Sustaining Costs | 19-6 |
Table 19-8: | Royalties as % of NSR & Percent of total Oz per Royalty | 19-7 |
Table 19-9: | Royalties as % of NPI & Percent of total Oz | 19-7 |
Table 22-1: | Mineral Reserve Estimate, March 27, 2026 | 22-4 |
Table 23-1: | Estimated Costs for Recommended Work for the Grey Fox Project | 23-3 |
| Project: 169525666 | viii |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Table of Contents
List of Figures
Figure 1-1: | Production Profile by Mining Method | 1-10 |
Figure 3-1: | Fox Complex Properties | 3-2 |
Figure 3-2: | Eastern Properties | 3-4 |
Figure 3-3: | Stock Properties | 3-5 |
Figure 3-4: | Western Properties North Parcel Blocks | 3-7 |
Figure 3-5: | Western Properties South Parcel Blocks | 3-8 |
Figure 3-6: | Eastern Properties Royalties | 3-10 |
Figure 3-7: | Stock Properties Royalties | 3-11 |
Figure 3-8: | Western Properties Royalties | 3-12 |
Figure 3-9: | Sandstorm Gold Stream Agreement | 3-14 |
Figure 3-10: | Newmont First Right of Refusal | 3-16 |
Figure 6-1: | Geological Map of the Timmins-Matheson Sector within the Abitibi Subprovince | 6-1 |
Figure 6-2: | Map of the Southern Abitibi Greenstone Belt | 6-2 |
Figure 6-3: | Grey Fox Area Schematic Geological Plan Map with section lines (A-A’ and B-B’) | 6-5 |
Figure 6-4: | Section A-A’ cut perpendicular to the principal C1 vein orientation at Grey Fox | 6-6 |
Figure 6-5: | Section B-B’ cut perpendicular to Whiskey Jack, A1, A3 faults and the Gibson-Kelore | 6-6 |
Figure 6-6: | Basic principles for LIBS scanning | 6-7 |
Figure 6-7: | Plan View Geology Map of the Stroud Deposit | 6-9 |
Figure 6-8: | Longitudinal Section (looking NE) of the Updated Stroud Resource Block Model | 6-10 |
Figure 6-9: | Project-wide Longitudinal Section of Stock | 6-11 |
Figure 6-10: | Exploration Drilling at Stock East, Schematic Cross-Section Looking to Northeast | 6-12 |
Figure 6-11: | Exploration Drilling at Stock West, Schematic Cross-Section Looking to Northeast | 6-13 |
Figure 6-12: | Stratigraphic Column for the General Black Fox – Hislop Area | 6-16 |
Figure 6-13: | Interpreted Geology for the Fox Eastern Property | 6-18 |
Figure 6-14: | Interpreted Geology of the Stock Property and the Significant Gold Mineralized Zones | 6-21 |
Figure 6-15: | Geological Plan View Map of the Timmins Area, which includes the Western Properties 6-22 | |
Figure 6-16: | Stratigraphic column for the Timmins area including McEwen’s Western Properties | 6-23 |
Figure 6-17: | Abitibi Greenstone Belt: Relationship of Gold Deposition to Major Structural Conduits | 6-24 |
Figure 6-18: | Schematic Cross-Section of Main Gold Systems Showing Depth of Emplacement | 6-26 |
Figure 6-19: | Schematic Comparison of Epithermal and Orogenic Environments | 6-29 |
Figure 7-1: | Plan View Geology Map for the Eastern Property | 7-2 |
Figure 7-2: | 2025 High-Res Drone Magnetic Survey over Grey Fox | 7-4 |
Figure 7-3: | Longitudinal Section View of Stock Property | 7-7 |
Figure 7-4: | Distribution of Drilling at the Eastern Properties | 7-3 |
Figure 7-5: | Distribution of Surface Drilling at the Stock Property | 7-6 |
Figure 7-6: | Southern Portion of the Western Properties Drill Hole Collar Location Plan | 7-8 |
Figure 7-7: | Northern Portion of the Western Properties Drill Hole Collar Location Plan | 7-9 |
Figure 10-1: | Modal Compositions of 147 Zone, CZ and Graphite Master Composites | 10-6 |
Figure 10-2: | Head Grade vs Recovery for 147 Zone | 10-18 |
Figure 10-3: | Rougher Flotation Kinetics for Whole-Ore Samples | 10-37 |
Figure 10-4: | Overall Recoveries through Cyanidation versus Flotation for Underground Samples | 10-38 |
Figure 11-1: | Plan View of the Grey Fox Project Lithology Model | 11-48 |
Figure 11-2: | Plan View of the Grey Fox Project Mineralized Zones and Domains | 11-49 |
Figure 11-3: | Section Comparing Block Grades vs Drill Hole Data, Whiskey Jack, Grey Fox Model | 11-53 |
Figure 11-4: | Section Comparing Block Grades vs Drill Hole Data, Gibson Zone N, Grey Fox Model | 11-54 |
Figure 11-5: | Plan View of the Potentially Mineable Stope Shapes at Grey Fox | 11-56 |
Figure 11-6: | Experimental Grade-Tonnage Sensitivities at Various Cut-Off Grades | 11-57 |
Figure 11-7: | Longitudinal View of the Mineralized Domains at Stroud (looking NE) | 11-60 |
Figure 11-8: | Plan View of Blocks and Informing Drill Holes at Stroud, Domains 20 &10 | 11-62 |
Figure 11-9: | Vertical Section of Estimated Blocks and Informing Drill Holes in Domain 20 at Stroud | 11-63 |
| Project: 169525666 | ix |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Table of Contents
Figure 11-10: | Long Section NE View of the Generated Stroud MSO Shapes | 11-65 |
Figure 11-11: | Experimental Sensitivities at Various Cut-Off Grades | 11-66 |
Figure 11-12: | Long Section Looking North of Black Fox Mineralized Domains | 11-68 |
Figure 11-13: | Experimental Grade Tonnage Sensitivities at Various Cut Off Grades | 11-73 |
Figure 11-15: | East-West Long Section View Comparing Block Grades with Drill Hole Data in Froome Domain 501 | 11-79 |
Figure 11-16: | Plan View at Elevation 9840 Comparing Block Grades with Drill Hole Data | 11-79 |
Figure 11-17: | Long Section Looking North of Potentially Mineable Stope Shapes at Froome | 11-81 |
Figure 11-18: | Experimental Grade Tonnage Sensitivities at Various Cut Off Grades | 11-82 |
Figure 11-20: | Isometric View of Long view of Stock West and Main Mineralized Zones and Background Envelope | 11-85 |
Figure 11-21: | Section View Comparing Block Grades in Domains 10 and 20 with Drill Hole Data | 11-89 |
Figure 11-22: | Plan View Comparing Block Grades with Drill Hole Data | 11-90 |
Figure 11-23: | Long Section View of the Potentially Mineable Stope Shapes at Stock West & Main | 11-92 |
Figure 11-24: | Experimental grade tonnage sensitivities at Various Cut Off Grades | 11-93 |
Figure 11-26: | Isometric View of Long View of Stock East Zone Showing Modelled Domains 1 & 100 (Background) | 11-96 |
Figure 11-27: | Experimental Grade Tonnage Sensitivities at Various Cut Off Grades | 11-100 |
Figure 11-28: | Isometric View of the Davidson-Tisdale North Area, External Contours | 11-103 |
Figure 11-29: | Isometric View of the Davidson-Tisdale North Area, Internal Contours | 11-104 |
Figure 11-30: | Isometric View Looking South of the S Zone Wireframe | 11-105 |
Figure 11-31: | Cross-Section Comparing B Zone Estimated Blocks and Composite Data | 11-107 |
Figure 11-32: | Plan View, Davidson-Tisdale MSO Shapes, Blocks >1.30 g/t Au | 11-109 |
Figure 11-33: | Experimental Grade Tonnage Sensitivities at Various Cut ff Grades | 11-110 |
Figure 13-1: | Grey Fox Mine Zones in Plan View with Google Maps | 13-1 |
Figure 13-2: | Whiskey Jack Zone looking South | 13-2 |
Figure 13-3: | Grey Fox North looking North | 13-3 |
Figure 13-4: | Grey Fox South Looking North | 13-4 |
Figure 13-5: | Grey Fox Length-Weighted and Cumulative RQD Distribution | 13-6 |
Figure 13-6: | Grey Fox Joint Orientations and Critical Joint | 13-7 |
Figure 13-7: | Rock stress factor “A” | 13-9 |
Figure 13-8: | Joint Orientation Factor “B” | 13-10 |
Figure 13-9: | Gravity Adjustment Factor “C” | 13-11 |
Figure 13-10: | Whiskey Jack Stability Graph | 13-12 |
Figure 13-11: | Remainder of Grey Fox Stability Graph | 13-13 |
Figure 13-12: | Wp versus depth BGS, Whiskey Jack | 13-15 |
Figure 13-13: | Wp versus depth BGS, Remainder of Grey Fox | 13-16 |
Figure 13-14: | Sill Pillar Dimensions, Resisting Stress and Normal Stress Vectors | 13-17 |
Figure 13-15: | Fs,crown at increasing Total Thickness | 13-20 |
Figure 13-16: | PF,crown at increasing Total Thickness | 13-21 |
Figure 13-17: | Typical Level Development Whiskey Jack Zone 115 Level | 13-29 |
Figure 13-18: | Typical Level Development Grey Fox North Zone Block 2 165 Level | 13-30 |
Figure 13-19: | Typical Level Development Grey Fox South Block 1 115 Level | 13-31 |
Figure 13-20: | Whiskey Jack Zone Mining Blocks Looking South | 13-34 |
Figure 13-21: | Remaining Grey Fox North Mining Blocks Looking North | 13-35 |
Figure 13-22: | Grey Fox South Mining Blocks Looking North | 13-35 |
Figure 13-23: | Typical Longitudinal Stope Sequence with Center Access (Long Section View) | 13-37 |
Figure 13-24: | Typical Longitudinal Stope Sequence with End Access (Long Section View) | 13-37 |
Figure 13-25: | Annual Lateral Development Metres Profile | 13-44 |
Figure 13-26: | Production Profile by Mining Method | 13-46 |
Figure 13-27: | Ventilation Schematic Initial Ramp Development | 13-54 |
Figure 13-28: | Whiskey Jack Initial Flowthrough Ventilation Established | 13-55 |
| Project: 169525666 | x |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
Table of Contents
Figure 13-29: | Whiskey Jack Full Production Ventilation System | 13-56 |
Figure 13-30: | Grey Fox North and Grey Fox South at Full Production Ventilation System | 13-57 |
Figure 13-31: | Backfill Placement | 13-61 |
Figure 13-32: | Underground Power Distribution Routing | 13-69 |
Figure 13-33: | Type 1 Electrical Room Layout | 13-70 |
Figure 13-34: | Type 2 Electrical Room Layout | 13-71 |
Figure 14-1: | Block Flow Diagram for the Treatment of Grey Fox Ore | 14-2 |
Figure 15-1: | Grey Fox Site Plan | 15-1 |
Figure 15-2: | Grey Fox and Existing Black Fox Site Plan | 15-3 |
Figure 15-3: | Grey Fox Site Access Road | 15-5 |
Figure 15-4: | Surface Maintenance Shop – Section View | 15-7 |
Figure 15-5: | Example of Typical Warehouse | 15-8 |
Figure 15-6: | Surface Routing of Buried Cables | 15-11 |
Figure 15-7: | Locations of Radio Repeaters at the Grey Fox Site | 15-13 |
Figure 15-8: | Grey Fox Conceptual Water Management General Arrangement | 15-15 |
Figure 15-9: | Conceptual Water Balance Schematic | 15-17 |
Figure 15-10: | Grey Fox to Stock Mill Haul Route | 15-18 |
Figure 15-11: | Stock Mill TMA and Conceptual Western Expansion Area | 15-20 |
Figure 15-12: | Water Balance Schematic | 15-25 |
Figure 15-13: | Water Treatment Plant Conceptual Design | 15-31 |
Figure 19-1: | Undiscounted After-Tax Cash Flow | 19-2 |
Figure 19-2: | Life of Mine Processing Profile (tonnes) | 19-4 |
Figure 19-3: | Life of Mine Production Profile (Payable Au) | 19-4 |
Figure 19-4: | Sensitivity Analysis | 19-8 |
Figure 20-1: | Plan View of Grey Fox and Stroud Projects in relation to Hislop Property | 20-2 |
| Project: 169525666 | xi |
Grey Fox Mine Prefeasibility Study S-K 1300 Technical Report Summary
Acronyms / Abbreviations
Acronyms / Abbreviations
Acronym / Abbreviation | | Full Name |
ABA | | Acid-Base Accounting |
AEP | | annual exceedance probability |
ALS | | ALS Metallurgy |
AP | | Acid Potential |
ARD/ML | | Acid Rock Drainage / Metallic Leaching |
Au | | gold |
BGS | | below ground surface |
Bwi | | Bond Ball Mill Work Index |
Ca | | calcium |
CaO | | calcium oxide (quicklime) |
CaCO3 | | calcium carbonate |
CIL | | carbon-in-leach |
CIP | | carbon-in-pulp |
CLDZ | | Cadillac-Larder Lake Deformation Zone |
CN, CN– | | cyanide ion |
CNWAD | | Weak-Acid-Dissociable Cyanide |
CO2 | | carbon dioxide |
COOP | | Central Ontario Orthophotography Project |
Cu | | copper |
CZ | | Contact Zone |
DEM | | digital elevation model |
Dwi | | Drop-Weight Index |
EA | | Environmental Assessment |
ECA | | Environmental Compliance Approval |
EM | | electromagnetic |
ERD | | External Reference Distribution |
FeS2 | | Pyrite (Iron Disulfide) |
FW | | footwall |
FZ | | Fault Zone |
GKDZ | | Gibson-Kelore Deformation Zone |
GRG | | Gravity Recovery Grade |
HCT | | Humidity Cell Test |
HG | | High Grade |
| Project: 169525666 | xii |
Grey Fox Mine Prefeasibility Study S-K 1300 Technical Report Summary
Acronyms / Abbreviations
Acronym / Abbreviation | | Full Name |
HPGR | | High Pressure Grinding Rolls |
HR | | Hydraulic Radius |
HW | | hangingwall |
IA | | Initial Assessment |
ICP | | Inductively Coupled Plasma |
JK Tech | | Julius Kruttschnitt Technology |
LG | | Low Grade |
LGC | | Low-grade, low-pyrite |
LGP | | Low-grade, high-pyrite |
LOM | | life-of-mine |
MC | | Master Composite |
MDMER | | Metal and Diamond Mining Effluent Regulations |
MECP | | Ministry of the Environment, Conservation and Parks |
MEM | | Ministry of Environment and Mines |
MIBC | | methyl isobutyl carbinol |
MMER | | Metal Mining Effluent Regulations |
Mo | | molybdenum |
MSO | | Mineable Shape Optimizer |
NaCN | | sodium cyanide |
NE | | northeast |
NHLFZ | | Nighthawk Lake Fault Zone |
NNP | | Net Neutralization Potential |
NP | | Neutralizing Potential |
NPAG | | Non-Potentially Acid Generating |
NPI | | Net Profits Interest |
NPR | | Neutralization Potential Ratio |
NPV | | Net Present Value |
NSG | | non-sulphide gangue |
NSR | | Net Smelter Return |
OPEX | | Operating Expenditure |
PAG | | Potentially Acid Generating |
PAX | | potassium amyl xanthate |
PCS | | Process Control System |
PDDZ | | Porcupine-Destor Deformation Zone |
PEA | | Preliminary Economic Assessment |
PFS | | Prefeasibility Study |
| Project: 169525666 | xiii |
Grey Fox Mine Prefeasibility Study S-K 1300 Technical Report Summary
Acronyms / Abbreviations
Acronym / Abbreviation | | Full Name |
PMV | | Pillowed Mafic Volcanic |
ppm | | parts per million |
PVD | | prefabricated vertical drain |
PWQO | | Provincial Water Quality Objectives |
P₈₀ | | Particle Size (80th percentile) |
PAX | | Potassium Amyl Xanthate |
PSD | | Particle Size Distribution |
ppm | | parts per million |
PTTW | | Permit to Take Water |
ROM | | Run-of-Mine |
RPEEE | | Reasonable Prospects for Eventual Economic Extraction |
RSD | | Relative Standard Deviation |
SAG | | Semi-Autogenous Grinding |
SAGB | | Southern Abitibi Greenstone Belt |
SABC | | SAG mill–Pebble Crusher–Ball mill Circuit |
SAC | | strong acid cation |
SBA | | strong base anion |
SGH | | Spatiotemporal Geochemical Hydrocarbon |
SGS | | SGS Minerals Services |
SEDS | | Siltstone/Epidote/Diopside Skarn |
SFE | | Shake Flask Extraction |
SO₂ | | sulphur dioxide |
S (or S%) | | Sulphur Content |
SMC | | Steve Morrell Comminution |
SP | | Set Point |
T₈₀ | | Transfer Size (80th Percentile) |
TDH | | Total Dynamic Head |
TOC | | Total Organic Carbon |
TW | | True-Width |
UAV | | Unmanned Aerial Vehicle |
UMW | | underground mine workings |
US$ | | United States dollar |
VTEM | | Versatile Time Domain Electromagnetic |
XPS | | XPS Minerals Services (now ALS Minerals) |
µm | | micrometers |
w/w | | weight-by-weight |
| Project: 169525666 | xiv |
Grey Fox Mine Prefeasibility Study S-K 1300 Technical Report Summary
Acronyms / Abbreviations
Acronym / Abbreviation | | Full Name |
WAD | | Weak Acid Dissociable |
WEA | | Western Expansion Area |
Units of Measure
Unit | | Definition |
d | | day |
g | | gram |
g/L | | gram(s) per litre |
g/t | | gram(s) per tonne |
gpm | | gallon(s) per minute |
h | | hour |
km | | kilometre |
HP | | horsepower |
kWh/t | | Kilowatt-hours per tonne |
kWh/m³ | | Kilowatt-hours per cubic metre |
kg/t | | kilogram(s) per tonne |
L | | litre |
m | | metre |
m² | | square metre(s) |
m²/t/d | | square metre(s) per tonne per day |
m³ | | cubic metre(s) |
mg/L or mg L –¹ | | milligram(s) per litre |
ppm | | parts per million |
t | | Metric tonne |
T | | Imperial Ton |
t/d | | tonne(s) per day |
t/m²/h | | tonne(s) per square metre per hour |
t/m³/h | | tonne(s) per cubic metre per hour |
| Project: 169525666 | xv |
Grey Fox Mine Prefeasibility Study S-K 1300 Technical Report Summary
Glossary
Glossary
Term | | Definition |
Eastern Properties | | The land tenure forming the eastern portion of properties of the Fox Complex, which includes Grey Fox, Froome, and Black Fox. |
Fox Complex | | The entire package of properties owned by McEwen Inc. in Ontario. |
Stock Properties | | The land tenure forming the central portion of properties of the Fox Complex, located in Stock Township. |
Western Properties | | The land tenure forming the western portion of properties of the Fox Complex, known by the names Buffalo-Ankerite and Davidson-Tisdale. It should be noted that previous Technical Reports have referred to the Fuller and Paymaster properties. These were sold in October 2026 to a subsidiary of Discovery Mining Ltd (“Discovery”) and are referred to in this TRS in passing and for historical context only as they are no longer owned or operated by McEwen. |
| Project: 169525666 | xvi |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary
1 | Executive Summary |
1.1 | Introduction |
The Grey Fox Project (Grey Fox) is a gold mining project located near Matheson, Ontario, adjacent to the existing Black Fox Mine, and is being developed by McEwen Inc. (McEwen). This Technical Report Summary (TRS or Report) presents the results of a prefeasibility study (PFS) for Grey Fox.
The Project consists of two underground mines, each accessed via dedicated portals and declines. Longhole mining methods are planned for ore extraction at a nominal production rate of 1,500 tonnes per day (t/d) during the first seven years of operation, increasing to 2,700 t/d during the subsequent six years. Ore is expected to be processed at the existing Stock Mill, located approximately 30 km away.
This Technical Report Summary describes several aspects of the Grey Fox Project, including:
· | Mineral Resource estimates. |
· | Mineral Reserve estimates supported by a life-of-mine (LOM) plan. |
· | Capital and operating cost estimates. |
· | An economic analysis of Grey Fox. |
Preparation of this Technical Report Summary was completed with contributions from the following firms.
· | Stantec Consulting Ltd. |
· | McEwen Inc. |
· | DRA |
· | Arcadis |
Unless otherwise stated, all costs are reported in Q1 2026 United States dollars (US$).
Unless otherwise stated, all units of measurement are metric.
1.2 | Property Description |
Grey Fox is part of the Fox Complex, a portfolio of gold properties located in the Timmins–Matheson region of northeastern Ontario, comprising multiple past-producing, operating, and development-stage assets with access to established regional infrastructure and processing capacity. The Grey Fox deposit is made up of six principal mineralized zones: 147, 147NE, Contact, Grey Fox South, Gibson and Whiskey Jack. The Complex is organized into three principal groups—Eastern, Stock, and Western Properties—and includes the operating Froome Mine and Stock Mill, the former Black Fox and Stock mines, and several development-stage and historical deposits.
McEwen holds a majority interest in the mineral tenure across the Complex within a well-established mining jurisdiction. Certain properties are subject to royalties and a gold stream, and Indigenous agreements are in place for the Eastern and Stock Properties, with additional agreements required for the Western Properties.
| Project: 169525666 | 1-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary
Environmental obligations are managed under approved closure plans, and no material issues have been identified that would preclude project development.
Further details regarding property ownership, agreements, and permitting considerations are provided in Section 3 of the main report.
1.3 | Accessibility, Climate, Local Resources, Infrastructure and Physiography |
The Fox Complex is located within the established Timmins mining district of northeastern Ontario and benefits from excellent year-round accessibility via provincial highways, secondary roads, and nearby commercial air service. The project is situated close to the regional centers of Timmins, Matheson, and Kirkland Lake, where mining services, skilled labor, and supplies are readily available. It is supported by existing infrastructure including electrical power, transportation corridors, and nearby processing facilities.
The region experiences a typical northern Ontario climate with cold winters and warm summers, which permit year-round exploration and mining activities. Physiography across the project area is characterized by low to moderate relief, glacial overburden, wetlands, lakes, and boreal forest vegetation, with elevations generally ranging from approximately 250 m to 330 m above sea level.
Further details on accessibility, climate, local resources, infrastructure, and physiography for the Grey Fox Project and the surrounding area are provided in Section 4 of the main report.
1.4 | History |
Grey Fox is the primary focus of this PFS and represents a key growth and development asset within McEwen’s Fox Complex in the Timmins–Matheson mining district of Ontario, a historically significant gold-producing region. The deposit comprises several principal mineralized zones, including Gibson, Contact, Grey Fox South, and Whiskey Jack.
The project has been advanced through successive phases of exploration and development by prior operators and McEwen, including drilling, underground development, geophysical surveys, trenching, and resource definition programs. Historical work at Gibson included underground development and limited production, while more recent exploration campaigns have refined the geological model and supported Mineral Resource estimation.
Since acquiring the property in 2017, McEwen has completed systematic drilling programs to de-risk known zones, test extensions, and identify additional mineralized lenses. A key refinement in 2019 improved the understanding of mineralization orientation and supported enhanced confidence in geological interpretation and modeling.
The 2025 Mineral Resource estimate forms the basis for this PFS, and previous estimates are considered historical and not relied upon. Further details on the exploration history and development of the Grey Fox deposit are provided in Section 5 of the main report.
| Project: 169525666 | 1-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary
1.5 | Geological Setting, Mineralization, and Deposit |
The Grey Fox deposit is interpreted to be a multi-domain, structurally controlled gold system hosted within mafic metavolcanic rocks, metasedimentary units, and intrusive rocks known as the Gibson Syenite. The deposit is divided into two principal geological domains, or blocks, separated by the Contact Fault: the 147– Grey Fox South Block and the Gibson Block. Gold mineralization is primarily associated with steeply dipping, northeast-southwest-striking sheeted vein arrays (C-veins), with the principal mineralized zones including 147, 147NE, Grey Fox South, and Gibson. Mineralization is controlled by vein geometry, structural preparation, lithological and rheological contrasts, and host-rock chemistry, with higher-grade zones typically developed in favourable metavolcanic and metasedimentary units.
The geological model is considered appropriate for the current PFS level of study and provides a reasonable basis for Mineral Resource estimation and mine planning, with additional work expected to refine structural controls and mineralization continuity. Further details on the Grey Fox deposit and its geological interpretation are provided in Section 6.
The Grey Fox vein systems exhibit characteristics consistent with a shallow-crustal, epizonal orogenic gold environment, characterized by quartz–carbonate vein-hosted mineralization. Mineralization occurs within a network of structurally controlled vein arrays developed under brittle upper-crustal conditions.
This deposit model supports continuity of mineralized structures and provides a framework for ongoing exploration targeting within similar structural settings across the project area. Further details on deposit characteristics and geological interpretation are provided in Section 6.6 of the main report.
1.6 | Exploration |
Grey Fox represents the principal exploration focus within the Eastern Properties and a key growth component of the Fox Complex. Since acquiring the property in 2017, McEwen has advanced the Grey Fox Project through extensive drilling, geophysical surveys, geological interpretation, UAV imagery, trenching, mechanical stripping, mapping, channel sampling, and surface validation programs designed to define and expand mineralized zones and improve the geological model.
Exploration activities have improved confidence in the interpretation of mineralization and supported the current Mineral Resource estimate. The Grey Fox deposit comprises multiple zones within a broader structural and lithological corridor that remains partially tested along strike and at depth, with surface exploration constrained in part by widespread overburden.
Recent programs have enhanced the definition of structural corridors and identified additional potential beyond the currently defined resources. As a result, the Grey Fox deposit provides a strong opportunity for further resource growth within the PFS framework.
Further details on exploration activities and results for the Grey Fox deposit and surrounding area are provided in Section 7 in the main report.
| Project: 169525666 | 1-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary
1.7 | Drilling |
Drilling at Grey Fox has been completed over multiple campaigns by historical operators and, more recently, by McEwen, providing the geological, assay, geotechnical, hydrogeological, and metallurgical information required to support the PFS. Historical drilling from the late 1970s through the 1990s included sludge sampling, BQ- and NQ-diameter core drilling, although documentation of some early sampling procedures is limited.
Since 2018, McEwen has advanced the Grey Fox drill database through systematic surface diamond drilling, primarily using NQ core, with work completed by established drilling contractors and logged at controlled company facilities. Further details on drilling programs are provided in Section 7 in the main report.
1.8 | Sample Preparation, Analyses and Security |
Sampling, sample preparation, analytical procedures, quality assurance/quality control (QA/QC), and security protocols for Grey Fox and the Eastern Properties have been implemented in accordance with industry best practices to support Mineral Resource estimation. Current programs utilize systematic, geologically controlled sampling, supported by documented chain-of-custody procedures to maintain sample integrity.
Analytical work has been carried out primarily by ISO/IEC 17025-accredited laboratories using fire assay and, more recently, photon assay techniques, with appropriate multi-element methods applied as required. The QA/QC program, including the insertion of control samples and external verification, demonstrates acceptable accuracy, precision, and absence of material bias. Historical data incorporated into the Mineral Resource estimate has been reviewed and deemed acceptable, with no identified issues that would materially impact data reliability.
The Qualified Person (QP) considers the sampling, analytical methodologies, QA/QC procedures, and sample security measures to be adequate and appropriate, and concludes that the resulting dataset is reliable and suitable for use in Mineral Resource estimation. Further details on sampling, sample preparation and security are provided in Section 8 in the main report.
1.9 | Data Verification |
Data verification for the Grey Fox Mineral Resource has been conducted by the QP through comprehensive review and validation procedures, incorporating drilling data collected from 2014 through 2026 together with relevant historical datasets. Verification activities included database audits against original assay certificates, collar and survey validation, statistical review of QA/QC data, site inspections of core handling and logging practices, and independent umpire laboratory testing.
Historical data from prior operators were selectively validated through certificate reconciliation, confirmatory drilling, and comparison with previous technical studies, with greater reliance placed on modern datasets where documentation is more complete. Minor limitations typical of legacy datasets were identified;
| Project: 169525666 | 1-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary
however, these have been considered in Mineral Resource classification and do not materially affect data reliability.
Overall, verification results demonstrate acceptable accuracy, precision, and consistency of the geological, assay, and survey data, and the QP considers the dataset to be reliable and suitable for use in Mineral Resource estimation. Further details on data verification procedures and limitations are provided in Section 9 in the main report.
1.10 | Mineral Processing and Metallurgical Testing |
Metallurgical testwork conducted on Grey Fox mineralization indicates that the ore is generally amenable to conventional gold recovery methods, with performance varying by domain and sulphide content. Section 10 of the main report provides detailed information on past and recent processing and testing of Fox Complex ores.
1.10.1Comminution
Comminution testing shows that the ore is relatively competent and requires high grinding energy, with Bond Ball Mill Work Index values ranging from approximately 18 kWh/t to 27 kWh/t. The majority of the orebody corresponds to the higher end of this range, and process design has been based on conservative hardness assumptions. Additional variability testing is planned to further refine the hardness distribution.
1.10.2Gravity Testing
Gravity recovery testwork conducted on open pit samples confirmed the presence of coarse free gold, with gravity recoverable gold (GRG) test values ranging between 4% and 32%. Extended gravity recoverable gold (EGRG) tests achieved mass pulls below 0.2% of new feed mass, with high gold grades recovered to a concentrate between 200 g/t and 1,200 g/t Au, confirming the presence of free coarse gold in the samples tested.
Underground samples tested in 2025 contained significantly less GRG compared to the open pit samples tested. For the underground ore, a gravity concentration step is not essential and can be omitted. Inclusion of a gravity recovery step is recommended only for treatment of open pit ores.
1.10.3Flotation
Bulk sulphide flotation has been shown to be highly effective on Grey Fox ore, particularly for pyritic and high-sulphur ore types. Testing on open pit samples yielded gold recoveries ranging from 91% to 97% into an 8% to 12% mass pull concentrate. The highest recoveries exceeding 95% were achieved at finer grind sizes (P₈₀ = 60 µm); however, similar recoveries were also achieved at coarser grind sizes (up to P₈₀ = 120 µm). The flotation concentrates produced are primarily pyrite with lower amounts of base metals that are amenable to direct cyanidation. A carbon pre-float was ineffective but did not significantly impact overall flotation performance. Underground samples yielded marginally lower recoveries, with an average gold recovery of 87.2%.
| Project: 169525666 | 1-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary
For all samples tested to date, a gravity-flotation flowsheet outperformed a gravity-leach flowsheet by approximately 7% to 14% in terms of overall gold recovery. However, the rougher flotation concentrates did not achieve saleable concentrate grades as a standalone product and additional upgrading through cleaning stages would be required.
1.10.4Cyanidation of Flotation Products
Cyanidation of flotation concentrates resulted in variable gold extraction, dependent on pyrite content and grain size. As-floated concentrates (P₈₀ ~60 µm) yielded gold recoveries via cyanidation of approximately 77% to 82% for open pit samples. Regrinding to a P₈₀ of approximately 25 µm improved gold extraction by approximately 2% to 4%, with no additional benefit observed at finer grind sizes, indicating that a portion of the gold is not accessible through cyanidation.
Underground samples showed greater variability and generally lower performance compared to open pit samples. Cyanidation of flotation tailings consistently yielded high extractions, with open pit samples achieving recoveries exceeding 74% and final tailings grades below 0.1 g/t Au, while underground samples yielded an average extraction of 72% and an average final tailings grade of 0.19 g/t Au.
A split-leach approach, comprising separate treatment of flotation concentrates and tailings, is supported by the testwork and has the potential to match or exceed whole-ore leach recoveries while providing flexibility in balancing recovery and grinding requirements.
1.10.5Whole-Ore Cyanidation
Whole-ore leach testwork demonstrated a wide range of recoveries related to head grade and sulphur content. Higher-grade, lower sulphide mineralization achieved gold recoveries of approximately 88% to 94%, whereas lower-grade or higher sulphide material yielded reduced recoveries in the range of approximately 71% to 80%. Recent open pit testwork showed similar variability, with recoveries ranging from as low as 64% to as high as 92% and averaging approximately 80%.
Preg-robbing effects are minimal. Whole-ore cyanidation is considered viable for higher-grade, lower sulphide ores but is less suitable for high-pyrite or low-grade domains due to lower recoveries and high reagent consumption.
1.10.6Cyanide Detoxification
Cyanide destruction using the SO₂/air process is effective and reduces Weak Acid Dissociable (WAD) cyanide concentrations to below applicable regulatory criteria (Ontario Provincial Water Quality Objectives). Treated solutions generally meet water quality guidelines for cyanide and most metals, with minor molybdenum exceedances noted. The process is considered robust and scalable.
Underground samples have not yet been tested but are expected to respond similarly; additional testing is recommended to confirm this assumption.
| Project: 169525666 | 1-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary
1.10.7Sedimentation
Settling tests show that underflow densities of approximately 65% solids (w/w) can be achieved using non-ionic flocculants. Dynamic settling and rheology testing indicate that conventional thickening and deposition strategies are applicable. The sedimentation behavior of the Whiskey Jack and Gibson Zone underground samples has not been tested. Future sedimentation testwork should include flotation concentrate samples to confirm the sizing of a concentrate thickener for the proposed flowsheet.
1.10.8Environmental
Static geochemical testing of waste rock and tailings materials suggests that most samples are non-potentially acid generating (NPAG), with the remainder considered uncertain and subject to ongoing kinetic testing. Tailings residues from cyanidation and detoxification were classified as NPAG. Decant water chemistry met applicable discharge criteria, aside from minor molybdenum exceedances. No environmental testwork was conducted on underground samples as part of the 2025 program.
1.11Mineral Resource Estimates
The Grey Fox Mineral Resource estimate, exclusive of Mineral Reserves, as reported in Section 11, has an effective date of April 2, 2026. The Mineral Resource estimate is presented in Table 1-1.
Table 1-1: Grey Fox Mineral Resource Estimate, April 2, 2026
Classification | | Tonnes (kt) | | Au Grade (g/t) | | Contained Au (koz) |
Indicated | | 9,681 | | 2.25 | | 701 |
Inferred | | 4,696 | | 2.57 | | 388 |
Notes:
· | The QP for the estimate is Mr. Carson Cybolsky, P.Geo, an employee of McEwen. |
· | Mineral Resources are reported above an economic cut-off grade of 1.35 g/t Au, assuming underground extraction methods, a metallurgical recovery of 90%, mining cost of $67.72/t, processing costs of $30.77/t, G&A costs of $16.60/t, a variable net smelter return (NSR) royalty ranging from 0.15% to 3.0%, dilution of 15%, and a gold price of $3,000/oz. |
· | Figures may not sum due to rounding. |
· | Data cut-off date for the Mineral Resource estimate is July 11, 2025 |
Inclusive of Mineral Reserves, the Grey Fox Mineral Resource estimate includes the totals summarized in Table 1-2.
Table 1-2: Grey Fox Mineral Resource, Inclusive of Mineral Reserves, April 2, 2026
Classification | | Tonnes (kt) | | Au Grade (g/t) | | Contained Au (koz) |
Indicated | | 18,819 | | 3.28 | | 1,986 |
Inferred | | 5,056 | | 2.69 | | 438 |
Notes:
· | The QP for the estimate is Mr. Carson Cybolsky, P.Geo, an employee of McEwen. |
· | Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
| Project: 169525666 | 1-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary
· | Indicated resources are reported inclusive of reserves reported in Section12. |
· | Mineral Resources are reported above an economic cut-off grade of 1.35 g/t Au, assuming underground extraction methods, mining cost of $67.72/t, processing costs of $30.77/t, G&A costs of $16.60/t, metallurgical recovery of 90%, a variable NSR royalty ranging from 0.15% to 3.0%, dilution of 15%, and a gold price of $3,000/oz. |
· | Figures may not sum due to rounding. |
· | Data cut-off date for the Mineral Resource estimate is July 11, 2025 |
This Report also includes a maiden Mineral Resource estimate for the nearby Stroud deposit, with an effective date of March 26, 2026. The Stroud estimate includes 1,866 kt at 2.80 g/t Au for 168 koz Au in the Inferred category. No Indicated Mineral Resources are reported for Stroud.
Additional deposits within the Fox Complex have also been updated and are included in this report. In addition to Grey Fox and Stroud, Fox East includes Black Fox and Froome. Stock is divided into the Stock West, Stock Main, and Stock East, while Fox West includes Davidson-Tisdale. Mineral Resource statements for these deposits are presented in Section 11.
1.12Mineral Reserve Estimates
The Grey Fox Mineral Reserve estimate, prepared by Stantec and effective March 27, 2026, is based on Indicated Mineral Resources from the block model provided by McEwen. Material not classified as Measured or Indicated Mineral Resources was excluded from consideration for Mineral Reserve estimation. The Mineral Reserve estimate has been prepared using definitions and categories applicable under SEC Regulation S-K 1300.
The Mineral Reserve estimate includes longitudinal stopes, overhand cut-and-fill stoping, ore development, marginal longitudinal stopes, and marginal development, with allowances for external dilution, internal dilution, and mining recovery. Cut-off grades vary by mining method, with undiluted cut-off values of 2.40 g/t Au for longitudinal stopes, 2.00 g/t Au for marginal longitudinal stopes, and 2.70 g/t Au for cut-and-fill stopes. A minimum mining width of 3.0 m was applied for all stoping methods.
Total dilution is estimated at 46.5%, consisting of 11.6% external dilution and 34.9% internal dilution. Total mineable recovery is estimated at 91.2%.
Table 1-3 outlines the estimated Grey Fox Mineral Reserve. Further details on Mineral Reserve estimates are provided in Section 12.
Table 1-3: Grey Fox Mineral Reserve Estimate, March 27, 2026
Classification | | Ore (kt) | | Au Grade (g/t) | | Contained Au (koz) |
Proven | | 0 | | 0.00 | | 0 |
Probable | | 9,406.8 | | 3.24 | | 980.3 |
Total Reserve | | 9,405.8 | | 3.24 | | 980.3 |
Note: Some numbers may not sum due to rounding.
| Project: 169525666 | 1-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary
1.13Mining Methods
Grey Fox will be developed as two underground operations: Grey Fox North, comprising the Whiskey Jack, Gibson, Contact, and 147NE zones, and Grey Fox South, comprising the 147 and South zones. The zones are illustrated in Figure 13-1. Ore will be mined using a combination of longitudinal retreat longhole mining, supplemented by overhand cut-and-fill methods, and hauled to the existing Stock Mill at the Stock Property.
Mining will occur in two phases. Phase 1 (Grey Fox North) begins with development to access the Whiskey Jack Zone, with operations ramping up to approximately 1,500 t/d by 2030. Phase 2 (Grey Fox South) commences in 2035, with combined production reaching approximately 2,700 t/d before ramping down through 2041.
Geomechanical assessments indicate that the proposed mining methods are appropriate for the rock mass conditions, with conventional ground support systems and mine design parameters expected to provide adequate stability. Hydrogeological modelling indicates that groundwater inflows can be managed using conventional mine dewatering systems.
Mining operations will utilize conventional trackless underground equipment supported by mine ventilation, dewatering, backfill, electrical distribution, communication systems, and other underground infrastructure typical of modern underground mining operations. Most of the mineral resource will be extracted using the longitudinal longhole mining method, as summarized in Table 1-4.
Table 1-4: Ore Tonnes by Mining Method
Mining Method | | Grey Fox North | | Grey Fox South | | Recovered Ore Tonnes |
Longitudinal Longhole | | 4,713651 | | 3,009,295 | | 7,722,946 |
Cut and Fill | | 55,165 | | 62,819 | | 117,984 |
Development | | 921,239 | | 643,660 | | 1,564,899 |
Total | | 5,690,055 | | 3,715,774 | | 9,405,829 |
The initial focus at Grey Fox will be the extraction of higher-grade material from the Whiskey Jack Zone. Mining will ramp up to 1,500 t/d within Grey Fox North, and subsequently to 2,700 t/d with the addition of Grey Fox South in 2035. See Figure 1-1 for the production schedule.
| Project: 169525666 | 1-9 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary

Figure 1-1: Production Profile by Mining Method
Further details regarding mine design, production scheduling, geotechnical and hydrogeological considerations, and supporting infrastructure are provided in Section 13.
1.14Processing and Recovery Methods
Metallurgical testwork indicates that Grey Fox mineralization exhibits variable ore characteristics, with whole-ore cyanidation recoveries ranging from approximately 70% to 95%. Comminution testwork indicates relatively hard and competent ore, with available grinding power at the Stock Mill representing the primary throughput constraint. Although flotation with concentrate regrinding has the potential to improve recoveries for some domains, it was not incorporated into the proposed flowsheet due to cost and operational complexity.
The proposed processing strategy incorporates primary crushing at Grey Fox, with crushed ore transported to the Stock Mill for processing through the existing crushing, grinding, cyanidation, carbon-in-leach, and gold recovery circuits. The operation is designed for a nominal throughput of approximately 1,470 t/d and an overall gold recovery of approximately 88%.
Further details regarding metallurgical testwork, process design criteria, and the proposed process flowsheet are provided in Section 14.
1.15Infrastructure
The Grey Fox Project will consist of a centralized surface infrastructure supporting underground operations via the North and South portals. Principal infrastructure includes a primary crushing facility, ore and waste storage areas, water management systems, ventilation facilities, and supporting site infrastructure.
The Project benefits from integration with existing infrastructure at the nearby Black Fox Mine and Stock Mill, reducing capital requirements and supporting a phased development strategy. Ore will be hauled approximately 34 km to the Stock Mill using existing transportation infrastructure, and power will be supplied through a 27.6 kV grid connection along Tamarack Road.
| Project: 169525666 | 1-10 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary
Water management systems have been developed to collect, manage, and transfer contact water to existing treatment facilities at Black Fox. A site-wide water balance supports the design, with underground dewatering requirements estimated at approximately 6,540 m³/d at full production.
Further details regarding site infrastructure, transportation, power supply, ore and waste management, and water management are provided in Section 15.
1.16Market Studies and Contracts
Gold is a freely traded commodity with widely established pricing, and the sale of production is considered assured. As such, a detailed market study was not undertaken.
Based on monthly closing data from April 2024 to April 2026, the approximate trailing average gold price is US$3,000 per ounce.
No sales contracts are currently in place for Grey Fox. Future doré sales are expected to follow industry terms.
Refining and transportation costs have been estimated based on comparable operations in the region, with typical refining charges, high gold payability (approximately 99.95%), and nominal shipping costs applied in the economic analysis. Further details regarding market assumptions, pricing, and sales terms are provided in Section 16.
1.17 | Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups |
The Grey Fox Project is located near Matheson, Ontario, within the Abitibi Greenstone Belt and benefits from existing mining infrastructure, a well-established regulatory framework, and extensive environmental baseline information from current and historical operations.
Baseline studies indicate typical boreal forest conditions with surface water and groundwater systems that are well characterized and monitored. Water management planning includes transfer of contact water to the existing Black Fox treatment facilities. Although certain constituents, including arsenic, are expected to require treatment prior to discharge, established treatment methods are expected to effectively manage water quality.
The Project is subject to federal and provincial regulatory requirements. Based on the current Project design, a federal Impact Assessment is not required. Key provincial approvals include Environmental Compliance Approvals, a Permit to Take Water, and a Closure Plan Amendment.
The Project is located within areas traditionally used by Indigenous communities. Engagement with local First Nations, Métis organizations, regulators, and stakeholders has been ongoing. An Impact Benefit Agreement is in place with Apitipi Anicinapek Nation.
| Project: 169525666 | 1-11 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary
Closure and reclamation planning includes flooding and sealing of underground workings, stabilization of disturbed areas, revegetation, and removal of infrastructure with the objective of achieving long-term environmental stability.
Overall, environmental studies completed to date, existing infrastructure, and permitting experience at the Black Fox operation indicate that the Project is environmentally and socially viable. Key risks related to water treatment, permitting, and stakeholder engagement are considered manageable through established mitigation measures and ongoing consultation.
Further details regarding environmental studies, permitting, closure planning, and community engagement are provided in Section 17.
1.18Capital and Operating Costs
1.18.1Capital Costs
The capital cost estimate meets the requirements for a Class 3 estimate (AACE), with an expected accuracy of ±15%, and is reported in Q1 2026 US dollars.
Total capital costs are estimated at $350.3 million, comprising $176.6 million in project period capital and $173.7 million in sustaining capital. Including pre-production and closure costs, total capital is estimated at approximately $361.9 million.
Capital costs are primarily associated with underground mine development and infrastructure, with additional costs related to surface facilities, water treatment systems, contingency, and closure.
1.18.2Operating Costs
LOM operating costs are estimated at approximately $1,397.7 million, or $148.6 per tonne processed. Operating costs are dominated by underground mining, with additional contributions from processing, tailings management, and water treatment.
Further details regarding capital and operating costs are provided in Section 18.
1.19Economic Analysis
An economic model was prepared to estimate annual project cash flows based on the engineering, cost, and revenue assumptions for the Project. The economic analysis results are based on forward-looking information that is subject to a number of known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those presented herein.
Using a base case discount rate of 5%, the Project returns an after‑tax net present value (NPV) of $282.1 million, an after-tax internal rate of return (IRR) of 24.8%, and after-tax cumulative cash flow of $493.2 million.
| Project: 169525666 | 1-12 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary
Sensitivity analysis evaluated the impact of changes in key parameters, including gold price, head grade, operating costs, and capital costs. The Project is most sensitive to variations in head grade and gold price.
Further details regarding the economic analysis are provided in Section 19.
1.20Adjacent Properties
The Grey Fox deposit is located proximal to the Porcupine-Destor fault zone in the Abitibi Greenstone Belt, an area well known for historical and current gold production. The Eastern Properties, which include Grey Fox, are surrounded by claims and leases held by exploration companies and operators, including Onyx Gold Inc., STLLR Gold Inc., Mayfair Gold Corp., and Agnico Eagle Mines Ltd.
Further details regarding adjacent properties are provided in Section 20.
1.21Interpretation and Conclusions
The QPs conclude that the Grey Fox Project is technically robust and appropriately defined at the PFS level. McEwen holds a 100% interest in the mineral tenure, with surface rights, royalties, and stakeholder agreements considered typical and sufficient to support development, with no material constraints identified.
Geologically, Grey Fox is interpreted as a structurally controlled epizonal gold system hosted in metavolcanic, metasedimentary, and intrusive rocks. Mineralization is primarily controlled by vein arrays, major fault structures, and lithological contrasts, with multiple domains requiring consideration in modeling and mine planning. Drilling density is generally sufficient, with additional work recommended to improve confidence and support resource conversion.
Metallurgical testwork indicates relatively hard ore with variable recoveries (71% to 94%), and modest gravity recovery potential, highlighting the importance of comminution design and geometallurgical domaining. Mineral Resources are considered reliable and support the defined Mineral Reserve of 9.4 Mt at 3.24 g/t Au (approximately 980 koz), based on a gold price of $2,200/oz.
Mining methods, infrastructure, and water management strategies are conventional and supported by operating experience in the region, with optimization opportunities identified in areas such as tailings management and water treatment.
Economically, the Project demonstrates positive results, including an after‑tax NPV (5%) of $282.1 million and IRR of 24.8%, with sensitivity primarily to gold price and head grade. Overall, the Project is considered viable at the PFS level, with further work focused on reducing geological and metallurgical uncertainties and optimizing design assumptions.
Further details regarding interpretation and conclusions are provided in Section 22.
| Project: 169525666 | 1-13 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
1 Executive Summary
1.22Recommendations
The Grey Fox Project is recommended to advance to the next stage of development, supported by targeted technical programs to further de-risk and optimize the Project.
Key recommended programs include:
| ● | Early Works: Surface geotechnical investigations, confirmation of overburden conditions, and refinement of portal and ventilation raise designs. |
| ● | Exploration: Continued diamond drilling to expand and upgrade resources, particularly in the Gibson, Whiskey Jack (at depth), Grey Fox South, and 147 zones, supported by geochemical and structural analysis. |
| ● | Mining: Increased geotechnical characterization, optimization of stope design and sequencing, and evaluation of alternative development strategies and automation. |
| ● | Metallurgy: Additional testwork to optimize recovery and confirm processing assumptions. |
| ● | Tailings: Assessment of alternative tailings storage options aligned with GISTM best practices, including potential use of the Black Fox open pit. |
| ● | Infrastructure: Site investigations and confirmation of integration with existing Black Fox infrastructure. |
| ● | Hydrogeology: Updating of the hydrogeological model to reflect an underground-only mining scenario and validate groundwater inflow assumptions. |
The estimated cost of these programs is approximately $13.5 million.
Further details regarding recommendations are provided in Section 23.
| Project: 169525666 | 1-14 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
2 Introduction
2 | Introduction |
2.1 | Terms of Reference |
At the request of McEwen, this Technical Report Summary (TRS) was prepared to support the development of an underground mining operation at the Grey Fox property near Matheson, Ontario. McEwen is headquartered in Toronto, Ontario, is legally domiciled and incorporated in the State of Colorado, and trades on the Toronto and New York Stock Exchanges under the symbol MUX. McEwen holds a 100% interest in the mineral claims and mining leases comprising Grey Fox.
The purpose of this Report is to summarize the findings of the PFS completed for Grey Fox as of the effective date given in Section 2.3.
Users of this Report are encouraged to confirm that this is the most recent TRS for Grey Fox, as it may be superseded by subsequent technical disclosures.
The quality of information contained in this Report is considered consistent with the level of effort associated with the services provided and is based on the following:
· | Data supplied by third-party sources. |
· | Information available at the time of preparation. |
·The qualifications, assumptions, and limitations presented herein.
This TRS includes the following key activities:
· | Review and acceptance of the current Mineral Resource model for Grey Fox. |
· | Preparation of an underground mine design and production schedule using previous hydrogeological modeling and geotechnical information prepared by Stantec. |
· | Preparation of a Mineral Reserve estimate using appropriate modifying factors. |
· | Development of a metallurgical flowsheet for processing Grey Fox material at the existing Stock Mill. |
· | Preparation of specifications for supporting project infrastructure, including access, power supply, water treatment, ventilation, buildings, and tailings storage facilities. |
· | Summary of the environmental baseline work and permitting requirements. |
· | Development of capital and operating cost estimates. |
· | Preparation of an economic model, including discounted cash flow and sensitivity analyses. |
· | Development of recommendations for further work required for the continued development of the Project. |
The presentation of this information requires Qualified Persons (QPs) to derive subtotals, totals and weighted averages that may inherently involve rounding, and consequently, introduce a margin of error. These are not considered material.
This report provides Mineral Resource and Mineral Reserve estimates for Grey Fox. Inferred Mineral Resources are considered too speculative geologically to be included in Mineral Reserves. The Mineral Reserve estimate presented herein represents the first public disclosure of Mineral Reserves for the Project.
| Project: 169525666 | 2-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
2 Introduction
2.2 | Site Visits and Scope of Personal Inspection |
By virtue of their education, experience, and professional qualifications, the authors of this Technical Report Summary are QPs in their respective disciplines, including resource estimation, mining, geology, metallurgy, engineering, cost estimation, and mineral economics.
Table 2-1 lists the individual QPs responsible for preparation of this Report, their titles, areas of responsibility, and the dates of their site visits.
Table 2-1: Details of QPs and Site Visits
Qualified Person | | Title | | Report Area of Responsibility | | Site Visit |
| | | | | | |
Mark Hatton, P.Eng. | | Senior Mining Engineer | | Sections 1.1, 1.12, 1.13, 1.15, | | Oct 7, 2025 |
Stantec | | | | 1.16, 1.18, 1.19, 1.21, 1.22, 2, | | |
| | | | 12, 13, 15.1 to 15.7, 16, 18.1, | | |
| | | | 18.2, 18.2.1, 18.2.4 to 18.3.1, | | |
| | | | 19, 21, 22.7 to 22.9, 22.12 to | | |
| | | | 22.15, 23.1.1, 23.1.3, 23.1.6, | | |
| | | | 23.2, 24, 25 | | |
| | | | | | |
Carson Cybolsky, P.Geo | | Senior Resource Geologist | | Sections 1.7 to 1.9, 1.11, 5.4.1, | | Actively Works |
McEwen | | | | 8, 9.2, 11.1 to 11.8, 22.6 | | On-Site |
| | | | | | |
Sean Farrell, P.Geo. | | Exploration Manager | | Sections 1.2 to 1.6, 1.20, 3, 4, 6, | | Actively Works |
McEwen | | | | 7, 20, 22.1 to 22.4, 23.1.2 | | On-Site |
| | | | | | |
Luke Willis, P. Geo. | | Director of Resource Modeling | | Sections 11.9, 11.10 | | Jan 17, 2025 |
McEwen | | | | | | |
| | | | | | |
Gerd Wiatzka, P. Eng. | | National Expert, VP, Director of | | Sections 9.3 to 9.5, 15.10 to | | Oct 7, 2025 |
Arcadis | | Mining | | 15.12, 18.2.3, 18.3.3, 18.3.4, | | |
| | | | 22.10, 22.11, 23.1.5 | | |
Niel Morrison, P.Eng. | | Principal Process Engineer | | Sections 1.10, 1.14, 9.6, 10, 14, | | Feb 26, 2026 |
DRA | | | | 15.8, 18.2.2, 18.3.2, 22.5, | | |
| | | | 23.1,.4 | | |
| | | | | | |
Sheldon Smith, MES P.Geo. | | Senior Hydrologist | | Sections 1.17, 15.9, 17, 23.1.7 | | N/A |
Stantec | | | | | | |
Sheldon Smith did not conduct a separate site visit. The QP relied upon verifications performed by the Lead Mining QP during their inspection on Oct 7, 2026, which was deemed sufficient for the economic evaluation. A physical visit would yield no additional verifiable technical data beyond the information provided in the hydrological model and the closure plan.
| Project: 169525666 | 2-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
2 Introduction
2.3 | Effective Dates |
The effective date of the Grey Fox Mineral Resource estimate is April 2, 2026.
The effective date of the Mineral Reserve estimate is March 27, 2026.
The effective date of this Technical Report Summary is November 9 2026.
2.4 | Information Sources and References |
Key sources of information for this report include:
· | Referenced documents listed in Section 24. |
· | Information provided by the McEwen management team, as described in Section 18 and 17. |
2.5 | Units of Measure |
All currency units and references to “dollars” or “$” are in United States dollars unless otherwise noted.
The metric system is used throughout. References to “t” or “tonnes” refer to dry metric tonnes unless otherwise noted.
2.6 | Previous Technical Reports |
· | “Technical Report for the Black Fox Complex, Canada” April 2018 by SRK for McEwen Mining (under NI 43-101). |
· | “Technical Report Summary on the Initial Assessment of the Fox Complex, Ontario, Canada.” December 2021 by Wood for McEwen Mining. |
· | “Technical Report Summary on the Initial Assessment of the Fox Complex, Ontario, Canada.” February 2025 by McEwen Mining. |
| Project: 169525666 | 2-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description
3 | Property Description |
The Fox Complex comprises three groups of properties, including past-producing and currently operating mines, as well as a processing facility, located within and around the City of Timmins, in northeastern Ontario, Canada (Figure 3-1).
The Eastern Properties include the currently operating Froome Mine (Froome and Froome West), the Grey Fox property, the Stroud property, Black Fox North, and the formerly operating Black Fox Mine. These properties are located in Beatty and Hislop Townships, approximately 60 km east of Timmins.
The approximate geographic center of the Black Fox Mine is 48° 32’ 2” N and 80° 20’ 2” W (UTM coordinates: 549170 E and 5375871 N, NAD83, Zone 17). Black Fox North is located approximately 4 km north of the Black Fox Mine. The Grey Fox property is located approximately 3 km southeast of Black Fox, and the Stroud property is contiguous with the southwestern portion of Grey Fox.
The approximate geographic center of the Grey Fox property is 48°30’20.0” N and 80°18’20.0” W (UTM coordinates: 551100 E and 5372750 N, NAD83, Zone 17). Surface elevations in the area range from approximately 275 m to 325 m above sea level.
The Stock Properties include the historical Stock Mine, the Stock West and Stock East deposits, and the currently operating Stock Mill. These are centrally located within Stock Township, north of Highway 101, approximately 20 km west of Matheson and 43 km east of Timmins.
In 2024 McEwen started infrastructure-related operations at the historical underground Stock Mine. The approximate geographic center of Stock is 48° 33’ 0” N and 80° 45’ 1” W (UTM coordinates: 518421 E and 5377476 N, NAD83, Zone 17).
The Western Properties include the Buffalo Ankerite and Davidson-Tisdale deposits (and previously included the Fuller and Paymaster properties which are no longer owned by McEwen), located in Tisdale and Deloro Townships within the municipal boundaries of Timmins. These deposits are past producers and form part of the historic Porcupine Gold Camp, which has produced more than 70 Moz of gold over the past 110 years.
The approximate geographic centers are as follows:
· | Buffalo Ankerite: 48° 26’ 31” N and 81° 16’ 14” W (UTM: 479994 E and 5365448 N). |
· | Davidson-Tisdale: 48° 30’ 46” N and 81° 13’ 40” W (UTM: 483186 E and 5373326 N). |
(All coordinates are in NAD83, Zone 17.)
| Project: 169525666 | 3-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description

Figure 3-1: Fox Complex Properties
3.1 | Mineral Tenure and Surface Rights |
The properties of the Fox Complex consist of several blocks of land totaling 135 parcels, representing either patented mining claims, mining leases, and overlapping surface rights, covering approximately 7,234 ha of mining land and 3,461 ha of surface land.
All surface rights and mining rights parcels are located in the Tisdale, Deloro, Stock, Bond, Beatty, and Hislop townships, with boundaries defined by the Cochrane (06) Land Registry Office. The parcels are one of the following: a freehold mining land (mining patent), an unpatented mining claim, a mining lease, a freehold surface land, or a surface lease.
In the figures that follow, parcels with surface holdings without mining rights are shown in green; parcels with mining rights without surface rights are shown in gray, and parcels with both surface and mining rights are shown in orange.
All required fees and duties have been paid, and the claims are in good standing.
The Property Identification Number (PIN) is a numeric identifier issued by the Land Registry Office that references registered transactions associated with the land.
| Project: 169525666 | 3-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description
3.1.1 | Eastern Properties |
McEwen holds a 100% ownership interest in the Eastern Properties, located in Hislop and Beatty townships, covering Grey Fox, Stroud, Froome, Black Fox, and Black Fox North deposits (Figure3-2).
The Eastern Properties comprise 52 parcels with surface and/or mining rights, including 10 mining leases and 3 leased patents, covering approximately 2,184 ha (5,396 ac). The Black Fox North property consists of 50 unpatented claims totaling approximately 650 ha (1,606 ac).
3.1.1.1Grey Fox
The entire mineralized zone for the Grey Fox Project, including Gibson, is situated within the boundaries of the following PINs: 65380-0489, 65380-0556, 65380-0636, 65380-0490, 65380-0491 and 65380-0498. The property is located approximately 3 km southeast of the Black Fox Mine.
3.1.1.2Stroud
The Stroud property is located south of, and contiguous with the Grey Fox property and lies within the boundaries of the following PINs: 65380-0422, 65380-0443, 65380-0444, 65380-0445, 65380-0465 and 65380-0466. These parcels are patented mining claims for which McEwen owns both surface and mining rights, with the exception of surface rights for PINs 65380-0441 and 65380-0442.
3.1.1.3Froome Mine (Main Zone & West Zone)
The Froome Main Zone is situated within the boundaries of the following PINs: 65366-0143, 65380-0552 and 65380-0553. The Main Zone is situated approximately 700 m west of the Black Fox Mine open pit. The Froome West Zone is located within PIN 65366-0143, approximately 200 m west of the Main Zone.
3.1.1.4Black Fox Mine
The Black Fox Mine open pit and underground mine are located within the boundaries of PIN 65380-0556, with the associated mine complex spanning PINs 65380-0676, 65380-0556 and 65380-0670.
3.1.1.5Black Fox North
The Black Fox North property consists of 50 unpatented mining claims, totaling approximately 650 ha (1,606 acres), located approximately 4 km north of the Black Fox Mine. McEwen does not hold surface rights over this property (Figure3-2).
3.1.2 | Stock Property |
McEwen holds a 100% ownership interest in the Stock Property, which comprises 31 parcels, including 14 patented parcels with surface and/or mining rights and 17 mining leases, covering approximately 1,633 ha in Stock Township (Figure 3-3).
| Project: 169525666 | 3-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description
The Stock Mill and related facilities are situated within the boundaries of the following PINs: 65363-0060, 65363-0061,65363-0085, 65363-0086, 65363-0087, 65363-0088, 65363-0232 and 65363-0241.
The entire Stock West mineralized zone is situated within the following PINs: 65363-0061, 65363-0237, and 65363-0240, approximately 1 km southwest of the Stock Mill.

Figure 3-2: Eastern Properties
| Project: 169525666 | 3-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description

Figure 3-3: Stock Properties
3.1.3 | Western Properties |
The Western Properties are located in several parcel blocks, including the Davidson-Tisdale property in the northern part of Tisdale Township and a second block of contiguous parcels comprising the Buffalo Ankerite property to the south in Tisdale and Deloro townships. Surface and mining rights for the northern parcel blocks are shown in Figure 3-4, and those for the southern parcel blocks are shown in Figure 3-5.
3.1.3.1 | Buffalo Ankerite |
McEwen holds a 100% interest in the Buffalo Ankerite property, which consists of 17 parcels with surface and/or mining rights, covering approximately 654 ha in Deloro Township. The property boundaries are
| Project: 169525666 | 3-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description
based on field surveys, historical records, and parcel mapping from the Ministry of Mines’ Mining Lands Administration System (MLAS).
The mineralized zone for the Buffalo Ankerite deposit is located within the following PINs: 65442-0714, 65442-0717, 65442-0718, and 65442-0860.
3.1.3.2 | Davidson-Tisdale |
McEwen holds a 100% interest in the Davidson-Tisdale property, which consists of 14 parcels with surface and/or mining rights, covering approximately 448 ha in Tisdale Township.
The mineralized zone is situated within the boundaries of the following PINs: 65399-0129, 65399-0130, and 65399-0133.
| Project: 169525666 | 3-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description

Figure 3-4: Western Properties North Parcel Blocks
| Project: 169525666 | 3-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description

Figure 3-5: Western Properties South Parcel Blocks
| Project: 169525666 | 3-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description
3.2 | Royalties and Encumbrances |
3.2.1 | Royalties |
The Eastern Properties are subject to royalties shown in Figure 3-6.
Portions of the Grey Fox Project are subject to the following royalties:
· | Schumacher royalty (3% net smelter return [NSR]) |
· | Triple Flag Royalty (formerly Newmont royalty) (2.5% NSR) |
· | Parsons-Ginn royalty (5% net profits interest [NPI] or sliding-scale NSR) |
In addition, a portion of the Grey Fox Project is subject to the Gray royalty (0.15% NSR).
The Froome Mine is subject to two royalties: a 3% NSR on the Steinman parcel and a 1.5% NSR on the Durham parcel. The Durham royalty is not applicable to the current mine plan.
The Black Fox Mine is not subject to royalties; however, both the Black Fox and Froome mines are subject to a gold streaming agreement originally with Sandstorm Resources Ltd. (Sandstorm), now held by Royal Gold Inc. (see Section 3.3.1)
Portions of the Stock Properties are subject to royalties as shown in Figure 3-7. The historical Stock Mine is subject to a 1% NSR payable to Franco-Nevada. The Stock West and Stock East deposits are not subject to these royalties.
The Western Properties are subject to royalties as shown in Figure 3-8. The Davidson-Tisdale property is not subject to royalties in the area of the current Mineral Resources.
| Project: 169525666 | 3-9 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description

Figure 3-6: Eastern Properties Royalties
| Project: 169525666 | 3-10 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description

Figure 3-7: Stock Properties Royalties
| Project: 169525666 | 3-11 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description

Figure 3-8: Western Properties Royalties
| Project: 169525666 | 3-12 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description
3.2.2 | Stakeholders and Interested Parties |
Stakeholders include the First Nations associated with the Abitibi Indian Reserve 70, which is jointly used by the Abitibiwinn (Québec) and Apitipi Anicinapek (Ontario) First Nations, as well as local private landowners within Hislop and Beatty townships. The Abitibi Indian Reserve 70 is located approximately 25 km east of the Black Fox Mine site.
McEwen has undertaken ongoing consultation with Indigenous communities, the public, and government regulators regarding operations, environmental commitments, and planned activities.
3.3 | Agreements |
3.3.1 | Sandstorm Streaming Agreement |
On November 9, 2010, Brigus Gold entered into a gold streaming agreement with Sandstorm, under which Sandstorm agreed to purchase 12% of gold production from the Black Fox Mine beginning in January 2011 and 10% of future production from the Black Fox Extension, at a fixed price of $500/oz. Sandstorm made an upfront payment of $56.3 million in connection with this agreement.
On November 5, 2012, Brigus Gold exercised an option to repurchase a portion of the stream for $24.4 million, reducing Sandstorm’s interest to 8% of production from the Black Fox Mine and 6.3% from the Black Fox Extension (Figure 3-9).
On October 20, 2025, Sandstorm transferred its interest in the streaming agreement to Royal Gold Inc.
Currently, McEwen sells 8% of gold production from the Froome Mine to Royal Gold Inc. at a base price of $624.86/oz (2026), subject to annual adjustment based on the consumer price index, capped at 2%. Any future production from remaining Black Fox areas would also be subject to this agreement.
The streaming agreement applies to gold produced within the defined agreement boundaries, including Froome and any future mining at Black Fox.
| Project: 169525666 | 3-13 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description

Figure 3-9: Sandstorm Gold Stream Agreement
| Project: 169525666 | 3-14 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description
3.3.2 | Indigenous Communities |
McEwen has entered into agreements with First Nations that assert treaty and Aboriginal rights within the areas of the Eastern and Stock properties. These agreements provide a framework for collaboration in the development and operation of the Grey Fox Project and include provisions for financial participation, employment and skills training opportunities, business development, and consultation and dispute resolution.
In addition, McEwen engages with Indigenous communities in connection with permitting applications and ongoing project activities.
An Impact Benefit Agreement has been in place with the Apitipi Anicinapek Nation for the Eastern properties since 2011 and updated in 2026. The Métis Nation of Ontario has also been consulted with respect to the Eastern Properties.
McEwen does not currently have agreements in place with Indigenous communities for the Western Properties. Agreements will be required for those projects to move forward. Nearby operations have agreements in place with Flying Post First Nation, Matachewan First Nation, and Mattagami First Nation through the Wabun Tribal Council, as well as Apitipi Anicinapek Nation.
3.3.3 | Newmont Agreement |
The Newmont agreement (now held by Triple Flag Precious Metals Corp.) was originally executed with Apollo Gold in 2009. Under the terms of the agreement, if McEwen intends to dispose of any interest in property located near the Black Fox Mine (excluding corporate transactions), McEwen must notify the counterparty in writing, which then has the opportunity to consider acquiring all or part of McEwen’s interest in the named property.
On February 4, 2026, a one-time payment of C$1.0 million was made to Maverix Metals Inc. (a subsidiary of Triple Flag Precious Metals Corp.) to satisfy a provision of the agreement related to total gold resources (M+I+I) meeting or exceeding 500,000 oz on specified claims listed in the original agreement with Newmont.
| Project: 169525666 | 3-15 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description

Figure 3-10: Newmont First Right of Refusal
| Project: 169525666 | 3-16 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
3 Property Description
3.4 | Environmental Liabilities |
Environmental liabilities related to historical and current mining activities at the Fox Complex properties are addressed through approved closure plans. These plans have been prepared in accordance with regulatory requirements and approved by the Ministry of Mines and the Ministry of Environment, Conservation and Parks.
3.5 | Significant Risk Factors |
The Fraser Institute Annual Survey of Mining Companies (Mejía and Aliakbari, 2024) provides an independent assessment of the overall political risk facing an exploration or mining project across various global jurisdictions. Overall, Ontario ranked 10 out of 86 jurisdictions in the survey on the investment attractiveness index which combines the policy perception index in which Ontario ranked 13th, with results from the best practices mineral potential index where it ranked 14th.
The QP has identified the following risk factors associated with operating in Ontario:
· | Mineral title risk: Uncertainties may exist with respect to mineral tenure, including issues related to boundary definition, assessment work, and overlapping claims. |
· | Environmental regulation: The introduction of stricter standards and enforcement, increased fines and penalties for noncompliance, more stringent environmental assessments of proposed projects, and a heightened degree of responsibility could have an adverse effect on project development. Unknown environmental conditions arising from historical or natural factors may also present risk. |
| Project: 169525666 | 3-17 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
4 Accessibility, Climate, Local Resources, Infrastructure, and Physiography
4 | Accessibility, Climate, Local Resources, Infrastructure, and Physiography |
4.1 | Accessibility |
The Grey Fox Project area is accessible from Toronto via Highways 400 and 69 to Sudbury, Highway 144 to Timmins, Highway 11 from Barrie to Matheson, and Highway 101 westward to Timmins. The City of Timmins is also serviced by regularly scheduled commercial flights from Toronto and other regional centers.
The Grey Fox property is accessible from Highway 101 via Tamarack Road (Hislop 2 Road), located approximately 10 km east of Matheson. The Black River-Matheson Township, which includes the communities of Holtyre, Matheson, Ramore, Shillington, Val Gagné, and Wavell, has a population of approximately 2,500. Access within the property is achieved by various drill roads and all-terrain vehicle trails.
The Eastern Properties are located approximately 10 km east of Matheson, 60 km east of Timmins (population approximately 45,000), and 55 km north-northwest of Kirkland Lake (population approximately 8,000). Highway 101 provides direct access through the Black Fox property, with site infrastructure located south of the highway.
All claims pertaining to the Western Properties are located under the municipality of the City of Timmins and are accessible by either provincial or municipal roads. The Buffalo Ankerite property is near, or intersected by, secondary highways. The Davidson-Tisdale property is accessible by an all-weather gravel road north of Crawford Street in South Porcupine.
The Stock Property is located in Stock Township on the north side of Highway 101, approximately 20 km west of the community of Matheson and 43 km east of the City of Timmins. The area encompassing the mine property is not noted as a major tourist attraction or its outdoor recreational esteem. However, there are permanent residences, cottages, and tourist cabins located at Reid Lake (west and upstream of the property) and at Moose Lake (south and downstream of the mine property). The Stock Mine site is easily accessible via an access road from Provincial Highway 101 located approximately 1.5 km to the south. Highway 101 (along with numerous all-weather secondary, concession, and lot roads) provides excellent access to all of the Stock claim groups.
See Figure 3-1 for locations of the properties making up the Fox Complex.
4.2 | Local Resources and Infrastructure |
Supplies and services are available in Kirkland Lake, Matheson, Sudbury or Timmins, and materials can be delivered with a 12-hour turnaround time. Forestry and mining are the primary industries in the region, and the properties are located within well-established mining camps. Therefore, mining and exploration personnel as well as equipment can be locally sourced.
| Project: 169525666 | 4-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
4 Accessibility, Climate, Local Resources, Infrastructure, and Physiography
A 500 kV power line and transformer station are within 2 km of the Buffalo-Ankerite property. Numerous operational gold processing facilities (as well as facilities on care and maintenance) are located in the Timmins area. The closest is the Dome Mill Complex owned and operated by Discovery. This complex has a rated capacity between 12,000 t/d and 14,000 t/d dependent on rock hardness.
Electrical power is available at Stock and Froome and readily available at the Grey Fox Project site via power lines along Tamarack Road.
4.3 | Climate |
The minimum mean annual temperatures in the Timmins region range from -22°C in January to +11°C in July. The maximum mean annual temperatures in the Timmins region range from -10°C in January to +24°C in July. The mean annual rainfall for the region is 543 mm. The mean annual snowfall over the winter is 308 cm (https://climate.weather.gc.ca/).
Rapid melting of accumulated snowfall can produce local flooding on the property for short periods during the spring months. Average monthly wind speeds for the region are 11 km/h to 15 km/h (Dyck, 2007). It is possible to conduct mining and exploration activities year-round.
Operations on all the properties can continue year-round.
4.4 | Physiography |
4.4.1 | Eastern Properties |
The Eastern Properties are predominantly agricultural land with a mature willow shrub, poplar, black spruce, and white birch forest along the southern and eastern edges of the property. The region is characterized by outwash deposits from continental glaciation, including raised beaches, flat clay pans and eskers. The low to moderate topography is marked by rock knobs and ridges (Dyck, 2007). The elevation around the Eastern Properties ranges from 295 m to 330 m above sea level. There is limited bedrock outcrop exposure for the Eastern Properties.
Surface waters around the eastern property include lakes, rivers, and their associated habitats. Lakes include Froome Lake located 0.25 km west of the Black Fox mine; Leach Lake located 1.4 km northwest of the mine; and Lawler Lake located 1.7 km to the south. Two other lakes, Salve Lake and Nickel Lake, are respectively located 5.2 km and 5.9 km north of the mine and form the headwaters of Salve Creek.
The Eastern Properties are located within the Salve Creek and Pike River watersheds, which are both tributaries of the Black River. Black River flows north into the Abitibi River, which in turn flows into Moose River. Moose River ultimately flows into James Bay (Dyck, 2007).
4.4.2 | Stock Property |
The Stock Property consists of an active mill and tailings facility. The historical Stock Mine is in redevelopment with anticipated production to commence late 2026.
| Project: 169525666 | 4-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
4 Accessibility, Climate, Local Resources, Infrastructure, and Physiography
The site is contained in an area of stratified silts and clays and includes wetland depressions. The topography in the vicinity of the property is controlled by a level lacustrine plain of sand and clay bounded by esker/outwash units to the east and west. The ridges are considered to be bedrock-controlled, although available information indicates that overburden thickness over the bedrock is significant.
Local topographic variations range from 267 m to 276 m above sea level. The gentle undulating terrain is characterized by dry-to-moist clay surfaces with shallow wet organics occurring in the depressions. Local areas of moderate relief are generally well drained. In contrast, topographical lows are frequently occupied by organic wetland deposits and are poorly drained. There are no known bedrock outcrop exposures at the Stock Property.
4.4.3 | Western Properties |
The Western Properties are historical mining sites with residential areas adjacent to them, except at Davidson-Tisdale. The area in the vicinity of the properties is typical of glacial regions with low to moderate topographic relief and numerous rivers and lakes. Elevations range from approximately 250 m to 300 m above sea level. Drainages are characterized by creeks and rivers which comprise part of the Arctic watershed. Bedrock outcrop exposure is limited on the properties.
The Timmins area supports boreal forest tree species and an active timber, pulp, and paper industry. Local tree species include the American Mountain Ash, Balsam Fir, Black Spruce, Eastern White Cedar, Eastern White Pine, Jack Pine, Pin Cherry, Red, Tamarack, Trembling Aspen, White Birch, White Spruce, and Speckled Alder.
| Project: 169525666 | 4-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
5 History
5 | History |
Exploration and mining activities have occurred in the Timmins and Matheson areas since the early 1900s with numerous operators, varying ownership structures, partnerships, agreements, and joint ventures with varying degrees of success. The properties that now make up the present-day Fox Complex are the result of an amalgamation of several of these ownership histories culminating in the purchase of both the Lexam VG and Primero Gold Corp. properties and assets in 2017 through separate transactions.
The Fox Complex comprises a group of gold properties in Ontario currently owned by McEwen, including the Eastern Properties, Stock Property, and Western Properties. The Eastern Properties include the Grey Fox, Froome, and Black Fox properties; the Stock Property forms the central portion of the Fox Complex located in Stock Township; and the Western Properties currently comprise the Buffalo Ankerite and Davidson-Tisdale properties; until the recent October 2026 sale to Discovery, the Fuller and Paymaster properties were also part of the Western Properties. See Figure 3-1 for the locations of the McEwen-owned properties.
This section focuses on the Grey Fox Project, which forms the basis of this TRS, followed by relevant and supporting historical context from adjacent properties within the Fox Complex.
5.1 | Grey Fox Project |
The Grey Fox Project is located within the Eastern Properties of the Fox Complex and represents the primary focus of this Technical Report Summary. The project comprises several zones of mineralization, including the Gibson, Contact, Grey Fox South and Whiskey Jack zones, developed through successive exploration programs.
The Grey Fox property was first staked by Frederick Schumacher in the early 1900s. In 1936, the area was mapped by the Ontario Department of Mines. Eventually the claims were patented and worked as farmland until 1992. From 1937 to 1989, there was no reported exploration activity. In 1989, Goldpost Resources drilled an unknown number of holes in the Contact breccia zone, with unspecified results (Atherton, 1989).
In the area of the Gibson deposit, originally called Hislop West, two shafts were sunk between 1933 and 1939. Both were mined to 122 m, with underground and surface diamond drilling, drifting, and crosscutting. In 1946, S.J. Bird (later Martin-Bird) diamond drilled 11 holes totaling 2,972 m. During the period between 1979 and 1980, A.P. Ginn and G.E. Parsons (Parsons) completed geological and magnetic surveys, and diamond drilling. Additional diamond drilling and a VLF-EM survey took place in 1981 by Parsons and Armco Minerals Exploration Ltd. (Armco) in the north half of lot 4, concession 4, which were reported to have intersected high-grade gold tenors (Atherton, 1981).
In 1983, Geddes Resources Ltd. (Geddes Resources) and Armco completed geophysical surveys, trenching, and drilling. In 1986, subsequent to a 2,133 m surface diamond drilling program, Goldpost Resources Inc. (Goldpost Resources) initiated an exploration decline ramp to explore anomalous gold tenors associated with the north-northeast striking Gibson Fault. In 1987, Goldpost Resources mined a 61 m crosscut; diamond drilled 56 holes totaling 7,798 m from underground; and extended the decline ramp an additional 579 m to the 122 m level. In the following year, Goldpost Resources completed a magnetic
| Project: 169525666 | 5-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
5 History
survey, extended the decline ramp by 610 m, drifted 168 m, and diamond drilled more than 7,620 m from underground.
Goldpost Resources reported drill defined material at Gibson, above the 122 m level in 1989.
Mining Corporation of Canada Ltd. (Mining Corp) purchased Gibson from Goldpost Resources and began mining in 1989 (Fenwick et al., 1990; Atherton, 1989). According to Hemlo maps for the Pike River project, about 8,000 t were mined at a grade of 27.4 g/t Au (Ontario Ministry of Mines, n.d.).
According to Buss (2010), Noranda acquired the property in the early 1990s and developed a north-south grid along the Contact Zone in 1993 (Garber, 1997) and conducted a magnetometer and induced polarization resistivity survey on the property in 1994. This was followed up with three exploration holes spaced 200 m apart along the north end of the Contact Zone, for a total of 919 m. Whole rock geochemistry was also performed on one of the drill holes (Garber, 1997).
Noranda optioned the property in 1995 to Hemlo (Buss, 2010). Hemlo and Battle Mountain Gold Company (Battle Mountain) developed an east-west grid over the property and drilled holes on the south end of the zone. Battle Mountain also calculated a resource estimate on the Contact Zone based on results from the previous year’s drilling program.
In July 1996, Hemlo merged with Battle Mountain And (in conjunction with Cameco Gold) drilled holes on the central portion of the Contact Zone at a 200 m spacing and submitted samples for mineralogical examination (Garber, 1997). Additional drilling was conducted on the south end of the Contact Zone in 1997, after which a resource calculation was completed. The property was then transferred back to the Schumacher Estate.
Apollo Gold acquired the property in November 2007 and began drilling the southern extension of the Contact Zone in 2008.
The 2010 and 2011 Brigus Gold exploration drilling programs led to the completion of a Mineral Resource estimate supporting open pit and underground mining in October 2012 (Daigle, 2012).
To upgrade the classification, an updated Mineral Resource estimate followed the 2012 and part of the 2013 drilling programs completed by Brigus Gold (Pelletier et al., 2013).
The 2014 and 2015 Primero drilling programs focused on infill drilling and expanding the Mineral Resources on the 147 Zone, Contact, and Grey Fox South zones.
McEwen began drilling both infill and step-out drill holes at Grey Fox in 2018. That same year, SRK produced an updated Mineral Resource estimate for a Technical Report for McEwen (SRK, 2018).
The 2019 drill programs at Grey Fox focused on deep exploration at Gibson, the discovery of Whiskey Jack and de-risk drilling at 147, 147NE, and Grey Fox South. Successive drilling campaigns from 2020 to 2025 were concentrated on further delineating Whiskey Jack and Gibson with additional drilling at 147 and Grey Fox South. This drilling was designed to identify new lenses of mineralization and continue growing the resource.
| Project: 169525666 | 5-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
5 History
Importantly, up until 2018, the majority of the drill holes at Grey Fox were drilled perpendicular to stratigraphy, a practice that reflected the understanding at the time of the orientation of the mineralization. In early 2019, much of the mineralization (excluding the Contact Zone) was determined to be oriented oblique to stratigraphy (mineralization trending NE-SW). Therefore, many of the subsequent drill holes were reoriented in a SE direction to achieve more optimal drill angles for the mineralization.
McEwen updated the resource estimates for Grey Fox in 2019, 2020, 2021, 2024 and 2025. The 2025 Mineral Resource estimate that forms the basis for this PFS is the most recent and current resource estimate. All previous resource estimates are now considered historical and should not be relied upon.
Drilling history at Grey Fox is tabulated in Table 5-1.
Table 5-1: Summary of Grey Fox Drilling
Company | | Year | | No. Drill Holes | | Metres Drilled | | Target Zone |
|
Abuy Gold Mines | | 1939-1945 | | 16 | | 1,277.0 | | Gibson | |
Martin-Bird Gold Mines | | 1946 | | 11 | | 2,972.0 | | Gibson | |
Nevada Exploration | | 1973-1974 | | 11 | | 610.0 | | | |
A.P. Ginn and G.E. Parsons | | 1979-1980 | | 38 | | 3,910.0 | | Gibson | |
Armco | | 1981 | | 18 | | 884.0 | | Gibson | |
Geddes Resources and Armco | | 1983-1984 | | 28 | | 2,170.0 | | Gibson | |
Goldpost Resources | | 1986-1989 | | At least 56 | | 17,549.0 | | Gibson surface and | |
Noranda | | 1993 | | 21 | | 5,533.0 | | Contact | |
Noranda | | 1994 | | 6 | | 1,367.0 | | Contact | |
Battle Mountain/Hemlo | | 1995 | | 8 | | 2,109.0 | | Grey Fox | |
Battle Mountain and Cameco Gold | | 1996 | | 16 | | 5,872.0 | | Contact, 147, South, Gibson, | |
Battle Mountain and Cameco Gold | | 1997 | | 13 | | 5,367.5 | | Contact, 147, South, Gibson, | |
Glimmer/Exall | | 2001 | | 4 | | 1,667.0 | | Romios | |
Apollo Gold | | 2008 | | 16 | | 3,715.0 | | Southern extension of Contact | |
Apollo Gold | | 2009 | | 53 | | 9,960.0 | | Contact | |
Brigus Gold | | 2010 | | 76 | | 29,084.0 | | Contact, Gibson, South, | |
Brigus Gold | | 2011 | | 274 | | 101,893.0 | | Contact, Gibson, South, 147 | |
Brigus Gold | | 2012 | | 282 | | 87,971.0 | | Contact, 147, Whiskey Jack, South | |
Brigus Gold | | 2013 | | 148 | | 65,417.0 | | Contact, 147, South | |
Primero | | 2014 | | 199 | | 81,933.0 | | Contact, 147, South | |
| Project: 169525666 | 5-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
5 History
Company | Year | No. Drill Holes | Metres Drilled | Target Zone |
Primero | 2015 | 57 | 26,094.0 | Contact Zone, Gibson, South |
McEwen | 2018 | 64 | 25,181.3 | Gibson, 147, 147NE |
McEwen | 2019 | 219 | 89,266.0 | Gibson, 147, 147NE, South, |
McEwen | 2020 | 13 | 4,438.0 | Whiskey Jack |
McEwen | 2021 | 29 | 11,396.0 | Gibson and Whiskey Jack |
McEwen | 2022 | 14 | 6,135 | Gibson and Whiskey Jack |
McEwen | 2023 | 21 | 10,703 | Gibson and Whiskey Jack |
McEwen | 2024 | 128 | 42,419 | Gibson, 147, 147NE, South, |
McEwen | 2025 | 179 | 64,001 | Gibson, 147, South, Contact, |
McEwen | 2026 to date | 12 | 4,700 | Gibson, Whiskey Jack, Stroud |
5.2 | Stroud Property |
The Stroud property is contiguous with the Grey Fox property and forms part of the Eastern Properties of the Fox Complex. The acquisition of the Stroud property by McEwen was completed in late 2024. The first meaningful drilling took place on the property in the early 1970s by Gunnex Ltd. on the Main Zone. Subsequent drilling programs by different operators demonstrated the presence of additional zones of mineralization on the property. An internal and undisclosed historical resource estimate prepared by Atticus Geoscience Consulting in 2021 reported approximately 271 koz of gold (M+I+I). After McEwen’s purchase of Stroud, about 6,500 m of drilling was executed during the 2025 drilling season with the principal purpose of verifying this 2021 historical resource.
5.3 | Eastern Properties |
The following sections summarize the history of other properties within the Eastern Properties of the Fox Complex, which provide regional and operational context to the Grey Fox Project.
McEwen acquired all assets of the Eastern and Stock properties in 2017 from Primero Mining Corp (Primero). All assets associated with the Stroud deposit were acquired in 2024 from Stroud Resources Ltd. Refer to Figure 3-1 for the position of McEwen’s Ontario properties.
5.3.1 | Black Fox Mine |
Drilling on the Black Fox properties was first conducted by Dominion Gulf in 1952, followed by Hollinger Consolidated Gold Mines Ltd. (Hollinger) in 1962. The drill holes were drilled near diabase dykes located in the easternmost part of the properties. In 1988, Glimmer Resources, Inc. (Glimmer) put together the property package using a combination of crown and private lands. In 1989, Noranda Exploration Company Ltd. (Noranda) entered into a joint venture agreement with Glimmer to earn a 60% interest in the properties.
| Project: 169525666 | 5-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
5 History
Between 1989 and 1994, Noranda, and later Hemlo Gold Mines Inc. (Hemlo), completed eight drill programs. In all, 27,800 m of drilling was completed in 142 holes. In addition to diamond drilling, exploration was conducted by way of geological, magnetic and gradiometer surveys, a UTEM survey, and a limited induced polarization survey. In 1996, a final feasibility study on the Glimmer Gold Project was based on probable reserves outlined to a depth of 250 m.
The joint venture advanced an access ramp from surface to 55 m depth in 1996. Exall Resources Ltd. (Exall) purchased the property from Hemlo in April 1996, obtaining approximately 60% interest with Glimmer holding the remaining portion. A bulk sample was taken in 1997 from underground following development of a spiral decline ramp to a depth of 120 m, and 3,800 m of drifting. Commercial production from the Glimmer Mine was achieved in 1998. The sample and production were custom milled at St Andrew Goldfields Ltd.’s (St Andrew’s) Stock Mill from 1997 through 2001, after mineral tests carried out by Lakefield Research and others.
In September 2002, Apollo Gold Corporation (Apollo Gold) completed the acquisition of the assets of the Glimmer Mine from Exall and Glimmer. The project was renamed the Black Fox property. Between 2003 and 2007, Apollo Gold completed five drill programs. In addition to diamond drilling, exploration was conducted by way of induced polarization surveys.
In 2008, Apollo Gold produced a feasibility study declaring Mineral Reserves. On 28 July 2008, Apollo Gold completed the acquisition from St Andrew of its Stock Mill and related equipment, infrastructure, property rights, laboratory, and tailings facilities.
In October 2008, Apollo Gold awarded a contract for the removal of the glacial till material over the open pit site, and work commenced on 23 October 2008. During the same year, Apollo Gold received all necessary permits and approvals required to commence mining activities of the open pit. Apollo Gold received a Certified Closure Plan Approval, an Amended Certificate of Approval for Industrial Sewage Works, and a surface and groundwater Permit to Take Water (PTTW).
Apollo Gold commenced open pit mining at the Black Fox Mine in March 2009. The 2009 drilling program focused on the Pike River property to test the northern extension of mineralization from the adjoining Grey Fox Project.
Apollo Gold and Linear Gold Corporation (Linear Gold) merged to form Brigus Gold Corporation (Brigus Gold) in June 2010. The drilling surface program completed 14 condemnation drill holes (3,468 m) around the Black Fox Mine. A helicopter-borne, high-resolution magnetometer survey was completed in September 2010, covering the 17 km2 Black Fox mine.
Apollo Gold and Brigus Gold continued drilling at the Black Fox Mine from January 1, 2008 to December 31, 2013.
Details of the drilling history at Black Fox is tabulated in Table 5-2.
On March 5, 2014, Primero acquired all issued and outstanding common shares of Brigus Gold.
| Project: 169525666 | 5-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
5 History
Table 5-2: Summary of Black Fox Drilling
Company | Year | No. Drill Holes | Metres Drilled |
| | | |
Dominion Gulf | 1952 | Unknown | Unknown |
| | | |
Hollinger | 1962 | Unknown | Unknown |
| | | |
Noranda | 1989-1994 | 142 | 27,800 |
| | | |
Glimmer/Exall | 2000-2002 | 1,088 | 96,053 |
| | | |
Apollo Gold | 2003-2007 | 889 | 224,162 |
| | | |
Apollo Gold/Brigus Gold | 2010-2013 | 1,318 | 135,800 |
| | | |
Primero | 2014-2017 | 2,605 | 387,419 |
| | | |
McEwen | 2018-2026 | 1,793 | 247,528 |
| | | |
Total | | 7,835 | 1,118,762 |
5.3.1.1Past Production
Historical production from the Glimmer Mine era is shown in Table 5-3. The Black Fox Mine production between 2009 through December 2024 is summarized in Table 5-4. Note that the Stock Mill production includes material mined from the Froome Mine and from stockpiles.
Table 5-3: Production History (mined) of the Glimmer Mine from 1997 to 2001*
Year | Tonnes | Au Grade (g/t)** | Au (oz) | Recovery (%) |
| | | | |
1997 | 194,460 | 6.62 | 39,884 | 96.4 |
| | | | |
1998 | 308,734 | 6.69 | 64,319 | 96.9 |
| | | | |
1999 | 258,699 | 5.93 | 48,266 | 97.8 |
| | | | |
2000 | 255,234 | 5.83 | 46,418 | 97.0 |
| | | | |
2001 | 81,700 | 4.61 | 11,895 | 98.2 |
| | | | |
Total | 1,098,827 | 6.14 | 210,782 | 97.1 |
Notes:
* From historical records. Some numbers may not sum due to rounding and conversion factors. Grades and recoveries are straight averages
** Grades are calculated from reported production ounces, tonnes and recovery. From 2008 Apollo Gold Corporation Technical Report.
Table 5-4: Production History of the Black Fox & Froome Mine from 2009 to December 2025
Year | Open Pit Tonnes | UG Tonnes | Total Tonnes Mined | Tonnes Milled | Mill Au Head Grade (g/t) | Au Produced (oz) | Recovery (%) |
2009 | 631,000 | - | 631,000 | 531,000 | 3.28 | 52,152 | 93% |
2010 | 792,482 | - | 792,482 | 718,400 | 3.17 | 67,499 | 92% |
2011 | 433,267 | 170,889 | 604,156 | 725,541 | 2.54 | 55,756 | 94% |
| Project: 169525666 | 5-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
5 History
Year | Open Pit Tonnes | UG Tonnes | Total Tonnes Mined | Tonnes Milled | Mill Au Head Grade (g/t) | Au Produced (oz) | Recovery (%) |
2012 | 907,077 | 164,926 | 1,072,003 | 735,573 | 3.43 | 77,374 | 95% |
2013 | 663,428 | 297,110 | 960,538 | 752,959 | 4.34 | 98,710 | 94% |
2014 | 775,403 | 122,249 | 897,652 | 695,131 | 3.00 | 64,018 | 95% |
2015 | 849,668 | 140,836 | 990,504 | 875,833 | 2.58 | 69,733 | 96% |
2016 | - | 234,518 | 234,518 | 913,235 | 2.22 | 62,171 | 96% |
2017 | - | 263,549 | 263,549 | 685,293 | 3.14 | 66,733 | 96% |
2018 | - | 255,982 | 255,982 | 268,288 | 5.57 | 46,672 | 97% |
2019 | - | 213,887 | 213,887 | 243,677 | 4.88 | 37,288 | 98% |
2020 | - | 200,326 | 200,326 | 234,744 | 3.19 | 23,129 | 96% |
2021 | - | 306,962 | 306,962 | 303,377 | 3.24 | 29,290 | 93% |
2022 | - | 419,496 | 419,496 | 344,587 | 3.77 | 37,315 | 89% |
2023 | - | 395,713 | 395,713 | 456,831 | 3.35 | 44,236 | 90% |
2024 | - | 303,979 | 303,979 | 403,669 | 2.54 | 29,430 | 89% |
2025 | - | 285,054 | 285,054 | 290,365 | 2.89 | 23,249 | 86% |
Total | 5,052,325 | 3,775,476 | 8,827,801 | 9,178,503 | 3.19 | 884,755 | 94% |
Notes:
· | UG = underground. |
· | Milling tonne values (for 2016 & 2017) are higher than the mining tonnes due to processing of residual open pit low grade stockpile. |
· | Two milling tonne values (for 2023 & 2024) are higher than the mining tonnes due to re-claiming material because of the higher gold price (originally sent as waste from the open pit waste dump). |
· | 2025 Milled Tonnes, Ounces and Grade calculated from 2025 KPI report, removing as a percentage, material processed from Stock Mine. |
· | Total Head Grade and Recovery calculated from weighted average of 2009-2025 values. |
5.3.2 | Froome Mine (Main Zone and West Zone) |
Noranda began exploration on the Froome Lake claims in 1991 using a ground total field magnetometer and a very low frequency electromagnetic survey (EM), finding results consistent with the geological terrain of the Porcupine-Destor Deformation Zone (PDDZ). This work was followed by geological mapping in both the Froome and Glimmer claims.
The Froome deposit is located on the Durham, Plouffe, and Steinman properties acquired by Apollo Gold. The Durham and Plouffe properties were acquired in 2003 and the Steinman property in 2007.
In 2014, Primero completed a diamond drilling program which discovered the Froome (Main) deposit. This program was targeting an induced polarization anomaly, intercepting 23 m (core length) of silicified rock with disseminated pyrite. Through the latter part of 2015 and early 2016, subsequent diamond drilling defined mineralization over a strike length of approximately 150 m and dip length of approximately 300 m. In addition, drilling in 2016 identified a second zone of mineralization 25 m below the main deposit.
| Project: 169525666 | 5-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
5 History
By the end of 2025 most of the mineralized material from the main zone at Froome had been mined out and McEwen had transitioned to mining at the West zone which is described in more detail below.
The Froome West zone is located approximately 300 m west of the main Froome zone and saw limited drilling until 2024. The West zone is characterized by generally narrow, orogenic quartz-carbonate veining hosted in mafic volcanic rocks. The mineralization is interpreted to occur in a tight, northwest-southeast trending fold with the fold hinge plunging steeply to the southwest. Currently the zone has been traced approximately 175 m along strike and has a dip component of about 350 m. Most of the higher grade and wider mineralization occurs within the fold hinge.
Drilling history at Froome Mine (through December 2025) is summarized in Table 5-5.
The initial Mineral Resource estimate for the Froome (Main) deposit was calculated in 2017 by Primero. The Primero Mineral Resource estimate is now considered historic as it has been updated numerous times since then, including in this report.
Table 5-5: Summary of Froome Drilling
Company | Year | No. Drill Holes | Metres Drilled |
Noranda | 1991-1994 | 2 | 551 |
| | | |
Glimmer/Exall | 2000-2002 | 1 | 200 |
| | | |
Apollo Gold | 2003-2007 | 1 | 693 |
| | | |
Primero | 2014-2017 | 219 | 65,051 |
| | | |
McEwen | 2018-2025 | 915 | 164,594 |
| | | |
Total | | 1,138 | 231,089 |
5.3.3 | Black Fox North |
The claims pertaining to Black Fox North were acquired by McEwen in 2017 along with the remaining portions of the Eastern Properties. All assessment work performed on these claims, including work completed by McEwen, is publicly available through the Mining Land Administration System (Ontario Ministry of Mines, n.d.).
5.4 | Stock Property |
The Stock Property forms the central portion of the Fox Complex and hosts the Stock Mine and processing facilities, including the Stock Mill, which provide infrastructure support to the Eastern Properties.
The Stock Property was originally staked and drilled by Hollinger Gold Mines Ltd. (Hollinger) from 1959 to 1964 with mineralization being discovered in 1961. This work located auriferous carbonate rocks, volcanic rocks, and porphyries in proximity to the PDDZ, but limited exploration funds and changing exploration priorities postponed further evaluation. The claims were allowed to lapse.
| Project: 169525666 | 5-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
5 History
Quebec Sturgeon River Mines Ltd. (Quebec Sturgeon) re-staked the property and discovered substantial gold mineralization in 1973. Development began in 1974 and included construction of a headframe with a shaft being collared and driven through 15 m of overburden and 4 m of bedrock.
From 1980 to 1981, Quebec Sturgeon deepened the three-compartment shaft to 82 m below surface, and a shaft station was established on the 61 m level. Some 413 m of drifting and crosscutting were completed on this level along with a total of 4,481 m of underground drilling from 113 holes. Quebec Sturgeon ceased all work in early 1982 due to the drop in gold price.
In 1983, a $14 million equity financing was completed by turning the property over to St Andrew Goldfields Ltd. (St Andrew), a 68% owned subsidiary of Quebec Sturgeon. Development resumed on the property in mid-1983 and the shaft had been deepened to 269 m and underground development had been conducted on four levels by the end of 1985.
In early 1986, St Andrew acquired additional property along the PDDZ by purchasing Labrador Mining and Exploration Company Ltd.’s (Labrador Mining and successor of Hollinger) interest in properties in three townships and by entering into joint venture agreements with Esso Resources Canada Ltd. (Esso) and Quebec Sturgeon. In mid-1987, St Andrew announced that the Stock Township deposit would be brought into production. Financing was raised in Europe in 1988, and an announcement was made that a 454 t/d mill would be constructed by late 1988. Production and milling of stockpiled development material at the Stock Mine began in 1989.
In 1989, St Andrew bought out the remaining interests of Esso. By the end of 1989, five levels in the Stock Mine had been developed and 91,500 t of material had been milled to produce 17,999 oz of gold. The shaft could not be used below the fourth level due to bad ground conditions, and the fifth, sixth and seventh levels had to be accessed by a ramp. Mining methods included cut-and-fill, room-and-pillar, and longhole.
Between 1988 to 2000, production of 130,000 oz of gold from 733,000 t of material at an average grade of 5.5 g/t Au was mined from the N2, West and Central chutes. Mining and milling were suspended in December 2000 to focus on a financial restructuring and to deal with a working capital deficit and debt burden.
In 2004, St Andrew dewatered and rehabilitated the underground workings, and the Stock head frame and hoist were refurbished. An underground development, mining and drilling program was then undertaken. During 2004, 30,500 t grading 2.56 g/t Au were mined and treated at the Stock Mill.
In 2005, underground mining operations were again suspended at the Stock Mine because of the decision to extend the period of the Advanced Exploration Program at the nearby, St Andrew’s-owned Clavos Mine. Daily production levels at the Stock Mine were insufficient for the Stock Mill to operate at profitable levels.
Underground development and drilling in the deeper portions of the Stock Mine did not generate sufficient gold resources to sustain future economic mining operations and the mine was placed on care and maintenance pending further exploration.
In 2006, RPA prepared a technical report on behalf of St Andrew on their properties in and around the Timmins area. No Mineral Resources or Mineral Reserves were reported at Stock (Gow and Roscoe, 2006).
| Project: 169525666 | 5-9 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
5 History
The Stock Mine and mill facility were sold in 2008 to Apollo Gold (later Brigus Gold). Brigus Gold purchased and upgraded the Stock Mill to provide milling facilities for its Black Fox project. Refurbishment of the mill was completed in April 2009, and it began operating on 01 May 2009.
McEwen acquired the property and all its assets in 2017.
Stock East was discovered in 2018 by McEwen; Stock West was discovered in 2019. In 2019 a drilling program was laid out and designed to identify mineralization below the Main Zone. By mid 2021 mineralization below the N2 shoot at the Main Zone had been intersected. Successive drilling campaigns at Stock up until early 2024 were primarily designed to expand & delineate additional mineralization at all three of these zones (Stock West, Stock Main/Mine, and Stock East).
Since 2025, McEwen has been developing a new access ramp into the historical Stock Mine workings and is establishing the underground and surface infrastructure needed to support initial production later in 2026. Production is intended to ramp up to 1,500 t/d in 2027. The evaluation of the potential mine life is ongoing.
Drilling history at Stock, including Stock Main, Stock East and Stock West are tabulated in Table 5-6.
Table 5-6: Summary of Stock Drilling
Company | Year | No. Drill Holes | Metres Drilled | Target Zone |
Various companies | 1959-1982 | 315 | 31,950 | |
| | | | |
St Andrew | 1983-2008 | 1,124 | 91,282 | Stock Main, Stock East |
| | | | |
Brigus Gold | 2008-2017 | 6 | 2,164 | |
| | | | |
Primero | 2014-2015 | 35 | 10,541 | |
| | | | |
McEwen | 2018 | 91 | 28,389 | Stock East |
| | | | |
McEwen | 2019 | 108 | 43,219 | Stock East, Stock Main N-2 Chute |
| | | | Extension, Stock West |
| | | | |
McEwen | 2020 | 33 | 17,813 | Stock West |
| | | | |
McEwen | 2021 | 136 | 61,046 | Stock West, Stock Main N-2 Chute |
| | | | Extension |
| | | | |
McEwen | 2022 | 125 | 45,612 | Stock West, Stock Main |
| | | | |
McEwen | 2023 | 209 | 65,505 | Stock West, Stock Main, Stock East |
| | | | |
McEwen | 2024 | 52 | 11,402 | Stock East, Stock West |
| | | | |
McEwen | 2025 | 0 | 0 | |
| | | | |
McEwen | 2026 to date | 25 | 3,064 | Stock East |
| | | | |
Total | | 2,259 | 411,987 | |
5.4.1 | Past Production |
Production commenced in July 1989 and ceased in mid-1994 due to a lack of working capital. The central chute was discovered in 1994 by underground drilling, and the 8-12 decline had almost reached the central shoot when the mine closed.
| Project: 169525666 | 5-10 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
5 History
The overall historical production of the Stock Mine to date is shown in Table 5-7. Over half of the production came from the N2 chute where 405,298 t gold was mined, with an average grade of 6.2 g/t Au. The average grade increased in 1992, when production from the higher-grade west chute commenced. From 1992 to 1994, 103,857 tonnes at an average grade of 9.1 g/t Au were mined and processed from the west shoot, recovering 30,425 oz of gold.
Table 5-7:Stock Mine Production History, St Andrew
| | Average Mined Au | | |
Year | Tonnes Milled | Grade (g/t) | Contained Au (koz) | Recovered Au (koz) |
1989 | 90,883 | 3.87 | 11,320 | 10,657 |
| | | | |
1990 | 163,129 | 5.59 | 29,310 | 27,295 |
| | | | |
1991 | 132,191 | 5.62 | 23,897 | 21,961 |
| | | | |
1992 | 173,413 | 6.79 | 37,848 | 36,301 |
| | | | |
1993 | 151,187 | 5.14 | 24,998 | 23,788 |
| | | | |
1994 | 20,677 | 5.38 | 3,578 | 3,403 |
| | | | |
2000 | 68,723 | 5.88 | 12,983 | 12,395 |
| | | | |
2004 | 23,015 | 1.83 | 1,355 | 1,355 |
| | | | |
2005 | 7,527 | 4.78 | 172 | 172 |
| | | | |
Total | 830,745 | 5.48 | 145,461 | 137,327 |
Table 5-8 summarizes the gold ounces recovered in 2025 by McEwen during the development of the new Stock Mine ramp:
Table 5-8: Production History of the Stock Mine from 2025
Year | Underground Tonnes | Total Tonnes Mined | Tonnes Milled | Mill Au Head Grade (g/t) | Au Produced (oz) | Recovery (%) | |
2025 | 16,746 | 16,746 | 15,331 | 0.96 | 408 | 86% | |
| | | | | | | |
Total | 16,746 | 16,746 | 15,331 | 0.96 | 408 | 86% | |
5.5 | Western Properties |
The Western Properties form the western portion of the Fox Complex and include the Buffalo Ankerite and Davidson-Tisdale properties. These properties are not directly material to the Grey Fox Project but provide regional context within the Fox Complex.
McEwen acquired the mineral rights to the Western Properties through the 2017 acquisition of Lexam VG Explorations Inc. The history of the individual property mineral rights ownership is discussed in the history for each property.
| Project: 169525666 | 5-11 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
5 History
5.5.1Buffalo Ankerite Property
Prior to 1935, Buffalo Ankerite was developed by two independent owners. The operations were distinct and covered two different mineralized bodies, the South Zone (Buffalo Ankerite South) and the North Zone (Buffalo Ankerite North). In 1935, the operator of Buffalo Ankerite North, Buffalo Ankerite Holdings Ltd. (BAH, previously Buffalo Ankerite Gold Mines Ltd.) consolidated both properties under its ownership. Since 1935 the property has been held by numerous operators who performed various exploration and mining activities.
Details of the drilling history at Buffalo Ankerite is tabulated in Table 5-9.
Table 5-9: Summary of Buffalo Ankerite Drilling
Company | Year | No. Drill Holes | Metres Drilled | Target Zone |
Various companies | Prior 1953 | Unknown | Unknown | Historical records limited |
Vedron and Pamour | 1982 | 15 | 1,245 | |
Placer Dome | 2001 | 15 | 2,728 | North |
Placer Dome | 2002 | 59 | 6,097 | South |
Lexam VG | 2005-2012 | 66 | 26,806.1 | North |
Lexam VG | 2005-2012 | 159 | 54,419.4 | South |
Total | | 314 | 91,295.5 | |
5.5.1.1 | Past Production |
Production from the Buffalo Ankerite and the March operations between 1926 and 1953 totaled 4.8 Mt with an average grade of 6.5 g/t Au. Total metal produced was 1.02 Moz Au.
Between 1978 and 1982, production came from Pamour extracting the Buffalo Ankerite South crown pillars and milled at their adjacent Timmins Mill. The amount of material mined was not consistently reported by Pamour and the total is unknown. In 1978, Pamour reported milling 38,160 t. The Regional Geologist for Timmins reported 16,300 t in 1982 (Kustra, 1983). A later three-dimensional model created by Dome Mines suggests that a total of approximately 320,000 t of material was removed.
5.5.2 | Davidson-Tisdale Property |
The property was incorporated as Davidson Gold Mines Ltd. in 1911 and was succeeded in 1919 by Davidson Consolidated Gold Mines Ltd. Little work was done from 1945 to the early 1980s.
In 1994, a study commissioned by Placer Dome provided an estimate of an open pit mineable resource.
From 1999 to 2003, Northcott Gold Inc. (Northcott, formerly DTM) drilled several holes. Northcott subsequently optioned the property to Vedron in 2003, allowing Vedron to earn a 50% undivided interest. From 2003 to 2006, Vedron drilled a significant number of holes. In 2004, the company amended the option
| Project: 169525666 | 5-12 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
5 History
agreement to allow earning 75%. In 2005, the option agreement was further amended, resulting in Vedron acquiring 54% of the interest in the property.
A Mineral Resource was estimated by Guy and Puritch in 2007 (Guy and Puritch, 2007). Vedron expenditures on the property had increased the interest to 66% by the filing of their 2007 annual information form in June. Later in 2007, a preliminary economic assessment was filed on Davidson-Tisdale. In 2008, the option expired with Vedron earning a 68.5% interest in the Tisdale property by 2014, with Laurion Mineral Exploration Inc. (Laurion, previously Northcott) holding the remaining 31.5%.
In 2010, Vedron purchased the remaining 31.5% minority stake in Davidson-Tisdale, held by SGX Resources, Inc. (previously Laurion) to fully control the property.
From 2006 to 2010, Vedron continued to drill diamond drill holes from surface.
In 2013, a Mineral Resource estimate and technical report was prepared by P&E and RPA (Armstrong et al., 2013). An updated Mineral Resource estimate was performed for the 2021 Fox Complex IA and this has been updated for this PFS and is now considered as the current Mineral Resource estimate.
Details of the drilling history at Davidson-Tisdale is tabulated in Table 5-10.
Table 5-10: Summary of Davidson-Tisdale Drilling
Company | Year | No. Drill Holes | Metres Drilled |
| | | |
Various companies | Prior 1980 | 24 | 5,267.0 |
| | | |
Dome Mines | 1981 | 11 | 1,118.0 |
| | | |
DTM | 1983-1984 | 35 | 4,576.8 |
| | | |
Getty | 1984-1987 | 537 | 49,165.9 |
| | | |
Midas Minerals | 1989 | 5 | 1,486.2 |
| | | |
Northcott | 1999-2003 | 17 | 399.3 |
| | | |
Lexam VG | 2003-2015 | 97 | 23,397.5 |
| | | |
Total | | 726 | 86,410.7 |
5.5.2.1 | Past Production |
Production from 1918 to 1921 was processed on site with a 10-stamp mill until it burned down in 1924. A reported total of 8,501 t at 8.9 g/t Au was milled, and 2,438 oz gold recovered using mercury amalgamation, with about 20% of the gold content was lost using this process.
From April to November 1988, custom milling of the mined material at Davidson-Tisdale occurred at the nearby Giant Yellowknife Go-Mill. A total of 39,800 t was mined and milled during the Getty period, producing a total of 7,300 oz of gold and 5,665 oz silver.
| Project: 169525666 | 5-13 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
6 | Geological Setting, Mineralization, and Deposit |
Property geology described herein for Davidson-Tisdale and Buffalo Ankerite properties was derived from technical reports prepared by P&E (Mineral Resource estimate) and RPA (Armstrong et al., 2013; Ehasoo et al., 2014).
Figure 6-1 is a geological map showing the locations of the Eastern, Stock and Western Properties.

Figure 6-1: Geological Map of the Timmins-Matheson Sector within the Abitibi Subprovince showing Distribution of Gold Mining Operations
6.1 | Regional Stratigraphy |
The Fox Complex properties are underlain by Precambrian rocks of the Southern Abitibi Greenstone Belt (SAGB), located in the central part of the Wawa-Abitibi Subprovince, southeastern Superior Province, of northeastern Ontario (Figure 6-2). The SAGB consists of numerous intercalated assemblages of 2,750 Ma (million years) to 2,695 Ma metavolcanic rocks and their intrusive equivalents, which are unconformably overlain by the younger 2,690 Ma to 2,685 Ma Porcupine and 2,677 Ma to 2,670 Ma Timiskaming metasedimentary assemblages and alkalic intrusive rocks.
| Project: 169525666 | 6-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit

Source: (Modified after Poulsen et al., 2000, and Dube and Gosselin, 2007)
Figure 6-2: Map of the Southern Abitibi Greenstone Belt
6.2 | Mineral Occurrences & Mineralization Types |
Gold mineralization at both the Eastern and Stock Properties is part of a metallogenetic domain, and shares similarities with ultramafic-hosted and associated deposits that occur along the PDDZ corridor between Nighthawk Lake and the Froome and Black Fox Mines to the East. This domain includes deposits such as those at Nighthawk Lake (Porcupine Peninsular Mine, Hopson Zone, Ronnoco deposit), the Aquarius Deposit, the Taylor Mine (West Porphyry, Shoot and Shaft Zones), and the Black Fox Mine. Similar ultramafic-hosted styles are also present along the Cadillac-Larder Lake corridor to the south, as is exemplified by the Kerr Addison Mine. All these deposits occur in association with sets of reverse quartz shear veins and associated sets of gently to moderately dipping quartz-carbonate-albite extension vein arrays in areas where strong complex rheological control influences the position of mineralization in areas of high strain. Specifically, mineralization at Black Fox, Stock and Froome West is interpreted to be orogenic lode gold deposits. The Grey Fox deposit, located about 3 km Southeast of Black Fox, appears to differ in mineralization style, with studies suggesting an epizonal to high level orogenic deposit based on current lithological, structural, and mineralogical observations.
| Project: 169525666 | 6-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
6.2.1 | Grey Fox |
The Grey Fox deposit is hosted within mafic metavolcanic, metasedimentary, and syenite units, likely from the Lower Blake River Formation. The Project is divided into two main blocks with distinct lithological packages (Figure 6-3). The SE block (147-Grey Fox South Block) is a layered mafic metavolcanic sequence comprised of massive, pillowed, and variolitic metavolcanic units with minor interflow metasediment horizons. The NW block (Gibson Block) is comprised of altered metasediments intruded by a syenitic stock (the Gibson Syenite). The metasedimentary and metavolcanic units in both blocks strike ~350° and are steeply dipping at approximately 70° to the east. They are angularly unconformable to the Lower Tisdale mafic and ultramafic metavolcanics to the north, which strike ~140° and dip 45° to the SW. The units are generally weakly foliated, although the foliation can increase locally in the presence of shearing. Some lithologies (including sedimentary horizons and contacts) may have localized displacement, as suggested by cataclastic breccias and narrow semi-brittle shear zones associated with mineralization (Ross and Rhys, 2011).
The two blocks are separated by the Contact Fault which runs N-S along the contact between the metasediments and the mafic metavolcanics. The deposit is constrained to the NE and at depth by the A-1 thrust fault, which is likely part of an imbricate fan of the PDDZ and separates the Grey Fox units from the Lower Tisdale rocks, and to the SW by the sub-vertical Gibson-Kelore Shear Zone.
Most of the mineralization at Grey Fox occurs within numerous sub-parallel NE-SW striking sheeted vein sets referred to as C-1 veins (Figure 6-4) that dip steeply to the NW. These are accompanied by extensional conjugate C-2 veins, which are mainly E-W trending and south-dipping. Collectively known as C-veins, these are the dominant host of the mineralization in the Gibson, 147, 147NE and Grey Fox South zones. A third, flat lying set of veins (C-3) may also exist, but likely play a minor role in mineralization.
The orientation of the C-1 veins varies slightly across the property, striking ~230° at 147 Zone and Grey Fox South, rotating to 245° at 147NE. They are steeply dipping at ~68-70° to the NW. On the west side of the Contact Fault, there is a noticeable difference in the orientation of the veining hosted within the Gibson syenite and metasediments, with the C-1 set with a strike/dip of ~223°/-67° in the south end of the Gibson zone, rotating to 210°/75° near the Gibson portal, and rotating back to ~240°/88° at the north end of the Gibson zone. The differences in the strike/dips of the C-1 veins between the two sides of the Contact Fault is likely due to the rheological contrast between the mafic metavolcanic rocks on the east side of the fault verses the metasediments on the west side.
The C-veins are quartz+albite+ferromagnesian dolomite veins. They commonly display crustiform textures with molybdenite±graphite stylolites and can be brecciated in the larger vein sets. They range in scale from 1 cm-2 cm to 2 m-3 m wide and can occur individually or as anastomosing lenses with strike lengths between 100 m-700 m. The veining appears to have textures associated with epizonal orogenic gold deposits, and this is supported by fluid inclusion studies (Tuba, 2019). Gold occurs as free gold or associated with fine grained sulphides and is found around quartz grains and in the stylolites and along vein margins. The distribution of the gold within the veins tends to be nuggety/inhomogeneous.
The host lithology also plays an important role in gold deposition. Mineralization at the 147, 147NE, and Grey Fox South zones is strongly concentrated where the NE-SW trending C-veins intersect the N-S striking variolitic iron-tholeiite flows. These intersections create strong, steep mineralized plunges to the
| Project: 169525666 | 6-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
north hosted within the flows. This is likely due to the chemical interaction between the silica+carbonate rich gold bearing fluids in the C-veins and the iron rich metavolcanics creating favorable conditions for gold deposition. Mineralization, especially at the Grey Fox South zone, is associated with hematization which occurs in albite-carbonate dominant alteration assemblages often peripheral to mineralized zones, and also as outer envelopes to some veins. Pyritic carbonate-albite-sericite alteration generally overprints the hematite, suggesting that much of the pervasive hematite is early, although later structurally controlled hematite is suggested in vein envelopes as well. The presence of hydrothermal hematite and carbon in vein envelopes suggest that alternating redox states, potentially in response to fluid mixing or evolution, may have contributed to gold deposition.
Mineralization at the Gibson zone is mainly hosted within C-veins that crosscut the metasediment unit (Gibson metasediments) and into the Gibson Syenite with the highest concentrations within the C-veins in the metasediments and proximal to the intrusion itself. Gold mineralization in the veins within the Gibson metasediments is typically associated with quartz+sericite+sulphide alteration, along with visually significant but unquantified molybdenite±graphite mineralization in stylolites within the veins and along fractures in the host rock.
The concentration of gold in the C-veins within the Gibson Syenite tends to be lower than in the metasediments with a few exceptions such as the historic bulk sample at the Gibson ramp, and the deeper breccia zone to the southeast of the intrusion. The deeper breccia zone is associated with alternating intense biotite+chlorite+albite alteration and amphibole+seritcite+potassium feldspar+dolomite alteration. Drilling has suggested that high grade zones exist below 500 m from surface, although further work is needed to confirm the depth extent of these zones. Minor chalcopyrite-covellite-bornite mineralization is also disseminated throughout the intrusion.
In addition to the sheeted C-veins, gold is also concentrated along the N-S Contact Fault (Contact Zone) and the Whiskey Jack shear. At the Contact Zone, the rheological contrast between the metasediments and the mafic metavolcanics provides a pathway for the gold-bearing fluids. The gold in this area is associated with an increase in quartz+sericite+pyrite alteration in the wall rock, with much of the gold depositing in the metasediment side of the fault.
At Whiskey Jack, the gold mineralization is associated with ferromagnesian dolomite+sericite rich shear veining which occurs extensionally between the A-1 and A-3 shears with a strike/dip of ~125°/65°, parallel to the A-3 fault in that location (Figure 6-5). Veining consists of multiple sets/pulses of cataclasite textured material over widths of up to approximately 7 m. This veining and associated shearing appear more brittle-ductile suggesting a deeper depth of formation than the C-veins. Compared to the nuggety C-veins, the mineralization in the Whiskey Jack shear veins tends to be more continuous with higher average grades, but lower overall contained ounces when compared to other zones at Grey Fox.
| Project: 169525666 | 6-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit

Source: (McEwen, 2024)
Figure 6-3: Grey Fox Area Schematic Geological Plan Map with section lines (A-A’ and B-B’)
| Project: 169525666 | 6-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit

Figure 6-4: Section A-A’ cut perpendicular to the principal C1 vein orientation at Grey Fox

Figure 6-5: Section B-B’ cut perpendicular to Whiskey Jack, A1, A3 faults and the Gibson-Kelore
| Project: 169525666 | 6-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
In July of 2024 a deportment study (Marchand, 2026) by Jacques Marchand Engineering Consulting on the nature of mineralization at the Whiskey Jack and Gibson zones was commissioned by McEwen. This study included state of the art LIBS (Laser Induced Breakdown Spectroscopy) scanning on select drill core from those two zones. Scanning was performed by an Elemission ECORE LIBS scanning machine in Montreal, QC, Canada. Refer to Figure 6-6 for a diagram on LIBS technology.

Source: (Marchand, 2026)
Figure 6-6: Basic principles for LIBS scanning
Some of the key observations from this deportment study include:
· | Gold primarily exists mostly as finely plated particles in pyrite cleavage surfaces or intergranular. |
· | The gold grains identified are predominantly less than 30µm in size and even as fine as 5 µm. |
· | The presence of magnetite is likely to lower the gold grade in the mineralized host rocks regardless of lithology. |
· | Sulphide content is typically low, less than 1%, and the gangue is composed of a significant amount of carbonate. |
· | A portion of the Grey Fox deposit may be a hybrid type of gold deposit between porphyry copper system and an orogenic gold system. |
6.3 | Stroud Property |
Mineralization on the Stroud property is interpreted to result from a series of continuous structural and hydrothermal events. Following the accumulation of the volcano-sedimentary pile, folding and subsidence,
| Project: 169525666 | 6-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
accompanied by the regional and local development of stress couples, set up a tensional regime whereby dilatant zones were developed, generally preparing the ground for the subsequent series of hydrothermal events, culminating in gold deposition. The development of the regional and local fabric elements, accompanying the folding and fracturing/shearing formed the channel-ways for the auriferous siliceous fluids, resulting in the present gold-bearing siliceous mineralized structures (Wetmore, 2004).
The structure (or deposit) at Stroud is subdivided into three zones, from NW to SE: the Creek Zone, the Creek Zone Extension and the Main (Gunnex) Zone. The Creek Zone Extension is located in the vicinity of late, unmineralized diabase dykes. Within the mineralized structure, shear intensities and rock types vary, and over a general thickness of approximately 20 m to 45 m in width, the gold mineralization associated with “gray veins” (injection of grey quartz-carbonate veins) and siliceous systems is interpreted to occur in shoots in the form of anastomosing networks in plan and section (Wetmore, 2004).
The 2025 drill program at Stroud confirmed the presence of previously reported mineralization and was also consistent with overall structural models for the deposit. Refer to Figure 6-7 for an updated geological plan view map of the Stroud deposit and Figure 6-8 for a longitudinal section of the updated resource block model.
| Project: 169525666 | 6-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit

Figure 6-7: Plan View Geology Map of the Stroud Deposit
| Project: 169525666 | 6-9 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit

Figure 6-8: Longitudinal Section (looking NE) of the Updated Stroud Resource Block Model
6.3.1 | Stock Property |
The prospective PDDZ corridor tracks across approximately 7 km through the Stock property. To date, most of the exploration has been focused on assessing a 3 km segment of this and includes the area of the former Stock Mine, as well as at Stock East and Stock West (Figure 6-9). The (historical) Stock Mine deposits (N and M Zones; West and Central zones), have a moderate west plunge defined by the lenticular to lobe-like shapes of hosting mafic volcanic rocks and surrounding carbonate alteration envelope. These are surrounded by lenses of highly strained, talc-chlorite ultramafic rocks (Siragusa, 1994). Limited historical documentation suggests that much of the mined material is comprised of swarms/zones of white quartz veining (both shear and extensional) hosted within sericite-carbonate altered mafic volcanic bands and along mafic-ultramafic contacts. The quartz shear veins were often accompanied by disseminated pyritic mineralization in shear zones. Pyrite altered, albitized dykes formed additional areas of mineralization sometimes associated with the shear veins (Siragusa, 1994).
| Project: 169525666 | 6-10 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit

Note: Image facing north. All drill results are presented as TWs.
Figure 6-9: Project-wide Longitudinal Section of Stock
Stock East is directly associated with the Nighthawk Lake Fault Zone (NHLFZ) which splays off the PDDZ in proximity to that deposit. Gold mineralization in the Stock East area appears to be related to enhanced gold-pyrite accumulation (often exceeding 10%) and is often located within well-developed quartz breccias. In addition, the deposit is in the hangingwall (HW) of the NHLFZ whereas the Stock West deposit is located between the PDDZ and NHLFZ. See Figure 6-10 for a typical cross-section through the Stock East deposit.
| Project: 169525666 | 6-11 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit

Figure 6-10: Exploration Drilling at Stock East, Schematic Cross-Section Looking to Northeast
The Stock West deposit was discovered in mid-2019 and is associated with the PDDZ, approximately 1.1 km west of the historical Stock Mine shaft, in an area where the NHLFZ has bifurcated/splayed away from the main PDDZ. The section of the Stock West deposit (which steeply dips to the south) is characterized by the following:
· | Chlorite (talc ± serpentine schists) with variable green carbonate ultramafics Ankerite alteration |
· | Minor mafic volcanic rocks |
o | In the footwall (FW) to the north, these rocks may be silica-sericite altered, pyritized, and quartz veined bound by Porcupine sedimentary rocks. |
o | In the HW to the south, these rocks may be a variably altered feldspar porphyry or relatively undeformed mafic volcanic rocks, likely of the Tisdale Assemblage. |
| Project: 169525666 | 6-12 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
In the Stock West drilling program, principal intercepts obtained in 2019 occur over an approximately 300 m by 200 m area within which multiple >5 g/t Au intercepts have been obtained over intervals up to several tens of metres in green carbonate ultramafics. Adjacent holes to the higher-grade areas show that this body thins laterally and is probably lenticular in form (Figure 6-11).

Source: (McEwen, 2024)
Figure 6-11:Exploration Drilling at Stock West, Schematic Cross-Section Looking to Northeast
The overall texture is consistent with a possible origin as a potentially pyroxene‑olivine porphyritic ultramafic intrusion that is now completely altered, which may have been coeval with the finer-grained, probable komatiite flow sequence that is host to the intrusion. Local abrupt variations in its grain size from medium to coarse grained suggest potential for relict textures of pegmatitic phases (Rhys and Ross, 2020).
| Project: 169525666 | 6-13 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
6.3.2 | Western Properties |
Many deposits spread over the Porcupine Mining Camp have contributed to approximately 70 Moz of gold production since 1910. Common characteristics of this significant gold deposition are listed below:
| ● | Dominant source of gold is within quartz vein lodes containing locally coarse free gold. |
| ● | Greater than 50% of the major Hollinger deposit’s gold is associated with pyrite formation. |
| ● | Quartz vein lode deposits are structurally controlled areas of dilatancy which permitted the development of vein zones. |
| ● | The majority of gold production in the camp is hosted by rocks of the Tisdale Assemblage. |
Minor production came from 1) pyrite-bearing pyroclastics within the mafic volcanic rocks of the Tisdale Group, 2) vein sets intruding local felsic porphyry bodies (Pearl Lake and Miller porphyries), 3) quartz veins within the sediments of the Porcupine and Timiskaming Assemblage (Dome Mine) where they unconformably overlie productive portions of the Tisdale Assemblage.
The main minerals of these gold-bearing zones are quartz, carbonates, alkali feldspar (most commonly albite), sericite, pyrite, tourmaline, arsenopyrite, scheelite, and molybdenite. Pyrrhotite is common in the deep parts of deposits, as well as in deposits hosted in banded iron formation. Arsenopyrite seems to be common in deposits hosted in sedimentary rocks.
The concentration of gold may be considered a product of the alteration process, as well as the concentrations of barite, tungsten, antimony, tellurium, molybdenum, and arsenic. Although gold in quartz veins is the most distinctive occurrence, the gold in some deposits is found predominantly within the wall rock.
6.4 | Structural Geology |
Major crustal-scale faults, such as the PDDZ and Cadillac-Larder Lake Deformation Zone (CLDZ) commonly occur at assemblage boundaries and are spatially associated with east-west trending belts of Porcupine and Timiskaming assemblage metasedimentary rocks. These major faults record multiple generations of deformation, including normal, strike-slip, and reverse movements. The PDDZ and CLDZ define a corridor of gold deposits, generally known as the Timmins-Val D’Or camp (Robert et al., 2005), which accounts for the bulk of historical and current gold production from the Superior Province.
The PDDZ extends across the Highway 101 area, continuing westward to the Kapuskasing Structural Zone (Ayer et al., 1999a) and eastward through Québec to the Grenville Front area (Mueller et al., 1996) for a total distance of more than 600 km. The PDDZ strikes southeast in Hislop Township and generally becomes more east striking along the rest of Highway 101 (Siragusa, 1994). The deformation zone is complex, with different structural styles restricted to specific segments. Each segment is bound, to a first order approximation, by prominent north-northwest-striking faults that transect the PDDZ (Figure 6-12).
Several important secondary structures occur in the vicinity of the Black Fox Mine. The Gibson-Kelore Deformation Zone (GKDZ) is one of the most recognizable structural features on the Black Fox and Grey Fox properties and is defined by a strongly fractured-broken band of talcose-chloritic schist. Regional airborne geophysical surveys indicate that this splay departs the regional track of the PDDZ and trends
| Project: 169525666 | 6-14 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
south-eastwards for approximately 4 km to 5 km, passing off the southern property limits. Studies suggest the steeply southwest dipping GKDZ brittle-ductile structure contains schist, fault gouge and extensive fracturing. West of the Fault, the stratigraphy is an east-striking, south-facing homoclinal sequence. Structural fabrics are commonly nonpenetrative fracture cleavages.
The GKDZ is one of the five regionally bounding cross-faults that separate different segments along the PDDZ from Timmins to Québec. The structural style and setting of gold mineralization in each segment is different and knowledge of these differences can be used to tailor exploration programs specific to each segment (Berger, 2001).
Jensen (1985) identified the Ross Fault as the northwest-striking lineament immediately east of the Ross Mine. Berger (2002) has modified the extent and strike of the fault based on detailed airborne geophysical data. The fault is located near or on the inferred axis of an anticline that closes in the vicinity of the Ross mine.
The Arrow Fault is a local name applied to a shear zone striking 085° located near the southern limit of the Grey Fox cluster of exploration targets. The fault is defined by a prominent linear disruption in airborne magnetic patterns and corresponds to sheared rock on the ground (Berger, 2002).
| Project: 169525666 | 6-15 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit

Source: (modified after Thurston et al., 2008)
Figure 6-12:Stratigraphic Column for the General Black Fox – Hislop Area
West of the Hislop Fault, the PDDZ strikes southeast to east and dips 45° to 65° to the south. The PDDZ marks the contact between the Porcupine and Tisdale Assemblages and is characterized by mafic and ultramafic schist in zones that range from 250 m to 800 m wide, as well as numerous foliation-parallel and crosscutting brittle faults. The main trace of the PDDZ is accurate between the Hislop and Garrison faults (Berger, 2002).
Clastic and chemical metasedimentary rocks of the Timiskaming Assemblage occur within the deformation zone that varies between 100 m and 1,500 m wide. Talc-chlorite schist occurs along the north margin of the
| Project: 169525666 | 6-16 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
deformation zone in the Tisdale Assemblage and is indicative of ductile strain. The southern limit of the deformation zone is marked by brittle-ductile faulting accompanied by diabase dyke intrusions and abrupt contacts between the Lower Blake River and Timiskaming Assemblages. The deformation zone is near vertical and kinematics are poorly constrained. North-northeast and north-northwest brittle and brittle-ductile faults transect and offset the PDDZ.
One splay structure is also important to the Stock Mine property setting. The southwest-trending NHLFZ bifurcates/splays away from the main PDDZ in the vicinity of the Stock East deposit and has been traced by regional geophysical survey responses for approximately 15 km into the historically mined and explored Nighthawk peninsula area.
6.5 | Property Geology |
The Eastern Property straddles a 5 km segment of the regional PDDZ, between the GKDZ to the southwest and the Porcupine sediments to the northeast (Figure 6-13). The Black Fox and Froome mines are underlain by a complex series of faulted-thrusted slabs and wedges structurally emplaced into the 500 to 1,000 m belt that separates the PDDZ from the semi-parallel GKDZ splay structure. These intercalated, nonconformable units are generally composed of Lower Tisdale Assemblage, localized felsic intrusive rocks, and localized wedges of Porcupine and Temiskaming clastic sedimentary rocks. Grey Fox appears to lie stratigraphically above Black Fox and Froome and is possibly part of the Blake River assemblage.
| Project: 169525666 | 6-17 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit

Figure 6-13: Interpreted Geology for the Fox Eastern Property
| Project: 169525666 | 6-18 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
6.5.1 | Grey Fox |
The Grey Fox deposit is underlain by an overturned, steeply east dipping assemblage of metasedimentary and massive, pillowed, and variolitic mafic metavolcanics with minor interflow sedimentary rocks. In the western part of the area, a syenitic to dioritic feldspar porphyry (locally referred to as the Gibson Syenite) intrudes the metasedimentary unit.
The deposit area is bound to the West by the steeply southwest dipping GKDZ (which juxtaposes a chlorite – talc schist, typical of the GKDZ at the Black Fox Complex) and a locally brecciated feldspar porphyry. This fault contact is locally crosscut by diabase dykes, likely of the Matachewan dyke swarm. To the east, the Grey Fox deposit is bound by a moderately- to steeply-dipping to the west/southwest fault. The HW rocks are comprised of mafic metavolcanic rocks, metasediments and the syenite package of the Grey Fox area, while the FW rocks are made up of moderately to steeply southwest dipping ultramafic and mafic metavolcanic rocks correlated with those hosting the Black Fox deposit. A penetrative foliation is developed with the bounding faults, and locally in narrow intra-package shear zones associated with mineralization and along contacts. No tectonic fabric corresponding to the regional fabric has been identified within the metasedimentary-metavolcanic-feldspar porphyry package hosting the deposit.
The metasedimentary package, previously assigned to the Timiskaming Assemblage by Berger (2002), is up to 350 m true width and consists of graded sandstone to mudstone layers, with bedding tops to the west. However, geochronological sampling by McEwen in 2021 of the Gibson syenite, which is observed to crosscut the sediments, returned a date of ~2,688.3 ± 0.9 Ma, suggesting the sediments (and possibly the adjacent volcanics) are part of the older lower Blake River formation.
At the Contact Zone, the metasedimentary-mafic metavolcanic contact is steeply dipping to the east from surface to a depth of approximately 300 m, below which the contact rolls to a steep dip to the west. West of the 147 Zone, the metasedimentary-metavolcanic contact steeply dips to the east from surface to the extent of drilling at 500 m below surface.
The mafic metavolcanic package, originally assigned to the Tisdale Assemblage by Berger (2002) but is now thought be part of the Lower Blake River Assemblage, is situated between the east dipping metasedimentary package to the west and west dipping ultramafic metavolcanic package to the east. The metavolcanic package ranges from 300 m true width in the north to at least 800 m at the southern boundary of the property. The mafic metavolcanic package consists of interleaved massive to pillowed mafic flows and massive to pillowed variolitic mafic interflows, with true widths ranging from 10 m to 130 m true width. The mafic metavolcanic flows dip steeply to the east and are truncated by the A-1 fault at the contact with the ultramafic metavolcanic rocks to the northeast. In the central part of the deposit, an outcrop of pillowed variolitic metavolcanic rock suggest flow tops are to the west.
| Project: 169525666 | 6-19 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
6.5.2 | Stroud Property |
The following description of the Stroud property is taken directly from the Hislop Township Gold Project, Matheson Area, Ontario, Technical Qualifying Report (Wetmore, 2004):
“Except where disturbed by faulting and minor folding, the predominantly metavolcanic rocks within the mineralized zone trend northwest and dip some 70 degrees to the southwest. The overlying argillites, arkose and arkosic conglomerates appear to conformably overlie the pillowed and massive metavolcanics. The ultramafic rocks appear to be semi-conformable within the Creek Zone and, in part, somewhat discordant in the Main Zone. The feldspar porphyry, likewise, shows both conformable and cross-cutting relationships to the metavolcanics. The steeply dipping, north to north-west trending diabase dykes cross-cut all rock units.
The hydrothermal alteration accompanying mineralization is typified by increasing carbonatization, sericitization, silicification and (plus or minus) hematite approaching the mineralization. Where hematized, the rocks have a pink cast. Altered metavolcanics, metasediments, and feldspar porphyry sections are subsequently bleached, appearing waxy yellow to buff-coloured, due to serecitization and carbonatization. Ultramafic rocks are generally dark waxy green where serpentinized or buff-coloured where carbonatized.
The indicated faults are generally cross-cutting to sub-parallel and exhibit ductile to brittle deformational characteristics. The most prominent of these is the steeply dipping Hislop Fault, and where encountered in drill core, is characterized by intense hydrothermal alteration, (hematization, sericitization), schistosity and /or fault gouge. The effect that it has on mineralization has not been determined.”
In 2025, McEwen drilled approximately 6,300 m at Stroud which was mainly designed to verify a historical resource. The geology and structures seen in the drill core were consistent with observations made from previous drilling campaigns performed on the property.
6.5.3 | Stock Property |
The Stock property occurs along the PDDZ corridor, which separates moderately- to steeply -south‑dipping Porcupine Assemblage turbiditic metasedimentary rocks to the north from ultramafic and mafic metavolcanic rocks of the Tisdale Assemblage to the south (Figure 6-14). Both the Porcupine and Tisdale Assemblages young to the south, based on graded bedding, pillow facing, and stratigraphic distribution patterns both on the property and in drilling on adjacent properties, although folding in the Porcupine Assemblage results in local inversions. The juxtaposition of South-younging (2,680 Ma to 2,690 Ma) Porcupine Assemblage to the north of the fault towards older structurally overlying and south younging (>2,700 Ma) Tisdale Assemblage rocks to the south indicates substantial reverse displacement along the contact area that forms the main strand of the PDDZ to emplace the older volcanic rocks onto the younger sedimentary units.
| Project: 169525666 | 6-20 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit

Source: (McEwen, 2026)
Figure 6-14: Interpreted Geology of the Stock Property and the Significant Gold Mineralized Zones
6.5.4Western Properties
Generally, thick accumulations of glacial overburden cover more than 90% of the Timmins area. Only a limited number of bedrock exposures occur in the four Western Properties (Figure 6-15).
The northern sector of the Porcupine Mining Camp is dominated by an irregular accumulation of Tisdale Assemblage volcanic flows, intercalated with several belts and irregular wedges of Porcupine sediments. This stratigraphic sequence is apparently focused along an irregular lineament (known locally as the New Mines Trend) diverging westwards off a southwest-trending flexure of the PDDZ at the Pamour Mine splay-point.
Figure 6-16 is a stratigraphic column for the Timmins area which includes the Western Properties.
| Project: 169525666 | 6-21 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit

Source: (McEwen, 2026)
Figure 6-15: Geological Plan View Map of the Timmins Area, which includes the Western Properties
| Project: 169525666 | 6-22 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit

Source: (modified after Dinel et al., 2008)
Figure 6-16: Stratigraphic column for the Timmins area including McEwen’s Western Properties
| Project: 169525666 | 6-23 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
The southern sector of the central Porcupine Mining Camp is focused on a belt-sequence of mineralized bodies which extend from the Dome Mine (to east), through Buffalo Ankerite (a McEwen property) and the Paymaster and Fuller claims (non-McEwen properties), to the western Delnite Mine property. They occur within the South Tisdale Anticline sector and are underlain by a sequence of ultramafic and mafic flows of the Hershey Lake Formation, and locally subdivided mafic flows (C-series) of the Central Formation. The discordant contact/delineation between these two formations is locally referred to as the Paymaster Shear (Pope, 2000).
6.6Deposit Types
Numerous studies and exploration results over the past 50 years have focused on gold deposition styles and mineralization controls within the Abitibi Greenstone Belt. Most deposits are unique, with minor differences in geochemical characteristics and/or formational environments (Figure 6-17). Many of these gold deposit types can be grouped into “clans,” or families, of deposits that formed either through related processes or represent distinct products of large-scale hydrothermal systems (Robert et al., 1997; Poulsen et al., 2000).
The Eastern Properties, Stock Property, and Western Properties are all located proximal to an approximately 200 km central segment of the PDDZ, which has generated approximately 100 Moz of gold since 1910. More than 100 gold deposits are distributed along this major crustal-scale fault zone, which exhibits compressional to trans-extensional characteristics. Studies suggest a long-lived, multi-staged orogenic system, with repeated cycles of opening and closing resulting in the emplacement of auriferous quartz-carbonate veins, a major component of the Greenstone deposit clan (Dubé and Gosselin, 2007).

Source: (McEwen, 2026)
Note: Estimated gold production as of December 2025
Figure 6-17: Abitibi Greenstone Belt: Relationship of Gold Deposition to Major Structural Conduits
| Project: 169525666 | 6-24 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
At the Black Fox and Froome mines and the Stock and Western Properties, gold-bearing veins are predominantly associated with:
· | Structurally controlled dilatant zones (shearing, brecciation, offsets) |
· | Greenschist facies metavolcanic host rocks |
· | Crustal-scale faults (i.e., the PDDZ) |
· | Syn-tectonic intrusive bodies |
These characteristics are consistently seen at the Western Properties, Stock Property, and Froome sites and are classified as orogenic gold occurrences related to longitudinal shear zones. These greenstone-hosted quartz-carbonate vein deposits represent a sub-type of lode gold deposits (Poulsen et al., 2000) and correspond to structurally controlled, complex epigenetic deposits hosted in deformed, metamorphosed terranes (Dubé and Gosselin, 2007) (Figure 6-18).
Gold mineralization at the Grey Fox deposit, located approximately 3 km southeast of the Black Fox Mine, exhibits the following characteristics:
· | Spatial association with syenite, melanosyenite, and quartz-feldspar porphyritic intrusive rocks. |
· | Strong association with molybdenum, tungsten, and arsenic geochemistry (Kelly, 2018). |
· | Occurrence within narrow quartz-carbonate veins exhibiting crustiform and colloform textures. |
· | Spatial association with sericite-albite-carbonate alteration. |
| Project: 169525666 | 6-25 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit

Source: (modified after Poulsen et al., 2000; Robert, 2004)
Figure 6-18: Schematic Cross-Section of Main Gold Systems Showing Depth of Emplacement
The current interpretation of the Fox Complex Exploration team is that the Grey Fox deposit could be a combination of epizonal and orogenic gold deposits.
6.6.1Greenstone-Hosted Quartz Carbonate-Vein Deposits
Greenstone-hosted quartz-carbonate vein deposits typically occur in deformed greenstone terranes of all ages (Dubé and Gosselin, 2007), especially those containing commonly variolitic tholeiitic basalts and ultramafic komatiitic flows intruded by intermediate to felsic porphyry intrusions, sometimes with swarms of albitite or lamprophyre dykes (for example, Timmins and Red Lake districts). Deposits are associated with collisional or accretionary orogenic events and are typically distributed along reverse-oblique, crustal-scale major fault zones, commonly marking convergent margins between major lithological boundaries such as volcano-plutonic and sedimentary domains (for example, the PDDZ and the CLDZ). These major structures are characterized by varying increments of strain, resulting in multiple generations of steeply dipping foliations and folds within a complex collisional geological setting.
Crustal-scale faults are thought to represent the main hydrothermal pathways toward higher crustal levels. However, deposits are spatially and genetically associated with higher-order compressional reverse-oblique
| Project: 169525666 | 6-26 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
to oblique brittle-ductile high-angle shear zones, commonly located less than 5 km away and best developed in the HW of the major fault (Robert, 1990). Brittle faults may also host mineralization, as illustrated by the Kirkland Lake Main Break, a brittle structure hosting the 25 Moz Kirkland Lake gold deposit. The deposits typically formed late in the tectonic-metamorphic history of the greenstone belts (Groves et al., 2000), with mineralization occurring syn- to late-deformation, typically post-peak greenschist facies and syn-peak amphibolite facies metamorphism (Kerrich and Cassidy, 1994; Hagemann and Cassidy, 2000).
The greenstone-hosted quartz-carbonate vein deposits are also commonly spatially associated with Timiskaming-type regional unconformities. Several deposits are hosted by a Timiskaming-like regional unconformity (e.g., the Pamour and Dome deposits in Timmins) or located next to one (e.g., the Campbell-Red Lake deposit in Red Lake) (Dubé et al., 2003), suggesting an empirical time and space relationship between large-scale greenstone quartz-carbonate gold deposits and regional unconformities (Hodgson, 1993; Robert, 2000; Dubé et al., 2003).
Stockworks and hydrothermal breccias may represent the main host to the mineralization when developed in competent units such as granophyric facies of gabbroic sills. Due to the complexity of the geological and structural setting, and the influence of strength anisotropy and competency contrasts, the geometry of the vein network varies from simple (such as the Silidor deposit in Canada) to complex geometries with multiple orientations of anastomosing and/or conjugate sets of veins, breccias, stockworks and associated structures (Dubé et al., 1989; Hodgson, 1989; Robert et al., 1994; Robert and Poulsen, 2001).
Economic-grade mineralization also occurs as disseminated sulphides in altered (carbonatized) rocks along vein selvages. In this document, the term ore is used in its common industry sense (for example, ore shoots, ore mineral, ore pass) and does not imply Mineral Resources or Mineral Reserves.
Ore shoots are commonly controlled by either:
· | Intersections between different veins or host structures, or between an auriferous structure and a reactive and/or competent rock type such as iron-rich gabbro (geometric ore shoot). |
· | The slip vector of the controlling structure(s) (kinematic ore shoot). For laminated fault-fill veins, the kinematic ore shoot is oriented at a high angle to the slip vector (Robert et al., 1994; Robert and Poulsen, 2001). |
At the district scale, greenstone-hosted quartz-carbonate vein deposits are associated with large-scale carbonate alteration, commonly distributed along major fault zones and subsidiary structures (Dubé and Gosselin, 2007). At the deposit scale, the nature, distribution, and intensity of the wall-rock alteration are largely controlled by the composition and competence of the host rocks and their metamorphic grade. Typically, alteration haloes are zoned and characterized, at greenschist facies, by iron carbonatization and sericitization, with sulphidation of immediate vein selvages (mainly pyrite, less commonly arsenopyrite).
The main gangue minerals are quartz and carbonate, with variable amounts of white micas, chlorite, scheelite, and tourmaline. Sulphide minerals typically constitute less than 10% of the mineralization. The main ore minerals are native gold with pyrite, pyrrhotite, and chalcopyrite, without significant vertical zoning (Dubé and Gosselin, 2007).
| Project: 169525666 | 6-27 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
6.6.2Low-Sulphidation Epithermal Gold Deposits
At the district scale or larger, the tectonic setting of epithermal gold deposits is characterized by extension, which localizes and facilitates the emplacement of magma and, at higher levels, hydrothermal fluids (Taylor, 2007). Regionally extensive rift zones can also provide the extensional framework. Pull-apart basins formed between regional strike-slip faults, or at transitions between these faults, provide favourable sites for intrusions and epithermal deposits. Synchronous tectonic and hydrothermal activity is indicated in some deposits by the fact that many of the vein-bearing faults were active during and after vein filling, resulting in tectonic vein breccias and displacement of mineralized and altered rocks.
Low-sulphidation epithermal gold deposits are harder to recognize in ancient terranes because they are often not as intimately associated with igneous rocks, and their commonly occurring alteration mineral assemblages may not be unique or may no longer be preserved, depending on the grade of subsequent metamorphism (Taylor, 2007).
Low-sulphidation epithermal gold deposits are distinguished from high-sulphidation deposits primarily by their sulphide mineralogy (pyrite, sphalerite, galena, chalcopyrite), typically hosted within quartz veins with local carbonate, and by associated near-neutral wall-rock alteration (illite clays) deposited from dilute hydrothermal fluids (Corbett and Leach, 1998).
Nearly any rock type (even metamorphic rocks) may host epithermal gold deposits, although volcanic, volcaniclastic, and sedimentary rocks tend to be more common (Taylor, 2007). Typically, epithermal deposits are younger than their enclosing rocks, except where deposits form in active volcanic settings and hot springs. In these cases, the host rocks and epithermal deposits can be essentially synchronous with spatially associated intrusive or extrusive rocks. Lithological control mainly reflects competent or brittle host rocks that develop throughgoing fractures that act as vein hosts, although permeability is locally important. In interlayered volcanic sequences, epithermal veins may be confined to competent rocks, while intervening less competent sequences preferentially host fault structures (Corbett, 2007).
Low-sulphidation gold deposits that occur further removed from active magmatic vents may be controlled by structural features, with zones of fluid mixing and emplacement of smaller magmatic bodies (e.g., dykes) (Taylor, 2007). Meteoric waters dominate the hydrothermal systems, which are nearly pH neutral in character. Low-sulphidation gold deposit related geothermal systems are more closely linked to passive rather than active magmatic degassing (if at all) and are sustained by the energy provided by cooling subvolcanic intrusions or deeper magma chambers.
The morphology of epithermal vein-style deposits can be quite variable. Deposits may consist of roughly tabular lodes controlled by the geometry of the principal faults they occupy, or comprise interconnected fracture fillings in stockworks, breccias, and lesser fractures, or form by replacement of rock or void space. These deposits may take on the morphology of the lithological unit or porous rock body replaced (e.g., irregular breccia pipes and lenses). Volumes of replacement mineralization may be discordant and irregular, or concordant and tabular, depending on porosity, permeability, and water-rock interaction. In very near-surface deposits, an upward enlargement of altered and mineralized zones may be found centered around hydrothermal conduits. Brecciation of previously emplaced veins can form permeable zones along irregularities in fault planes, resulting in vertically plunging mineralized zones in strike-slip faults and more horizontal mineralized zones in dip-slip faults.
| Project: 169525666 | 6-28 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
Structures act as fluid pathways, and dilational portions of these structures may represent sites of enhanced fluid flow, promoting the development of ore shoots that host most mineralization in many low-sulphidation vein systems (Corbett, 2002). Elsewhere, fault intersections host ore shoots at sites of fluid mixing. Several structural settings produce ore shoots of varying orientations. Steeply dipping strike-slip structures develop vertical ore shoots in flexures and fault jogs, where tension veins and dilatant sheeted veins are common. Normal and listric faults in extensional settings host wider and higher-grade veins as flatter ore shoots within steeply dipping vein systems. In compressional settings, reverse faults host flat-plunging ore shoots.
6.6.3Epizonal-Type Gold Deposits
Epizonal gold deposits represent a sub-class of orogenic gold systems formed at shallow crustal levels, typically at depths of less than 6 km and under relatively low temperature conditions of approximately 200°C to 350°C (Gebre-Mariam et al., 1995; Groves et al., 1998). These conditions give rise to a suite of geological and structural characteristics that distinguish epizonal deposits from their mesozonal and hypozonal counterparts. Epizonal deposits are further distinguished from epithermal deposits by the depth of formation, and by the former being derived from orogenic fluids utilizing deep-seated structures as fluid + pathways, whereas the latter are largely formed by circulating meteoric fluids due to heating from a proximal igneous source (Figure 6-19).

Source: (Groves et al. 1998)
Figure 6-19: Schematic Comparison of Epithermal and Orogenic Environments
| Project: 169525666 | 6-29 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
6 Geological Setting, Mineralization, and Deposit
Epizonal deposits form under low-pressure conditions characteristic of upper crustal environments and are associated with brittle deformation regimes. Mineralization is typically hosted within fault zones, brittle shear zones, vein arrays, and fracture networks. Ore-bearing vein systems are dominated by quartz–carbonate– sulfide assemblages, occurring as stockworks and sheeted vein sets. Diagnostic vein textures include crustiform banding, comb quartz, open-space filling, and breccias, which collectively reflect the brittle deformation conditions and episodic, high-flux fluid flow events characteristic of the epizonal environment (Groves et al., 1998; Goldfarb and Groves, 2015).
Past and ongoing studies at Grey Fox including fluid inclusion studies, mapping, core logging, and modeling suggest that the Gibson, 147, Contact and Grey Fox South zones may have formed in an epizonal gold setting. The absence of alteration consistent with circulating meteoric fluids suggest an epizonal orogenic environment as opposed to a near-surface epithermal one. Fluid inclusion work at Grey Fox commissioned by McEwen (Tuba, 2019, internal report) suggests a formational depth for the gold veining at Grey Fox at ~1.5 to 2.0 kbar which equates to ~5-7 km depth, deeper than typical epithermal deposits and placing it within the lower epizonal to upper mesozonal regimes (Groves et al., 1998), possibly transitioning from one to the other as vein textures appear to show characteristics of both epizonal (Gibson, 147, Grey Fox South) and mesozonal (Whiskey Jack) environments.
| Project: 169525666 | 6-30 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
7Exploration and Drilling Programs
This section summarizes the exploration and drilling programs completed within the greater Fox Complex and the Grey Fox Project area and describes the methods used to collect, document, and validate geological information. Exploration activities have included geological mapping, geophysical surveys, surface sampling, and diamond drilling, which collectively support the geological interpretation, Mineral Resource estimation, and ongoing evaluation of the Project. The section also describes drilling procedures, core handling and logging practices, and other exploration activities relevant to the understanding of the mineralization.
7.1General Exploration
7.1.1Eastern Properties
Following acquisition of the Eastern Properties in 2017, McEwen conducted a range of exploration activities beginning in 2018, including geophysical surveys, drilling, and trenching. Several exploration programs were carried out concurrently across the claim group, allowing evaluation of several targets through property-scale surveys and drilling campaigns.
Figure 7-1 presents a plan view geology map of the Eastern Properties (excluding Black Fox North) and illustrates the locations of the principal zones that make up the Grey Fox deposit (Whiskey Jack, Gibson, Contact, 147NE, 147, and Grey Fox South).
| Project: 169525666 | 7-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs

Figure 7-1: Plan View Geology Map for the Eastern Property
| Project: 169525666 | 7-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
7.1.1.1 Grids and Surveys
The most recent traditional grid work was completed between 2002 and 2003 to facilitate an EM TITAN-24 geophysical survey over the Grey Fox and Froome areas. In September 2019, a UAV photographic survey was completed over the Grey Fox target area to support geological mapping and target evaluation. Several low-altitude UAV surveys were also conducted over exposed bedrock areas within the 147 Zone.
7.1.1.2 Geological Mapping
The Eastern property is generally overlain by 5 m to 40 m of clay and till overburden, which significantly limits bedrock exposure. Known bedrock exposures are limited to localized areas south of the Black Fox mining operations and at a road cut along Highway 101 west of the property boundary, where mafic volcanic rocks and a Matachewan diabase dyke are exposed. No natural bedrock exposures have been identified within the Grey Fox or Froome areas.
7.1.1.3 Geochemical Sampling
The presence of extensive glacial tills and dense clay overburden, locally up to 40 m thick, limits the effectiveness of conventional soil geochemistry surveys across the Eastern Properties. As a result, such surveys have not been widely utilized.
7.1.1.4 Geophysics
Several vintages of regional airborne geophysical surveys have been conducted across the Eastern Properties, including the Grey Fox, Froome, and Black Fox areas. These surveys have supported regional geological interpretation, including identification of structural features and lithological boundaries.
In 2010, a DCIP TITAN-24 geophysical survey was completed over the majority of the Eastern Properties, with anomalies identified from this program contributing directly to the discovery of the Froome deposit. In 2025, an additional TITAN-24 DCIP and MT survey was completed over the southern portion of the Eastern Properties, specifically Grey Fox (Figure 7-2). Several anomalies were identified, including a broad resistivity high in the Gibson area, which is interpreted to correspond to known mineralization.
Airborne magnetic surveys, including a property-wide survey completed in 2010 and higher-resolution drone-based surveys completed in 2025 over the Grey Fox/Stroud and Froome areas, have helped define the lithological and structural boundaries across the property.
| Project: 169525666 | 7-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs

Figure 7-2: 2025 High-Res Drone Magnetic Survey over Grey Fox
Completed geophysical surveys are summarized in Table 7-1.
Table 7-1: Eastern Properties Geophysical Surveys
Date / | | Service | | | | | | |
Location | | Provider | | Survey Type | | Survey Basis | | Note |
1991 | | Noranda | | Total Field Magnetic & | | - | | Froome Lake Claim |
| | | | VLF Electromagnetic | | | | |
| | | | survey | | | | |
1993 | | Exscis | | Total Field Magnetic VLF | | Survey grid totalling 15.4 line- | | - |
| | Exploration | | Electromagnetic survey | | km | | |
| | Ltd. | | | | | | |
2003 | | Quantec | | Electromagnetic TITAN | | Deep penetrating | | - |
Black Fox | | | | 24 geophysical survey | | | | |
Complex | | | | | | | | |
2010 | | Scott Hogg & | | Airborne magnetics | | - | | - |
Black Fox | | Associates | | | | | | |
| | Ltd. | | | | | | |
2010 | | Quantec | | TITAN 24 survey | | DCIP & MT | | Coverage of the |
| | | | | | | | majority of the Eastern |
| | | | | | | | properties. |
| Project: 169525666 | 7-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
Date / | | Service | | | | | | |
Location | | Provider | | Survey Type | | Survey Basis | | Note |
2016 | | Exsics | | Down-hole mise-à-la- | | Two holes within Froome | | Sedimentary rock dips |
Froome | | Exploration | | masse electromagnetic | | mineralization | | to the south-southwest |
| | Ltd. | | survey | | | | and strike length of |
| | | | | | | | 125 m-175 m |
2018 | | Geotech Ltd. | | Helicopter-borne | | Two survey grids totalling | | Several conductors |
Black Fox | | | | electromagnetic survey, | | 1,164 line-km split between | | delineated; no follow |
& Stock | | | | high-resolution VTEM | | Black Fox Complex and Stock | | up drilling has |
Mill | | | | | | Mill | | occurred |
2019 | | CGG Canada | | Airborne gravity | | 100 m spaced grid lines flown | | Four target areas |
| | Services Ltd. | | gradiometry employing | | at a height of 35 m. | | outlined for exploration |
| | TERRA | | the HeliFALCON platform | | Filtering was completed to | | follow-up, two of which |
| | Resources | | | | reduce terrain effects, line | | have been previously |
| | | | | | corrections and potential | | drilled and explained. |
| | | | | | impact from underground | | |
| | | | | | voids | | |
2019 | | Quantec | | Orion 3D plus | | 3D depth connection between | | Favourable resistivity |
Grey Fox | | Geoscience | | electromagnetic survey | | responses collected at surface | | likely indicating silica- |
| | | | | | and in situ bedrock. | | albite enrichment at |
| | | | | | Electromagnetic injections | | 500 m level occurring |
| | | | | | within a 1.5 km x 1.8 km | | below current drill |
| | | | | | quadrant – 176 from surface, | | limits. Follow-up with |
| | | | | | 256 subsurface from 7 holes. | | 750 m holes in 2021 |
| | | | | | | | and 2022. |
2025 | | Quantec | | TITAN24 DCIP & MT | | To support mineral exploration | | |
| | Geoscience | | Geophysics Survey | | by using subsurface resistivity | | |
| | | | | | and chargeability data to | | |
| | | | | | identify key geological | | |
| | | | | | features, delineate potential | | |
| | | | | | mineralized zones, and map | | |
| | | | | | lithological variations. | | |
| | | | | | Specifically, the survey aims to | | |
| | | | | | detect structures such as | | |
| | | | | | faults, fractures, and | | |
| | | | | | mineralized areas, distinguish | | |
| | | | | | mineralized from non- | | |
| | | | | | mineralized rock based on | | |
| | | | | | electrical contrasts, and | | |
| | | | | | differentiate rock types to | | |
| | | | | | improve geological mapping | | |
| | | | | | and targeting. | | |
2025 | | Terrascope | | Drone Magnetic Survey | | Drone magnetic survey over | | |
| | Inc. | | | | Grey Fox including Stroud | | |
| Project: 169525666 | 7-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
7.1.1.5 Pits and Trenches
In September 2019, McEwen exposed a part of the 147NE structure near-surface. High-pressure washing followed by detailed geological mapping confirmed the presence of northwest-dipping veinlets and breccias hosted within massive mafic volcanic rocks. This work provided additional insight into the continuity and relationship between hydrothermal breccias and veinlets within the 147 area that define mineralized structures.
Channel samples were then cut-collected across the exposed mineralized structure. Sample channels were cut with walls 8 cm to 10 cm apart and to depths of approximately 10 cm to 13 cm. Gold assays returned low-grade values.
7.1.1.6 Additional Surveys
In September 2019, Zen GeoMap conducted several low-altitude (<30 m above ground level) UAV survey passes on a grid pattern over the 147-target area, which had recently been exposed by mechanical stripping. This work generated high-resolution imagery of the brecciated vein system and confirmed the intensity, orientation, and structural limits of the breccia-hosted vein model within the Grey Fox area.
7.1.1.7 Exploration Potential
Considerable exploration potential exists for the remainder of the Eastern Properties, including:
· | Untested volcanic stratigraphy within the FW of the Black Fox-Grey Fox trend. |
· | Assessment of the actual track of the PDDZ structure extending approximately 4 km southeast of the Black Fox mining operations. |
· | Northwest of the current Gibson Zone resource at Grey Fox where there is evidence of repeating veins sets associated with contact between the Gibson Syenite and metasediments to the east. |
· | Below 300 m el. at the Whiskey Jack Zone at Grey Fox where the mineralization remains open. |
· | Deeper (>300 m el.) drilling at Grey Fox South where the drilling density is lower when compared to other parts of the deposit. |
An ongoing exploration program at Froome is targeting potential extensions of mineralization at depth and along strike.
Continued drilling at Black Fox North could potentially identify ‘Croesus-style’ veins that may extend along strike from the historic Croesus Mine, located approximately 5 km southeast of the Black Fox North claims.
7.1.2Stock Property
Historically, the lack of sustained exploration funding and limited gold production within the Shillington-Stock area have resulted in exploration efforts being focused primarily on “quick-test” drilling along the east-west track of the PDDZ. Mine infrastructure and hazards commonly limit access into prospective staging points for proposed exploration drilling. A summary of the historical exploration activities at Stock can be found in “Technical Report Summary on the Initial Assessment of the Fox Complex, Ontario, Canada” (McEwen, 2025).
| Project: 169525666 | 7-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
Since McEwen took ownership of the Stock property in 2017, exploration activities have included aerial and geophysical surveys, structural interpretation and analysis, and drilling. Significant drilling programs have been completed at Stock West, Stock Main, and Stock East over the past nine years.
The majority of exploration at the Stock property since the 1990s has been concentrated within three discrete areas, each approximately 600 m x 400 m in size, or “windows,” that straddle the prominent PDDZ corridor as it tracks across the property. Escalating success at Stock East between 2018 and 2024, followed by success at Stock West from 2019 to 2023, has dominated exploration planning, culminating in updated Mineral Resource estimates, as well as initiation of studies such as an IA, an internal economic study and consultations. Future Exploration drilling should focus on the down plunge components of Stock West, Stock Main (down the ‘N2’ chute) and Stock East (Figure 7-3).

Note: Looking north. All drill hole results reported as TWs.
Figure 7-3: Longitudinal Section View of Stock Property
Drilling at Stock Main from 2021 to 2023 has targeted potential additions to mineralization near surface, at depth, and in proximity to the proposed Stock West decline and portal area.
7.1.3Western Properties
A summary of exploration activities for the Western Properties can be found in a technical report prepared by Roscoe Postle & Associates (Altman et al. 2014), supplemented by internal documentation generated between 2012 and 2015. In addition, all active Mineral Resource estimates for the Western Properties are not material to the Grey Fox Mineral Resource estimate contained in this report.
| Project: 169525666 | 7-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
7.2Drilling Programs
A significant amount of drilling has been completed at the Fox Complex over the past century, much of which is historical in nature. Drilling described herein includes holes drilled for geological exploration, metallurgical testwork and geotechnical investigations. A complete drilling history is summarized in Section 5. Drill holes used in the Mineral Resource estimations are summarized below.
7.2.1Eastern Properties
The Eastern Properties comprise Grey Fox, Stroud, Froome, and Black Fox properties.
Approximately 1,713 drill holes totaling 633,384.5 m have been completed in the Grey Fox-Hislop-Stroud area by several operators since 1993. Drill holes used in the Grey Fox and Stroud Mineral Resource estimations are summarized in Table 7-2. Figure 7-4 shows the locations of surface drill hole collars for the Eastern Properties. Drilling at Froome from 2000 to the present consists of 1,111 drill holes (221,282 m). The drill holes used in the Froome Mineral Resource Estimate are summarized in Table 7-3.
A total of 7,731 core drill holes, totaling approximately 1,097,796 m, have been completed on the Black Fox Mine property since 1989. Drill holes in the Black Fox Mineral Resource estimation are summarized in Table 7-4.
Table 7-2: Summary of Grey Fox and Stroud Drilling Used in Mineral Resource Estimation
Company | | Year | | No. Drill Holes | | Metres Drilled | | Target Zone |
| | | | | | | | |
Gunnex Ltd. | | 1974 | | 32 | | 2,573 | | Stroud |
Pancontinental Mining Ltd. | | 1980 | | 13 | | 1,691 | | Stroud |
Pancontinental Mining Ltd. | | 1981 | | 6 | | 1,292 | | Stroud |
Chevron Minerals Ltd. | | 1986 | | 9 | | 1,437 | | Stroud |
Chevron Minerals Ltd. | | 1987 | | 23 | | 3,679 | | Stroud |
Chevron Minerals Ltd. | | 1988 | | 38 | | 10,128 | | Stroud |
Chevron Minerals Ltd. | | 1989 | | 5 | | 1,806 | | Stroud |
Noranda, St Andrew | | 1993 | | 10 | | 3,118 | | Stroud, Grey Fox |
Goldfields Ltd. | | | | | | | | |
Noranda | | 1994 | | 4 | | 762.0 | | Grey Fox |
Battle Mountain/ Hemlo | | 1995 | | 8 | | 2,109.0 | | Grey Fox |
Gold | | | | | | | | |
Battle Mountain/ Cameco | | 1996 | | 16 | | 5,872.0 | | Contact, 147 and South Zone, |
Gold | | | | | | | | Gibson and Hislop North |
Battle Mountain/ Cameco | | 1997 | | 13 | | 5,367.5 | | Contact, 147, South Zone, Gibson |
Gold | | | | | | | | and Hislop North |
Glimmer/Exall | | 2001 | | 4 | | 1,667.0 | | Romios |
St Andrew Goldfields Ltd. | | 2006 | | 6 | | 2,058 | | Stroud |
St Andrew Goldfields Ltd. | | 2007 | | 16 | | 5,337 | | Stroud |
| Project: 169525666 | 7-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
Company | | Year | | No. Drill Holes | | Metres Drilled | | Target Zone |
| | | | | | | | |
Apollo Gold | | 2008 | | 16 | | 3,715.0 | | Southern extension of Contact |
| | | | | | | | Zone |
Apollo Gold | | 2009 | | 53 | | 9,960.0 | | Contact Zone |
Brigus Gold | | 2010 | | 69 | | 26,766.2 | | Contact Zone, Gibson, South |
| | | | | | | | Zone, Hislop North, 147 Zone |
Brigus Gold | | 2011 | | 274 | | 101,893.2 | | Contact Zone, Gibson, South |
| | | | | | | | Zone, 147 Zone |
Brigus Gold | | 2012 | | 268 | | 81,444.4 | | Contact Zone, 147 Zone, South |
| | | | | | | | Zone |
Brigus Gold | | 2013 | | 144 | | 63,816.4 | | Contact Zone, 147 Zone, South |
| | | | | | | | Zone |
Primero | | 2014 | | 187 | | 76,027.2 | | Contact Zone, 147 Zone, South |
| | | | | | | | Zone |
Primero | | 2015 | | 56 | | 25,716.7 | | Contact Zone, Gibson, South Zone |
McEwen | | 2018 | | 46 | | 17,896.5 | | Gibson, 147 Zone, 147NE Zone |
McEwen | | 2019 | | 222 | | 90,341.7 | | Gibson, 147 Zone, 147NE Zone, |
| | | | | | | | South Zone, Whiskey Jack |
McEwen | | 2020 | | 15 | | 5,061.7 | | Whiskey Jack |
McEwen | | 2021 | | 29 | | 11,404.8 | | Contact Zone, Gibson, 147 Zone, |
| | | | | | | | South Zone, Whiskey Jack |
McEwen | | 2022 | | 14 | | 6,561.2 | | Contact Zone, Whiskey Jack |
McEwen | | 2023 | | 21 | | 11,047.8 | | Contact Zone, Gibson, Whiskey |
| | | | | | | | Jack |
McEwen | | 2024 | | 126 | | 41,872.8 | | Contact Zone, Gibson, 147 Zone, |
| | | | | | | | South Zone, Whiskey Jack |
McEwen | | 2025 | | 93 | | 32,900.4 | | Stroud, Grey Fox |
McEwen | | 2026 | | 3 | | 668 | | Stroud |
Total | | | | 1,839 | | 655,990.5 | | |
| Project: 169525666 | 7-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs

Figure 7-4: Distribution of Drilling at the Eastern Properties
| Project: 169525666 | 7-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
Table 7-3: Summary of Froome Drilling Used in Mineral Resource Estimation
Company | | Year(s) | | No. Drill Holes | | Metres Drilled |
Noranda | | 1989-1994 | | 1 | | 197 |
Glimmer/Exall | | 2000-2002 | | 1 | | 200 |
Apollo Gold | | 2003-2007 | | 1 | | 693 |
Primero | | 2014-2017 | | 219 | | 64,997 |
McEwen | | 2018-2025 | | 890 | | 155,392 |
Total | | | | 1,112 | | 221,479 |
Table 7-4: Summary of Black Fox Drilling Used in Mineral Resource Estimation
Company | | Year | | No. Drill Holes | | Metres Drilled |
Noranda | | 1989-1994 | | 119 | | 23,987 |
Glimmer/Exall | | 1998-2002 | | 876 | | 84,828 |
Apollo Gold | | 2003-2009 | | 898 | | 222,904 |
Apollo Gold/Brigus Gold | | 2010-2013 | | 1,456 | | 146,049 |
Primero | | 2014-2017 | | 2,610 | | 374,368 |
McEwen | | 2018-October 2024 | | 1,772 | | 245,660 |
Total | | | | 7,731 | | 1,097,796 |
7.2.2 | Stock Property |
Drilling at the Stock Property has been completed across multiple target zones, including Stock East, Stock West, and Stock Main, to support Mineral Resource delineation. Drill holes used in the Stock Mineral Resource estimations are summarized in Table 7-5, with drill hole collar locations shown in Figure 7-5.
Table 7-5: Summary of Stock Drilling Used in Mineral Resource Estimation
Company | | Year(s) | | No. Drill Holes | | Metres Drilled | | Target Zone |
St Andrew | | 1983-2008 | | 47 | | 13,320 | | Stock East |
Brigus Gold | | 2011 | | 6 | | 2,166 | | Stock West |
Brigus Gold, Primero | | 2014 | | 15 | | 5,663 | | Stock Main |
Primero | | 2015 | | 19 | | 4,699 | | Stock Main |
McEwen | | 2018 | | 90 | | 26,704 | | Stock East, Main |
McEwen | | 2019 | | 106 | | 46,461 | | Stock East, West |
McEwen | | 2020 | | 30 | | 17,727 | | Stock West |
McEwen | | 2021 | | 142 | | 68,298 | | Stock West, Main |
McEwen | | 2022 | | 126 | | 50,288 | | Stock West, Main |
McEwen | | 2023 | | 185 | | 62,928 | | Stock West, Main, East |
| Project: 169525666 | 7-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
Company | | Year(s) | | No. Drill Holes | | Metres Drilled | | Target Zone |
McEwen | | 2024 | | 49 | | 9,627 | | Stock East |
Total | | | | 815 | | 307,881 | | |
All drilling data for Grey Fox, Froome, Black Fox and Stock properties are current to the individual drilling database cut-off dates applied in the Mineral Resource estimates, as summarized below:
· | Grey Fox – 11 July 2025 |
· | Froome – 31 December 2025 |
· | Black Fox – 31 December 2025 |
· | Stock – West and Main Zones – 23 October 2023 |
· | Stock – East Zone – 20 May 2024 |
| Project: 169525666 | 7-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs

Figure 7-5: Distribution of Surface Drilling at the Stock Property
| Project: 169525666 | 7-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
7.2.3Western Properties
The Western Properties include the Davidson-Tisdale and Buffalo Ankerite properties. Multiple phases of exploration and mining activity have occurred on these properties since 1910. Prior to the early 2000s, exploration drilling was sporadic and driven by mineralization boundaries. Historical drilling records are available in paper format and require additional organization to support future work.
Lexam conducted systematic, results-driven exploration programs between 2003 and 2015. Details of drilling procedures during this period are assumed based on review of several available drill logs, maps and cross & longitudinal sections from that era.
A summary of drilling completed on the Davidson-Tisdale property is provided in Table 7-6, with drill hole collar locations shown in Figure 7-6 and Figure 7-7.
Drilling completed at the Buffalo Ankerite deposit does not support a current Mineral Resource estimate and is therefore not considered relevant to this report.
Table 7-6: Summary of the Western Properties Drilling Used in the Mineral Resource Estimate
Company | | Year(s) | | No. Drill Holes | | Metres Drilled |
Davidson-Tisdale Property | | | | | | |
DTM | | 1983-1984 | | 35 | | 4,576.8 |
Getty | | 1984-1987 | | 537 | | 49,165.9 |
Midas Minerals | | 1989 | | 5 | | 1,486.2 |
Northcott | | 1999-2003 | | 17 | | 399.3 |
Lexam | | 2003-2015 | | 97 | | 24,397.5 |
Total | | | | 691 | | 80,025.7 |
| Project: 169525666 | 7-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs

Figure 7-6: Southern Portion of the Western Properties Drill Hole Collar Location Plan
| Project: 169525666 | 7-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs

Figure 7-7: Northern Portion of the Western Properties Drill Hole Collar Location Plan
| Project: 169525666 | 7-9 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
7.3Drilling Methods
Early drilling operations conducted from both surface and underground were completed using primarily diamond drilling methods. Historical drill data have not been used to define Mineral Resources unless the data could be verified through documented QA/QC procedures, supported by confirmation from nearby drill holes or re-logged using McEwen’s logging, sampling and QA/QC procedures.
7.3.1Eastern Properties
Surface diamond drilling operations at the Eastern Properties have been conducted by several local drilling contractors since the 1970s. Standard drilling procedures and protocols have remained consistent as rigs shift from target to target within the property area. No underground exploration drilling has been completed at Grey Fox since the late 1980s, when Gold Post Resources conducted an underground drill program at the historical Gibson mine.
Fully hydraulic diamond drill rigs have been commonly utilized by the various drilling contractors since 2010. Advancements such as mechanized rod breaking, remote-control manipulation, and safety-perimeter cages have improved drilling efficiency, with coring performance increasing by approximately 30% to 50%. As a result, typical production rates today range from 80 m to 120 m per 24-hour period.
NQ-diameter coring (47.6 mm) has been the standard drill core size at the Grey Fox and Froome targets since 2010. Drill core is removed from the core tube carrier and immediately placed into wooden core boxes with a capacity of approximately 4.5 m of core. During drilling, contractors place a small wooden block identifying the downhole length of overburden and progressively place depth marker blocks at 3 m intervals of core. Once filled, the core boxes are transported to McEwen’s nearby core facility for logging, photography, and sawing for assay. As drill rods are withdrawn in 3 m lengths, drillers carefully count the rods arriving to surface to verify that the lowest depth-block recorded in the core boxes is accurate.
7.3.1.1 Grey Fox
Sludge samples were collected at Grey Fox during drilling programs in 1979 and throughout the 1980s and were used as a guide for most of the core sampling. Core diameter was NQ from 1983 onwards with BQ used prior to that time. Heath & Sherwood served as the drilling contractor during this period. Reports from Mr. Peter Ginn (claim owner during that period) do not document the core sampling methods used. All information from this time period was acquired from the MLAS (Mining Lands Administration System – Ontario) and does not specify any details.
During Noranda-era drilling (1988-1994), NQ-diameter core was collected and transported to the Hemlo Gold Mines storage facility at the Aunor mine site in Timmins. Core was split for assay. Longyear was the drilling contractor used during this period.
From 2018 to the present, McEwen has employed several surface diamond drilling contractors at Grey Fox, including Norex (now Major Drilling), Black Diamond Drilling, NPLH Drilling, and Major Drilling. The primary core size has remained NQ. Drill core collected from 2018 to 2019 was shipped to temporary logging facilities located at the intersection of Pine Road and Tamarack Road, in proximity to the Black Fox mine.
| Project: 169525666 | 7-10 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
From 2020 onward, Grey Fox drill core has been logged at either the Stock Mill facilities or the Black Fox mine core shack.
7.3.1.2 Stroud
Historical drilling (post 1970) on the property was completed by experienced Canadian diamond drill contractors using industry-standard methods of the time. The earliest programs used B- and A-diameter core, while later Chevron and other programs predominantly used wireline NQ core. Drill collars were surveyed from the property grid, and hole deviation was monitored at regular intervals, with gyroscopic surveys used where greater accuracy was required. Core handling, logging, sampling, and QA/QC procedures were conducted in accordance with accepted industry practice for the time, including standards, blanks, and check assays. Most drill core and supporting geological and assay records are still available, providing an adequate basis for interpretation and incorporation into the PFS. Since the McEwen acquisition of Stroud in 2024, the same practice that has been used for Grey Fox, which is described in Section 7.3.1.1, has been implemented.
7.3.1.3 Black Fox
Initial surface stage drilling operations at Black Fox were conducted by Noranda between 1989 and the mid-1990s and was performed using NQ-diameter core, with reduction to BQ diameter where ground conditions required. Drilling during this period was executed by Norex Drilling (since merged with Major Drilling). Drill core was sent to the Hemlo Gold Mines storage facility at the Aunor mine site in Timmins for storage and logging. The core was split and sent for assay.
Subsequent diamond drilling at Black Fox, completed up to 2026, was a combination of surface and underground drilling programs. Specific drilling details are summarized in Table 7-4. Drilling during this period was completed by several drilling contractors. Core diameters varied from HQ to BQ, depending on ground conditions and hole length. The exploration core was processed, split and stored at the Black Fox core facility prior to being sent for assay. Delineation and definition core were similarly processed and sampled at the Black Fox core facility and sent for assay. Any remaining portions of delineation and definition core were discarded.
7.3.1.4 Stock Property
Drilling operations completed at the Stock Property since 2018 have employed the same drilling contractors and operating procedures described for the Eastern Properties, using NQ-diameter core. Sealed core boxes are delivered daily by the foreman to McEwen’s logging facilities at the Stock Mill facility.
Brigus Gold performed a drilling program in 2011 using Norex Drilling. Samples were taken from zones that indicated mineralization or areas that are commonly associated with mineralization.
According to the RPA report for the property (Roscoe et al., 2003), most of the surface diamond drilling was completed between 1961 and 1989, while most of the underground diamond drilling was carried out between 1981 and 1994. Limited documentation is available describing the specific sampling methods used during these time periods. Most underground drilling conducted between 1989 and 1994 utilized AQ-
| Project: 169525666 | 7-11 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
diameter core, while most of the surface drilling completed before 1996 used BQ-diameter core. All of the underground and surface drilling from 1996 to 2000 employed NQ-diameter core.
Generally, the diamond drill core was split, with one half being assayed and the remaining half retained. While the mine was in production from 1989 to 1994, assays were carried out on some whole core from infill drilling.
A manual core splitter was used prior to 1994. Since 1996, a diamond core saw with a continuous supply of fresh water has been used for core cutting.
7.3.2Western Properties
Lexam VG exclusively employed Norex Drilling for all surface drilling across the Western Properties. After 2010, the majority of Norex’s drill rig fleet consisted of hydraulic rigs configured to recover NQ-diameter core.
The Western Properties have large footprints from historical underground development. The development is now flooded or infilled with sand. The QP considers it reasonable to assume that drilling contractors reduced the core diameter to BQ (36.5 mm) when a surface-staged exploration drill hole encountered underground voids and proceeded onwards into solid rock.
Under Lexam VG ownership, drill core from the rigs was picked up twice per day by core technicians and taken to core logging facilities in nearby South Porcupine. Towards the end of Lexam VG’s activities, the exploration team was based at the Davidson-Tisdale property.
7.4Logging Procedures
Standard logging procedures (described herein) have been followed since approximately 1996. Since January 2018 regionally accepted gold industry standard practices have been consistently implemented.
Core boxes are opened and immediately checked for missing or damaged core when they arrive to the core shack from the drill rigs. Core is logged immediately or placed into steel holding racks adjacent to the logging stations. Core is first fitted together and aligned to ensure continuity and proper alignment of any structural fabric. The geologist marks off 1 m standard intervals and calculates rock quality data (for every 3 m drilling run). Lithology, alteration, and mineralization styles are identified and logged, and structural features are carefully recorded, including foliations, offsets and displacements, and ductile deformations of linear flow features.
7.4.1Eastern Properties
Gemcom logging software was commonly used on site between 2015 and 2018 and has since been replaced by Datamine DH Logger.
Drill core is photographed from an elevated perspective to capture images of three to five core boxes at a time. These images are downloaded, labelled using a standard numbering format, and stored with the corresponding drill logging records.
| Project: 169525666 | 7-12 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
Paper logging of historical drilling includes records of mineralization, lithology, and geological structure.
7.4.2Stock Property
Since 2018, McEwen has followed the same logging procedures at the Stock Property as those for the Eastern Properties.
Paper logging of historical drilling includes records of mineralization, lithology, and geological structure.
7.4.3Western Properties
Lexam followed a consistent core logging protocol for all properties, recording the lithological, structural, alteration, and mineralogical features.
According to the technical report prepared by RPA (Altman et al., 2014), surface drilling at Buffalo Ankerite between 2009 and 2012 followed a system where the Lexam technicians collected rock quality measurements and indicated core recoveries in addition to the usual core logging. Geological features such as alteration, mineralization and rock unit descriptions were logged into the Geotic Log software system. The Geotic lithological legend was later incorporated into the Gemcom GEMS-3D geological modeling software. Drill core was photographed after samples were marked up.
Paper logging of historical drilling includes records of mineralization, lithology, and geological structure.
7.5Core Recovery
7.5.1Eastern Properties
Recovery of diamond drill core during advancement through bedrock is generally reliable across the Black Fox and Froome properties, with recoveries of at least 85% achieved unless localized fault zones or voids are intercepted. The country rock underlying the Eastern Property claims is generally weakly deformed, and faults in the deposit areas are relatively competent when drilled at angles greater than 45° to the structural zone. The majority of modern drilling within the Grey Fox cluster of targets has been oriented at high angles to the north-south foliation. Core recoveries have typically exceeded 85%.
After 2015, drill holes at Froome were designed to dip at high angles to the GKDZ, adjacent to the targeted mineralized zones, maximizing driller’s core recovery. This pattern was intended to reduce the influence of the structural fabric of the Gibson-Kelore Fault, lowering the tendency for core to naturally part along foliation planes within soft chloritic ± talc schistose ultramafic volcanic rocks.
Drill logs from historical drilling that informed Mineral Resource estimates indicate similar recovery values.
7.5.2Stock Property
Country rock underlying the Stock Property targets is relatively strongly deformed due to the proximity of the PDDZ and the Nighthawk Lake fault structures. Core recovery rates between 85% and 100% are achieved when drilling through competent mafic volcanic flows or hard, unfractured felsic intrusive rocks.
| Project: 169525666 | 7-13 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
However, localized zones of soft, chloritic and talcose rubble, including chips and gravel, can occasionally impede the driller’s coring to depth. Approximately 5% of drill holes completed since 2018 failed to penetrate such zones to target depth, often resulting in drill rod breakage and loss.
Drill logs from historical drilling used to inform resources indicate similar recovery performance.
7.5.3Western Properties
Country rock in the south-central portion of the Porcupine Mining Camp is moderately to strongly deformed due to the proximity of the PDDZ and associated South Tisdale Anticline structures. According to the technical report prepared by P&E and RPA (Altman et al., 2014), core recoveries of approximately 99% were reported at the Paymaster, Buffalo Ankerite, and Fuller sites where drill holes passed through competent mafic volcanic flows or hard, unfractured felsic intrusives. The QP is unaware of any significant fault gouge or structural conditions that materially limited core recovery at the Davidson-Tisdale exploration site.
Historical drill logs used to inform mineral resource estimation indicate similar core recovery rates.
7.6Collar Surveys
7.6.1Eastern Properties
Historical drill sites were selected and laid out using a 50 m tape from established cuts and were picketed relative to a 1,000 m-spaced gridline system developed along the flanks of Tamarack Road.
Between 2008 and 2015, diamond drill hole collars at the Grey Fox, Froome, and Black Fox targets were spotted in the field using a handheld GPS unit with an accuracy of approximately 1 m. Since 2016, collar locations have been surveyed using a differential GPS accurate to within approximately 1 m and linked to the base station at the Black Fox mine.
Since 2019, drilling contractors have been using Reflex Instruments EZ-Gyro TN-14 gyroscopic tool to capture survey and collar alignment data. The TN-14 tool uses a north-seeking gyroscopic compass digitally linked to the local GPS grid.
Drill holes competed from 1988 onward were surveyed using handheld GPS units. Follow-up surveys using conventional surveying methods were required to accurately locate hole collars.
Drill holes completed prior to 1980 were surveyed using transit methods.
7.6.2Stock Property
Between 2018 and 2019, diamond drill holes were spotted using a handheld GPS with an accuracy of approximately 1 m. Since 2019, McEwen has utilized differential GPS to establish accurate survey control for drill hole collars. All data collected are reported in NAD83 coordinates, UTM Zone 17U, and are referenced to the base station established at the Stock Mill.
| Project: 169525666 | 7-14 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
Since October 2020, drillers have been using Reflex Instruments TN-14 collar gyroscopic survey tool.
Since spring 2021, McEwen Inc. began using an independent DeviSight APS differential GPS tool, a true-north azimuth gyro-alignment system, to improve the accuracy of planned collar locations and drill azimuth alignments. In summer 2023, McEwen returned to surveying drill hole collars using differential GPS with real-time kinematic correction.
Earlier drill holes from 1988 were surveyed using handheld GPS units. Follow-up surveys using conventional surveying methods have since been carried out to accurately locate those hole collars.
7.6.3Western Properties
Drill logs coupled with the technical report prepared by RPA (Altman et al., 2014) indicate that drill hole collars were surveyed using a differential corrected GPS instrument commonly achieving positional accuracy of approximately 0.1 m under favourable conditions.
Drill holes dating back prior to 1988 were re-surveyed using handheld GPS units. Conventional surveying methods for the period were used to accurately locate hole collars.
7.7Downhole Surveys
7.7.1Eastern Properties
Between 2014 and 2017, drillers used an EX-Shot downhole survey tool that utilizes a magnetic-north-pointing single-shot gimballed globe compass, with readings collected at 50 m intervals.
Since 2017, drillers have been using Reflex Instruments EZ Gyro or multi-shot Sprint orientation tools, which are north-seeking gyroscopic compasses proven to reduce magnetic effect. This is particularly important given the presence of high-iron mafic and ultramafic rock units within the Black Fox and Froome mines and the Grey Fox stratigraphic sequences. Survey data were collected at 50 m intervals, with downhole data digitally relayed to a handheld receiver at surface. Paper copies were inserted into core boxes at the appropriate survey locations.
Noranda drill logs indicate that Tropari or acid Pajari methods were used for downhole surveys. No indication of downhole survey methods is available on drill logs prepared by Ginn or Parsons.
7.7.2Stock Property
Paper drill logs generated in the 1990s indicate that downhole survey readings were collected on a hole-by-hole basis; however, the survey method and sensitivity are rarely noted. Drill logs from the 1990s indicate that Tropari or acid Pajari methods were used.
From 2018 onward, drillers have followed the same downhole survey procedures as those described for the Eastern Properties, using EZ Gyro tools with data collected at 50 m intervals.
| Project: 169525666 | 7-15 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
7.7.3Western Properties
According to the technical report prepared by RPA (Altman et al., 2014), Lexam supervised drillers to collect downhole survey data using a Reflex EZ-Shot instrument, with readings taken at 50 m intervals.
7.8Geotechnical, Hydrological and Metallurgical Drilling
Geotechnical diamond drill holes have been completed on the Eastern and Stock properties.
At Grey Fox, six geotechnical holes totaling 1,218 m were drilled in 2013. Seven NQ-sized holes totaling 525 m were drilled at the Stock Main deposit in 2010.
Twenty-two (22) boreholes have been completed as monitoring wells at Grey Fox, primarily in overburden, with a total length of approximately 375 m. Overburden drilling was typically completed using 200 mm hollow-stem augers, with bedrock portions drilled using NQ-diameter coring. These installations were completed by various consultants between 2011 and 2015.
In 2006, four NQ-diameter holes totaling 630 m were drilled at Black Fox. Ten additional holes totaling 2,017 m were drilled by Primero between 2015 and 2016, with partial geotechnical logging (including weathering, rock strength, rock quality designation, and joint roughness), completed on selected exploration holes. In 2017, six NQ3-diameter holes totaling 1,646 m were drilled along the Black Fox ramp toward Froome.
Forty (40) monitoring wells were installed primarily in overburden at Black Fox in 2004 and 2005. The total length of boreholes with installations is approximately 700 m. Overburden drilling was typically completed using 150 mm to 200 mm hollow-stem augers, with bedrock portions drilled using NQ-diameter coring.
In 2025, an approximately 1,400 m HQ drill program was executed at Grey Fox to support metallurgical studies for the project. In addition, some samples for metallurgical testing were obtained from half-core intervals of NQ-diameter exploration drill holes.
7.9Sample Length and True Thickness
7.9.1Eastern Properties
Mineralization at Grey Fox is controlled by northeast-trending (C1) which dip to the Northwest and East-West trending, south-dipping (C2) structures and, locally, by the interaction of these structures with steeply east-dipping lithological contacts. Due to the variable orientations of these structures, the relationship between sample length and true thickness can be variable.
Most drilling at Grey Fox completed between 2008 and 2016 was oriented in an east-to-west azimuth. This drilling orientation resulted in low-angle intersections of mineralized veinlets and breccias relative to the core axis, in which cases true widths may be as low as 10% to 20% of the drilled core length. Since 2018, the majority of drilling in the Gibson, Grey Fox South, 147, and 147NE zones at Grey Fox has been oriented northwest to southeast, resulting in higher-angle intersections, typically greater than 60° to the core axis, where true widths may be as high as 80% to 90% of the core length. Low-angle south-dipping
| Project: 169525666 | 7-16 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
7 Exploration and Drilling Programs
mineralized structures corresponding to the C2 structural set are also intercepted in this northwest to southeast orientation.
7.9.2Stock Property
Exploration drilling over the past 40 years at the Stock Property has been designed to intersect the PDDZ corridor of alteration and mineralization at near-perpendicular angles, with most drill holes oriented toward azimuths between 330° and 360°. The steeply southeast-dipping stratigraphic sequence allows these drill holes to cut the conformable mineralized structures at high angles, typically greater than 60° to the core axis, where the true width may be as high as 80% to 90% of the drilled core length.
7.9.3Western Properties
According to the technical report prepared by RPA (Altman et al., 2014), Lexam attempted to intercept exploration targets at near-perpendicular attack angles. This approach included near-vertical drilling to intersect flat-lying mineralized zones at Davidson-Tisdale, as well as the swinging/reactive dip angles to bracket the folded stratigraphy at the northern and southern target zones at Buffalo Ankerite.
7.10Drilling Completed Since Database Close-out Date
Drilling has continued at Grey Fox and Froome since the Fusion SQL database close-out date of March 31, 2026. Drilling completed since that date includes the following:
| ● | Grey Fox: Drilling has continued, targeting potential mineralization expansion at the Gibson, Whiskey Jack and Stroud Zones. |
| ● | Froome: Infill and definition drilling is ongoing as of the date of this report. |
7.11QP Comment on Exploration and Drilling Programs
Mineral deposits within the Fox Complex are relatively narrow and exhibit variable orientations. As geological understanding improves, drill programs must be reoriented accordingly to more accurately capture the true volume of mineralization. Insufficient drilling in orientations that are perpendicular to the fabric of the deposits risk overestimation of the volumes of the Mineral Resource.
Many of the deposits remain open at depth and along strike.
The QP is of the opinion that the quantity and quality of lithological logging, collar and downhole survey data collected during exploration and infill drilling programs at the Fox Complex deposits are sufficient to support Mineral Resource estimation.
| Project: 169525666 | 7-17 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
8 Sample Preparation, Analyses and Security
8Sample Preparation, Analyses and Security
This section describes the sampling methods, sample preparation, analytical procedures, QA/QC programs, and sample security measures used to support the Grey Fox and Stroud Mineral Resource estimates which are part of the Eastern Properties and the main focus of this PFS.
For all other resource areas (remaining Eastern Properties, Stock and the Western Properties) which are not integral to this PFS, technical details of the sample preparation, analysis, QA/QC and security are as described in the 2025 Mineral Resource estimation (IA) Technical Report Summary (McEwen, 2025).
8.1Sampling Methods and Sample Preparation
8.1.1Current Sampling Programs (McEwen)
McEwen’s sampling protocols for drill core are designed to ensure that sample intervals are representative and appropriate for the geological features observed. Sample intervals are selected by McEwen geologists during the core logging process based on geological features such as lithological contacts, alteration, and mineralization. Sample lengths typically range from 0.3 m to 1.5 m, with key geological boundaries not crossed where possible.
Drill core samples are identified using uniquely barcoded sample tags that record the sample from-to interval and relevant notes. Sample tags are placed between the drill core and the core box at the sample interval. Sample booklet stubs are labelled, archived in boxes, and stored adjacent to the sampling facility.
For exploration drill core, the core is sawn into two equal halves using an industry-standard diamond saw. One consistent half of the core sample is returned to the core box in proper sequence, with the corresponding ticket stub placed in the core box. The other half of the sawn core is bagged, tagged with the corresponding sample number, sealed, and grouped into batches for shipment.
Sample bags are grouped into batches of 10 and placed into larger woven polypropylene bags for transport. All sample shipments are assigned specific work order numbers, with digital PDF documentation sent to the receiving laboratory prior to sample arrival.
8.1.1Historical Sampling
Historical drilling data from previous operators that are relied upon for the Mineral Resource estimate includes programs completed by Primero and Brigus Gold, where drill core was logged and sampled by, or under the supervision of, Primero or Brigus Gold geologists. Drill core was cut in half using a diamond saw, with one half submitted for assay and the remaining half retained.
Historical sampling data from Exall, Noranda Exploration, and Apollo Gold were validated through previous Mineral Resource estimate studies performed by McEwen.
| Project: 169525666 | 8-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
8 Sample Preparation, Analyses and Security
8.2Analytical Methods and Laboratories
8.2.1Analytical Methods
Until 2023, gold analysis was undertaken using fire assay (FA) with atomic absorption (AA) finish (FA-AA) for standard-grade samples and FA with gravimetric finish (FA-Grav) for over-limit samples. Since 2023, McEwen has adopted the PhotonAssayTM analysis method, which uses high-energy X-rays to determine gold content through the measurement of gamma ray emissions. PhotonAssay provides accurate results up to 350 ppm Au, with over-limit values undergoing secondary analysis at reduced X-ray beam intensity. This non-destructive method allows for the re-use of certified reference material (CRM) jars.
Multi-element analysis has been performed using inductively coupled plasma optical emission spectroscopy (ICP-OES) following aqua regia or four-acid digestion.
PhotonAssay differs from traditional fire assay in that it is non-destructive, uses larger sample volumes (300 g–500 g versus 30 g–50 g), and has a broader analytical range without requiring separate over-limit analysis in most cases.
8.2.2Laboratories
A summary of laboratories used for sample preparation and analysis is provided in Table 8-1. All laboratories used since 2018 are commercial facilities operating under ISO/IEC 17025 accreditation. Affiliation with McEwen is noted where applicable.
| Project: 169525666 | 8-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
8 Sample Preparation, Analyses and Security
Table 8-1:Analysis Laboratories Used in Resource Estimation
Laboratory | Period of | Location | Country | Analysis | Accreditation | Prep facility | Analysis | Affiliation to |
| Use | | | Method | | only | Lab | McEwen |
PolyMet | 2009-2016 | Cobalt, ON | Canada | FA | no information | | X | independent |
Laboratories | | | | | found | | | |
Accurassay | 2012-2016 | Thunder Bay, ON | Canada | FA | ISO 17025 | | X | independent |
Laboratories | | | | | | | | |
Swastika | 2012-2016 | Swastika, ON | Canada | FA | ISO 17025 | | X | independent |
Laboratories | | | | | | | | |
Paragon | 2025-2026 | Timmins, ON | Canada | PA | ISO 17025 | X | | affiliated (27.3%) |
Advanced Labs | | | | | | | | |
Paragon | 2025-2026 | Surrey, BC | Canada | PA | ISO 17025 | | X | affiliated (27.3%) |
Advanced Labs | | | | | | | | |
Paragon | 2025-2026 | Hamilton, ON | Canada | PA | ISO 17025 | | X | affiliated (27.3%) |
Advanced Labs | | | | | | | | |
Paragon | 2025-2026 | Reno, NV | United | FA | ISO 17025 | | X | affiliated (27.3%) |
Geochemical | | | States | | | | | |
MSALABS | 2023-2026 | Timmins, ON | Canada | PA | ISO 17025 | | X | independent |
MSALABS | 2023-2026 | Val-d’Or, QC | Canada | PA | ISO 17025 | | X | independent |
MSALABS, Head | 2023-2026 | Langley, BC | Canada | FA | ISO 17025 | | X | independent |
Office | | | | | | | | |
Pangea | 2021-2023 | Guamuchil, | Mexico | FA | ISO 17025 | | X | affiliated (100%) |
Laboratories | | Sinaloa | | | | | | |
ALS Ltd. | 2017-2020 | Timmins, ON | Canada | FA | ISO 17025 | X | | independent |
ALS Ltd. | 2017-2020 | Vancouver, BC | Canada | FA | ISO 17025 | | X | independent |
Activation | 2014-2022 | Timmins, ON | Canada | FA | ISO 17025 | | X | independent |
Laboratories Ltd. | | | | | | | | |
Activation | 2014-2022 | Ancaster, ON | Canada | FA | ISO 17025 | | X | independent |
Laboratories Ltd. | | | | | | | | |
| Project: 169525666 | 8-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
8 Sample Preparation, Analyses and Security
Laboratory | Period of | Location | Country | Analysis | Accreditation | Prep facility | Analysis | Affiliation to |
| Use | | | Method | | only | Lab | McEwen |
Activation | 2020-2022 | Geraldton, ON | Canada | FA | ISO 17025 | | X | independent |
Laboratories Ltd. | | | | | | | | |
AGAT | 2009-2022 | Timmins, ON | Canada | FA | ISO 17025 | X | | independent |
Laboratories | | | | | | | | |
AGAT | 2009-2022 | Rouyn, QC | Canada | FA | ISO 17025 | X | | independent |
Laboratories | | | | | | | | |
AGAT | 2009-2022 | Mississauga, ON | Canada | FA | ISO 17025 | | X | independent |
Laboratories | | | | | | | | |
SGS Canada | 2011-2017 | Sudbury, ON | Canada | FA | ISO 17025 | | X | independent |
SGS Canada | 2011-2017 | Toronto, ON | Canada | FA | ISO 17025 | | X | independent |
SGS Canada | 2011-2017 | Cochrane, ON | Canada | FA | ISO 17025 | | X | independent |
Notes:
| ● | Method abbreviations: FA = Fire Assay, PA = PhotonAssayTM |
| ● | “Preparation Facility Only” marked with “X” indicates laboratories that only prepare samples. |
| ● | “Analysis Lab” marked with “X” indicates laboratories that perform analysis. |
| ● | Affiliation indicates relationship to McEwen (independent or affiliated with ownership % where applicable). |
| Project: 169525666 | 8-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
8 Sample Preparation, Analyses and Security
Exploration samples are shipped multiple times per week to Paragon Advanced Labs for preparation and photon assay analysis. Since September 2025, most photon assay work has been completed by Paragon.
Check assays (approximately 5%) for fire assay are submitted to ALS Vancouver, while PhotonAssay check assays (approximately 20%) are sent to MSALABS (Timmins, Ontario).
8.2.3Historical Laboratories
Historical laboratories used for assays incorporated into the Mineral Resource estimate include those listed below and in Table 8-1.
| ● | Swastika Laboratories (Swastika, Ontario) |
| ● | SGS Canada (Cochrane, Ontario; Rouyn-Noranda, Québec) |
| ● | AGAT Laboratories (Mississauga, Ontario) |
| ● | PolyMet Laboratories (Cobalt, Ontario) |
| ● | Techni-Lab (Timmins, Ontario) |
| ● | ALS Canada (various locations) |
| ● | XRAL Laboratories (Intertek Testing Services-Bondar Clegg) |
| ● | Bell White Laboratories |
| ● | Accurassay Laboratories |
8.3Quality Assurance and Quality Control
8.3.1QA/QC Program
McEwen maintains a QA/QC program that includes the insertion of blank samples, CRMs, and duplicate samples into the drill core sampling sequence.
Blanks are inserted at a ratio of one per 20 samples (or two per 21 samples for photon assay). Prior to 2019, blanks consisted of core blanks from unmineralized core sections and certified blank pulp material. Since 2019, coarse blanks composed of commercial high-silica aggregate purchased in bulk from Technominex in Rouyn-Noranda, Québec, have been used.
CRMs are inserted at a ratio of one per 21 samples. Prior to 2019, CRMs purchased from Rocklabs Ltd. (SK78, SG66, SN75, SE68, Ox98) were used. Beginning in February 2019, OREAS standards replaced Rocklabs standards. For PhotonAssay, CRMs specifically certified for the PhotonAssay process are utilized. Insertion of standards with photon assay is performed at the external laboratory using code-matching CRM jars provided by McEwen.
Duplicate samples were inserted between 2017 to 2019, with pulp duplicates at a ratio of one per 20 samples and field duplicates inserted between 2017 and 2018. Following external review (Bloom and Jolette, 2019), which indicated very good duplicate repeatability, McEwen discontinued the insertion of pulp and field duplicates and now relies on each laboratory’s internal duplicate protocols. For PhotonAssay, duplicate readings of the assay jar are used to calculate a weighted average result, which is reported on the certificate. The lab also performs preparation duplicates at a rate of one per 21 samples.
| Project: 169525666 | 8-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
8 Sample Preparation, Analyses and Security
External umpire testing has been conducted since at least 2017, with pulps representing approximately 5% to 7% of the annual assay volume submitted by McEwen for check analysis. Following adoption of Paragon as the primary assay laboratory, the rate of comparison testing has increased to 20%. MSALABS has been designated as the referee sample laboratory.
8.3.2QA/QC Results
The QA/QC results from McEwen’s current sampling programs demonstrate good accuracy and precision. The insertion of CRMs has shown acceptable accuracy, with the vast majority of results falling within acceptable tolerance limits (typically ±2 standard deviations of certified values). Blank results consistently return values below detection limits, indicating minimal contamination. Duplicate analyses show good precision, with coefficient of variation values typically below 20%, indicating acceptable repeatability.
QA/QC performance is monitored daily as assays come in and reviewed as a group on a monthly basis. Where CRM failures are identified, corrective actions are implemented immediately, including re-analysis of affected batches and communication with the laboratory. No systematic bias has been identified in the assay data.
The QP has reviewed the QA/QC data and considers the results sufficient to support the reliability of the assay data used in the Mineral Resource estimate.
8.3.3Historical QA/QC
Historical QA/QC programs from previous operators varied in their approach and rigor. Review of historical QA/QC indicates that programs completed by Primero and Brigus Gold included in-field insertion of blanks, CRMs, and field duplicates, with in-laboratory QA/QC managed by the contracted analytical laboratories. Based on review, the QA/QC program is considered adequate for the data quality.
Historical QA/QC programs from operators whose data are not used in the Mineral Resource estimate (including Apollo Gold, Exall, and Noranda Exploration) have not been relied upon and are not considered material to this report.
Overall, the historical QA/QC data are considered adequate for use in the Mineral Resource estimate and do not introduce material uncertainty.
8.4Sample Security
8.4.1Chain of Custody and Handling
Sample chain of custody is maintained through standardized procedures including tagging, bagging, sealing, and documented transport.
Sample bags are sealed with heavy plastic tie-wraps after filling and labelled with the sample number. Sealed transport bags are stored within a secure area immediately adjacent to the logging and sampling facility. From 2014 to 2021, exploration drill core samples were shipped off site to commercial laboratory preparation facilities. Sample transport was handled by McEwen personnel or contracted carriers.
| Project: 169525666 | 8-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
8 Sample Preparation, Analyses and Security
From 2021 to 2023, samples were sent to Pangea Laboratory in collapsible plastic storage containers, sealed using numbered plastic seals. Samples were shipped via Gardewine (intermediary only) to a broker in Naco, Arizona, who then reshipped the samples to the laboratory.
Since 2023, samples have been transported directly to MSALABS and Paragon by McEwen employees. Samples shipped to Paragon facilities in Hamilton, Ontario or Surrey, BC are transported in sealed wooden shipping crates to maintain sample integrity.
Drill core, rejects, and pulps are stored in secure locations at the Fox Complex facility. The core logging facility is locked, with access restricted to authorized personnel.
8.4.2Security Practices by Period
Historical operators maintained sample security through chain-of-custody procedures appropriate for their periods of operation. Drill core was boxed, covered, and sealed at the drill rigs and transported to logging facilities, where company personnel assumed responsibility for core handling. Samples were cut by technicians, bagged, sealed, and grouped into batches for shipment.
8.4.3Databases
Since 2017 when McEwen acquired the Fox Complex from Primero, a SQL database in Datamine Fusion has been the primary location for the collation, storing and tracking of all geological data including the sampling and assaying procedures.
Datamine’s DH Logger software is used to record all logging and sampling data entry. Upon completion of logging, and subsequent satisfaction of a senior geologist and the database manager, the files are compiled, organized, and uploaded to the Datamine Fusion SQL database. Currently, the data from DH Logger is uploaded electronically, as is assay data from the external laboratories. Laboratory data is uploaded by the Database Manager into the Datamine Fusion SQL database.
The Fusion database uses a series of read-write permissions to ensure database integrity; access is restricted only to authorised personnel. Back-ups of the digital data archive are performed on a regular basis.
For the earlier 2014–2017 programmes, drill hole logging data (collar locations, down hole surveys, geology etc.) and related assays were collected and added to Gemcom project files. Separate workspaces were used for Grey Fox and Froome.
Regular QA/QC audits on collar locations, down-hole surveys, and assay certificates were performed over the period. Once verified, drill holes would be locked in the Gemcom project to ensure no changes to the data could occur. After McEwen’s acquisition, four GEMCOM databases were merged into one SQL database in Datamine Fusion.
At the Stock East Zone, early exploration holes (2018 campaign) were logged and processed utilizing the Gemcom software and captured as PDF files using Primero’s formatting. In 2019, the team transitioned to using the Datamine products and procedures described above.
| Project: 169525666 | 8-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
8 Sample Preparation, Analyses and Security
Historical information before 1993 is not relied on for resource estimation at Grey Fox.
8.5QP Opinion
The QP has reviewed the sampling methods, sample preparation and analytical procedures, QA/QC programs, and sample security measures described in this section. Based on this review, the QP offers the following opinions:
| ● | The sampling methods used are appropriate and adequate to support representative sample collection for Mineral Resource estimation. |
| ● | Sample preparation and analytical methods, including fire assay, PhotonAssayTM, and ICP techniques, are appropriate for the style of mineralization encountered and are consistent with industry-standard practices. |
| ● | QA/QC procedures implemented by McEwen, including the insertion of blanks, CRMs, and duplicates, along with external umpire testing, are sufficient to demonstrate the reliability of assay data. |
| ● | Sample security measures, including chain-of-custody documentation, sealed transport, and secure storage, are adequate to maintain data integrity. |
| ● | The data derived from the sampling, analytical, and QA/QC programs are suitable for use in Mineral Resource estimation. |
| Project: 169525666 | 8-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
9 Data Verification
9Data Verification
9.1.1Drill Core Verification
The QP reviewed all assay, collar, survey, and QA/QC data associated with drilling conducted from 2014 to the most recent results available in 2026, including McEwen drilling programs on the Eastern Properties and relevant historical data incorporated into the Mineral Resource model.
The QPs reviewed prior technical reports and verification studies and conducted independent audits, data checks, and physical inspections, where possible.
The QP applied the following data verification procedures:
| ● | Database Audits: Assay results were cross-checked against original laboratory certificates to confirm data integrity. Assay intervals, sample IDs, and QA/QC sample insertions were validated within the digital assay database. |
| ● | Collar and Survey Verification: Collar locations and downhole surveys were verified against original survey records and field GPS data. Discrepancies were identified for the Stroud project and reconciled. |
| ● | QA/QC Review: The QP reviewed QA/QC data including blanks, CRMs, duplicates, and umpire laboratory results as described in Section 8. Statistical evaluations confirmed acceptable accuracy and precision. |
| ● | Core Inspections: The QP conducted site visits to assess drill core recovery, logging practices, and core storage procedures to confirm consistent geological and sampling protocols. |
| ● | Independent Validation: Randomly selected samples and pulps from the database were independently arranged and submitted for umpire laboratory analysis to confirm assay accuracy, with results reviewed by the QP. |
9.1.2Verification of Historical Data
Historical drilling data incorporated into the Mineral Resource model originates from multiple operators, including Primero, Brigus Gold, Apollo Gold, Chevron Minerals Ltd., Pancontinental Mining Ltd., and Gunnex Ltd. The QP audited a significant portion of these datasets by cross-checking assay certificates, collar records, and QA/QC information against the compiled database.
Verification efforts focused primarily on data generated from the 2010s onward, where documentation is more complete. Key assay results were confirmed where original certificates were available.
Although some early datasets lack complete QA/QC records or chain-of-custody information, most historical data incorporated into the model have been verified either directly or through corroborative evidence, including prior technical reports and independent reviews.
| Project: 169525666 | 9-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
9 Data Verification
9.1.3Limitations on Data Verification
The QP notes the following limitations, which are typical of historical exploration datasets:
| ● | Incomplete QA/QC records and missing assay certificates for some early drilling programs. |
| ● | Downhole surveys for certain underground holes completed prior to 1995 rely on collar orientation only, without continuous deviation measurements. |
| ● | Gaps in chain-of-custody documentation for older historical drill programs. |
| ● | Physical core inspection was limited to available core; some legacy core storage conditions were suboptimal but adequately documented. |
These limitations have been considered in the classification of Mineral Resources and are not considered to materially impact the overall reliability of the dataset.
9.1.4Data Verification Results
The QP’s verification work indicates that:
| ● | QA/QC results show consistent accuracy and precision within accepted industry limits. |
| ● | Duplicate and umpire assay comparisons confirm repeatability and do not indicate systematic bias. |
| ● | CRM recoveries indicate acceptable analytical performance across all laboratories, including McEwen-affiliated facilities (Paragon Advanced Labs and Pangea Laboratories) and independent laboratories (MSALABS, ALS, AGAT, SGS). |
| ● | Survey, collar, and assay data are internally consistent and suitable for Mineral Resource estimation. |
9.1.5QP Opinion on Data Adequacy
The QPs responsible for the respective disciplines are satisfied that:
| ● | Sampling, assay, survey, and QA/QC data used in the Mineral Resource estimate are reliable and of sufficient quality for the purposes of this technical report. |
| ● | Verification procedures support the accuracy and precision of the dataset. |
| ● | Identified limitations are typical of historical datasets and have been appropriately considered in resource classification. |
| ● | Overall, the QPs are satisfied that the data supporting the Mineral Resource estimate are reliable and of sufficient quality to support Mineral Resource estimation in accordance with SEC Regulation S-K 1300. |
9.2Property-Specific Verification
9.2.1Eastern Properties Data Verification
Verification indicates that McEwen drilling data since 2014 are of sufficient quality and integrity, with strong QA/QC performance and consistent survey and collar accuracy.
| Project: 169525666 | 9-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
9 Data Verification
9.2.2Stroud Project Data Verification
Verification work indicates that the historical Stroud drill hole database is sufficiently reliable for use in the current Mineral Resource estimate. Collar locations were validated through RTK re-surveying and transformation from the local mine grid to UTM NAD83, resulting in acceptable spatial agreement.
Assay verification included recovery of historical certificates, re-logging and re-sampling of select holes, and a confirmatory drill program that twinned approximately 15% of historical holes. Independent checks by both the database manager and the QP identified only minor discrepancies (3 of 1,246 assay records), all conservative relative to original certificates.
Overall, drilling, survey, and assay data are considered adequate to support Mineral Resource estimation and geological interpretation.
9.3Geochemical and Water Analysis Verification
9.3.1QP Verification Procedures
For water quality data used in the water balance model, the QP reviewed available datasets and reports provided by McEwen to assess their suitability as geochemical source terms for different areas and rock types across the site. Calculation methods and model outputs, including spreadsheet and GoldSim models, were also reviewed.
The QP reviewed geochemical and water quality data used in the water and solute balance model described in Section 17. These data include site monitoring results (e.g., from the Black Fox East and West stockpiles), as well as laboratory-based static and kinetic testing, including shake flask extraction and humidity cell test results.
The QP evaluated the available data relative to their intended application in defining geochemical source terms for site features and considers the selected datasets appropriate for use in the model. Where available, data provided in project reports were compared with original laboratory analytical results to confirm consistency, including review of kinetic testing datasets.
9.3.2Data Verification Results
The QP considers the available data to be of acceptable quality. In cases where both summarized project report data and laboratory analytical results were available, comparisons indicate consistency between reported values and underlying analytical data.
The QP has determined that a greater degree of uncertainty is associated with the representativeness of specific datasets for application to certain source terms, particularly for the Grey Fox underground mine and associated surface features. This uncertainty does not reflect deficiencies in analytical data quality, but rather limitations in the availability of appropriate analogues to characterize future site-specific conditions. For example, there is uncertainty associated with predicting the quality of water to be pumped from underground workings, due to the absence of directly comparable datasets.
| Project: 169525666 | 9-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
9 Data Verification
Where uncertainty exists in the applicability of specific datasets, the QP considers that conservative assumptions have been applied in the selection of water quality inputs for modeling purposes.
The QP reviewed the water balance methods and key data inputs, including runoff coefficients, catchment areas, precipitation data, and geochemical source terms, and considers them appropriate for the intended level of study. GoldSim is recognized as an industry-standard tool for water and solute mass balance modeling in mining applications.
The QP recommends that, as additional geochemical characterization testing is completed in the future, these data be compared with historical datasets to further refine the selection of representative inputs for for modeling of full-scale waste rock runoff and mine dewatering conditions.
9.3.3QP Opinions on Data Adequacy
The QPs responsible for the respective disciplines are satisfied that:
| ● | Water quality datasets used in development of the water balance model are of acceptable quality. Although there is uncertainty in the applicability of specific datasets to certain geochemical source terms (e.g., identifying appropriate analogues for underground dewatering), conservative assumptions have been applied in assigning water quality inputs. |
9.4Tailings Storage Data Verification
The QP reviewed data used in the development of the tailings storage design and associated cost estimates. The review included geospatial, geotechnical, process, and cost input data, with the objective of assessing their suitability and reliability for the PFS level of study.
9.4.1Source Data
The following primary data sources were reviewed by the QP:
| ● | Topographic and Geospatial Data: |
o | 2025 aerial drone LiDAR data provided by Arcadis for the Stock Mill TMA and surrounding areas. |
o | The 2016 Central Ontario Orthophotography Project (COOP) 2-m digital elevation model (DEM) for areas not covered by the LiDAR survey. |
| ● | Geotechnical Data: |
o | Historical borehole and laboratory test data as referenced in prior design work (Golder 2015), including subsurface conditions relevant to dam foundations and embankment performance. |
| ● | Tailings Production Data: |
o | Historical operating data and projected mill throughput and tailings production rates used to define storage requirements and facility life. |
The QP reviewed these datasets in the context of their application to tailings storage design and considers them appropriate for use in support of the current level of study.
| Project: 169525666 | 9-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
9 Data Verification
9.4.2Data Verification Methods
The QP applied the following data verification procedures:
| ● | Topography and Volumes: |
Digital terrain models were cross-referenced against both recent LiDAR data and historical DEM datasets to assess the accuracy of derived dam surface elevations and tailings storage volumes. Comparisons between data sets indicate consistency in overall site geometry. Volumetric estimates were evaluated using industry-standard software tools (e.g., Autodesk Civil 3D) to confirm agreement between conceptual design volumes and actual site topography.
| ● | Geotechnical Conditions: |
Foundation conditions and embankment design parameters were reviewed against available borehole logs and laboratory test results. Where data gaps existed, the QP notes that conservative design values were applied, and that additional investigation is appropriately recommended for subsequent study phases.
| ● | Process and Tailings Data: |
Tailings production rates, physical tailings characteristics, and storage assumptions were reviewed relative to historical site operating data and typical industry benchmarks. The QP evaluated these inputs to confirm that projected tailings volumes and facility life are reasonable and consistent with the proposed mining and processing rates.
| ● | Supplemental Capacity and Site Constraints: |
Available lease boundary mapping was reviewed and compared with aerial imagery to assess land availability for potential future expansion The QP evaluated the consistency between mapped boundaries and physical state conditions to support conclusions regarding expansion potential.
| ● | Tailings Storage Facility Costing: |
Tailings storage facility capital costs were developed as a conceptual estimate using published, auditable benchmarks, including RECLAIM 7.0, escalated via Statistics Canada CPI to 2026 CAD; publicly available government engineering and remedial-action cost estimates, including US Environmental Protection Agency and US Army Corps of Engineers; and selective vendor budgetary quotations. The estimate includes contingency appropriate to a Class 5/4 study.
9.5Water Treatment
Water treatment inputs are based on water chemistry and flow rate data derived from the water balance. Water treatment costs are based on input from a water treatment specialist with experience in the design and specification of water treatment facilities and are supported by historical project pricing for the purchase and installation of vessels, pumps, and industrial metal buildings.
9.6Metallurgical Testing and Analysis
The QP was unable to independently verify the representativeness of all samples used in historical metallurgical testwork programs. A significant portion of the metallurgical testwork was completed by previous property owners and operators, and the documentation available to the QP did not, in all cases,
| Project: 169525666 | 9-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
9 Data Verification
include sufficient detail regarding sample selection methodologies, compositing procedures, sample locations, or the rationale used to define metallurgical domains.
Consequently, the QP cannot confirm that the samples tested are fully representative of the range of mineralization and metallurgical variability present within the deposit. The QP has relied upon the available historical records and the results of the metallurgical programs as documented. In the absence of complete sample selection records, it is inferred, based on industry practice, that the individuals responsible for the test programs selected and composited samples were selected and composited in a manner intended to reasonably represent the anticipated processing characteristics of the mineralized material. While the testwork results are considered suitable for the purposes of this study, the uncertainty associated with sample representativeness should be recognized when evaluating the metallurgical performance projections presented herein. Additional variability testwork utilizing samples selected under current QA and documentation protocols is recommended to further validate the metallurgical response of the deposit.
The QP is familiar with the laboratories that conducted the historical metallurgical testwork and understands them to be established facilities with recognized metallurgical testing capabilities. Based on the QP’s industry experience and prior interactions with these laboratories, their testing procedures, analytical methods, and QC practices are considered to be consistent with accepted industry standards for metallurgical investigations.
9.6.1QP Opinions on Data Adequacy
Although the QP was not directly involved in the execution of the historical test programs and has not independently audited the laboratories’ quality management systems, there is no indication from the available documentation or test results that the metallurgical data are unreliable or unsuitable for the purposes of this study.
| Project: 169525666 | 9-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
10Mineral Processing and Metallurgical Testing
10.1Summary
10.1.1Comminution
Comminution testwork was conducted on Grey Fox drill cores across several test campaigns, and included Steve Morrell Comminution (SMC) testing, Bond Ball Mill Work index (BWi) testing, and grind calibration work. The testwork indicates a requirement of high specific grinding energy. SMC testing yielded drop-weight index (DWi) values of 8 to 10 kWh/m³ and Axb parameter values of 30 to 35, corresponding to the 76th to 89th percentile range of the JKTech SMC database. These results reflect the highly competent nature of the ores tested. The BWi results also confirmed the extremely high energy requirement to grind the ore, with values for the harder composites reaching up to 27 kWh/t (147 Zone) and the softer end (some parts of the underground zones) closer to 18 kWh/t.
With the harder samples being from the 147 Zone, which represents approximately 2/3 of the deposit, it is evident that the average and design hardness values should be skewed towards the harder end of the range of test results. BWi test results were weighted according to ore tonnage distribution by domain. The 85th percentile is 27.1 kWh/t. The highest BWi value (27.1 kWh/t) applies to Domain 31 (147 Zone iron-rich mafic volcanics), which comprises 28.3% of the total orebody (refer to Table 10-1 for domain-specific distributions). Additional variability testing is scheduled for the next phase of the project to gain more granularity at the top end of the hardness curve.
Table 10-1:Orebody Breakdown by Zone and BWi
Domain ID | Tonnage | Proportion% | BWi (kWh/t) |
Domain 10 - Gibson South | 3,506,192 | 20.9 | 18.7(1) |
Domain 11 - Gibson North | 1,770,573 | 10.6 | 19.7(1) |
Domain 20 - Contact Zone | 1,253,925 | 7.5 | 20.7(2) |
Domain 30 – 147 Zone Mafic | 4,763,982 | 28.4 | 25.3(2) |
Domain 31 – 147 Zone Fe-rich mafics | 4,741,755 | 28.3 | 27.1(3) |
Domain 32 - Whiskey Jack | 717,137 | 4.3 | 19.5(4) |
Total Orebody | 16,753,564 | 100 | 23.4 |
Notes:
(1) | Average of three samples tested in 2025. |
(2) | Average of two samples tested in 2014 (XPS Phase 2). |
(3) | Single result of one sample tested in 2014 (XPS Phase 2). |
(4) | Average of two samples tested in 2025. |
| Project: 169525666 | 10-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
10.1.2Gravity Testing
Gravity recovery testwork conducted at ALS Metallurgy and XPS (on open pit samples) confirms the presence of coarse free gold, with gravity recoverable gold (GRG) test values ranging between 4% and 32%. Extended gravity recoverable gold (EGRG) tests achieved mass pulls below 0.2% of new feed mass, with high gold grades recovered to a concentrate between 200 g/t and 1,200 g/t Au, confirming the presence of free coarse gold in the samples tested. The underground samples tested in 2025 contained significantly less GRG compared to the open pit samples tested during preceding test programs. For the underground ore, a gravity concentration step is not essential and can be omitted. Inclusion of a gravity recovery step is recommended for treatment of the open pit ores.
10.1.3Flotation
Bulk sulphide flotation has been shown to be highly effective on Grey Fox ore types, especially for the pyritic and high-sulphur ore types. Testing by XPS and SGS on open pit samples yielded gold recoveries ranging from 91% to 97% into an 8% to 12% mass pull primary concentrate, using standard xanthate-type collectors at natural pH. The highest recoveries exceeding 95% were achieved at finer grind sizes (P80 = 60 µm). However, subsequent testwork confirmed that similar recoveries could be achieved at coarser grind sizes (up to P80 = 120 µm). The flotation concentrates produced were primarily pyrite with lower amounts of base metals, amenable to direct cyanidation. A carbon pre-float was ineffective due to the presence of carbonates, although this was not found to have a significant impact on overall flotation performance. Underground mine samples tested in 2025 yielded marginally lower overall recoveries using a flotation flowsheet, with an average gold recovery of 87.2%.
For all samples tested to date, a gravity-flotation flowsheet outperformed a gravity-leach flowsheet by 7% to 14% in terms of overall gold recovery. However, the rougher flotation concentrates produced did not achieve saleable concentrate grades as a standalone product. Further upgrading through additional cleaning stages would be required, but these have not been tested to date.
10.1.4Cyanidation of Flotation Products
Cyanidation of the flotation concentrates resulted in variable gold extraction, dependent on pyrite content and grain size. In general, as-floated concentrates (P₈₀ ~60 µm) yielded gold recoveries via cyanidation of 77% to 82% for the open pit samples. Regrinding of the concentrates to a P₈₀ ~25 µm improved gold extraction by approximately 2% to 4%. No additional benefit was observed by grinding to finer sizes approaching a P₈₀ ~12 µm. This suggests that some of the contained gold in pyrite is either very fine and locked within the pyrite lattice or is in solid solution and therefore not accessible through cyanidation.
For the underground samples, the results were more variable, with cyanidation gold extractions after regrinding ranging between 46% and 95%. The 46% result is considered anomalous, as leaching was not complete by the end of the test. After discounting this result as anomalous, two of the other seven samples yielded extractions on the order of 70%. Therefore, the underground samples underperformed compared to the open pit samples.
| Project: 169525666 | 10-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Cyanidation of flotation tailings consistently yielded high extractions. The open pit samples again outperformed the underground samples, with extractions exceeding 74% and final tailings grades below 0.1 g/t Au achieved. By comparison, the underground samples yielded an average extraction of 72% and an average final tailings grade of 0.19 g/t Au.
A split-leach approach, comprising concentrate and tailings leaching, is supported by the testwork, with the potential to match or exceed whole-ore leach recoveries while decoupling primary grind size, to some extent, from overall recovery, thereby offering potential savings in grinding costs.
10.1.5Whole-Ore Cyanidation
Whole-ore leach testwork was conducted on a range of composite materials and showed a wide range of recoveries tied to head grade and sulphur content. Free-milling ores from the 147 Zone returned gold recoveries of 88% to 94% at moderate grind sizes (P₈₀ of 75 to 100 µm). In contrast, low-grade pyritic ores or those with high S/Au ratios from the Contact Zone (CZ) and Grey Fox South showed reduced recovery, with values on the order of 71% to 80%, even after extending leach durations beyond 24 h.
The open pit samples tested in 2025 exhibited similar variability, ranging from as low as 64% recovery to as high as 92% recovery, with an average of 80%.
Preg-robbing is minimal and appears to correlate with total organic carbon (TOC) levels above 0.5%. The whole-ore cyanidation route is viable for higher-grade, low-sulphur ores, but should be avoided for high-pyrite or low-grade domains due to lower recoveries and high reagent consumption.
10.1.6Cyanide Detoxification
Cyanide (CN) destruction via the SO₂/air process was demonstrated to be effective. In batch and continuous tests conducted on leached slurries from both the 147 Zone and CZ master composites (MCs), Weak Acid Dissociable (WAD) CN levels were reduced from approximately 165 mg/L to <0.1 mg/L using SO₂ doses of 4.0 to 4.8 g/g CNWAD and a copper catalyst at 0.06 to 0.12 g/g CNWAD. The resulting solutions met Ontario Provincial Water Quality Objectives (PWQO) guidelines for cyanide and most metals. Some elevated molybdenum levels were noted in decant solutions, but all other metals remained within acceptable limits. The process is considered robust and scalable.
The underground mine samples from Whiskey Jack and Gibson Zones have not been tested to date but their response to this method of detoxification is expected to be similar. Testing is recommended to confirm this assumption.
10.1.7Sedimentation
Settling tests show that underflow densities of approximately 65% solids (w/w) can be achieved using non-ionic flocculants at dosages on the order of 25 g/t. Dynamic settling tests yielded optimum solids loadings of 0.41 to 0.47 t/m2/h for the 147 Zone and CZ, respectively. Rheology testing confirms manageable yield stresses (27 to 52 Pa at 68% solids), indicating that conventional thickening and deposition strategies are applicable. The sedimentation behavior of the Whiskey Jack and Gibson Zone underground samples was
| Project: 169525666 | 10-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
not tested. Future sedimentation testwork should include flotation concentrate samples to confirm the sizing of a concentrate thickener for the proposed flowsheet.
10.1.8Environmental
Static geochemical testing, including acid-base accounting, net acid generating, and shake flask extraction (SFE) testing of waste rock and tailings materials, suggests that most samples are non-potentially acid generating (NPAG), with 70% to 78% exceeding the neutralization potential ratio (NPR) >2 threshold. The remainder are considered uncertain and subject to ongoing kinetic testing. Paste pH values for all samples were alkaline (8.5 to 9.6), and sulphur was dominantly present as sulphide. Tailings residues from cyanidation and detoxification were classified as NPAG, with a Neutralizing Potential to Acid Potential (NP:AP) ratio greater than 40. Decant water chemistry met applicable discharge criteria, aside from minor molybdenum exceedances. No environmental testwork was conducted on underground samples as part of the 2025 program.
10.2Introduction
This chapter summarizes all available metallurgical testwork results for the Grey Fox deposit, together with other pertinent information required to support preliminary feasibility and trade-off studies. For the purposes of this report, the testwork programs were grouped as historical programs, referring to programs conducted for previous owners, and recent programs conducted by McEwen. Process design criteria are defined based on these test results and are used as the basis flowsheet development and subsequent equipment sizing for the studies.
10.3Test Work Completed to Date
This section summarizes all completed metallurgical and geochemical testwork available on the Grey Fox deposit. Please refer to Table 10-2, where each document is listed by its name, title, and general theme, excluding any reports that are strictly proposals or quotations for future work.
Table 10-2:Test work Programs
Authoring Entity and Date | Report Title | Scope of Work |
JKTech, Oct. 2012 | SMC Test Report on Three Samples | Comminution parameters for 147, |
| from Grey Fox | breccia, and tuff domains |
SGS Canada, March 27, 2013 | 13327-002 Met Report: A | Gravity, flotation, whole-ore |
| continuation of testwork on samples | leaching, cyanide detox, rheology |
| from Grey Fox | |
SGS Canada, March 27, 2013 | 13327-002 QEMSCAN Report: A | Bulk mineralogy and gold |
| continuation of testwork on samples | deportment |
| from Grey Fox | |
XPS Consulting and Test work | Geometallurgical Definition and | Initial scoping-level gravity and |
Services, Dec. 6, 2013 | Metallurgical Assessment of Grey | cyanidation tests |
| Fox Zones, Phase 1 | |
| Project: 169525666 | 10-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Authoring Entity and Date | Report Title | Scope of Work |
XPS Consulting and Test work | Geomet Definition and Metallurgical | Variability testing of multiple 147 |
Services, Feb. 10, 2014 | Assessment of Grey Fox Zones, | Zone and CZ composites |
| Phase 2 | |
XPS Consulting and Test work | Geometallurgical Assessment of | Flotation and leaching of flotation |
Services, Nov. 10, 2014 | Grey Fox Pyritic (Phase 3) and Grey | products. Inclusion of Grey Fox |
| Fox South | South. |
XPS Consulting and Test work | Brigus Grey Fox Phase IV: Leaching | Flotation optimization and carbon |
Services, June 9, 2015 | with Flotation | prefloat analysis |
Golder Associates, March 30, 2016 | Grey Fox Deposit – Interim kinetic | Leach columns and kinetic test |
| geochemistry results update #2 | results over short durations |
ALS Metallurgy, Feb. 11, 2020 | KM6034 –Metallurgical and | Cyanidation leach, grind sensitivity, |
| Environmental Test Work for the | environmental residue |
| Grey Fox Deposit | characterization. Grey Fox 147NE |
| | Composite |
ALS Metallurgy, October 2025 | KM7663 –Metallurgical and | Comprehensive test program for the |
| Environmental Test Work for Grey | previously untested Whiskey Jack |
| Fox Underground Zones | and Gibson Zones |
10.4Historical Metallurgical Testing Results
10.4.12013 SGS Master Composite & Variability Program
The report titled “An Investigation into Continuation of Testwork on Samples from Grey Fox” (SGS Project 13327-002, March 27, 2013) (SGS, 2013) was commissioned to support the ongoing metallurgical characterization of ore from both the 147 Zone and the CZ and included an expanded testwork scope focused on processing and environmental aspects.
10.4.1.1Sample Selection and Compositing Rationale
Two (2) MCs were generated from coarse assay rejects (stage‑crushed to <10 mesh) representing the 147 Zone and CZ ore types. Sub-sampling instructions were provided by EHA Engineering; preparation, splitting and head sampling were completed at SGS. Composite design targeted representative lithologies and gold grade population, while providing ≥10 kg for each downstream test per domain.
10.4.1.2Head Assay
Screened‑metallics fire assay indicates head grades of 3.35 g/t Au for the 147 Zone MC and 4.64 g/t Au for the CZ MC, with >97% of the gold reporting to the -105 µm fraction. There is good agreement between the grades determined through the screened metallics procedure and the direct fire assays. This suggests the absence of a significant nugget effect. This observation is supported by the high proportion of gold in the - 150 mesh fraction.
Multi‑element Inductively Coupled Plasma scans showed low deleterious element levels (Cu ≤0.015%, As <50 ppm), while total carbon occurred mainly as carbonate (~95% of Ct). QEMSCAN analysis identified
| Project: 169525666 | 10-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
a predominantly quartz–carbonate gangue with 3% to 5% pyrite; visible gold was free‑milling and largely liberated at <75 µm. Key results are summarized in Table 10-3.
Table 10-3:Head Assays for 147 Zone and CZ Master Composites
Master | Screened | Direct Fire | Cu (%) | Ag (g/t) | S (%) | Ct (%) | CO3 (%) |
Composite | Metallics Au | Assay Au | | | | | |
| (g/t) | (g/t) | | | | | |
147 Zone | 3.35 | 3.36 | 0.010 | 1.6 | 1.70 | 2.76 | 9.77 |
CZ | 4.64 | 4.56 | 0.015 | 1.8 | 1.90 | 1.91 | 6.61 |
10.4.1.3Bulk Modal Mineralogy
Modal mineralogy determined by QEMSCAN at a grind of P₈₀ ~150 µm revealed that both MCs were dominated by silicate gangue (>70 vol%), with carbonates constituting the next most abundant group, and sulphides making up only a few percent. Please refer to Figure 10-1. The graphite composite exhibited similar silicate proportions but contained ~4% pyrite and trace graphite.

Figure 10-1: Modal Compositions of 147 Zone, CZ and Graphite Master Composites
| Project: 169525666 | 10-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
10.4.1.4Grain Size and Liberation Statistics
QEMSCAN particle sectioning across four sieve fractions (+150 µm, –150 µm/+75 µm, –75 µm/+25 µm and –25 µm) showed that:
| ● | Pyrite liberation averaged 70% across the whole feed. Liberation improved markedly with size reduction, reaching ~80% in the –75 µm/+25 µm band and >90% in the –25 µm band for both MCs. Non-liberated pyrite was predominantly intergrown with silicates (hard and soft) with only minor complex locking. |
| ● | Silicate gangue (quartz + feldspars + chlorite/sericite) was inherently well liberated (>90% free or liberated) at all sizes. |
| ● | Carbonate liberation was limited in the coarse fractions, with only ~45% free/liberated above 150 µm. Liberation improved to ~60% in the –75 µm/+25 µm interval and to 85%–90% below 25 µm. Residual locked carbonate was mainly associated with silicates. |
Table 10-4 below summarizes how much of the pyrite (the main sulphide of economic interest) was either free or liberated. Values were calculated from the liberation data tables in the SGS QEMSCAN report [3] for the three composites. These data confirm that a primary grind of P₈₀ = 75 µm is sufficient to expose the majority of gold‑bearing pyrite surfaces, consistent with the >90% Au flotation recoveries obtained in SGS
Tests F7–F8 [2].
Table 10-4:Pyrite Liberation Per Size Range for Three Composites
Size Fraction | 147 Zone MC | CZ MC | Graphite Composite |
Combined | 74.4% | 74.9% | 72.1% |
+150 µm | 58.9% | 51.0% | 36.2% |
-150 µm/+75 µm | 69.6% | 69.2% | 69.4% |
-75 µm/+20 µm | 80.9% | 77.7% | 80.8% |
-20 µm | 91.3% | 92.6% | 95.3% |
10.4.1.5Gravity Recovery
EGRG tests on the 147 Zone MC achieved 28% gold recovery to a Mozley concentrate grading 629 g/t Au at P80 ≈ 91 µm, while a finer grind (P80 ≈ 69 µm) increased recovery to ~32% with concentrate grades exceeding 1,100 g/t Au. The CZ MC yielded ~22% GRG at a similar grind, reflecting a higher proportion of gold hosted in sulphide minerals. Refer to Table 10-5 for detailed results.
Table 10-5:Gravity Recovery for 147 Zone and CZ
Test ID | Ore Type | Grind P80 (µm) | Conc. Mass (%) | Conc. Au (g/t) | Au Recovery (%) |
G 5 | 147 MC | 91 | 0.13 | 629 | 28.0 |
G 8 | 147 MC | 69 | 0.10 | 1 142 | 32.1 |
G 3 | CZ MC | 97 | 0.18 | 511 | 17.2 |
G 9 | CZ MC | 74 | 0.09 | 1 242 | 21.6 |
| Project: 169525666 | 10-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
The gravity recoveries achieved are marginally below the rule-of-thumb minimum of 25% recovery required during laboratory testing to justify inclusion of a gravity recovery step in the flowsheet.
10.4.1.6Flotation
Sulphide flotation with carbon pre-flotation of gravity tails was conducted using a reagent suite of kerosene, potassium amyl xanthate (PAX), methyl isobutyl carbinol (MIBC), and MaxGold 900 (modified dithiocarbamate). This testing showed gold recoveries exceeding 90% at mass pulls between 10% and 15%, producing concentrates grading 21 g/t to 33 g/t Au.
Combined gravity and flotation recoveries of +93% and +94% were observed for 147 Zone and CZ composites, respectively.
At the time of the flotation tests, only total carbon assays were available, and it was suspected that the carbon was only present in organic or graphitic forms. However, it was later determined that most of the carbon present was in the form of carbonate, which explains the poor performance of the carbon pre-float, which recovered only 1.8% of the contained carbon in tests F-7 and F-8.
Refer to Table 10-6 and Table 10-7 for additional information.
Table 10-6:Flotation Results for 147 Zone and CZ
ID | Product | Wt% | Au (g/t) | TOC (%) | S (%) | Au Dist | C Dist | S Dist |
Test | | | | | | (%) | (%) | (%) |
F-8 (147) | Carbon Pre- | 1.6 | 35.8 | 3.25 | 2.72 | 25.3 | 1.8 | 2.8 |
| Float Conc | | | | | | | |
F-8 (147) | Bulk Ro Conc | 8.2 | 18.1 | 1.96 | 17.4 | 66.3 | 5.8 | 93.6 |
F-8 (147) | Carbon + Ro | 9.8 | 21.0 | 2.17 | 15.0 | 91.5 | 7.6 | 96.4 |
| Conc | | | | | | | |
F-8 (147) | Ro Tail | 90.2 | 0.21 | 2.85 | 0.06 | 8.5 | 92.4 | 3.6 |
F-8 (147) | Head | 100 | 2.24 | 2.78 | 2.78 | 100 | 100 | 100 |
| (Calculated) | | | | | | | |
F-8 (147) | Head (Direct) | | 2.08 | 2.76 | 1.57 | | | |
F-7 (CZ) | Carbon Pre- | 1.7 | 30.0 | 2.13 | 4.13 | 9.9 | 1.8 | 2.8 |
| Float Conc | | | | | | | |
F-7 (CZ) | Bulk Ro Conc | 12.5 | 33.7 | 0.87 | 18.0 | 83.5 | 5.6 | 92.3 |
F-7 (CZ) | Carbon + Ro | 14.2 | 33.3 | 1.02 | 16.4 | 93.4 | 7.5 | 95.7 |
| Conc | | | | | | | |
F-7 (CZ) | Ro Tail | 85.8 | 0.39 | 2.08 | 0.14 | 6.6 | 92.5 | 4.9 |
F-7 (CZ) | Head | 100 | 5.05 | 1.93 | 1.93 | 100 | 100 | 100 |
| (Calculated) | | | | | | | |
F-7 (CZ) | Head (Direct) | | 4.36 | 1.91 | 2.59 | | | |
| Project: 169525666 | 10-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Table 10-7:Stage Recoveries after Carbon Pre-flotation Results for 147 and CZ Samples
| 147 Zone | CZ |
Gravity | 28.0 | 17.2 |
Flotation | 91.5 | 93.4 |
Combined | 93.9 | 94.5 |
10.4.1.7Cyanidation of Gravity Tailings
Bottle-roll cyanidation tests were conducted on gravity tailings at 40% (w/w) solids, pH 10.5–11.0 and 0.5 g/L NaCN for 48 h, following a 1-h pre-aeration step. Results are shown in Table 10-8.
Table 10-8:Bottle Roll Cyanidation Results for 147 and CZ MC Samples
Composite | Head Feed | Cyanidation Stage | Overall Au | Residue | NaCN Cons. | CaO Cons. |
| Au (g/t) | Au Extraction (%) | Recov. (%) | Au (g/t) | (kg/t) | (kg/t) |
147 MC | 2.36 | 75 | 83 | 0.58 | 0.51 | 0.97 |
CZ MC | 4.22 | 69 | 76 | 1.29 | 0.55 | 0.88 |
Combined gravity + cyanidation extractions yielded overall gold recoveries of 83% (147 MC) and 76% (CZ MC).
10.4.1.8Detoxification
Leach tails from CN-16 (147 MC) and CN-17 (CZ MC) were subjected to an SO₂/Air–Cu-catalyzed detox process consisting of one (1) batch and three (3) continuous trials for each composite. The retention time for the continuous trials were approximately 60 minutes. Results are summarized as follows:
| ● | 147 Zone MC: Weak-acid-dissociable cyanide (CNWAD) dropped from 169 mg L⁻¹ to ≤ 0.1 mg L⁻¹ in every continuous run. Sulphur dioxide consumption ranged from 4.75 g to 4.34 g SO₂ per gram of CNWAD, with a constant Cu catalyst dose of 0.11 g g⁻¹ CNWAD. |
| ● | CZ MC: CNWAD was similarly reduced from 162 mg L⁻¹ to ≤ 0.1 mg L⁻¹ across all three continuous tests. Sulphur dioxide demand varied between 4.50 g and 3.98 g SO2 per gram of CNWAD. Copper addition started at 0.12 g per gram of CNWAD (CND 2) and was lowered to 0.06 g per gram of CNWAD for trials CND 2-1 and CND 2-2. |
10.4.1.9Sedimentation
Settling and rheology tests were performed on 10 kg lots of the 147 MC and CZ MC, each milled to P₈₀=83 µm. Flocculant optimization showed that a non-ionic polymer (Magnafloc 351) proved optimal at a dosage rate of 15 g/t. Static settling tests were assessed at varying feed rates, after which it was determined that a 10% pulp density produced the best clarity/underflow compromise for both composites. Refer to Table 10-9 for sedimentation test results.
| Project: 169525666 | 10-9 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Table 10-9:Dynamic Solid-Liquid Separation Tests Results
Test No. | Feed Solids | Underflow | Unit Area | Initial Rate |
| (%) | Solids (%) | (m²/t/d) | (m/h) |
5 | 5 | 62 | 0.084 | 0.94 |
6 | 10 | 68 | 0.078 | 0.56 |
7 | 15 | 67 | 0.119 | 0.20 |
8 | 20 | 66 | 0.232 | 0.06 |
Dynamic thickening tests showed that, for the 147 MC, 26 g/t flocculant resulted in 64.5% solids underflow density at 88 m³/m²/d net rise rate, 0.41 t/m³/h solids loading, and 3.6 m³/m²/ h net hydraulic loading. For the CZ MC, at a 20 g/t flocculant dosage, a 65% underflow density was obtained, with net rise rate of 103 m³/m²/d, solids loading of 0.47 t/m³/h, and net hydraulic loading of 4.3 m³/m²/h.
Both thickener underflows exhibited a critical solids density of ~68%. At this density, the 147 Zone MC displayed yield stresses of 41 Pa (unsheared) and 27 Pa (post-shear), while the Contact-Zone MC measured 52 Pa and 30 Pa, respectively. JKTech Comminution Testing – “Final SMC Report for Grey Fox Project” (JKTech Job 12007/P53, 12 October 2012).
10.4.1.10Sample Handling and Density Checks
SMC test data for three (3) Grey Fox composites (147 Zone MC, Breccia, and Tuff) were received by JKTech from SGS Minerals Services on October 12, 2012 and analyzed to generate JKSimMet comminution parameters. The SMC protocol, a drill‑core variant of the JK Drop‑Weight test, provides ore breakage characteristics (A, b, ta, DWi) and derives specific‑energy indices (Mia, Mih, Mic) essential for preliminary comminution circuit design.
The core for all three (3) Grey Fox composites (147 Zone MC, Breccia, and Tuff) was quarter-cut, weighed in air and water, and its density established prior to breakage testing. Average specific gravities determined from the SMC Test were 2.91 for both the Breccia and 147 Zone MCs and 2.71 for the Tuff sample.
10.4.1.11Drop-Weight Index Test Results
The Drop‑Weight Index (Dwi) indicates a consistently hard ore. Axb values corroborate this, with the Breccia sample being the most resistant to impact breakage. Note that lower Axb values indicate a more competent sample and vice versa. The resultant test parameters and obtained indices are shown in Table 10-10.
Table 10-10:JKTech Results
Sample | DWi | Axb | Category | ta | Mia (kWh/t) | Mih (kWh/t) | Mic (kWh/t) |
| (kWh/m³) | | | | | | |
147 Zone | 9.01 | 32.6 | Hard | 0.29 | 22.9 | 18.0 | 9.3 |
Breccia | 9.58 | 30.1 | Hard | 0.27 | 24.0 | 19.1 | 9.9 |
| Project: 169525666 | 10-10 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Sample | DWi | Axb | Category | ta | Mia (kWh/t) | Mih (kWh/t) | Mic (kWh/t) | |
| (kWh/m³) | | | | | | | |
Tuff | 7.82 | 35.3 | Moderately | 0.33 | 21.7 | 16.6 | 8.6 | |
| | | Hard | | | | | |
DWi values plot between the 76th and 89th percentiles of the >11,000‑sample SMC database, underscoring the ore’s high competency, while Axb percentiles are in the 13% to 26% range, meaning 74% to 87% of the ores in the database are softer. Breccia is, as expected, the hardest sample tested. The t10 @1 kWh/t averages 26.9%, which is also in the harder quartile of JKTech data.
High DWi and low Axb dictate a power‑intensive comminution circuit. JKTech correlations indicate that ore with these hardness characteristics typically requires:
| ● | Elevated SAG mill specific energy or the inclusion of a pebble crusher is required to maintain throughput. |
| ● | Potential benefit from high-pressure grinding rolls (HPGR) ball‑mill flowsheets where Mih (~17 to 19 kWh/t) falls below Mia, offering energy savings of ~10% to 15% relative to SAG mill–Pebble Crusher–Ball mill Circuit (SABC) designs. This is offset by a relatively modest throughput and low cost of electricity in Ontario which makes the HPGR option less attractive |
10.4.2Phase 1 Variability Assessment
The Phase 1 metallurgical testwork program was conducted by XPS in 2013 and documented in “Geomet Definition & Metallurgical Assessment of Grey Fox Zones, Phase 1” (Report 5013826.00, dated December 6, 2013) (XPS, 2013) represents the first systematic geometallurgical assessment of the Grey Fox deposit and was conducted to better understand ore variability and its implications for gold recovery across different geological and lithologic domains.
The primary aim of the program was to assess how gold recovery performance varies with geological characteristics—such as lithology, sulphide content, alteration, and depth—by conducting metallurgical and mineralogical testing on a carefully selected suite of composite samples.
The Phase 1 metallurgical testwork program provides critical early-stage insights into ore variability and its implications for gold recovery across the deposit. The 2013 study forms the foundation for defining geometallurgical units and supports the development of a predictive framework for processing behavior, laying the groundwork for optimization in both mine design and processing strategy.
10.4.2.1Variability Sample Matrix
Eight (8) variability composites were selected to benchmark the principal geometallurgical controls at Grey Fox. Selection criteria targeted lithology (147 Zone vs CZ), host unit, and depth (Upper vs Lower horizons) while maintaining a similar head‑grade window (~3 g/t) to isolate textural and sulphide effects. The resulting matrix provides a representative first‑pass dataset on which subsequent phases will be built (Table 10-11).
| Project: 169525666 | 10-11 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Table 10-11: Sample Compositing Matrix
Comp # | Zone | Host Lithology | Horizon | Target Au (g/t) | Au (g/t) |
1 | 147 FW | Variolitic Volcanic (VIV) | Upper | 2.97 | 4.31 |
2 | 147 FW | VIV | Lower | 2.92 | 6.37 |
3 | 147 HW | Mafic Intrusive (MI) | Upper | 3.08 | 2.20 |
4 | 147 HW | MI | Lower | 2.90 | 3.15 |
5 | CZ FW | Sedimentary (SED) | Upper | 2.96 | 3.37 |
6 | CZ FW | SED | Lower | 2.99 | 5.70 |
7 | CZ HW | Mafic Volcanic (MV) | Upper | 2.96 | 2.36 |
8 | CZ HW | MV | Lower | 2.97 | 3.03 |
Note: HW = Hangingwall, FW = Foot Wall
10.4.2.2Head Assay and Mineralogical Correlation
Head assays showed gold grades from 2.20 g/t to 6.37 g/t and sulphur grades from 0.93% to 2.92%. Elevated sulphur (proxy for pyrite) was most pronounced in CZ units and correlates negatively with leach recovery. Composite‑scale QEMSCAN and backscatter electron imaging confirmed that CZ MV samples host finer, pyrite‑locked gold grains, whereas 147 Zone samples contain coarser, partially liberated gold. Typical major‑element chemistry for the eight (8) composites is summarized in Table 10-12.
Table 10-12: Head Assays of Composites
Comp # | Zone | Au (g/t) | S (%) | Fe (%) | Pyrite vol. (%)† |
1 | 147 FW | 4.31 | 1.18 | 10.49 | 2.8 |
2 | 147 FW | 6.37 | 1.47 | 10.28 | 4.1 |
3 | 147 HW | 2.20 | 0.93 | 9.79 | 1.6 |
4 | 147 HW | 3.15 | 1.14 | 9.79 | 2.0 |
5 | CZ FW | 3.37 | 2.12 | 4.33 | 4.6 |
6 | CZ FW | 5.70 | 1.33 | 3.57 | 6.6 |
7 | CZ HW | 2.36 | 1.41 | 7.27 | 4.0 |
8 | CZ HW | 3.03 | 2.92 | 8.46 | 6.6 |
Note: † Pyrite volume derived from modal mineralogy tables (XPS Phase 1 Report Appendices 2).
| Project: 169525666 | 10-12 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
10.4.2.3Whole-Ore Cyanidations
Whole-ore cyanidation testing was conducted using a batch (bottle-roll) methodology on all eight variability composites. Test conditions were standardized across all samples to enable direct performance comparison:
| ● | Charge size: 2 kg. |
| ● | Initial pH: 11.0 (adjusted with lime addition). |
| ● | NaCN dosage: 2,500 mg/L (maintained at equilibrium throughout test). |
| ● | Pulp density: 40% solids (w/w). |
| ● | Dissolved oxygen: 8–10 mg/L (maintained by air sparging). |
| ● | Sampling intervals: 2, 4, 6, 24, and 48 h. |
Final gold recovery varied considerably across the composites, ranging from 70% to 93%, and correlated primarily with ore head grade and sulphur content.
Dissolved oxygen levels were maintained within the 8-10 ppm range through air sparging. Sodium cyanide consumption spanned 1.26 kg/t (MV Upper) to 2.45 kg/t (147 FW Lower), as shown in Table 10-13.
Table 10-13: Whole-Ore Cyanidation Results
Comp # | Zone | Au Recovery | NaCN Consumed | Average Au grain size |
| | (%) | (g/t) | (µm) |
1 | 147 FW | 84.8 | 1,859 | 5.6 |
2 | 147 FW | 93.4 | 2,452 | 4.4 |
3 | 147 HW | 86.2 | 1,383 | 3.2 |
4 | 147 HW | 89.3 | 2,081 | 7.3 |
5 | CZ FW | 87.5 | 2,109 | 9.2 |
6 | CZ FW | 92.8 | 1,725 | 31.9 |
7 | CZ HW | 76.6 | 1,258 | 5.4 |
8 | CZ HW | 70.0 | 1,667 | 2.7 |
Kinetic analysis of leach solutions sampled at 2, 4, 6, 24, and 48 h revealed different dissolution kinetic profiles by Zone: 147 Zone composites leached fast, reaching 65% of their ultimate extraction within the first 2 h, whereas CZ ores lagged significantly, with averaged 2-h recoveries of ~41%. These kinetic differences have implications for leach tank sizing: CZ ore required longer residence times to achieve comparable recovery to 147 Zone material at the same grind size.
With the average recovery of 85% after 2 days of leaching, it is evident that the ore body contains significant portions that are mildly refractory.
Gold extraction is chiefly grade‑driven with a secondary penalty from pyrite. 147 Zone composites averaged 88% recovery, whereas CZ composites averaged 81%, primarily due to the poor‑performing MV subgroup.
| Project: 169525666 | 10-13 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Within zones, upper vs lower horizons did not materially affect recovery at this grind size. The data also confirms that higher sulphur grades (>2%) combined with lower gold grades (<4 g/t) generally yields a sub 80% recovery. The two worst performing variability samples (7 and 8) also exhibited below average gold grain sizes, again hinting at some encapsulation of gold within the pyrite matrix. The results suggest that higher grades occur when coarse free gold is present, while lower grades are associated with much finer gold, often locked in sulphides and hence not amenable to cyanidation.
10.4.3Phase 2 Composite Program
The Phase 2 metallurgical testwork program was conducted by XPS and documented in “Geomet Definition & Metallurgical Assessment of Grey Fox Zones, Phase 2” (Report 5013826.00, dated February 10, 2014) (XPS, 2014a). This Phase 2 campaign continued the systematic geometallurgical evaluation of the Grey Fox deposit initiated in Phase 1, with a specific focus on validating and refining metallurgical domains and assessing their predictive value for processing performance.
The results of XPS’s Phase 1 testwork program demonstrated that the four laboratory composites comprising high- and low-grade material from the 147 Zone, and the two principal lithologies from the CZ (MV and SEDS units), are accurate, homogeneous, and representative of the current resource. The testwork further confirmed that these composites provide a suitable and reliable basis for predicting full-scale plant performance.
The main objectives of the Phase 2 program were:
| ● | To confirm and validate the metallurgical behavior of key geometallurgical units through comparative leaching and flotation performance of the four selected composites. |
| ● | To assess the reproducibility and internal variability of leach recoveries and flotation responses, ensuring these units are suitable for metallurgical modeling and process planning. |
| ● | To refine and update Phase 1 conclusions using material from recent drilling, with particular emphasis on head-grade characterization, sulphur and carbon content, and ore hardness. |
| ● | To reaffirm the geometallurgical drivers for processing behavior, namely that Grey Fox remains a coarse-gold, pyrite-hosted deposit where metallurgical response is closely tied to sulphur and carbon variability. This included observations on the influence of carbonaceous content, pyrite deportment, and gold grain size on recovery. |
| ● | To explore the potential for flotation as a recovery route for high-sulphide, low-recovery leach material by quantifying gold recovery into sulphide-rich flotation concentrates. |
In summary, the Phase 2 metallurgical testwork program provides enhanced confidence in the use of the four geometallurgical composites as representative processing units for Grey Fox. By validating composite consistency and updating metallurgical profiles using current drilling, the program confirms that recovery variability is chiefly controlled by sulphide and carbon content. These findings support the development of predictive recovery models and provide a basis for informing plant design decisions.
10.4.3.1Composite Definition and Representativeness
Four (4) geometallurgical composites were prepared from drill core intervals considered representative of the Grey Fox orebody: 147 Zone High Grade (HG), 147 Zone Low Grade (LG), CZ–Massive Volcanic (MV)
| Project: 169525666 | 10-14 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
and CZ–Siltstone/Epidote/Diopside Skarn (SEDS). Core was stage‑crushed to –10 mesh, blended and rotary‑split. Triplicate external reference distribution assays confirmed homogeneity with relative standard deviations ≤7% for gold. The resulting head grades bracket the expected resource cut‑off ranges and provide a robust basis for flowsheet selection (Table 10-14).
Table 10-14: Composites Definitions
Composite | Lithology / Zone | Au (g/t) |
147 HG | Quartz feldspar porphyry | 9.49 |
147 LG | Mafic volcanic | 1.83 |
Contact MV | Massive volcanic | 3.91 |
Contact SEDS | Bedded tuffaceous siltstone | 2.96 |
10.4.3.2Head Grade and Mineralogy
Head assay results (as shown in Table 10-15) confirm gold association with pyrite. Arsenic and total carbon remain modest (As <0.02 %, TOC <3%) across all composites. Sulphur in Contact SEDS (3.1 %) is ~60% higher than Contact MV (1.9%), reversing Phase 1 trends and explaining the lower leach response for SEDS. QEMSCAN imagery showed ~90% of gold as ≤10 µm inclusions in pyrite or at pyrite–silicate boundaries, supporting a sulphide flotation flowsheet.
Table 10-15: Composite Head Assays
Composite | Au (g/t) | As (%) | Fe (%) | S (%) | TOC (%) | Remarks |
147 HG | 9.49 | 0.013 | 10.12 | 1.86 | 2.12 | Head grade higher than model; blended later |
147 LG | 1.83 | 0.006 | 10.06 | 1.03 | 1.62 | Provides dilution for 6 g/t blend |
Contact MV | 3.91 | 0.008 | 7.81 | 1.95 | 3.09 | Highest carbon; potential preg robbing |
Contact SEDS | 2.96 | 0.005 | 4.69 | 3.05 | 1.49 | Most pyritic sample |
10.4.3.3Comminution
BBWi values placed Grey Fox ores among the very hardest gold deposits globally (19–26 kWh/t). These results supported a high‑power conventional SAG/ball‑mill circuit or, alternatively, a secondary crush / closed‑circuit ball‑mill configuration should SAG throughput prove limiting. Please refer to Table 10-16 for a summary of results.
Table 10-16: Composite Head Assays
Composite | BWi (kWh/t) | Percentile* | Comment |
147 HG | 25.9 | 99 | Very hard – upper variability limit |
147 LG | 24.6 | 99 | Comparable hardness |
| Project: 169525666 | 10-15 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Composite | BWi (kWh/t) | Percentile* | Comment |
Contact MV | 22.1 | 97 | Slightly softer, very hard |
Contact SEDS | 19.2 | 89 | Hardness advantage |
10.4.3.4Gravity Recovery
Dedicated GRG testing was not repeated in Phase 2; however, rougher flotation concentrates showed gold call factors up to 120% (147 HG), indicating a persistent coarse‑gold/nugget component. Phase 1 testwork suggested 20% to 30% of gold is amenable to gravity; similar performance is inferred here, justifying a gravity circuit ahead of leach or flotation.
10.4.3.5Flotation
Single‑stage rougher flotation was carried out on all four composites at a grind P₈₀ ≈ 60 µm (consistent with the anticipated primary‑mill product), 40 min residence in a 5 L Denver cell, and a reagent suite comprising 110 g/t PAX and 25 g/t MaxGold 900, supported by 40 g/t MIBC frother. Flotation was done using tap water at natural pH of 8. Under these conditions gold recoveries ranged from 92.9% to 96.8% for the 147 Zone composites and 94.3% to 95.7% for the two CZ composites; pyrite recovery exceeded 95% in most cases while mass pull to concentrate ranged between 8% and 12%. Please refer to Table 10-17 for summary of the flotation results.
Table 10-17: Initial Flotation Results
Composite | Au Rec. (%) | FeS₂ Rec. (%) | SiO₂ Rec. (%) | Au Call Factor (%) |
147 Zone HG | 96.8 | 96.0 | 7.8 | 120 |
147 Zone LG | 92.9 | 95.0 | 7.6 | 125 |
Contact MV | 95.7 | 95.0 | 7.8 | 104 |
Contact SEDS | 94.3 | 95.5 | 11.7 | 85 |
Concentrate grades varied between 18 g/t and 105 g/t Au, with the higher values coinciding with the 147 Zone samples that contain a coarse gold component. The elevated “call factors” (>120%) calculated for 147 HG and LG indicate the presence of unassayed liberated gold remaining in the feed, whereas the lower call factor of 85% for Contact SEDS points to a finer gold‑in‑pyrite grain size. Overall, the data confirm that a single reagent recipe and 60 µm grind size can accommodate Grey Fox variability with minimal loss in performance, providing a sound baseline for the forthcoming locked‑cycle and concentrate treatment tests.
10.4.3.6Whole-Ore Cyanidation
Extended bottle‑roll cyanidation tests (sampling at 2, 4, 6, 24 and 48 h) conducted at P₈₀ ≈ 60 µm, 2,500 mg/l NaCN dosage, dissolved oxygen at >8 mg L⁻¹ and a target pH 11.0. Pulp Eh and residual CN⁻ were logged at 2, 8, 24 and 48 h intervals, but only the 24 h and 48 h gold extractions are reported by XPS and shown in Table 10-18.
| Project: 169525666 | 10-16 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Table 10-18: Extended Cyanidation Results
Sample | Head | NaCN | NaCN | Au | Au | Comments |
147 HG | 10.3 | 3.1 | 4.6 | 94.2 | 93.6 | Fast, diffusion limited after 8 h; no preg-robbing or thiocyanate build up |
147 LG | 2.42 | 1.7 | 2.4 | 82.2 | 83.2 | Kinetics governed by finer Au; plateau reached only after ~36 h |
147 Blend A | 7.09 | 1.0 | 1.4 | 90.5 | 93.0 | Confirms near linear grade vs recovery trend; CN efficiency improves at intermediate grade |
147 Blend B | 5.86 | 1.3 | 1.4 | 92.5 | 92.0 | Replicate validates projection at 6 g/t design grade |
Contact MV | 3.87 | 2.1 | 3.2 | 88.0 | 85.7 | Slight Au drop between 24 h & 48 h due to preg robbing by organic carbon (3% TOC) |
Contact SEDS | 3.07 | 1.6 | 2.2 | 70.8 | 70.5 | High sulphide slows dissolution; pre oxidation or finer grind recommended |
Based on the cyanidation results in Table 10-18, the 147 Zone behaved as a classic free‑milling system, with extraction almost linearly proportional to head grade. Blending high‑ and low‑grade material to a ~6 g/t Au feed grade yielded ~90% recovery after 24 h and exceeded 92% at 48 h. Cyanide consumption scaled with sulphide content but stabilised below 1 kg/t at the design grade, indicating that reagent efficiency improved when the excess sulphide surface area of low‑grade ore was diluted with high‑grade feed.
The CZ composited diverged markedly. Contact MV responds well initially (88% in 24 h) but showed a modest regression by 48 h, diagnosed by XPS as preg‑robbing from graphitic carbon that became active once dissolved gold concentrations fell below ~2 mg/L. In contrast, Contact SEDS extraction was inhibited from the outset, with only 71% of gold dissolved after 48 h. This behavior was attributed to the higher pyrite (~3% S) competing for cyanide and passivation of gold surfaces. Pre‑oxidation or finer grinding was therefore required for this domain.
Overall, these results confirmed that a whole‑ore leach flowsheet will be feasible for 147 Zone ore, provided that head grades stay above ~5 g/t (refer to Figure 10-2). For CZ ores, a flotation‑first route appears to be optimal. The blended tests clarified recovery at the reserve grade and will provide input into the recovery algorithms in the Grey Fox economic model.
| Project: 169525666 | 10-17 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing

Figure 10-2:Head Grade vs Recovery for 147 Zone
10.4.3.7Flotation Tailings Cyanidation
Although flotation tailings were not separately leached in Phase 2, the high (>95 %) pyrite recoveries imply low residual sulphide and a remaining unrecovered gold fraction of only 2%–3%, placing doubt on the efficacy and value of leaching flotation tails.
10.4.42014 Phase 3 Pyritic & South Study
The test program conducted in 2014 represents Phase 3 of metallurgical and geometallurgical investigation into the Grey Fox deposit by XPS for then-owner Brigus Gold. The findings of this testwork were documented in “Geometallurgical Assessment of Grey Fox Pyritic & Grey Fox South” (Report 5014812.00, dated November 10, 2014) (XPS, 2014b). This phase was aimed at advancing the process design by exploring the recovery behavior of both high-sulphur and variable-grade ore types through alternative flowsheet strategies.
The 2014 report documents Phase 3 metallurgical and geometallurgical testwork carried out by XPS on two ore sources from the Grey Fox deposit: a high-sulphur “Contact Zone Pyritic” composite and a suite of variability samples from Grey Fox South. The program combined bulk sulphide flotation, bottle-roll cyanide leaching, QEMSCAN mineralogy, and hardness testing to define geometallurgical units, measure gold deportment in pyrite, and establish how head grade and sulphur content control recovery. Its purpose was to generate the data needed to compare whole-ore leaching against flowsheets that float, regrind, and separately leach sulphide concentrates and tailings, thereby guiding process design for both the pyritic and Grey Fox South ores.
| Project: 169525666 | 10-18 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
This Phase 3 report extends the geometallurgical understanding of the Grey Fox deposit by targeting two challenging ore domains—high-sulphur pyritic and variable Grey Fox South ores. The comprehensive approach combining flotation, leaching, mineralogy, and hardness testing delivers the critical data needed to evaluate and compare processing strategies, optimize recovery, and support design decisions for future development phases.
10.4.4.1Sample Classification
Two distinct groups of samples were selected from the Grey Fox deposit to represent the expected variability in ore properties and associated metallurgical performance. One composite specifically represented the high-sulphur, low-grade CZ Pyritic ore, identified as potentially refractory due to its elevated sulphur content. In addition, six variability samples were sourced from the Grey Fox South zone. These samples spanned a range of lithologies including Variolitic Volcanics (VIV), Mafic Volcanics (MV), Mafic Intrusive (MI), and Sedimentary (SEDS) rocks, each reflecting a spectrum of gold and sulphur contents.
These Grey Fox South variability samples were later consolidated into four clearly defined geometallurgical units, facilitating easier interpretation and prediction of metallurgical performance:
| ● | High-grade (HG) ore with Au >4 g/t (Grey Fox South-HG). |
| ● | Low-grade (LG) ore with Au <4 g/t (Grey Fox South-LG). |
| ● | Low-grade, low-pyrite (LGC) ore defined by a S/Au ratio below 0.75 (Grey Fox South-LGC). |
| ● | Low-grade, high-pyrite (LGP) ore defined by a S/Au ratio above 0.75 (Grey Fox South-LGP). |
In parallel with the metallurgical classification, a detailed mineralogical analysis using QEMSCAN was undertaken on all feed samples and specifically on the CZ Pyritic concentrate after flotation, to thoroughly characterize pyrite liberation, gold deportment, and mineral associations impacting cyanide leach recoveries.
10.4.4.2Head Assays
Detailed head assays were conducted to characterize the ore samples prior to metallurgical testing. These assays highlighted the critical influence of sulphur and gold contents on downstream processing and recoveries. The CZ Pyritic composite specifically showed a relatively low gold grade of 1.92 g/t Au coupled with an elevated sulphur content of about 4.0%, resulting in a very high sulphur-to-gold ratio (S/Au ≈ 2.1), indicative of challenging recovery conditions.
The Grey Fox South geometallurgical units demonstrated a diverse set of head assay values, clearly delineating their metallurgical response, as shown in Table 10-19.
Table 10-19:Geomet Units Head Assay
Composite | Gold Grade (Au, g/t) | Sulphur (S,%) | S/Au Ratio |
CZ Pyritic | 1.92 | 4.0 | 2.1 |
Grey Fox South-HG | 5.3 | 1.5 | 0.28 |
Grey Fox South-LG | 0.95 | 1.4 | 1.5 |
| Project: 169525666 | 10-19 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Composite | Gold Grade (Au, g/t) | Sulphur (S,%) | S/Au Ratio |
Grey Fox South-LGC | 3.40 | 1.1 | 0.31 |
Grey Fox South-LGP | 2.99 | 3.9 | 1.3 |
10.4.4.3 | Comminution |
Ore hardness is critical for process design and throughput forecasting. Historical BWi data indicated that ores from the Grey Fox deposit vary from moderately hard to extremely hard. The CZ ores exhibited moderate hardness, with a BWi range from 19 kWh/t to 22 kWh/t. In contrast, the 147 Zone and particularly the VIV-rich ores from Grey Fox South displayed significantly higher hardness values, typically ranging from 24 kWh/t to 27 kWh/t, placing them in the category of very hard ores (Table 10-20).
Table 10-20: BWi Results by Zone
Zone / Lithology | BWi (kWh/t) |
Contact – SEDS-Tuff | 19.2 |
CZ – MV | 22.1 |
147 Zone – VIV + MI (LG) | 24.6 |
147 Zone – VIV + MI (HG) | 25.9 |
147 Zone – VIV + MV Blend | 27.1 |
In the case of Grey Fox South, this zone is largely comprised of VIV hosted ore with marginal amounts of MV and MI hosted ore making up the balance. This indicates that the expected BWi hardness of the Grey Fox South-hosted ore may fall between 24 kWh/t and 27 kWh/t and be considered in the 98th to 99th percentile for hardness.
To evaluate liberation and recovery trade-offs, all metallurgical testwork in this phase used a consistent primary grind size of approximately 60 µm (P₈₀). In addition, pyrite concentrates from flotation were further reground to finer sizes (25 µm and 12 µm) to investigate the impact on gold liberation and the subsequent extraction efficiencies via cyanide leaching.
10.4.4.4Whole-Ore Cyanidations
Whole-ore cyanidation tests involved duplicate 48-h bottle-roll leaches at a controlled pH of about 11 and cyanide concentration of approximately 2,500 ppm NaCN, with 50% solids loading. Both solutions and solids residues were assayed in duplicate, enhancing the reliability of the recovery estimates.
The CZ Pyritic composite achieved only moderate recovery (approximately 79%), indicating a significant proportion of gold being refractory and encapsulated in pyrite minerals. Grey Fox South geometallurgical composites yielded higher recovery rates reflecting the influence of gold grade and sulphur content, with HG achieving about 89%, LG around 73%, LGC around 75%, and LGP approximately 81% recovery, as shown in Table 10-21.
| Project: 169525666 | 10-20 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Table 10-21: Geomet Units Cyanidation Results
Composite | Gold Grade | Sulphur Grade | S/Au Ratio | Averaged Au |
| (g/t) | (%) | | Recovery (%) |
CZ Pyritic | 1.92 | 4.0 | 2.1 | 79.4 |
Grey Fox South-HG | 5.3 | 1.5 | 0.28 | 89.3 |
Grey Fox South-LG | 0.95 | 1.4 | 1.5 | 73.2 |
Grey Fox South-LGC | 3.40 | 1.1 | 0.31 | 75.5 |
Grey Fox South-LGP | 2.99 | 3.9 | 1.3 | 81.3 |
10.4.4.5Rougher Flotation
Rougher flotation tests were performed on 2-kg samples, at a grind size of P₈₀ of about 60 µm to evaluate the recovery of gold-bearing sulphides into a concentrate. The focus of the flotation tests was to determine the effect of pyrite-bearing ore; hence, only the CZ Pyritic composite and Grey Fox South-LGP composites were tested. The CZ Pyritic composite exhibited excellent flotation response, recovering approximately 93% of the gold and 97% of the sulphur into only 14% of the total mass. Similarly, the Grey Fox South-LGP composite showed comparable flotation efficiency, achieving about 95% gold recovery into a concentrate comprising approximately 15% of the total feed mass (Table 10-22).
Table 10-22: Geomet Units Flotation Results
Composite | Mass Pull (%) | Au Recovery (%) | Sulphur Recovery (%) |
CZ Pyritic | 14.0 | 93% | 97% |
Grey Fox South-LGP | 14.6 | 95% | Not reported |
10.4.4.6Flotation Tailings Cyanidation
Flotation tails were cyanide-leached without further regrinding. The tailings from the CZ Pyritic composite were successfully leached to a residual gold content of approximately 0.05 g/t Au. From the initial flotation tail feed (0.18 g/t Au), this represented around 74% recovery. Similarly, for the LGP composite, a gold recovery of 74.3% was achieved (Table 10-23), indicating minimal refractory gold in non-sulphide gangue minerals. Cyanide consumption was approximately 1.2 kg/t but maybe have been inflated due to the use of a very high cyanide concentration during the test. It is expected that cyanide consumption for tailings leaching would be <1 kg/t due to the removal of cyanide-consuming components from the tails.
Table 10-23: Flotation Tailings Cyanidation Results
Sample Type | Flotation Tail Grade | Leach Tails | Au Recovery from |
CZ Pyritic composite | 0.18 | 0.05 | 73.6% |
Grey Fox South-LGP | 0.16 | 0.04 | 74.3% |
| Project: 169525666 | 10-21 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
10.4.4.7Flotation Concentrate Cyanidation
Leaching tests on pyrite concentrates indicated limited recovery gains from intensive regrinding. At the as-floated grind size (~60 µm), the CZ Pyritic concentrate yielded about 80% gold recovery. Regrinding the concentrate to a P₈₀ of 25 µm improved recovery only slightly to 83%, while finer grinding to 12 µm provided no further recovery benefit, indicating diminishing returns at finer sizes due to pyrite-locked gold inclusions. The Grey Fox South-LGP composite reflected similar recovery compared to the CZ Pyritic composite (Table 10-24). Cyanide consumption was approximately 5 kg/t of leach feed but again from a very high cyanide concentration in solution.
Table 10-24: Flotation Concentrate Cyanidation Results
Sample Type | Conc Grade Au | Residual Au | Au Recovery from |
CZ Pyritic Composite Concentrate @ 60 µm | 12.6 | 2.59 | 80.2% |
CZ Pyritic Composite Concentrate @ 22 µm | 12.6 | 2.11 | 83.5% |
CZ Pyritic Composite Concentrate @ 12 µm | 12.6 | 2.09 | 82.9% |
Grey Fox South-LGP | 17.06 | 3.26 | 80.9% |
10.4.52015 Phase 4 Leaching-with-Flotation Investigation
The Phase 4 testwork program was completed by XPS and documented in the report titled “Brigus Grey Fox Phase IV: Leaching with Flotation” (Report 4015803.00, dated June 9, 2015) (XPS, 2015). This program was designed to evaluate processing optimization opportunities for Grey Fox South ore: the southernmost HG zone of the deposit. Specifically, Phase 4 targeted optimization opportunities around grind size, flotation, and leaching strategies.
The primary goals of this Phase 4 testwork program were:
| ● | To assess the response of Grey Fox South ore to flotation and leaching at grind sizes coarser than the baseline P₈₀ of 60 µm, with test grind sizes up to 120 µm. This was driven by previous observations of high energy consumption due to ore hardness. |
| ● | To evaluate whether flotation could effectively concentrate gold into a low-mass sulphide product, and if subsequent leaching of this concentrate and its tailings could maintain gold recovery while allowing for coarser primary grinding. |
| ● | To investigate whether a split leach approach (leaching of both flotation concentrate and tailings separately) offered any metallurgical advantages over conventional whole-ore leaching. |
To explore the operational flexibility provided by decoupling recovery from grind size, and assess if energy savings or increased throughput could offset minor losses in gold recovery, especially given the ore’s high hardness characteristics.
| Project: 169525666 | 10-22 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
10.4.5.1Sample Selection
A composite sample was prepared from mineralized drill core collected from both the 147 Zone and the CZ at Grey Fox South. The final composite was made from 37 core intervals comprising various lithologies (SED, VIV, MI/MV, FZ) and weighed approximately 40 kg. The expected head grade was 3.0 g/t Au. The assayed composite showed a slightly higher gold grade due to a known nugget effect. Sulphur levels across lithologies ranged from 0.4% to 2.9%. Refer to Table 10-25 for details pertaining to the samples used in this phase of testing.
Table 10-25: XPS Phase 4 Sample Selection
Lithology (Zone) | Core Intervals | Avg. S | Mass Weight | Au Grade |
SED (CZ) | 8 | 1.2 | 8.8 | 3.12 |
VIV (CZ) | 6 | 0.4 | 6.6 | 3.27 |
MI/MV (CZ) | 5 | 2.9 | 5.6 | 3.03 |
FZ (CZ) | 4 | 2.8 | 4.4 | 3.40 |
Subtotal Contact | 23 | 1.8 | 25.4 | 3.19 |
VIV (147) | 6 | 1.0 | 6.6 | 3.09 |
MV (147) | 6 | 1.7 | 6.6 | 2.54 |
MI (147) | 1 | 1.1 | 0.5 | 2.07 |
SED (147) | 1 | 0.5 | 1.1 | 2.62 |
Subtotal (147) | 14 | 1.1 | 14.8 | 2.78 |
Full Composite | 37 | 1.43 | 40.2 | 3.00 |
10.4.5.2Flotation
Flotation tests were conducted on the composite sample using 2 x 2.0 kg charges. Reagents used included 110 g/t PAX and 25 g/t Aero Maxgold 900 promoter, with MIBC frother. Flotation was performed at natural pH over 40 minutes. The aim was to recover gold into a low-mass sulphide concentrate for further treatment. Rougher flotation was performed on multiple grind sizes (P₈₀ of 60 µm, 90 µm, and 120 µm), and consistently achieved a gold recovery of ~94% with a mass pull of ~14%, indicating flotation performance is insensitive to grind over the range tested. Sulphur recovery followed the same trend, as shown in Table 10-26.
Table 10-26: XPS Phase 4 Flotation Results
Primary Grind P₈₀ | Mass Pull to Con. | Au Recovery to | S Recovery to |
60 | 13.8 | 93.6 | 96.7 |
90 | 12.7 | 94.0 | 95.7 |
120 | 14.5 | 93.9 | 95.7 |
| Project: 169525666 | 10-23 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
10.4.5.3Whole-Ore Cyanidation
Cyanidation of whole-ore samples was performed at 2,500 ppm CN dosage. This level was maintained throughout the leaching, which included solution collection and analysis after 6, 24 and 48 h of leaching. Leaching performance was evaluated at different grind sizes. The recalculated head grades differed considerably between the tests due to variations in the amount of gold found in solution; however, the duplicate tailings assays showed a clear trend toward higher gold losses as a function of increasing size consistent with plant experience.
As shown in Table 10-27, the tailings gold grade increased from 0.85 g/t Au at 60 μm to 0.97 g/t Au at 120 μm, or 0.12 g/t increase over a 60 μm increase in the P₈₀. This is equivalent to 0.02 g/t Au, or ~0.6% recovery, per 10 μm change in the P₈₀.
Table 10-27: Grind-Cyanidation Results
Primary Grind | Head Grade | Solution Grade | Tails Grade (g/t) | Call Factor | Calculated Au |
60 | 3.56 | 2.70 | 0.85 | 100 | 76.0 |
90 | 3.56 | 5.89 | 0.91 | 191 | 74.2 |
120 | 3.56 | 3.60 | 0.97 | 128 | 72.4 |
It is important to note that the nugget effect became more pronounced with coarser grind sizes, making it difficult to draw definitive conclusions regarding the grind-recovery relationship.
10.4.5.4Flotation Tailings Cyanidation
The flotation tailings, defined as non-sulphide gangue (NSG), were subjected to cyanidation at varying primary grind sizes. Leaching of NSG tails showed that gold recovery was less sensitive to grind size compared to whole-ore leaching. The indicated leach recovery was 73.9% at 60 μm, declining to 63% at 90 μm and 57% at 120 μm (Table 10-28). Expressed as a tailings grade, the final leach tailings rose from 0.10 g/t Au at 60 μm to 0.15 g/t Au at 120 μm, or a 0.05 g/t Au increase over a 60 μm increase in the P₈₀. This is equivalent to about 0.08 g/t Au, or approximately 0.25% recovery, per 10 μm change in the P₈₀. This indicates the presence of fine free gold for which recovery is independent of liberation size.
Table 10-28: Grind vs Flotation Recovery Results
Primary Grind | Flotation Tails | Solution Grade | Tails Grade (g/t) | Call Factor | Assayed Au |
60 | 0.30 | 0.28 | 0.10 | 128 | 73.9 |
90 | 0.36 | 0.22 | 0.13 | 97 | 62.9 |
120 | 0.31 | 0.19 | 0.15 | 108 | 56.7 |
| Project: 169525666 | 10-24 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
10.4.5.5Flotation Concentrate Cyanidation
The flotation concentrate (~14% of feed mass) was reground to a P₈₀ of ~35 µm in all cases before cyanidation. In Phase 3 testwork, further regrinding to finer sizes (P₈₀ 25 µm and 15 µm) showed only minor improvements in recovery for finer grinds, and therefore was not repeated. In the Phase 4 program, the focus was on confirming these results under different primary grind sizes. No significant change in flotation concentrate leach recovery was observed with changes in the original grind size of the ore, as indicated in Table 10-29.
Table 10-29: Grind vs Flotation Concentrate Cyanidation Results
Primary Grind | Flotation Conc | Leach Solution | Tails Grade (g/t) | Assayed Au |
60 | 31.3 | 25.6 | 5.78 | 81.9 |
90 | 38.7 | 32.1 | 5.91 | 84.5 |
120 | 25.3 | 20.1 | 5.14 | 79.7 |
10.5Recent Metallurgical Testing Results
10.5.12020 ALS Metallurgy Program KM6034
This program comprised metallurgical and environmental testwork conducted on mineralized material from the 147NE Zone of the Grey Fox deposit as part of McEwen’s ongoing evaluation and process development. The program was carried out by ALS Metallurgy in 2019 and 2020 and was designed to support process design through assessment of gold recovery potential via cyanidation, while also evaluating environmental considerations associated with leach residues. Findings from this testing program were documented in the report titled “Metallurgical & Environmental Testwork for the Grey Fox Deposit,” dated February 11, 2020 (ALS, 2020).
This program used six individual drill core composites and a MC from the 147NE Zone. The testing included bottle-roll cyanidation leach tests, grind size sensitivity analysis, head assay determination, environmental characterization of residues, and deportment analysis of refractory gold. The goal was to determine the cyanide leach amenability of the samples, understand the influence of grind size and reagent consumption on recovery, and gather supporting environmental data for residue management.
This testwork program provided critical information on the cyanidation leach performance of Grey Fox 147NE material, showing how grind size and composite variability influence recovery, reagent consumption, and leach kinetics. It also delivered environmental characterization data to support future permitting and waste management planning, and improved understanding of refractory gold deportment within the deposit. The results will guide process design decisions for gold recovery and support metallurgical modeling efforts for the Grey Fox Project.
| Project: 169525666 | 10-25 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
10.5.1.1Master and Variability Samples Compositing Strategy
ALS Metallurgy prepared a robust and methodically constructed composite sampling strategy to characterize the metallurgical behavior of ore samples from the 147NE Zone of the Grey Fox deposit. Samples were received by ALS on two separate dates (November 7 and 22, 2019), comprising 28 individual drill-core intervals of approximately 4 kg each.
From these individual samples, six variability composites (Composite 1 through Composite 6A) were carefully assembled, ensuring representative blending from specified drill-core intervals. Each variability composite aimed to capture unique metallurgical characteristics expected within the 147NE Zone.
This assembly approach enabled an accurate representation of spatial and geological variability, ensuring comprehensive coverage of anticipated ore variability. Individual variability composites ranged from approximately 4.7 kg (Composite 5) to 30.0 kg (Composite 2), allowing for sufficient mass to perform standardized cyanidation tests. MC 1 (totaling 40 kg), blended from equal proportions (8 kg) of Composites 1, 2, 3, 4, and 6A, provided a larger representative bulk sample for detailed grind sensitivity, comminution characterization, environmental testing, and gold deportment studies.
10.5.1.2Head Assays
Head assays conducted on each of the composites (Table 10-30) confirmed gold grades ranging from approximately 2.60 g/t to 8.09 g/t Au, with notable variations observed within duplicate assays, suggesting nuggety gold occurrences. Composite 2 yielded the highest average gold grade (8.09 g/t Au), whereas Composite 1 was the lowest grade sample (2.60 g/t Au). Significant assay variance in Composites 3, 4, and 6A suggested the presence of coarse gold particles, emphasizing the recommendation by ALS to employ screened metallic assays in future to enhance assay reliability and mitigate variability risks in head-grade determination.
Table 10-30: ALS Composite Sample Head Assays
Composite | Duplicate 1 Au (g/t) | Duplicate 2 Au (g/t) | Average Au (g/t) |
1 | 2.72 | 2.48 | 2.60 |
2 | 7.99 | 8.20 | 8.09 |
3 | 8.74 | 5.01 | 6.87 |
4 | 2.34 | 3.59 | 2.96 |
5 | 3.86 | 3.74 | 3.80 |
6A | 5.99 | 4.18 | 5.09 |
Master 1 | 4.49 | 5.15 | 4.82 |
| Project: 169525666 | 10-26 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
10.5.1.3Comminution
ALS performed rod-mill grind-calibration tests on every variability composite and on MC 1. Each test used a 2 kg charge, 1 L water and 20 kg mild-steel rods (Mill M2). The mill was stopped at timed intervals and the product screened through ASTM screens to generate full particle-size distributions. While these results are not used for sizing full-scale grinding mills, they do provide indicative information regarding differences in hardness.
The grind-calibration tests reveal a clear range in relative hardness: Composites 2 and MC 1 are the most resistant, needing more than 30 minutes of rod-milling to fall below a 100 µm P₈₀, whereas Composite 5 is the softest, achieving that size in only 22 minutes. This 20%–25% spread in grind time implies proportionally higher specific energy requirements for the harder ore samples—consistent with the very hard BWi of ~25 kWh/t recorded for MC 1. Nonetheless, every composite reached the design grind of ~100 µm within a practical 22-43 minute window. MC 1’s grind-sensitivity profile (157 µm→98 µm→66 µm) supplied the data underpinning subsequent cyanidation optimization. Together, these calibrated grind curves and work-index measurements provide a robust basis for sizing the primary grinding circuit and forecasting power demand across the deposit’s varying ore domains.
10.5.1.4Whole-Ore Cyanidation
Cyanidation leach tests performed at various grind sizes (66 µm, 98 µm, and 157 µm P₈₀) on MC 1 at a pulp density of 33% solids, pH 11 (maintained with lime), and a cyanide concentration of 600 ppm showed robust gold extraction performance between 66 µm (90.2% Au recovery) and 98 µm (91.0% Au recovery), with only a minor decrease observed at the coarser grind size of 157 µm (87.0% Au recovery).
Refer to Table 10-31 for results. Gold leach kinetics were rapid, achieving near-complete extraction within the first 6 h.
Table 10-31: ALS Grind-Whole Ore Cyanidation Results
Test | P80 | Au Extraction | Tail Au | NaCN | Lime | Calc. Head |
1 | 66 | 90.2 | 0.56 | 0.56 | 0.9 | 5.70 |
2 | 98 | 91.0 | 0.57 | 0.57 | 0.8 | 6.33 |
4 | 157 | 87.0 | 0.84 | 0.84 | 0.5 | 6.48 |
These findings indicated limited sensitivity to grinding finer than ~100 µm, providing a metallurgical basis for a design decision at or near 100 µm as a target grind size.
As shown in Table 10-32, leach testing of the variability composites at a standardized grind size (P₈₀ = 100 µm) showed consistently high gold extractions ranging from approximately 85.1% (Composite 3) to 95.8% (Composite 1). Composites with higher gold grades and higher sulphide content (e.g., Composite 2 and Composite 3) tended toward somewhat lower extraction efficiencies and higher cyanide and lime consumptions. This underscores the importance of monitoring sulphide-gold associations to optimize recovery and manage reagent use.
| Project: 169525666 | 10-27 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Table 10-32: ALS Variability Cyanidation Results
Composite | Au Extraction (%) | Tail Au (g/t) | NaCN (kg/t) | Lime (kg/t) | Head Au (g/t) |
1 | 95.8 | 0.21 | 0.2 | 0.5 | 4.94 |
2 | 90.8 | 0.96 | 1.1 | 1.1 | 10.41 |
3 | 85.1 | 1.05 | 1.0 | 1.2 | 7.05 |
4 | 93.0 | 0.22 | 0.4 | 0.5 | 3.15 |
5 | 91.1 | 0.42 | 0.4 | 0.9 | 4.74 |
6A | 91.3 | 0.65 | 1.1 | 1.1 | 7.49 |
10.5.22025 ALS Metallurgy Test Work Program KM7663
10.5.2.1Sample Description and Test Work Objectives
This testwork program, completed in October 2025, focused on samples from the underground zones Whiskey Jack and Gibson. These two zones constitute the bulk of the underground mine resource, whereas most of the previous testing was conducted using samples from the open pit mining zones. The primary objective of the program was to assess the amenability of these underground zones to the flowsheet as proposed for the open pit zones. A secondary objective was to adjust Process design criteria, if necessary, to include this part of the overall orebody.
Eight (8) drill core samples were provided to ALS Metallurgy for testing:
| ● | Samples 1, 2 and 3 from Gibson South. |
| ● | Samples 4, 5 and 6 from Gibson North. |
| ● | Samples 7 and 8 from Whiskey Jack. |
The testwork program consisted of head assays, mineralogy, comminution testing, flotation testing and leaching of flotation products.
10.5.2.2Head Assays
Head assays conducted on each of the underground samples (Table 10-33) show gold grades ranging from approximately 2.05 g/t to 6.28 g/t with an average of 3.8 g/t. The average for this set of samples is well above the life-of-mine (LOM) average which is expected to be closer to 2.5 g/t. This implies that average recovery results may be somewhat elevated.
Table 10-33: Underground Samples Head Assays
Sample ID | Fe (%) | S(t) (%) | TOC (%) | Au (g/t) |
Sample 1 | 2.35 | 0.50 | 0.06 | 2.98 |
Sample 2 | 3.81 | 0.20 | 0.07 | 4.25 |
Sample 3 | 6.75 | 0.84 | 0.05 | 2.05 |
| Project: 169525666 | 10-28 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Sample ID | Fe (%) | S(t) (%) | TOC (%) | Au (g/t) |
Sample 4 | 2.71 | 1.04 | 0.07 | 2.12 |
Sample 5 | 2.49 | 0.41 | 0.05 | 3.88 |
Sample 6 | 2.74 | 0.63 | 0.04 | 6.01 |
Sample 7 | 6.25 | 0.79 | 0.06 | 6.28 |
Sample 8 | 6.55 | 0.45 | 0.06 | 2.72 |
Gold assays were performed using the screen metallics method, whereby a representative sub-sample was screened at 75 µm and the oversize fraction, which may contain coarse particulate gold, was digested to extinction and the solution subsequently analyzed. The more voluminous -75 µm fraction was split into smaller fractions, two of which were analyzed for gold using conventional fire assay. The results of the screen metallics procedure are shown in Table 10-34.
For the three higher-grade samples (2, 6 and 7), the increase in average grade appears to be due to an increase in coarse gold content in the +75 µm size fraction. Comparing the +75 µm and -75 µm split grades indicates that grades are similar when the average grade is below 4 g/t Au; however, for the three higher-grade samples, the grade of the +75 µm fraction is noticeably higher than that of the -75 µm fraction. This assessment is supported by the mass and gold distribution splits, which are similar for the lower-grade samples, but for the three higher-grade samples show gold distributions that are much higher than the corresponding mass split to the +75 µm oversize.
Table 10-34: Screen Metallics Gold Assay
Sample ID | Average Au (g/t) | Size | Au grade (g/t) | Mass% | Gold Distribution (%) |
Sample 1 | 2.98 | >75 µm | 2.14 | 8.0 | 5.7 |
| | <75 µm | 3.05 | 92.0 | 94.3 |
Sample 2 | 4.24 | >75 µm | 5.36 | 7.0 | 8.9 |
| | <75 µm | 4.16 | 93.0 | 91.1 |
Sample 3 | 2.05 | >75 µm | 2.17 | 6.8 | 7.2 |
| | <75 µm | 2.04 | 93.2 | 92.8 |
Sample 4 | 2.12 | >75 µm | 2.07 | 4.9 | 4.8 |
| | <75 µm | 2.12 | 95.1 | 95.2 |
Sample 5 | 3.88 | >75 µm | 2.78 | 5.7 | 4.1 |
| | <75 µm | 3.95 | 94.3 | 95.9 |
Sample 6 | 6.01 | >75 µm | 8.36 | 5.8 | 8.1 |
| | <75 µm | 5.87 | 94.2 | 91.9 |
Sample 7 | 6.28 | >75 µm | 9.04 | 6.0 | 8.7 |
| | <75 µm | 6.10 | 94.0 | 91.3 |
Sample 8 | 2.72 | >75 µm | 1.65 | 7.0 | 4.3 |
| | <75 µm | 2.80 | 93.0 | 95.7 |
| Project: 169525666 | 10-29 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
The implication of this difference is that it supports the inclusion of a gravity concentration step in the flowsheet to remove coarse gold as early as possible. This would result in less variable gold grade feed to the downstream processes and would also increase the accuracy of metallurgical accounting.
10.5.2.3Mineralogy
Table 10-35 presents the mineral composition of the samples as determined by QEMSCAN.
Table 10-35: Minerals Composition of the Underground Samples
Minerals | Sample | Sample | Sample | Sample | Sample | Sample | Sample | Sample |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
Chalcopyrite | 0.1 | 0.1 | <0.1 | 1.3 | <0.1 | <0.1 | <0.1 | <0.1 |
Bornite | 0.0 | <0.1 | 0.0 | <0.1 | <0.1 | 0.0 | 0.0 | 0.0 |
Chalcocite | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | <0.1 | 0.0 | 0.0 |
Covellite | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | <0.1 | 0.0 | 0.0 |
Tetrahedrite | <0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
Cuprite/Native Cu | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
Other Sulphides | <0.1 | <0.1 | 0.0 | 0.0 | <0.1 | <0.1 | 0.0 | 0.0 |
Pyrite | 0.8 | 0.3 | 1.7 | 1.1 | 0.7 | 1.0 | 1.5 | 0.8 |
Iron Oxides | 0.5 | 2.1 | 0.3 | 0.3 | 0.2 | 0.1 | 0.1 | 0.3 |
Quartz | 8.1 | 7.6 | 1.0 | 4.8 | 35.8 | 34.1 | 33.4 | 37.9 |
Feldspars | 56.4 | 53.2 | 57.9 | 66.3 | 29.9 | 23.5 | 2.3 | 7.7 |
Chlorite | 2.9 | 7.9 | 30.1 | 7.9 | 6.5 | 3.7 | 17.0 | 9.6 |
Muscovite | 10.3 | 6.5 | 4.6 | 9.7 | 14.7 | 15.2 | 4.5 | 8.0 |
Biotite/Phlogopite | 1.4 | 3.0 | 1.7 | 2.1 | 1.5 | 1.7 | 3.2 | 2.2 |
Titanium Minerals | 0.6 | 1.0 | 0.6 | 0.4 | 0.6 | 0.5 | 1.2 | 2.2 |
Apatite | 0.8 | 1.3 | 0.7 | 0.5 | 0.3 | 0.3 | 0.1 | 0.2 |
Calcium Carbonates | 17.5 | 16.2 | 0.8 | 5.0 | 9.0 | 19.2 | 34.6 | 29.9 |
Kaolinite | 0.2 | 0.2 | 0.1 | 0.2 | 0.2 | 0.3 | 0.2 | 0.2 |
Others | 0.5 | 0.7 | 0.5 | 0.4 | 0.6 | 0.4 | 1.8 | 1.0 |
Feldspars, quartz and calcium carbonates are the most abundant minerals and constitute about 75% of the total mass. Chlorite and muscovite are also present in significant quantities. The low composition of kaolinite (0.2%) and absence of other clay minerals indicates that the ore should not pose significant handling challenges. Sulphide minerals contribute only 1.5% to the total mass.
Table 10-36 presents the breakdown of sulphide minerals in these samples.
| Project: 169525666 | 10-30 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Table 10-36: Sulphide Minerals Proportions in the Underground Samples
Sulphide Minerals | Sample | Sample | Sample | Sample | Sample | Sample | Sample | Sample |
Copper Sulphides | 6.6 | 11.5 | 0.9 | 42.4 | 3.1 | 1.0 | 1.4 | 1.5 |
Pyrite | 92.2 | 87.6 | 99.1 | 57.5 | 96.7 | 98.8 | 98.5 | 98.3 |
Molybdenite | 0.1 | 0.2 | 0.0 | 0.0 | <0.1 | 0.0 | 0.0 | 0.0 |
Galena | <0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | <0.1 | 0.0 |
Sphalerite | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | <0.1 | 0.0 | 0.0 |
Other Sulphides | 1.1 | 0.6 | <0.1 | 0.1 | 0.2 | <0.1 | 0.1 | 0.1 |
Pyrite is by far the most abundant sulphide, contributing more than 90% to the total sulphide mass in most of the samples. Minor quantities of copper sulphides are also present. Sample 4 is distinct in that it contains a significant quantity of chalcopyrite (42.4% of the total sulphides). For this sample, elevated cyanide consumption could be expected, and it may also cause adsorption problems because dissolved copper can compete with gold for adsorption sites on activated carbon. When treating this part of the orebody, it may be prudent to blend this chalcopyrite-rich feed with other run-of-mine (ROM) feed. Carbon stripping frequency would also need to be increased to accommodate the negative effects of this mineral.
10.5.2.4Comminution
Eight (8) samples were subjected to BWi testing and results are presented in Table 10-37.
Table 10-37: BWi Results
Sample ID | F₈₀ (µm) | P₈₀ (µm) | Grams/Revolution | BWi (kWh/t) |
Sample 1 | 2308 | 80 | 1.05 | 17.7 |
Sample 2 | 2418 | 77 | 0.89 | 19.7 |
Sample 3 | 2328 | 78 | 0.97 | 18.6 |
Sample 4 | 2345 | 81 | 1.01 | 18.3 |
Sample 5 | 2483 | 76 | 0.82 | 20.8 |
Sample 6 | 2427 | 75 | 0.85 | 20.1 |
Sample 7 | 2349 | 76 | 0.97 | 18.2 |
Sample 8 | 2343 | 75 | 0.83 | 20.7 |
Average | | | | 19.3 |
The closing screen size for all of the BWi tests was 106 µm.
The underground mine samples, with an average BWi of 19.3 kWh/t, are not as hard as the open pit ore samples tested in previous campaigns, which yielded BWi results around 24 kWh/t. These results display a moderate degree of variability which implies that the grinding circuits will not be subjected to excessive
| Project: 169525666 | 10-31 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
peaks and troughs with respect to ore feed hardness and should therefore be relatively easy to control and operate.
10.5.2.5Whole-Ore Cyanidation
The eight samples were subjected to whole-ore cyanidations after grinding to a P₈₀ of approximately 80 µm. Results are presented in Table 10-38. Test conditions were as follows:
| ● | Pulp density = 45%w/w solids. |
| ● | Total test duration = 48 h. |
| ● | NaCN concentration = 471 g/m3 (maintained by manual addition of NaCN). |
| ● | pH = 11.0 (maintained manually). |
| ● | Oxygen sparged in headspace of bottle roll. |
Table 10-38: Whole-Ore Cyanidation Results
Sample ID | Au | NaCN | Ca(OH)2 | Residence | Calc Head | Measured | Tails |
Sample 1 | 90.9 | 0.3 | 2.4 | 48 | 3.64 | 2.98 | 0.33 |
Sample 2 | 93.3 | 0.2 | 3.4 | 40 | 5.34 | 4.25 | 0.36 |
Sample 3 | 78.6 | 0.2 | 2.9 | 30 | 2.82 | 2.05 | 0.61 |
Sample 4 | 71.1 | 1.2 | 3.4 | 48 | 2.04 | 2.12 | 0.59 |
Sample 5 | 70.8 | 0.5 | 5.9 | 30 | 4.05 | 3.88 | 1.19 |
Sample 6 | 64.6 | 0.4 | 2.7 | 40 | 6.58 | 6.01 | 2.33 |
Sample 7 | 93.1 | 0.4 | 2.4 | 24 | 6.69 | 6.28 | 0.47 |
Sample 8 | 91.8 | 0.5 | 1.7 | 28 | 3.41 | 2.72 | 0.28 |
Average | 81.8 | 0.46 | 3.10 | 36 | 4.32 | 3.79 | 0.77 |
Whole-ore cyanidation results were similar to that of the open pit samples tested previously with a wide range of gold recoveries ranging from as low as 64.4% to 93.3%. Cyanide consumption rates were reduced compared to the open pit testing with the notable exception of Sample 4, where the abundance of cyanide-soluble copper resulted in a 1.2 kg/t cyanide consumption rate. The samples leached relatively slowly with many still leaching after 40 h of cyanidation.
10.5.2.6Gravity Concentration
The eight samples were subjected to gravity separation tests after grinding to a P₈₀ of approximately 80 µm. Two sets of gravity separation tests were conducted. In the first set, 2-kg sub-samples were used to measure gravity recoveries and grades. In the second set, 10-kg bulk gravity separation tests were conducted primarily to generate gravity tailings for downstream flotation and cyanidation testing. In both cases, a centrifugal concentrator was used as the first stage, followed by panning of the primary
| Project: 169525666 | 10-32 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
concentrate to produce an upgraded final concentrate. The two-stage approach is generally considered to produce results that best mimic full-scale operations.
Results are summarized in Table 10-39 and Table 10-40.
Table 10-39: Gravity Concentration Results (2 kg tests)
Sample ID | Mass Pull | Grade | Au Recovery | Calc Head | Measured Head |
Sample 1 | 0.6 | 122 | 19.2 | 3.54 | 2.98 |
Sample 2 | 0.9 | 141 | 26.5 | 4.71 | 4.25 |
Sample 3 | 0.5 | 58.2 | 12.6 | 2.45 | 2.05 |
Sample 4 | 0.6 | 53 | 15.9 | 2.06 | 2.12 |
Sample 5 | 0.5 | 89 | 11.6 | 3.88 | 3.88 |
Sample 6 | 0.6 | 76 | 7.3 | 6.25 | 6.01 |
Sample 7 | 0.8 | 115 | 15.3 | 6.27 | 6.28 |
Sample 8 | 0.7 | 83.1 | 21.3 | 2.72 | 2.72 |
Average | 0.65 | 92.2 | 16.2 | 3.99 | 3.79 |
Table 10-40: Gravity Concentration Results (10 kg bulk tests)
Sample ID | Mass Pull | Grade | Au Recovery | Calc Head | Measured Head |
Sample 1 | 0.16 | 163 | 11.0 | 2.32 | 2.98 |
Sample 2 | 0.19 | 208 | 14.8 | 2.64 | 4.25 |
Sample 3 | 0.19 | 614 | 30.0 | 3.85 | 2.05 |
Sample 4 | 0.18 | 86.2 | 8.7 | 1.76 | 2.12 |
Sample 5 | 0.18 | 256 | 12.2 | 3.74 | 3.88 |
Sample 6 | 0.18 | 220 | 6.9 | 5.78 | 6.01 |
Sample 7 | 0.22 | 115 | 4.2 | 5.90 | 6.28 |
Sample 8 | 0.20 | 83.1 | 6.8 | 2.43 | 2.72 |
Average | 0.19 | 218.2 | 11.8 | 3.55 | 3.79 |
Comparing the results for the 2-kg and 10-kg charges, the mass pull to concentrate was lower for the bulk test, which is attributed to differences in equipment operation. The lower mass pull is more representative of what would be expected in a full-scale plant. As a result of the lower mass pull, the resulting concentrate exhibited, on average, higher grades and a decrease in gold recovery to the gravity concentrate.
No meaningful correlations were observed between head grade and either recovery or gravity concentrate grade. The occurrence of GRG appears to be random and unrelated to grade variations. For these underground zones, gravity recoveries are noticeably lower than those recorded during earlier test programs for open pit samples. The average gravity recovery for the underground zones was approximately
| Project: 169525666 | 10-33 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
12%, compared to 25% recorded for the open pit zones. At these lower levels, a gravity recovery unit operation would likely not be included in the flowsheet for the full-scale plant.
Given that the mine plan has the underground zones being mined first, followed by the open pit later, there is an opportunity to defer capital expenditure by delaying the installation of the gravity circuit until the start of open pit mining.
10.5.2.7Cyanidation of Gravity Tails
A 2 kg sub-sample of the tailings produced from the bulk gravity separation tests (Table 10-39) was subjected to standard bottle-roll cyanidation. Cyanidation conditions were consistent with those used for the whole-ore cyanidation tests. Results are summarized in Table 10-41.
Stage gold recovery during cyanidation is reported as the percentage of gold extracted from the gravity tailings sample into solution. Overall gold recoveries, inclusive of both the preceding gravity step and subsequent cyanidation of the gravity tailings, are also presented. Overall recovery was calculated using both solution gold analysis by AA spectrometry and solids gold analysis by fire assay.
Good agreement was observed between recovery values calculated from solution and solids analyses, providing confidence in the accuracy of the test and analytical procedures used by the laboratory.
Table 10-41: Cyanidation of Gravity Tails Results
Sample ID | Au Stage | NaCN | Lime | Residence | Overall Recovery% | Overall Recovery% |
Sample 1 | 76.4 | 0.23 | 0.64 | 24 | 79.0 | 79.5 |
Sample 2 | 89.6 | 0.28 | 0.85 | 24 | 91.1 | 92.0 |
Sample 3 | 89.2 | 0.19 | 0.82 | 24 | 92.4 | 85.9 |
Sample 4 | 69.3 | 1.04 | 0.54 | 48 | 72.0 | 75.0 |
Sample 5 | 65.4 | 0.19 | 0.82 | 48 | 69.6 | 69.8 |
Sample 6 | 63.2 | 0.24 | 0.98 | 30 | 65.7 | 65.2 |
Sample 7 | 90.7 | 0.28 | 0.91 | 24 | 91.1 | 90.6 |
Sample 8 | 77.9 | 0.44 | 1.20 | 32 | 79.4 | 76.5 |
Average | 77.7 | 0.36 | 0.85 | 31.8 | 80.0 | 79.3 |
Comparing these results with the whole-ore cyanidation tests shows that overall recoveries were similar, with average recoveries of 80.7% for the whole-ore cyanidation tests compared to 79.7% for the gravity plus cyanidation route. This indicates that the addition of a gravity step does not necessarily improve overall gold extraction when sufficient time was allowed for coarse gold dissolution in whole-ore leach testing.
Comparison of minimum required residence times indicates that the gravity tailings leached faster than the whole-ore samples. This implies that a residence time of approximately 32 h will be sufficient for leaching of gravity tailings, whereas the same residence time may result in incomplete dissolution of coarse gold if the
| Project: 169525666 | 10-34 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
gravity step is omitted. Alternatively, a whole-ore cyanidation flowsheet would require more leach volume to achieve the same gold extraction as a gravity-leach flowsheet.
Measured reagent consumptions also differed between two routes, with gravity-leach cyanidation requiring less cyanide (0.36 kg/t vs 0.46 kg/t) and substantially less lime (0.85 kg/t vs 3.1 kg/t). These results indicate that a significant portion of the reagent consumers reported to the gravity concentrate. It is possible that the reagent consumption may be the same after intensive cyanidation of the gravity concentrate; however, there is potential to reduce reagent costs if intensive cyanidation incorporates a pre-oxygenation step, whereby cyanide-soluble sulphides may be oxidized to sulphate. The oxidation of reagent consumers was not tested in this test program but should be considered in future test programs if a gravity-plus-leach flowsheet is pursued.
10.5.2.8Rougher Flotation of Gravity Tails
A 2 kg sub-sample of the same bulk gravity tailings used for the cyanidation tests was subjected to rougher flotation testwork using the following conditions:
| ● | Denver flotation cell (4.4 L). |
| ● | Natural pH ranging from 8.3 to 8.6. |
| ● | Total duration of 8 minutes with sampling at 2-minute intervals. |
| ● | PAX additions ranging from 40 to 70 g/t (depending on visual observation of the froth). |
| ● | MIBC additions ranging from 44 to 60 g/t (visual observation of froth). |
Table 10-42 summarizes the results. All values in the table refer to the head grade (i.e., rougher floatation recovery represents the percentage of gold reporting to the rougher concentrate relative to the head sample, rather than the gravity tailings sample. The mass pull, similarly, is based expressed relative to the original ROM sample mass and does not represent a stage recovery from the previous step.
Table 10-42: Rougher Flotation of Gravity Tails Results
Sample ID | Gravity | Gravity Au | Rougher | Rougher Float | Overall Au | Overall Sulphur |
Sample 1 | 0.16 | 11.0 | 6.8 | 77.4 | 88.4 | 94.6 |
Sample 2 | 0.19 | 14.9 | 4.4 | 74.8 | 89.7 | 92.3 |
Sample 3 | 0.19 | 30.0 | 4.7 | 59.3 | 89.3 | 91.0 |
Sample 4 | 0.18 | 8.7 | 10.3 | 78.9 | 87.6 | 95.9 |
Sample 5 | 0.16 | 12.3 | 5.9 | 73.9 | 86.2 | 88.3 |
Sample 6 | 0.18 | 6.9 | 7.1 | 72.0 | 78.9 | 89.0 |
Sample 7 | 1.10 | 1.3 | 5.2 | 84.8 | 86.1 | 92.8 |
Sample 8 | 1.10 | 3.3 | 4.0 | 82.1 | 85.4 | 89.6 |
Average | 0.41 | 11.1 | 6.1 | 75.4 | 86.5 | 91.7 |
| Project: 169525666 | 10-35 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Comparison with results previously reported indicates that the rougher concentrate mass pull of 6.1% for these underground samples is lower than the average of 12% recorded for the open pit samples tested previously. This difference may be partly due to the shorter 8 minute total duration compared to 40 minutes for the open pit samples. However, evaluation of the incremental mass recoveries it is evident that very little additional mass or sulphide recovery is expected after 8 minutes.
Overall gold and sulphur recoveries for the underground samples, at 86.5% and 91.7%, respectively, were also lower than the corresponding recoveries of 93% and 95% reported for the open pit samples. The implication is that both cyanidation and flotation achieved lower overall gold recoveries for the underground samples relative to the open pit material.
10.5.2.9Whole-Ore Rougher Flotation
A 2 kg sub-sample of the original as-received samples was subjected to rougher flotation testwork after grinding to 80% passing 90 µm. The purpose of this set of tests was to evaluate whether the omission of an upstream gravity concentration step had any effect on flotation performance. The same conditions were employed as for the flotation test on gravity tailings.
Table 10-43 summarizes the results for the set of whole-ore rougher flotation tests.
Table 10-43: Whole-ore Rougher Flotation
Sample ID | Mass pull (%) | Gold Recovery (%) | Sulphur Recovery (%) |
Sample 1 | 4.8 | 89.7 | 93.0 |
Sample 2 | 4.7 | 89.6 | 87.6 |
Sample 3 | 6.7 | 91.0 | 96.7 |
Sample 4 | 11.6 | 88.7 | 84.9 |
Sample 5 | 6.3 | 88.4 | 88.9 |
Sample 6 | 8.2 | 79.4 | 89.8 |
Sample 7 | 5.6 | 88.8 | 89.8 |
Sample 8 | 3.9 | 88.1 | 86.3 |
Average | 6.5 | 88.0 | 89.6 |
Comparison of these results with the previous set of tests that included a gravity step indicates that the overall gold recoveries were marginally higher (88.0% vs 86.5%). However, given that recoveries were calculated from gold analyses of the gravity concentrate, which represents a small mass at a much higher grade, the observed difference is likely within the margin of error. The absence of a significant decrease in performance suggests that the gravity step is not an essential component of the overall flowsheet.
Samples were analyzed at 2 minute floatation intervals to assess kinetics. Figure 10-3 shows the averaged curve for all eight samples combined.
| Project: 169525666 | 10-36 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing

Figure 10-3: Rougher Flotation Kinetics for Whole-Ore Samples
Flotation kinetics were fast, with most of the recoverable gold reporting into the concentrate within the first 2 minutes. Recovery then slowed significantly but continued at a steady rate over the remainder of the 8-minute test duration. It appears that extending the test time beyond 8 minutes would likely have resulted in gold recoveries exceeding 90%. Given that previous test campaigns on open pit samples achieved approximately 93% but with 40 minutes of flotation time, it is likely that the shorter duration of the underground sample tests was a primary factor contributing to the lower recoveries achieved.
Figure 10-4 shows a comparison of the overall gold recoveries achieved through cyanidation versus flotation for all eight samples. For both cyanidation and flotation routes, the average results of the tests with and without gravity separation were used. The graph shows that the flotation route yielded less variable and, on average, superior results compared to cyanidation. The average recovery for the eight samples combined was 87.2% through flotation, compared to 80.2% through cyanidation. While the recoveries are marginally lower than for open pit samples, mostly due to shorter float times, the underground samples nevertheless exhibited good amenability to flotation.
| Project: 169525666 | 10-37 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing

Figure 10-4:Overall Recoveries through Cyanidation versus Flotation for Underground Samples
10.5.2.10Cyanidation of Rougher Tails
The rougher flotation tailings produced during the previous set of tests were subjected to bottle-roll cyanidations using the standard conditions as listed in Section 10.5.2.5. Results are tabulated in Table 10-44.
Note that the gold stage recoveries represent the average of recoveries calculated from the solution analysis by AA spectroscopy and from the fire assays of the tailings residues. The results show that approximately 72% of the gold contained in the rougher tails was extracted through cyanidation. Given that the rougher tails contain approximately 12% of the ROM feed gold, the downstream cyanidation of the rougher tails contributes approximately 8.6% to the overall gold recovery.
Table 10-44: Cyanidation of Rougher Flotation Tails
Sample ID | Au Stage | Calc Feed | Tails grade | NaCN | Lime | Residence |
Sample 1 | 77.7 | 0.39 | 0.09 | 0.50 | 0.7 | 24 |
Sample 2 | 76.5 | 0.54 | 0.13 | 0.42 | 0.69 | 48 |
Sample 3 | 80.1 | 0.34 | 0.07 | 0.16 | 0.67 | 48 |
Sample 4 | 68.3 | 0.25 | 0.08 | 0.39 | 0.63 | 48 |
Sample 5 | 52.9 | 0.46 | 0.22 | 0.40 | 0.81 | 24 |
| Project: 169525666 | 10-38 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Sample ID | Au Stage | Calc Feed | Tails grade | NaCN | Lime | Residence |
Sample 6 | 55.7 | 1.53 | 0.68 | 0.83 | 1.05 | 24 |
Sample 7 | 78.4 | 0.87 | 0.19 | 0.39 | 1.13 | 24 |
Sample 8 | 85.7 | 0.49 | 0.07 | 0.46 | 0.75 | 48 |
Average | 71.9 | 0.61 | 0.19 | 0.44 | 0.80 | 36 |
Cyanide and lime consumptions were similar to those recorded during the gravity tailings series of tests. Four of the samples exhibited slower leach kinetics, with a significant amount of leaching continuing into the second day. This behavior is unexpected because leaching from silicates is usually fast and complete within 24 h.
Another unexpected result was the tailings grade of 0.68 g/t Au recorded for Sample 6. It is possible that the gold in this sample was not liberated, which is consistent with the low flotation recovery observed for this sample. No follow-up testing was conducted on this material. It is therefore recommended that a similar sample be collected for future testing and that its products be subjected to a diagnostic procedure to determine the cause of its lower recovery.
10.5.2.11Cyanidation of Rougher Concentrate
Rougher flotation concentrates produced during the previous set of rougher flotation tests were ground to 80% passing 14 µm and then subjected to cyanidation. Regrinding of flotation concentrates allowed additional liberation and gold recovery during previous test campaigns for open pit samples. The purpose of this set of rougher concentrate cyanidations was to assess if the same holds true for the underground samples. The same set of standardized cyanidation conditions were used for this set of tests.
Results are tabulated in Table 10-45.
Table 10-45: Cyanidation of Rougher Flotation Concentrate
Sample ID | Au Stage | Calc Feed | Tails grade | NaCN | Lime | Required |
Sample 1 | 93.0 | 47.4 | 3.33 | 2.90 | 2.40 | 24 |
Sample 2 | 94.0 | 69.9 | 4.19 | 2.40 | 2.50 | 24 |
Sample 3 | 82.1 | 33.6 | 6.03 | 1.30 | 1.70 | 30 |
Sample 4 | 45.8 | 14.1 | 7.63 | 5.70 | 0.70 | 48 |
Sample 5 | 69.7 | 45.4 | 13.75 | 0.80 | 2.30 | 40 |
Sample 6 | 70.2 | 54.7 | 16.3 | 0.50 | 0.20 | 16 |
Sample 7 | 95.1 | 80.3 | 3.94 | 0.50 | 2.20 | 24 |
Sample 8 | 94.2 | 46.6 | 2.72 | 0.80 | 1.40 | 18 |
Average | 80.5 | 49.0 | 7.24 | 1.86 | 1.68 | 28 |
| Project: 169525666 | 10-39 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Samples 1, 2, 7 and 8 yielded stage gold recoveries exceeding 90%. However, the other four samples all yielded lower than expected recoveries, with some as low as 45.8% (Sample 4). This sample contained a large amount of cyanide soluble copper so it is possible that cyanide deficiency may have been partly responsible for the result (even though the cyanide was measured and replenished at timed intervals). The results suggest that it would be worthwhile to explore the possible application of the Albion process (which could destroy the sulphide matrix in an atmospheric oxidation step ahead of cyanidation).
Cyanide consumption was skewed by the 5.7 kg/t outlier recorded for Sample 4. Both cyanide and lime consumptions were highly variable as can be expected from concentrates.
Leach kinetics were, in most cases, faster than expected. The only sample requiring more than 40 h of leaching was Sample 4 which may, again, be due to insufficient cyanide.
10.5.2.12Combining the Results for the Float-Regrind-Leach Flowsheet
In this section, results from the entire underground test campaign were combined to estimate overall gold recovery for the float-regrind-leach flowsheet. Table 10-46 summarizes the results and illustrates the distribution of gold among the various products generated, including gravity concentrate, flotation concentrate, and leach solutions following leaching of the flotation tails and concentrate, respectively. The final two columns in Table 10-46 compare the overall recovery achieved using the flotation-based flowsheet with recovery obtained without the flotation step, using whole-ore cyanidation only.
The comparison shows that the addition of the flotation-regrind steps adds significant value to the flowsheet in terms of increased gold recoveries. Sample 4 is the only exception with the very low recovery of 54.4% being significantly lower than the 72.6% achieved for the leaching only flowsheet. This result for sample 4 is believed to be anomalous and due to cyanide deficiency and insufficient leach time during the cyanidation of the rougher concentrate. Flotation followed by regrinding will liberate more gold hence the expectation is that the result must be either the same or better when adding these additional steps. A significant decrease in recovery is not possible hence the observed result can be ignored as an anomaly. In the last two rows the averages are calculated first with sample 4 included then when excluding Sample 4 data. With sample 4 excluded the overall recovery for the flotation-regrind flowsheet is 86.1% which is significantly better than the 81.2% achieved without flotation. This outcome supports the decision to add the flotation step into the full-scale plant flowsheet.
It should be noted that the average recovery achieved for the underground samples with the float-regrind flowsheet is about 2% lower than what was previously achieved for the open pit samples. This difference is even more pronounced (about 5%) for the simpler flowsheet which excludes the flotation-regrind steps.
| Project: 169525666 | 10-40 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Table 10-46: Cyanidation of Rougher Flotation Concentrate
Sample ID | Gold Distribution (% of head feed) | Overall Au Recovery (%) | ||||
Gravity | Flotation | Tails Leach | Conc. Leach | With Float + | Without Float | |
Sample 1 | 15.1 | 77.4 | 5.8 | 72.0 | 92.9 | 84.6 |
Sample 2 | 20.7 | 74.8 | 3.5 | 70.3 | 94.4 | 92.0 |
Sample 3 | 21.3 | 59.3 | 15.5 | 48.7 | 85.5 | 81.8 |
Sample 4 | 12.3 | 78.9 | 6.0 | 36.1 | 54.4 | 72.6 |
Sample 5 | 11.9 | 73.9 | 7.5 | 51.5 | 70.9 | 69.9 |
Sample 6 | 7.1 | 72.0 | 11.6 | 50.5 | 69.3 | 64.2 |
Sample 7 | 9.8 | 84.8 | 4.3 | 80.6 | 94.7 | 91.8 |
Sample 8 | 14.1 | 82.1 | 3.3 | 77.3 | 94.7 | 84.3 |
Average | 14.0 | 75.4 | 7.2 | 60.9 | 82.1 | 80.1 |
Avg excl. | 14.3 | 74.9 | 7.4 | 64.4 | 86.1 | 81.2 |
10.6Process Design Criteria Derived from Test Results
The following Process design criteria (Table 10-47) consolidates all operating and design parameters that can be directly referenced to the Grey Fox metallurgical test programs (2013 to 2025). Values were extracted from MC, variability and bulk tests undertaken to date. Parameters are grouped by unit operation—mineralogy/head grade, comminution, gravity, flotation, cyanidation (whole ore, tails and concentrate), detoxification, and solid-liquid separation.
All reagent dosages are stated as consumption on a dry-solids basis (kg/t); residence times and grind sizes are those that achieved target metallurgical performance in the lab.
A flowsheet incorporating flotation followed by regrinding of the flotation concentrate yielded higher gold recoveries for some of the samples tested to date and should be the preferred route for any greenfield development. However, the existing Stock Mill flowsheet does not include flotation. Retrofitting flotation and regrinding into the existing mill flowsheet and layout would be costly and operationally disruptive. Additionally, the remaining Stock Main and West ore is not expected to benefit from flotation and represents approximately half of the total tonnage projected to be treated through the Stock Mill with Grey Fox material. Consequently, the existing whole-ore cyanidation flowsheet at the Stock Mill will be adopted, unchanged, for Grey Fox ore treatment.
These criteria are intended as a baseline for mechanical and mass-balance design for the trade-off and PFS studies.
| Project: 169525666 | 10-41 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Table 10-47: Process Design Criteria
Area | Parameter | Design Criterion / Typical Range | Notes / Basis |
Mineralogy and | Gold head grade (Au) | Nominal = 3.8 g/t | Test work Samples Typical Range = 3 – 5 g/t |
| Total sulphur (S) | 1.5%–2.0% | Dominated by pyrite; rises to ≈ 3% S in high-sulphide SEDS domains. Needs to be assessed with further variability testing. |
| Gangue minerals | Quartz-carbonate host; | Carbonate buffering limits acid |
| | CO₂ 7%–10%; SG ≈ 2.9 t/m³ | generation; density used for all volumetric throughputs. |
Comminution | BBWi | Nominal = 23 kWh/t; | Suggest a high-power SABC or HPGR- ball-mill circuit. |
| SMC parameters | DWi = 9.0–9.6 kWh/m³; | Confirms competent, impact-resistant ore. |
| Rock Density | 2.91 t/m³ (ore) | Used for equipment sizing and |
| | | mass/volume conversions. |
Whole-Ore Leach | Grind P₈₀ | P₈₀ = 75 µm | Diminishing returns < 100 µm. Unliberated gold appears to be fine. |
| Au Recovery | 64%-95% (Avg 84% for open pit zones and average 88% for the underground samples) | Average recovery for underground zones excludes anomalous results from the Gibson North zone. |
| Pre-aeration conditions | 1 h at 40% w/w solids, pH 10.5–11 (for open pit, not used for underground tests) | |
| Leach time | 36h | Tests range was 26 to 48 h |
| NaCN dosage | 1.1 kg/t for open pit samples; 0.46 kg/t for underground | MC & variability tests – KM6034 report. Important to note underground tests were done at lower cyanide levels. |
| Lime (CaO) | 1.2 kg/t (with pre- aeration) but >2 without (underground tests were without) | To hold pH ~11 |
Detoxification | Method | SO₂/Air + Cu catalyst | |
| CN-WAD start and end conc | 165 mg/t to 0.1 mg/l | |
| Residence | 180 min | Batch-tested |
Sedimentation | Thickener underflow density | 65% solids | |
| Project: 169525666 | 10-42 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
Area | Parameter | Design Criterion / | Notes / Basis |
| Unit area | 88 and 103 m³/m²/day net rise rate | 147 Zone and CZ |
| | 0.41 to 0.47 t/m2/h solids loading | 147 Zone and CZ |
| | 3.6 m³/m²/ h net hydraulic loading | 147 Zone |
| Flocculant | 15–25 g/t Magnafloc 351 (non-ionic) | |
10.7Recovery Model
The Grey Fox deposit comprises a combination of free milling gold and gold intricately associated with pyrite (semi-refractory). Recovery is generally positively correlated to liberation and negatively correlated to sulphur grade. With a limited volume of distinct variability samples tested to date it is not appropriate to attempt to define a predictive model at this juncture. Consequently, only averaged recoveries will be used for the PFS.
Whole-ore cyanidation results for the Gibson North Zone yielded unexpectedly low recoveries into the leach solutions. Upon investigation, it was observed that the selected intercepts had unusually high concentrations of graphite, phyllosilicate, and galena. It is possible that the poor recoveries could be attributed to re-adsorption of leached gold, surface coatings, or physical encapsulation of liberated gold. For the purposes of the PFS, these results were excluded from the estimation of average recovery for the combined underground zones.
Dissolved gold losses and losses to carbon fines are expected to be constant and independent of grade. A well-run carbon in pulp (CIP) adsorption circuit should maintain dissolved gold losses below 0.01 mg/L. At a solid-to-liquid ratio of roughly 1:1, this equates to a constant efficiency loss of 0.01 g/t. Gold losses to carbon fines are negligible by comparison.
The resultant recovery model for the Grey Fox underground deposit can therefore be formulated as follows:
Gold Recovery (%) = 87.8 - (1 / Head Grade)
Where 87.8 represents the average extraction achieved through cyanidation, and the second term represents dissolved gold losses as a function of head grade (g/t).
Opportunities to improve the overall recovery will be explored during future testwork programs. Adding a flotation step followed by fine grinding and leaching of flotation products has shown some promise. Adding an oxidation step after fine grinding to destroy the sulphide host matrix will also be explored.
| Project: 169525666 | 10-43 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
10.8Deleterious Elements
The current flowsheet will produce doré bars; therefore, no penalties are anticipated. Mineralogical testing showed that the ore does not contain significant quantities of arsenic, while head-grade analysis showed that mercury levels are not significant.
10.9Interpretation and Conclusions
Cyanidation, with or without gravity concentration, yielded mixed results, with some samples registering recoveries exceeding 94%, while a significant proportion of samples tested registered recoveries below 90%. Based on the testwork results, the average recovery with this type of flowsheet is estimated at approximately 87% for the underground zones. Additional testing is required to improve the accuracy of the recovery estimate.
Given the hardness of the samples tested, a SABC comminution circuit is recommended.
10.10Recommendation for Future Work
Historical testwork provides sufficient information on the Grey Fox deposit to support a PFS. However, beyond the PFS stage, and contingent upon the consideration of an optimized flowsheet that is not processing Grey Fox ore at the Stock Mill, several information gaps and opportunities remain, including the following:
· | The effects of pre-oxygenation, oxygen sparging, and the addition of chemical oxidants (e.g., PbNO3) on cyanide consumption have not been investigated. |
· | For fine grinding, vendor-specified fine-grinding tests are required, as Bond’s Fourth Law is not valid below a grind size of approximately 50 µm. This recommendation applies only to a flowsheet that contains a fine-grinding or regrinding step. |
· | Carbon adsorption testing, including assessment of the effects of carbon fouling by flotation reagents. |
· | The addition of a cleaning stage after the initial bulk flotation step should be tested, as this could reduce the costs for downstream processing of the concentrate. Of particular interest would be to assess the leach efficiency of the cleaner tails if they are rejected to tailings rather than recycled. Cleaner flotation should be tested both with and without regrinding. Producing a saleable flotation concentrate could result in an overall recovery above 90% if the cleaner tails are also amenable to cyanidation. |
· | Specific testing to assess the presence of preg-robbers. |
· | Sedimentation and rheology of the flotation concentrate have not been tested. |
· | Intensive cyanidation of gravity concentrate should be tested. |
· | Filtration of tailings could be considered, as this would provide information should paste backfill ever be considered. While this is not currently the case, it may be prudent to generate this information. |
| Project: 169525666 | 10-44 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
10 Mineral Processing and Metallurgical Testing
· | Water chemistry and the effects of recirculating process water need to be determined. Test work to date was conducted using neutral-pH tap water. The effects of flotation reagents, lime, and NaCN recirculating through the plant process water system must therefore be investigated. |
· | Testing of the Albion Process to evaluate the potential for overall recoveries exceeding 95%. Test work performed to date indicates that remaining unrecovered gold is locked within sulphides, which may be liberated if subjected to the full Albion Process. |
· | Locked-cycle testing should be undertaken if cleaner flotation is considered. |
· | Dilution testing to assess amenability to the use of Jameson flotation cells. |
While the current metallurgical and geochemical testwork programs have provided useful baseline data, it is important to note that the testing has predominantly been conducted on master or composite samples rather than on discrete variability samples. As such, the spatial and lithological variability across the deposit has not been thoroughly evaluated. Further investigation is warranted to assess the geometallurgical variability across the resource, particularly in relation to lithological domains, alteration styles, and sulphide content, and how these factors align with the mine plan and processing schedule. A structured variability testing program—incorporating both metallurgical and geochemical analyses on domain-specific intervals from representative boreholes—is recommended to ensure process performance assumptions remain valid across the full LOM.
Specific areas that should be confirmed through variability testing include:
· | Whole-ore cyanidation leach performance, especially in relation to sulphur content and Au/S ratios. |
· | GRG response across different lithologies and head grades. |
· | Flotation response and variability in sulphide recovery rates across domains. |
· | Cyanidation of flotation concentrates and tailings to quantify recovery contributions and assess leach kinetics. |
· | Variability in reagent consumption (cyanide, lime, flotation reagents) as a function of mineralogy. |
· | Confirmation of preg-robbing potential associated with variable carbonaceous content and its deportment. |
| Project: 169525666 | 10-45 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11Mineral Resource Estimates
11.1Approach
The 2026 Grey Fox Pre-Feasibility Study, and thus the more in depth engineering and economic aspects of this TRS, are based on the mineral resources defined at Grey Fox. In addition, the report also includes Resource Model updates for the following deposits which also occur on the broader Fox Complex Project areas:
· | Black Fox |
· | Froome |
· | Stroud |
· | Stock West and Main |
· | Stock East |
· | Davidson-Tisdale |
Two employees of McEwen are the QPs for all resource estimates in this report and have calculated the Mineral Resource estimates for Grey Fox, Black Fox, Froome, Stroud, Stock West and Main, Stock East and Davidson-Tisdale. The Resource Models were prepared and/or updated using Datamine Studio RM estimation software, with lithological modeling prepared using Leapfrog Geo software. Geostatistics were analyzed using Datamine’s Snowden Supervisor software module. To demonstrate the reasonable prospects for eventual economic extraction (RPEEE), all deposits were evaluated using Datamine’s Mineable Shape Optimizer (MSO) extension.
In general the methodology is as follows:
· | Compilation of the Resource Database and Data Validation |
· | Exploratory Data Analysis |
· | Geological Modeling |
· | Compositing of Sample Data |
· | Geostatistics and Block Estimation |
· | Model Validation |
· | Resource Classification |
· | Reasonable Prospects for Eventual Economic Extraction |
· | Mineral Resource Statement |
· | Factors That Could Affect Mineral Resource Estimates |
11.2Resource Estimation
The accuracy of resource (and later reserve) estimates is, in part, a function of the quality and quantity of available data and of geological interpretation (and later engineering) and judgment. Given the data available at the time this report was prepared, the estimates presented herein are considered reasonable. However, they should be accepted with the understanding that additional data and analysis available subsequent to the date of the estimates may necessitate revision. These revisions may be material.
| Project: 169525666 | 11-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.3Grey Fox
11.3.1Mineral Resource Database
The close-out date for the Mineral Resource database was 11 July 2025. A total of 23 drill holes were excluded from the drill database because they are geotechnical or metallurgical holes and were never assayed for gold. The database now consists of 1,659 core drill holes totalling 619,504 m of drill core and 322,665 m of sampled core. Unsampled intervals were considered barren and assigned a background gold grade of 0.0005 g/t or one quarter of the assay laboratory’s lower detection limit.
Drilling campaigns at Grey Fox have taken place since 2021 with 29 new holes in 2021, 14 new holes in 2022, 21 new holes in 2023, ramping up to 126 holes in 2024 and 65 holes in 2025. These holes were primarily drilled in the Gibson, 147, South and Whiskey Jack zones. Logging and assay results continue to indicate strong continuity in Whiskey Jack and an increase in confidence in the model. Drilling in the Gibson zone resulted in the modeling of additional C-veins, expanding resources to the North, as well as the validation of previously modeled C-veins. Drilling in the South and 147 Zone resulted in validation of previously modeled C-veins, intersecting them at optimal angles.
On importing the drill hole database from the central SQL database to Datamine Studio software in preparation for resource estimation, sample data were checked for missing and overlapping intervals in the assay and survey tables, and collar locations checked against the LiDAR topography surface.
11.3.2Geological Modeling
11.3.2.1Lithology
A lithology model was constructed to capture the seven key deposit lithologies as shown in Figure 11-1. The primary deposit area is bounded in the east by ultramafic metavolcanics and in the west by chlorite-talc schist ultramafic metavolcanics. Each are separated from the main deposit area by regional faults and deformation zones. The western portion of the deposit is hosted in a metasedimentary unit intruded by a brecciated syenitic- to dioritic-feldspar porphyry intrusion. The metasedimentary unit has an angular unconformity contact with an assemblage of metavolcanic mafic rocks in the east. There is a prominent diabase dyke (believed to be post mineralization) running through the assemblage sub-parallel to the unconformable sediment-mafic contact. The mafic metavolcanic units can be described as massive/pillowed, or variolitic textured and have been separated in the model based on those primary textures.
A 3D surface of the bedrock/overburden contact was generated from the drill holes and used to constrain the upper extent of mineralization.
| Project: 169525666 | 11-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2025)
Figure 11-1: Plan View of the Grey Fox Project Lithology Model
11.3.2.2Mineralized Zones
The Grey Fox deposit area is subdivided into six mineralized zones differing in host lithology. The zones include the Contact, 147, 147NE, Gibson and South Zone with the northern most mineralized lens of the Contact Zone area named the Whiskey Jack Zone (Figure 11-2). The mineralization is further categorized into six domains based on mineralization style, orientation, grade population, and host lithologies.
The mineralization wireframes were created by geologically interpreting the structures controlling mineralization, guided by structural data and gold grades. These were then explicitly modelled creating closed volumes around the defining drill hole intercepts at an approximate cut-off grade of 0.5 g/t Au.
| Project: 169525666 | 11-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2025)
Figure 11-2: Plan View of the Grey Fox Project Mineralized Zones and Domains
A description of each mineralized zone is summarized in Table 11-1.
Veins hosted in the syenite and sediments form the local Domains 10 and 11; Domain 10 has a lower grade population, and an orientation that strikes Southwest and forms the Gibson Main; Domain 11 has a slightly higher grade population, strikes Southwest and forms the Gibson North. Veins hosted in the mafic intrusive and volcanic rocks form Domain 30. The veins hosted in the variolitic units appear to be a continuation or subset of the veins in the surrounding mafic rocks and form Domain 31. Due to their physical continuity with Domain 30, but having a slight grade population difference, Domain 31 veins were estimated using a soft boundary contact with veins of Domain 30.
| Project: 169525666 | 11-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
Table 11-1: Grey Fox Mineralized Domains
Domain | | Description |
10 | | Southwest trending, steeply northwest dipping quartz veins and breccias hosted in sediments and the Gibson syenite intrusive (70° dip @ 280° dip direction) |
11 | | Southwest trending, steep northwest dipping quartz veins and breccias hosted in sediments and the syenite Gibson intrusive (80° dip @ 310° dip direction). This is a new domain, separated from Domain 10, due to a change in lens orientation and indicated by geostatistical data. |
20 | | North-south trending unconformity contact between mafic rocks and sedimentary rocks. Outcrop is steeply east dipping (75° dip @ 80° dip direction), at the northern extent and at depth the zone rolls over to a steep westerly dip (75° dip @ 250° dip direction) |
30 | | Southwest trending, steeply northwest dipping quartz veins and breccias hosted in mafic volcanic flows and mafic intrusive rocks (65° dip @ 310° dip direction) |
31 | | Southwest trending, steeply northwest dipping quartz veins and breccias hosted in dominantly iron-rich variolitic textured mafic rocks (65° dip @ 310° dip direction) |
32 | | East trending sub-vertical to steep south dipping quartz breccia veins hosted in mafic volcanic and intrusive rocks (75° dip @ 175° dip direction) |
11.3.2.3Background Envelope
A background envelope (Domain 100) of approximately 25 m was constructed around all mineralized domains to capture mineralized samples outside the mineralized domains and to estimate adjacent dilution.
11.3.3Composites
More than 70% of the assays have a sample length of 1 m. The modal composite length of 1 m was applied to samples within the mineralized zones which generated composites close to 1 m with a minimum composite length of 0.3 m. A modal composite length of 4 m was applied to samples within the background envelope (dilution) based on the parent cell size of the block model.
11.3.1Capping
The impact of high-grade outlier populations was analyzed using histograms, log probability plots, mean and variance, and cumulative metal plots. Results are presented in Table 11-2 for each mineralized domain with metal removed ranging from 4.6% in Domain 11 and 27.4% in Domain 20.
Table 11-2: Grey Fox – Metal Removed by Capping Composites
Domain | | Raw Composites | | Capped | | Capped Composites | | No. | | Metal | ||||
| | Mean (g/t) | | CV | | Grade (g/t) | | Mean (g/t) | | CV | | Capped | | Removed (%) |
10 | | 1.60 | | 3.67 | | 27 | | 1.47 | | 1.98 | | 29 | | 8.5 |
11 | | 1.99 | | 2.37 | | 27 | | 1.90 | | 2.06 | | 17 | | 4.6 |
20 | | 2.23 | | 10.02 | | 34 | | 1.62 | | 2.39 | | 19 | | 27.4 |
30 | | 1.65 | | 23.53 | | 87 | | 1.23 | | 3.94 | | 20 | | 25.4 |
| Project: 169525666 | 11-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
Domain | | Raw Composites | | Capped | | Capped Composites | | No. | | Metal | ||||
| | Mean (g/t) | | CV | | Grade (g/t) | | Mean (g/t) | | CV | | Capped | | Removed (%) |
31 | | 2.02 | | 8.58 | | 70 | | 1.76 | | 2.95 | | 27 | | 13.0 |
32 | | 4.22 | | 2.41 | | 48 | | 3.93 | | 2.06 | | 16 | | 6.8 |
100 | | 0.10 | | 19.07 | | 10 | | 0.09 | | 4.65 | | 115 | | 13.8 |
11.3.2Density
There are 14,459 density samples contained in the Mineral Resource database. Currently, one in twenty assay samples are selected for density analysis by the assay laboratory. A study of all density data was conducted to determine an average density value for each of the host lithology units. Blocks were assigned the average density per unit as listed in Table 11-3.
Table 11-3: Grey Fox – Density Values by Lithology
Lithology | No. of Samples | Avg. Density |
Ankerite Altered Ultramafic Volcanics (AUV) | 17 | 2.82 |
Fuchsite Altered Ultramafic Volcanics (CGR) | 98 | 2.89 |
Diabase (DIA) | 49 | 2.94 |
Mafic Volcanics (AMV, PMV, MV, MI, MR) | 3580 | 2.90 |
Quartz Veins (QV, QBX) | 55 | 2.86 |
Sediments (SED, GR) | 719 | 2.76 |
Felsic Intrusives (SYN, FI, FP) | 1660 | 2.76 |
Ultramafic Volcanics (UMV,UV,CUV,TUV) | 488 | 2.83 |
Variolitic Mafic Volcanics (VIV) | 4902 | 2.86 |
All Lithologies Combined | 11568 | 2.85 |
* 14,459 Total samples. Lowest 5 and highest 5 values removed from evaluation as outliers | | |
* Density measurements belonging to minor, unmodeled lithologies removed from density calculation. | | |
*Overburden given a specific gravity of 2.0 | | |
11.3.3Variography
The spatial distribution (continuity) of gold within each mineralized zone was evaluated using variograms.
Primary directions of the variograms were modeled based on observed mineralization orientations. These orientations were then examined statistically to ensure they represented the best possible fit with the variography. The stability of the variograms was evaluated by varying the direction specification and comparing the resulting experimental variograms. Variograms were modelled with two spherical structures, three rotations to match the strike, dip and plunge of the mineralized zone. Nugget effects range from 10% in Domain 30 and 32 to 20% in Domain 10, 11, 20, and 31.
11.3.4Grade Estimation
A block size of 4 m x 4 m x 4 m was selected based on drill hole spacing, composite length, the geometry of the modelled mineralized zones, and anticipated mining methods. Sub-cells down to 0.5 m x 0.5 m x 0.5 m
| Project: 169525666 | 11-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
were used to better reflect the shape and volume of the mineralized domains. No rotation was applied to the block model.
Ordinary kriging was used to estimate the blocks within the mineralized domains using a four-pass approach, although estimated blocks within only the fourth search neighborhood are not classified. Search neighborhoods are based on variography, with the range doubling from search pass 1 to search pass 2, multiplying by 2.5 from search pass 2 to search pass 3 and doubling from 3 to 4. Datamine’s dynamic anisotropy function was implemented due to the anisotropic nature and widths of the mineralized domains.
Data selection for mineralized domains in passes one and two used a minimum of nine and a maximum of 16 composites from at least three drill holes to estimate a given block. Data selection for mineralized domains in pass three and four used a minimum of five and a maximum of 12 composites from at least two drill holes to estimate a given block. Blocks within the background envelope were estimated using inverse distance to the power of three with its ellipsoid guided by the general lithology contact orientation determined through variography. Any blocks that were not estimated in one of the three passes were assigned a background gold value of one quarter of detection limit, or 0.0005 g/t.
The search parameters are presented in Table 11-4 below.
Table 11-4: Grey Fox Estimation Search Parameters
Domain | Orientation Rotation | | Search Volume 1 | Search Volume 2 | Search Volume 3 | Search Volume 4 Distances | | | | ||||||||||
Z | X | Z | | X(Stri ke) | Y(Dip) | Z(Perp) | X(Stri ke) | Y(Dip) | Z(Perp) | X(Stri ke) | Y(Dip) | Z(Perp) | X(Stri ke) | Y(Dip) | Z(Perp) | Min | Max | Max Composites | |
| Dynamic Anisotropic Search Volume | | | | | | | | | | | | | | | | | ||
10 | | | 120 | | 17 | 13 | 9 | 34 | 26 | 18 | 85 | 65 | 45 | 170 | 130 | 90 | | Search Vol 1&2 | |
11 | | | 150 | | 11 | 15 | 12 | 22 | 30 | 24 | 55 | 75 | 60 | 110 | 150 | 120 | 9 | 16 | 4 |
20 | | | 90 | | 17 | 28 | 6 | 34 | 56 | 12 | 85 | 140 | 30 | 170 | 280 | 60 | |||
| Dip Direction | Dip | | | | | | | | | | | | | | | | | |
30 | | | 90 | | 19 | 11 | 14 | 38 | 22 | 28 | 95 | 55 | 70 | 190 | 110 | 140 | | Search Vol 3&4 | |
31 | | | 80 | | 11 | 10 | 6 | 22 | 20 | 12 | 55 | 50 | 30 | 110 | 100 | 60 | 5 | 12 | 4 |
32 | | | 100 | | 13 | 7 | 2 | 26 | 14 | 4 | 65 | 35 | 10 | 130 | 70 | 20 | |||
100 | -170 | 80 | 150 | | 39 | 54 | 32 | 78 | 108 | 64 | | | | | | | 5 | 12 | 4 |
11.3.1Model Validation
The estimated block model was validated by visually comparing drill hole data with block grades and by reviewing swath plots to determine whether any local bias exists. Figure 11-3 shows a section view looking east for the Whiskey Jack Zone, and Figure 11-4 shows a section view looking northeast for Gibson Zone North, both comparing block grades with drill hole data using ±25 m clipping. These analyses indicate that the block model reasonably reflects the assay sample data, with only minor local bias in areas of sparse data.
| Project: 169525666 | 11-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2025)
Note: Looking east, ±25 m clipping
Figure 11-3: Section Comparing Block Grades vs Drill Hole Data, Whiskey Jack, Grey Fox Model
| Project: 169525666 | 11-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2025)
Note: Looking northeast, ±25 m clipping
Figure 11-4: Section Comparing Block Grades vs Drill Hole Data, Gibson Zone N, Grey Fox Model
11.3.2Confidence Classification
The QP is confident that the Grey Fox mineralization model honours the current informing data contained within the geological database. The sample locations and assay data are considered reliable and of sufficient quality to support Mineral Resource evaluation. The Mineral Resource model is constrained within mineralized domains based on lithological, structural and grade criteria and has been developed using core drilling completed on an irregular grid with drill hole spacing ranging from approximately 5 m and 50 m. The controls on the distribution of gold mineralization are well understood, and confidence in geological continuity is considered reasonable.
Classification criteria consider confidence in the continuity of mineralization, average distance to informing samples (weighted on distance), and continuity of drill hole spacing. The following classification criteria were applied:
· | Indicated: Assigned to those continuous blocks within the mineralized domains and within a weighted average informing sample distance of 40 m. The estimates had to be informed by, and the sample spacing had to be continuous between, three or more drill holes and estimated within the first three search passes. |
| Project: 169525666 | 11-9 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
· | Inferred: Assigned to those continuous blocks within the mineralized domains informed by at least two drill holes and within a weighted average informing sample distance of 60 m and estimated within the first three search passes. |
Blocks within the mineralized zones not meeting the above criteria were not classified. Blocks within the background envelope were not classified.
11.3.3Reasonable Prospects for Eventual Economic Extraction
For a Mineral Resource to be reported, the QP must determine that RPEEE has been established.
Due to the narrow-vein nature, geometry, and location of the Grey Fox mineralization, the QP considers the deposit to be amenable to underground mining methods. A cut-off grade of 1.35 g/t Au was determined using the cost and input parameters presented in Table 11-5, based on recent quotations and benchmarked against comparable projects.
Table 11-5: Grey Fox Mineral Resource Cut-off Grade Parameters
Parameter | Unit | Value |
Mining Cost | $US/t | 67.72 |
G&A Cost | $US/t | 16.60 |
Milling Cost | $US/t | 30.77 |
Transport Cost | $US/oz | 1.52 |
Payable Gold | % | 99.95 |
Dilution | % | 15 |
Gold Price | $US/oz | 3,000 |
Exchange Rate (US$/C$) | - | 1.35 |
Royalty (NSR) | % | * |
Mill Recovery | % | 90 |
Note: *Royalty is variable from 0.15% NSR to 3% NSR, with a calculated cut-off grade varying from 1.33 g/t to 1.37 g/t, ultimately a rounded 1.35 g/t cut-off grade was used for all of Grey Fox.
Reasonable prospects for eventual economic extraction were derived from potentially mineable shapes developed using Datamine’s Mineable Shape Optimizer function. A stope size of 12 m vertical height by 6 m wide along strike by a minimum 3 m wide across strike was adopted. This size was benchmarked against mined stopes at the nearby Black Fox underground mine. Sub stopes were developed at half height and half width along strike (6 m x 3 m) to account for local anisotropy of the grade continuity. Stopes with a width less than 3 m across strike were not considered potentially economical and excluded. Stope shapes were developed using the economic cut-off-grade of 1.35 g/t Au. All classified blocks were analyzed by the mineable shape optimizer with resulting stopes shown in Figure 11-5.
All classified blocks were flagged by the potentially mineable shapes including those below the 1.35 g/t Au cut-off grade, this is known as “must take material” and as a combined mineable shape they meet the
| Project: 169525666 | 11-10 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
necessary parameters, including the cut-off grade. Isolated, discontinuous stope shapes were not considered economic and were therefore removed and not included in the Mineral Resource Statement.

Source: (McEwen, 2025)
Figure 11-5: Plan View of the Potentially Mineable Stope Shapes at Grey Fox
Figure 11-6 presents the experimental grade–tonnage sensitivities at various cut-off grades. The sensitivities were generated using raw block grades and include both Indicated and Inferred classified blocks. Sensitivities include all classified blocks, not only those meeting RPEEE. These results are provided for comparative purposes only, to illustrate the potential effect of applying different cut-off grades on tonnage and grade. Sensitivity cases do not represent Mineral Resources and should not be interpreted as such.
| Project: 169525666 | 11-11 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2026)
Note: Sensitivities use raw block grades and include Indicated and Inferred blocks. These results are for comparison only and do not represent Mineral Resources.
Figure 11-6:Experimental Grade‑Tonnage Sensitivities at Various Cut‑Off Grades
11.3.4Mineral Resource Statement
Table 11-6 summarizes the Grey Fox Mineral Resource estimate, assuming underground stoping methods. The Mineral Resource estimate is limited to those parts of the gold mineralization for which the QP has determined RPEEE through underground stope extraction.
This Mineral Resource statement is reported exclusive of Mineral Reserves (Section 12). Mineral Resources were estimated after applying the RPEEE criteria and removing material classified as Mineral Reserves.
Table 11-6: Grey Fox Mineral Resource Statement, April 2, 2026, exclusive of Reserves
Classification | Tonnes (kt) | Au Grade (g/t) | Contained Au (koz) |
Indicated | 9,681 | 2.25 | 701 |
Inferred | 4,696 | 2.57 | 388 |
Notes:
· | Data cut-off date for the Mineral Resource estimate is July 11, 2025. The QP for the estimate is Mr. Carson Cybolsky, P.Geo, an employee of McEwen. |
| Project: 169525666 | 11-12 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
· | Mineral Resources are reported using Item 1300 of Regulation S-K. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
· | Resources are reported exclusive of the reserves reported in Section 12. |
· | Mineral Resources are reported above an economic cut-off grade of 1.35 g/t gold assuming underground extraction methods and based on a mining cost of $67.72/t, process cost of $30.77/t, G&A cost of $16.60/t, metallurgical recovery of 90%, variable royalty NSR from 0.15% to 3.0%, dilution of 15% and gold price of US$3,000/oz. |
· | Figures may not sum due to rounding. |
Table 11-7 summarizes the Grey Fox resource as inclusive of Reserves reported in Section 12.
Table 11-7: Grey Fox Mineral Resource Statement, April 2, 2026, inclusive of Reserves
Classification | Tonnes, kt | Au Grade, g/t | Contained Au, koz |
Indicated | 18,819 | 3.28 | 1,986 |
Inferred | 5,056 | 2.69 | 438 |
Notes:
· | Data cut-off date for the Mineral Resource estimate is 11 July 2025. The QP for the estimate is Mr Carson Cybolsky, P.Geo, an employee of McEwen. |
· | Mineral Resources are reported using Item 1300 of Regulation S-K. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
· | Indicated resources are reported inclusive of the reserves reported in Section 12. |
· | Mineral Resources are reported above an economic cut-off grade of 1.35 g/t gold assuming underground extraction methods and based on a mining cost of $67.72/t, process cost of $30.77/t, G&A cost of $16.60/t, metallurgical recovery of 90%, variable royalty NSR from 0.15% to 3.0%, dilution of 15% and gold price of US$3,000/oz. |
· | Figures may not sum due to rounding. |
11.3.5Factors That Could Affect the Mineral Resource Estimate
Factors that may affect the Grey Fox Mineral Resource estimate include:
· | Changes in the local geological interpretations and assumptions used to generate the estimation domains. |
· | Changes in mineralization and geological geometry and continuity of mineralized zones. |
· | Changes in assumptions of mineralization and grade continuity. |
· | Changes in the treatment of high-grade gold values. |
· | Changes in the grade interpolation methods and estimation parameter assumptions. |
· | Changes in the confidence assumptions and methods used in the mineral resource classification. |
· | Changes in the density and the methods used in the density assignments. |
· | Changes in metal price and exchange rates and other economic assumptions used in the cut-off grade determination. |
· | Changes in input and design parameter assumptions that pertain to the underground mining constraints. |
· | Changes to assumptions as to the continued ability to access the mine site, retain mineral and surface rights titles, maintain the operation within environmental and other regulatory permits, and maintain the social license to operate. |
| Project: 169525666 | 11-13 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
No other environmental, permitting, legal, title, taxation, socioeconomic, marketing, political or other relevant factors are known to the QP that would materially affect the estimation of Mineral Resources that are not discussed in this report.
11.4Stroud
11.4.1Mineral Resource Database
In March 2026, McEwen Inc. developed the initial Stroud mineral resource model. This model incorporates historic drilling results with follow up drilling completed by McEwen from the late 2025 and Q1 2026 confirmation drill campaign. The resource database includes 149 historic holes drilled from 1974 to 2007 as well as 31 holes drilled in Q4 2025 and Q1 2026 to confirm the mineralization described and captured in the historic database. The current drill hole database was closed on March 26, 2026 and consists of 180 holes, comprised of 36,486 m of drill core and 27,201 intervals (25,932 m) assayed for gold.
11.4.2Geological Modeling
The Stroud deposit occurs proximal to the Hislop fault, mostly within sheared, altered mafic metavolcanic rocks, but also within felsic intrusives, and to a lesser extent metasediments, volcanic tuffs and ultramafic intrusives. These units, along with the mineralization, are crosscut by younger diabase dykes. The mineralization was explicitly modelled by members of the McEwen Exploration team and the QP using Datamine Studio. Wireframes were snapped to drill intercepts, using approximately 0.5 g/t as a general cut-off for mineralization. Core logs, photos, assays, and previously modeled wireframes were used as a guide to orient the wireframes. The mineralization was divided into three domains based on geostatistics, geology, and geographic areas. All three domains show similar geology in that they are predominantly composed of altered (sericite, carbonate, +/-hematite) metavolcanic mafics within a shear zone:
· | Domain 10, historically the “Main Zone,” is composed of sheared, stacked veins within altered mafic metavolcanics, and also contains felsic porphyries and metasediments. This domain strikes at ~135° with a variable dip of ~35°-60°. |
· | Domain 20, historically the “Creek Zone,” is composed of sheared, stacked veins within altered mafic metavolcanic, and also contains felsic porphyries. This domain strikes at ~130° with a ~65° dip. |
· | Domain 30, historically the “Creek Zone Extension,” is composed of sheared, stacked veins within altered mafic metavolcanics, and also contains felsic porphyries. This domain has a more variable orientation with the strike at ~135°-150° with a ~55° dip. |
A longitudinal view of the different domains present at Stroud are shown in Figure 11-7.
| Project: 169525666 | 11-14 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2026)
Figure 11-7: Longitudinal View of the Mineralized Domains at Stroud (looking NE)
11.4.3Composites
Over 97% of all samples have core lengths between 0.5 m and 1.5 m. The modal composite length of 1 m was applied to samples within the mineralized zones which generated composites close to 1 m with a minimum composite length of 0.3 m and a maximum of 1.5 m. A composite length of 3 m was applied to samples within the background envelope (dilution) based on the parent cell size of the block model.
11.4.4Capping
The impact of high-grade outlier populations was analyzed using histograms, log probability plots, mean and variance, and cumulative metal plots. Results are presented in Table 11-8 for each mineralized domain, with metal removed ranging from 4.2% in Domain 30, to 18.4% in Domain 20. The capping values derived from this analysis were applied to drill hole sample composites.
Table 11-8: Stroud – Metal Removed by Capping Composites
Domain | | Raw Composites | | Capped | | Capped Composites | | No. | | Metal | ||||
| | Mean (g/t) | | CV | | Grade (g/t) | | Mean (g/t) | | CV | | Capped | | Removed (%) |
10 | | 2.56 | | 2.21 | | 27.0 | | 2.40 | | 1.85 | | 16 | | 6.4 |
20 | | 2.63 | | 4.54 | | 25.0 | | 2.14 | | 1.32 | | 3 | | 18.4 |
30 | | 2.45 | | 1.12 | | 8.5 | | 2.35 | | 1.04 | | 6 | | 4.2 |
Note: CV = coefficient of variation
| Project: 169525666 | 11-15 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.4.5Density
As no certified density measurements are in the historical data base, a value of 2.65 g/cm3, reported in previous estimation reports is considered as representative for the mineralized rock types and used in all tonnage calculations. As density measurements are taken from further additional drilling, this will be reevaluated and combined with the lithological model. This default value of 2.65 g/cm3 is considered adequate for Inferred classification but represents a potential source of uncertainty. Further testwork is underway and a density study will be conducted to create and refine the density model.
11.4.6Variography
The spatial distribution (continuity) of gold within each mineralized domain was evaluated using variograms.
Primary directions of the variograms were modelled based on observed mineralization orientations. The stability of the variograms were evaluated by varying the direction and comparing the resulting experimental variograms. The developed variograms displayed two spherical structures and three rotations to match the strike, dip and plunge of the modelled mineralization. Nugget effects are 20% for all Domains. Variography and Kriging Neighborhood Analysis were conducted on Datamine’s Supervisor software and were used to calculate search ellipse dimensions.
11.4.7Grade Estimation
A block size of 3 m x 3 m x 3 m was selected based on drill hole spacing, composite length, the geometry of the modelled mineralized zones, and anticipated mining methods. Sub-cells down to 0.5 m x 0.5 m x 0.5 m were used to better reflect the shape and volume of the mineralized domains. No rotation was applied to the block model.
Ordinary kriging was used to estimate the blocks within the mineralized domains using a three-pass approach. Search neighborhoods are based on variography with ranges doubling in length with each pass. Datamine’s dynamic anisotropy function was implemented due to the anisotropic nature and widths of the mineralized domains. This function aligns the search ellipse with the local dip and dip direction with the plunge defined as per the variography direction.
Data selection for all mineralized domains remained the same for all passes using a minimum of nine and a maximum of 16 composites from at least three drill holes to estimate a given block in the first three search passes. Data selection for the fourth search pass used a minimum of five and a maximum of 12 composites from at least two drill holes to estimate a given block, ultimately no blocks within the fourth search pass were classified.
Blocks within the background dilution envelope were estimated using ordinary kriging with its ellipsoid guided by dimensions determined through variography without the use of dynamic anisotropy. Any blocks that were not estimated in one of the four passes were assigned a background gold value of ¼ of detection limit, or 0.0005 g/t.
| Project: 169525666 | 11-16 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.4.8Model Validation
The estimated block model was validated by visually comparing the drill holes with the block grades (Figure 11-8 and Figure 11-9), with swath plots to determine whether any statistical local bias exists, and a nearest neighbor estimate versus the kriged estimate to determine if any global bias exists. A histogram comparison of the estimated grades versus the composite grades was also used to investigate grade smoothing. These analyses indicate the block model acceptably reflects the assay sample data with only minor local bias in areas of sparse data. There is a minor amount of local smoothing of the higher grades; however, the grade distribution of the samples is reasonably reproduced by the estimate.

Source: (McEwen, 2026)
Figure 11-8: Plan View of Blocks and Informing Drill Holes at Stroud, Domains 20 &10
| Project: 169525666 | 11-17 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2026)
Note: Looking east (550515E); ±15 m clipping
Figure 11-9: Vertical Section of Estimated Blocks and Informing Drill Holes in Domain 20 at Stroud
11.4.9Classification
The QP is confident that the Stroud mineralization model honours the current informing data from the geological database. The location of the samples and the assay data are sufficiently reliable to support Mineral Resource evaluation. The Mineral Resource model is constrained by mineralized domains based on lithological, structural and grade criteria and is modelled from core holes drilled on an irregular grid. The controls on the distribution of the gold mineralization are understood, and the confidence in geological continuity is reasonable.
| Project: 169525666 | 11-18 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
Classification criteria considers the confidence in the continuity of mineralization, average distance to informing samples, distance to the closest informing sample and continuity of drill hole spacing. The following classification criteria were defined:
· | Measured: No blocks were assigned the measured category. The QP requires the geological model and grade interpolation to be validated with either 10 m spaced definition drilling or physical mapping from surface or underground to assign a measured classification. |
· | Indicated: Until more robust data validation on historical data can be performed and density data can be confirmed, no blocks were assigned to the indicated category. |
· | Inferred: Assigned to those continuous blocks within the mineralized domains, informed by three or more drill holes, less than 30 m to the nearest sample, and within an average drill hole spacing of 50 m. |
11.4.10Reasonable Prospects for Eventual Economic Extraction
For a Mineral Resource to be reported, the QP must determine that RPEEE has been established.
Due to the narrow-vein nature, geometry, and location of the Stroud mineralization, the QP considers the deposit to be amenable to underground mining methods. A cut-off grade of 1.35 g/t Au was determined considering the costs and input parameters (Table 11-9) benchmarked with similar projects, in particular the nearby Grey Fox deposit.
Table 11-9: Stroud Mineral Resource Cut-off Grade Parameters
Parameter | Unit | Value |
Mining Cost | $US/t | 67.72 |
G&A Cost | $US/t | 16.60 |
Milling Cost | $US/t | 30.77 |
Transport Cost | $US/oz | 1.52 |
Payable Gold | % | 99.95 |
Dilution | % | 15 |
Gold Price | $US/oz | 3,000 |
Exchange Rate (US$/C$) | - | 1.35 |
Royalty (NSR) | % | 0 |
Mill Recovery | % | 90 |
RPEEEs were derived from potentially mineable shapes developed using Datamine’s Mineable Shape Optimizer function. A stope size of 12 m vertical height by 6 m wide along strike by a minimum 3 m wide across strike was adopted. This size was benchmarked against mined stopes at the nearby Black Fox underground mine. Sub stopes were developed at half height and half width along strike (6 m x 3 m) to account for local anisotropy of the grade continuity. Stopes with a width less than 3 m across strike were not considered potentially economical and excluded. Stope shapes were developed using the economic cut-off-grade of 1.35 g/t Au. All classified blocks were analyzed by the mineable shape optimizer with resulting stopes shown in Figure 11-10. All classified blocks were flagged by the potentially mineable
| Project: 169525666 | 11-19 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
shapes including those below the 1.35 g/t Au cut-off grade, this is known as “must take material” and as a combined mineable shape they meet the necessary parameters, including the cut-off grade.
Isolated, discontinuous stope shapes were not considered economic, and were therefore removed and not included in the Mineral Resource Statement.

Source: (McEwen, 2026)
Figure 11-10: Long Section NE View of the Generated Stroud MSO Shapes
Figure 11-11 presents the experimental grade–tonnage sensitivities at various cut-off grades. The sensitivities were generated using raw block grades and include all classified blocks, not only those meeting RPEEE. These results are provided for comparative purposes only, to illustrate the potential effect of applying different cut-off grades on tonnage and grade. Sensitivity cases do not represent Mineral Resources and should not be interpreted as such.
| Project: 169525666 | 11-20 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2026)
Note: Sensitivities use raw cut-off grades and include all Inferred blocks. This is for comparison to show what potential effect a change in cut-off grade would have and does not represent Mineral Resources.
Figure 11-11:Experimental Sensitivities at Various Cut-Off Grades
11.4.11Mineral Resource Statement
Table 11-10 summarizes the Mineral Resource estimates for Stroud, assuming underground stoping methods, reported in accordance with the 2014 CIM Definition Standards (2014). The Mineral Resource was limited to those parts of the gold mineralization for which there are reasonable prospects for eventual economic extraction via underground stope extraction.
Table 11-10: Stroud Mineral Resource Statement, March 26, 2026
Classification | Tonnes, kt | Au Grade, g/t | Contained Au, koz |
Indicated | 0 | 0.00 | 0 |
Inferred | 1,866 | 2.80 | 168 |
Note:
· | Effective date of the Mineral Resource estimate is March 26, 2026. The QP for the estimate is Mr. Carson Cybolsky, P.Geo, an employee of McEwen. |
· | Mineral Resources are reported using Item 1300 of Regulation S-K. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
· | Mineral Resources are reported above an economic cut-off grade of 1.35 g/t gold assuming underground extraction methods and based on a mining cost of $67.72/t, process cost of $30.77/t, G&A cost of $16.60/t, metallurgical recovery of 90%, dilution of 15% and gold price of US$3,000/oz. |
· | Figures may not sum due to rounding. |
| Project: 169525666 | 11-21 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.4.12Factors That Could Affect the Mineral Resource Estimate
Factors that may affect the Stroud Mineral Resource estimate include:
· | Changes in the local geological interpretations and assumptions used to generate the estimation domains. |
· | Changes in mineralization and geological geometry and continuity of mineralized zones. |
· | Changes in assumptions of mineralization and grade continuity. |
· | Changes in the treatment of high-grade gold values. |
· | Changes in the grade interpolation methods and estimation parameter assumptions. |
· | Changes in the confidence assumptions and methods used in the mineral resource classification |
· | Changes in the density and the methods used in the density assignments. |
· | Changes in metal price and exchange rates and other economic assumptions used in the cut-off grade determination. |
· | Changes in input and design parameter assumptions that pertain to the underground mining constraints. |
· | Changes to assumptions as to the continued ability to access the mine site, retain mineral and surface rights titles, maintain the operation within environmental and other regulatory permits, and maintain the social license to operate. |
No other environmental, permitting, legal, title, taxation, socioeconomic, marketing, political or other relevant factors are known to the QP that would materially affect the estimation of Mineral Resources that are not discussed in this report.
11.5Black Fox
11.5.1Mineral Resource Database
The close-out date for the Mineral Resource database is 31 December 2025 and consists of the following:
· | 7,731 core drill holes totalling 1,097,798 m of drill core and 438,200.1 m of sampled core (144 drill holes were excluded from the drill hole database, primarily due to low confidence in their locations). |
· | 13,332 strings of chip samples totalling 52,295.3 m from development headings were sampled for a total of 56,884 assays. |
Unsampled intervals were considered barren and were assigned a background gold grade of 0.0005 g/t, or one-quarter of the assay laboratory’s lower detection limit.
On importing the drill hole database from the central SQL database to Datamine Studio software in preparation for resource estimation, sample data were checked for the following:
· | Missing, duplicated and overlapping intervals in the assay and lithology tables. |
· | Missing and overlapping intervals in the survey table. |
· | Visually checking collar locations in 3D against mine excavations and surface topography. |
| Project: 169525666 | 11-22 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.5.2Geological Modeling
11.5.2.1Mineralized Domains
Gold mineralization at Black Fox occurs in several different geological settings within the main Ankerite Alteration envelope. The mineralization occurs within both ultramafic and mafic volcanic rock types within the outer boundaries of the PDDZ. The mineralization and alteration envelopes are primarily parallel/subparallel and adjacent to the regional A1 fault. The lenses of the mineralization have been developed within the main lithological and alteration units and primarily occur in vein arrays, shear veins, and replacement zones within the interleaved mafic and ultramafic host rocks.
The mineralized lenses were interpreted and explicitly modelled considering structural and lithological controls, and a grade threshold of approximately 0.5 g/t Au to demonstrate mineralized continuity. The mineralized lenses were divided into nine mineralized domains (Figure 11-12) based primarily on mineralization style, grade population statistics and primary host lithologies.

Source: (McEwen, 2025)
Figure 11-12: Long Section Looking North of Black Fox Mineralized Domains
| Project: 169525666 | 11-23 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.5.2.2Background Envelope
A background envelope (Domain 100) representing a low-grade alteration package surrounding the mineralization, was constructed around all mineralized domains to capture mineralized samples outside the mineralized domains and to estimate adjacent dilution.
11.5.3Composites
A large percentage of the assays within the mineralized domains have a sample length of 1 m. The modal composite length of 1 m was applied to all samples (drill hole and chip) in the database. This generated composites close to 1 m with a minimum composite length of 0.3 m.
11.5.4Capping
The impact of high-grade outlier populations was analyzed using histograms, log probability plots, mean and variance analysis, and cumulative metal plots. Results are presented in Table 11-11 for each mineralized domain, with metal removed ranging from 0.6% in Domain 6, to 45.9% in Domain 2. Capping was warranted on all mineralized domains except for Domain 5. The capping values derived from this analysis were applied to both drill hole and chip sample composites.
Table 11-11: Black Fox – Metal Removed by Capping Composites
Domain | | Raw Composites | | Capped | | Capped Composites | | No. | | Metal | ||||
| | Mean (g/t) | | CV | | Grade (g/t) | | Mean (g/t) | | CV | | Capped | | Removed (%) |
1 | | 3.86 | | 4.00 | | 52.0 | | 3.53 | | 2.05 | | 70 | | 8.4 |
1.1 | | 2.14 | | 4.45 | | 20.0 | | 1.64 | | 1.99 | | 40 | | 23.3 |
2 | | 6.43 | | 6.45 | | 28.0 | | 3.48 | | 2.00 | | 522 | | 45.9 |
2.1 | | 8.83 | | 3.46 | | 140.0 | | 7.86 | | 2.73 | | 38 | | 11.0 |
2.2 | | 2.58 | | 4.57 | | 16.5 | | 1.63 | | 2.00 | | 19 | | 36.9 |
3 | | 4.37 | | 5.53 | | 30.0 | | 2.93 | | 2.11 | | 259 | | 32.9 |
4 | | 1.99 | | 3.63 | | 29.0 | | 1.73 | | 2.03 | | 40 | | 13.3 |
5 | | 1.46 | | 1.42 | | - | | 1.46 | | 1.42 | | - | | - |
6 | | 0.90 | | 2.20 | | 33.0 | | 0.90 | | 2.09 | | 3 | | 0.6 |
100 (background) | | 0.26 | | 28.5 | | 15.0 | | 0.16 | | 5.44 | | 681 | | 36.1 |
100 (background) | | 0.26 | | 28.5 | | 30.0 | | 0.18 | | 6.95 | | 313 | | 28.5 |
Note: CV = coefficient of variation
11.5.5Density
A constant density value of 2.84 g/cm3 was applied to all material. This value has been used in previous estimates and for production tracking. This value has been validated by analyzing the average value of 150 specific gravity measurements, which are restricted to samples within mineralized domains, and taken from drill hole samples since 2018.
| Project: 169525666 | 11-24 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.5.6Variography
The spatial distribution (continuity) of gold within each mineralized domain was evaluated using variograms. Primary directions of the variograms were modelled based on field observations and interpreted mineralization orientations. The stability of the variograms were evaluated by varying the direction and comparing the resulting experimental variograms. The developed variograms displayed two spherical structures and three rotations to match the strike, dip and plunge of the modelled mineralization. Nugget effects range from 21% in Domain 6 to 33% in Domains 2 and 3.
11.5.7Grade Estimation
A block size of 3 m x 3 m x 3 m was selected based on drill hole spacing, composite length, the geometry of the modelled mineralized zones, and anticipated mining methods. Sub-cells down to 0.5 m x 0.5 m x 0.5 m were used to better reflect the shape and volume of the mineralized domains. No rotation was applied to the block model.
Ordinary kriging was used to estimate the blocks within the mineralized domains using a three-pass approach with increasing search neighborhoods with each pass. Datamine’s dynamic anisotropy function was implemented due to the anisotropic nature and widths of the mineralized domains. This function aligns the search ellipse with the local dip and dip direction of the mineralization, with the plunge component defined as per the variography direction.
Data selection for mineralized domains remained the same for the first and second passes using a minimum of 7 and a maximum of 15 composites from at least three drill holes to estimate a given block. The third pass reduced the minimum requirement to four composites from at least two drill holes. The search parameters are presented in Table 11-12.
Table 11-12: Black Fox Estimation Search Parameters
Domain | Orientation Rotation | Search Volume 1 Distances | Search Volume 2 Distances | Search Volume 3 Distances | Number of samples used to estimate | |||||||||||
| Z | X | Z | X(Stri ke) | Y(Dip) | Z(Perp) | X(Stri ke) | Y(Dip) | Z(Perp) | X(Stri ke) | Y(Dip) | Z(Perp) | Search Pass | Min | Max | Max Composites |
| Dynamic Anisotropic Search Volume | | | | | | | | | | | | | | ||
1 | | | 160 | 13 | 19 | 4 | 39 | 57 | 12 | 52 | 76 | 16 | | | | |
1.1 | | | 110 | 31 | 15 | 4 | 93 | 45 | 12 | 124 | 60 | 16 | 1 | 7 | 15 | 3 |
2 | | | 180 | 18 | 7 | 8 | 54 | 21 | 24 | 72 | 28 | 32 | | | | |
2.1 | | | 90 | 7 | 4 | 2 | 21 | 12 | 6 | 28 | 16 | 8 | 2 | 7 | 15 | 3 |
2.2 | Dip Direction | Dip | -150 | 9 | 5 | 2 | 27 | 15 | 6 | 36 | 20 | 8 | | | | |
3 | | | 150 | 4 | 3 | 2 | 12 | 9 | 6 | 16 | 12 | 8 | 3 | 4 | 15 | 3 |
4 | | | -130 | 12 | 12 | 5 | 36 | 36 | 15 | 48 | 48 | 20 | | | | |
5 | | | -150 | 16 | 13 | 3 | 48 | 39 | 9 | 64 | 52 | 12 | | | | |
6 | | | -150 | 10 | 15 | 14 | 30 | 45 | 42 | 40 | 60 | 56 | | | | |
100 0 run | 170 | 60 | 130 | 5 | 5 | 5 | | | | | | | 1 | 1 | 12 | 3 |
100 Main Run | 170 | 60 | 130 | 50 | 50 | 10 | 100 | 100 | 20 | 250 | 250 | 50 | 1, 2 | 4 | 18 | 3 |
Blocks within the background envelope (Domain 100) were estimated using inverse distance to the power of three with its ellipsoid guided by the deposit’s general mineralized orientation. An initial estimation pass focused on estimating areas where high-grade composites were not captured in the mineralized domains. This estimation pass used composites capped at 15 g/t gold with a tight isometric search ellipse to limit the number of blocks estimated to one or two in each direction. Three subsequent passes using composites capped at 30 g/t were made with increasing search ranges and any blocks not estimated were assigned a background gold value of one-quarter of the detection limit, or 0.0005 g/t.
| Project: 169525666 | 11-25 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.5.8Model Validation
In validating the estimated block model, nearest neighbor and inverse distance models were constructed. The nearest neighbor model produces a theoretically globally unbiased estimate of the average value when no cut-off grade is applied and is a good basis for checking the performance of different estimation methods.
The estimated block model was validated by visual inspection, with swath plots to determine whether any local bias exists, and with local and global reconciliations using randomly selected stopes in mined out areas.
Results of the validation show the estimated model acceptably reflects the sample data and past production results.
11.5.9Confidence Classification
The QP is confident that the Black Fox mineralization model honours the current informing data from the geological database. The location of the samples and the assay data are sufficiently reliable to support Mineral Resource evaluation. The Mineral Resource model is constrained by mineralized domains based on lithological, structural and grade criteria and is modelled from core holes drilled on an irregular grid. The controls on the distribution of the gold mineralization are understood, and the confidence in geological continuity is reasonable.
Block classification scenarios were analyzed using a combination of criteria, including confidence in the mineralization’s continuity, drill spacing, sample spacing (in the form of average distance to informing samples - weighted on kriging weights), and the number of drill holes used to estimate. The QP considers the average distance at approximately one-third the modelled variogram (10 m) to adequately represent the local mineralization grades considering the amount of informing data used in the estimate. The QP also considers the estimated grades, using a search distance equal to the average full sill ranges of the modelled variograms (30 m), to adequately represent the global mineralization grades.
The following classification criteria were defined:
· | Measured: Assigned to those continuous blocks within the mineralized domains, estimated within 10 m of informing composites from at least three drill holes. |
· | Indicated: Assigned to those continuous blocks within the mineralized domains, estimated within 10 m of informing composites from at least two drill holes. |
· | Inferred: Assigned to those continuous blocks within the mineralized domains estimated within 30 m of informing composites from at least two drill holes. |
Blocks within the mineralized zones not meeting the above criteria were not classified. Blocks within the background envelope were not classified.
11.5.10Reasonable Prospects for Eventual Economic Extraction
For a Mineral Resource to be reported, the QP must determine that RPEEE has been established.
| Project: 169525666 | 11-26 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
Due to the narrow vein nature, geometry, and location of the Black Fox mineralization, the QP considers the deposit to be amenable to underground mining methods. A cut-off grade of 1.35 g/t Au was determined considering the costs and input parameters (Table 11-13) based on recent quotations and benchmarked with similar projects.
Table 11-13: Black Fox Mineral Resource Cut-off Grade Parameters
Parameter | Unit | Value |
Mining Cost | $US/t | 62.66 |
G&A Cost | $US/t | 20.49 |
Milling Cost | $US/t | 32.21 |
Transport Cost | $US/oz | 1.52 |
Payable Gold | % | 99.95 |
Dilution | % | 15 |
Gold Price | $US/oz | 3,000 |
Exchange Rate (US$/C$) | - | 1.35 |
Royalty (NSR) | $US/t | 7.20 |
Mill Recovery | % | 95 |
RPEEEs were derived from calculating potentially mineable shapes developed using Datamine’s MSO function. A stope size of 12 m vertical height by 6 m wide, along strike by a minimum 3 m wide across strike was adopted. Sub stopes were developed at half height and half width along strike (6 m x 3 m) to account for local anisotropy of the grade continuity. Stope shapes were developed using the economic cut-off-grade of 1.35g/t Au. All classified blocks were analyzed by the mineable shape optimizer.
Isolated, discontinuous stope shapes were not considered economic and were therefore removed and not included in the Mineral Resource Statement. Mineralization below the 300 m level is not considered economic at this time due to the lack of accessibility and the current condition of workings at the deeper levels. All blocks beneath the 300 m level are coded as such and are not included in the Mineral Resource Statement.
Figure 11-13 presents the experimental grade–tonnage sensitivities at various cut-off grades. The sensitivities were generated using raw block grades and include Measured, Indicated and Inferred blocks. Sensitivities include all classified blocks, not only those meeting RPEEE. These results are provided for comparative purposes only, to illustrate the potential effect of applying different cut-off grades on tonnage and grade. Sensitivity cases do not represent Mineral Resources and should not be interpreted as such.
| Project: 169525666 | 11-27 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2026)
Note: Sensitivities use raw block grades and include Measured, Indicated and Inferred blocks. These results are for comparison only and do not represent Mineral Resources.
Figure 11-13:Experimental Grade‑Tonnage Sensitivities at Various Cut‑Off Grades
11.5.11Mineral Resource Statement
Table 11-14 summarizes the Mineral Resource estimates for Black Fox, assuming underground stoping methods, reported in accordance with the 2014 CIM Definition Standards (2014). The Mineral Resource was limited to those parts of the gold mineralization for which there are reasonable prospects for eventual economic extraction via underground stope extraction.
Table 11-14: Black Fox Mineral Resource Statement, December 31, 2025
Classification | Tonnes (kt) | Au Grade (g/t) | Contained Au (koz) |
Measured | 244 | 3.59 | 28 |
Indicated | 141 | 3.54 | 16 |
Total Measured + Indicated | 385 | 3.57 | 44 |
Inferred | 385 | 2.90 | 36 |
Note:
· | Effective date of the Mineral Resource estimate is 31 December 2025. The QP for the estimate is Mr. Carson Cybolsky, P.Geo, an employee of McEwen. |
· | Mineral Resources are reported using Item 1300 of Regulation S-K. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
| Project: 169525666 | 11-28 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
· | Mineral Resources are reported above an economic cut-off grade 1.35 g/t gold assuming underground extraction methods and based on a mining cost of $62.66/t, process cost of $32.21/t, G&A cost of $20.49/t, metallurgical recovery of 95%, dilution of 15% and gold price of US$3,000/oz. |
· | Figures may not sum due to rounding. |
· | Informing sample database cut-off date is 2 October 2024. Mining depletion date up to and including 31 December 2025. |
11.5.12Factors That Could Affect the Mineral Resource Estimate
Factors that may affect the Black Fox Mineral Resource estimate include:
· | Changes in the local geological interpretations and assumptions used to generate the estimation domains |
· | Changes in mineralization and geological geometry and continuity of mineralized zones |
· | Changes in assumptions of mineralization and grade continuity |
· | Changes in the treatment of high-grade gold values |
· | Changes in the grade interpolation methods and estimation parameter assumptions |
· | Changes in the confidence assumptions used in the resource classification |
· | Density assignment |
· | Changes in metal price and exchange rates and other economic assumptions used in the cut-off grade determination |
· | Changes in input and design parameter assumptions that pertain to the underground mining constraints |
· | Changes to assumptions as to the continued ability to access the mine site, retain mineral and surface rights titles, maintain the operation within environmental and other regulatory permits, and maintain the social license to operate. |
No other environmental, permitting, legal, title, taxation, socioeconomic, marketing, political or other relevant factors are known to the QP that would materially affect the estimation of Mineral Resources that are not discussed in this Technical Report Summary.
11.6Froome
11.6.1Mineral Resource Database
The close-out date for the Mineral Resource database was 31 December 2025 and consisted of 1,112 core drill holes totalling 221,479 m of drill core and 128,304 m of sampled core. The database also includes 1,599 strings of chip samples totalling 9,196 gold assays values from 8,617 m of underground development. Unsampled intervals were considered barren and assigned a background gold grade of 0.0005 g/t, or one-quarter of the assay laboratory’s lower detection limit.
On importing the drill hole and chip databases from the central SQL databases to Datamine Studio software in preparation for resource estimation, sample data were checked for missing and overlapping intervals in the assay, lithology and survey tables, and density values inspected to ensure no erroneous entries were present.
| Project: 169525666 | 11-29 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
Underground grade control drilling has continued since the close-out date for the Mineral Resource database in areas of proposed mining. Small local geological interpretations have been improved in these areas; however, no material difference is indicated by the results.
11.6.2Geological Modeling
11.6.2.1Mineralized Domains
The Froome project area is subdivided into four mineralized domains. There are two grade populations hosted primarily in metasediments and two grade populations hosted in FW mafic and ultramafic metavolcanics. All mineralized domains were created using explicit wireframing techniques around static drill holes. Figure 11-14 shows the location of the mineralized domains.
Domain 300 is comprised of the relatively higher gold grade population hosted in metasediments. A low grade mineralized mafic intrusive dyke (domain 300-MI) running through the core of Domain 300 was modelled separately to reduce the smearing of low-grade samples into the surrounding sediments and also to restrict high-grade samples in the surrounding sediments from the mafic dyke. No major structures were noted as gold mineralization is hosted within disseminated sulphide mineralization. However, grade trends were analyzed and planes representing those trends were created.

Source: (McEwen, 2025)
Figure 11-14:East-West Long Sectional View of Froome Project Mineralized Domains
Domain 301 is disseminated through the metasediments, primarily along the north (FW) contact and consists of a lower gold grade population.
| Project: 169525666 | 11-30 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
Both domains 500 and 501 are hosted primarily in the mafic and ultramafic metavolcanics in the FW of the metasediment unit. The mineralization of these domains is hosted in fault-filled quartz carbonate veins and breccias typical of Archean lode gold vein structures along the PDDZ. Statistical analysis of the gold grades within the mineralized lenses that make up these domains suggests there are two populations of gold grade. Domain 501 has a higher probability of containing higher-grade mineralization.
Average structural planes through the FW domain lenses were created to determine each lens anisotropy. The bedrock/overburden contact was generated from the drill holes and used to constrain the extent of mineralization.
11.6.2.1.1Background Envelope
A background envelope (Domain 400) was constructed around all mineralized domains to capture mineralized samples outside the mineralized domains and to estimate adjacent dilution.
11.6.3Composites
More than 50% of the assays within the mineralized domains have a sample length of 1 m. The modal composite length of 1 m was applied to all samples in the database. This generated composites close to 1 m with a minimum composite length of 0.3 m and a maximum of 1.5 m.
11.6.4Capping
The impact of high-grade outlier populations was analyzed using histograms, log probability plots, mean and variance, and cumulative metal plots. Results are presented in Table 11-15 with metal removed ranging from 0.4% in Domain 300 to 27.7% in Domain 500.
Table 11-15: Froome – Metal Removed by Capping Composites
Domain | Raw Composites | Capped | Capped Composites | No. | Metal | ||
| Mean (g/t) | CV | Grade (g/t) | Mean (g/t) | CV | Capped | Removed (%) |
300 | 3.19 | 1.07 | 19.0 | 3.17 | 1.05 | 21 | 0.4 |
300-MI | 2.7 | 1.11 | 8.5 | 2.55 | 0.99 | 55 | 5.4 |
301 | 1.23 | 1.64 | 10.0 | 1.19 | 1.44 | 43 | 3.5 |
500 | 2.1 | 7.3 | 19.0 | 1.52 | 1.58 | 7 | 27.7 |
501 | 2.03 | 5.72 | 45.0 | 1.74 | 2.73 | 17 | 14.3 |
400 | 0.07 | 3.56 | 2.3 | 0.06 | 2.61 | 92 | 4.5 |
Note: CV = coefficient of variation
| Project: 169525666 | 11-31 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.6.5Density
A bulk density analysis was completed for the previous resource update (dated 31 December 2024) and is still considered valid. In that resource update there were 2,973 density samples used in the Froome Mineral Resource bulk density analysis. Density samples were measured on NQ sized core with lengths between 10 and 15 cm, using the Archimedes’ Principle method. A study of all the density data in the resource database was conducted and used to determine an average density value for each of the modelled domains. The average densities for each domain are presented in Table 11-16 and applied to the blocks contained within.
Table 11-16: Froome – Density Values by Mineralized Domain
Domain | Density (g/cm3) |
300 | 2.76 |
301 | 2.76 |
500 | 2.85 |
501 | 2.85 |
400 | 2.81 |
11.6.6Variography
The spatial distribution (continuity) of gold within each mineralized domain was evaluated using variograms.
Primary directions of the variograms were modelled based on observed mineralization orientations. The stability of the variograms were evaluated by varying the direction and comparing the resulting experimental variograms. The developed variograms displayed two spherical structures and three rotations to match the strike, dip and plunge of the modelled mineralization. Nugget effects range from 0% in Domain 500, and 300-MI to 23% in Domain 301.
11.6.7Grade Estimation
A block size of 3 m x 3 m x 3 m was selected based on drill hole spacing, composite length, the geometry of the modelled mineralized zones, and anticipated mining methods. Sub-cells down to 0.5 m x 0.5 m x 0.5 m were used to better reflect the shape and volume of the mineralized domains. No rotation was applied to the block model.
Ordinary kriging was used to estimate the blocks within the mineralized domains using a three-pass approach. Search neighborhoods are based on variography with ranges doubling in length with each pass. Datamine’s dynamic anisotropy function was implemented due to the anisotropic nature and widths of the mineralized domains. This function aligns the search ellipse with the local dip and dip direction with the plunge defined as per the variography direction.
Data selection for mineralized domains 300, 300-MI & 301 remained the same for all passes using a minimum of seven and a maximum of 15 composites from at least three drill holes to estimate a given block. Data selection for mineralized domains 500 & 501 used a minimum of 5 and a maximum of 15
| Project: 169525666 | 11-32 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
composites from at least two drill holes to estimate a given block. Blocks within Domains 300-MI and 400 were estimated using ordinary kriging with its ellipsoid guided by the general lithology contact orientation determined through variography without the use of dynamic anisotropy. Any blocks that were not estimated in one of the three passes were assigned a background gold value of one quarter of the detection limit, or 0.0005 g/t.
Estimation search parameters are presented in Table 11-17 below.
Table 11-17: Froome Estimation Search Parameters
Domain | Orientation Rotation | Search Volume 1 | Search Volume 2 | Search Volume 3 | Search Volume 4 Distances | Number of samples used to Estimate | ||||||||||||||
Z | X | Z | X(Stri ke) | Y(Dip) | Z(Perp) | X(Stri ke) | Y(Dip) | Z(Perp) | X(Stri ke) | Y(Dip) | Z(Perp) | X(Stri ke) | Y(Dip) | Z(Perp) | Mi n | Ma x | Ma x | |||
| Dynamic Anisotropy | | | | | | | | | | | | | | | | | |||
300 | | 90 | 15 | 10 | 2.5 | 30 | 20 | 5 | 60 | 40 | 10 | 300 | 300 | 50 | 7 | 15 | | |||
301 | TRDIPDIR | TIRDIP | 90 | 7 | 10.5 | 4 | 14 | 21 | 8 | 28 | 42 | 16 | 300 | 300 | 50 | | | 3 | ||
500 | | 130 | 7.5 | 4 | 2.5 | 15 | 8 | 5 | 30 | 16 | 10 | 300 | 300 | 50 | 5 | 15 | | |||
501 | | 80 | 6.5 | 3.5 | 3 | 13 | 7 | 6 | 26 | 14 | 12 | 300 | 300 | 50 | | | | |||
| Z | X | Z | | | | | | | | | | | | | | ||||
300-mi | -170 | 75 | 110 | 2.5 | 9 | 1 | 5 | 18 | 2 | 10 | 36 | 4 | 7 | 15 | 3 | |||||
400 0 Run | 0 | 0 | 70 | 5 | 5 | 3 | | | | | | | 1 | 12 | 3 | |||||
400 Background | 0 | 0 | 70 | 20 | 18 | 18 | 40 | 36 | 36 | 60 | 54 | 54 | 7 | 15 | 3 | |||||
11.6.8Model Validation
The estimated block model was validated by visually comparing the drill holes with the block grades (Figure 11-15 and Figure 11-16), with swath plots to determine whether any statistical local bias exists, a nearest neighbor estimate versus the kriged estimate to determine if any global bias exists, and a local stope reconciliation. A histogram comparison of the estimated grades versus the composite grades was also used to investigate grade smoothing. These analyses indicate the block model acceptably reflects the assay sample data with only minor local bias in areas of sparse data. There is a minor amount of local smoothing of the higher grades; however, the grade distribution of the samples is reasonably reproduced by the estimate.

Source: (McEwen, 2025)
| Project: 169525666 | 11-33 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
Note: 10 m clipping, looking east
Figure 11-15: Section View Comparing Block Grades with Drill Hole Data in Froome Domain 501

Source: (McEwen, 2025)
Note: Zoomed in on Froome West Domain 501, 10 m clipping.
Figure 11-16:Plan View at Elevation 9840 Comparing Block Grades with Drill Hole Data
11.6.9Confidence Classification
The QP is confident that the Froome mineralization model honours the current informing data from the geological database. The location of the samples and the assay data are sufficiently reliable to support Mineral Resource evaluation. The Mineral Resource model is constrained by mineralized domains based on lithological, structural and grade criteria and is modelled from underground mapping and core holes drilled on an irregular grid, with an average spacing between drill holes of 10 and 30 m. The controls on the distribution of the gold mineralization are understood, and the confidence in geological continuity is reasonable.
For Domains 300 and 301, classification criteria considers the confidence in the continuity of mineralization, distance to the closest informing sample, and average drill hole spacing based on the three closest drill holes. The following classification criteria were defined:
· | Measured: Assigned to those continuous blocks within the mineralized Domains 300 and 301, informed by three or more drill holes, less than 7 m to the nearest drill hole, and within an average drill hole spacing of 10 m |
· | Indicated: Assigned to those continuous blocks within the mineralized Domains 300 and 301, informed by three or more drill holes, less than 15 m to the nearest drill hole, and within an average drill hole spacing of 25 m |
| Project: 169525666 | 11-34 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
· | Inferred: Assigned to those continuous blocks within the mineralized Domains 300 and 301, informed by three or more drill holes, less than 20 m to the nearest drill hole, and within an average drill hole spacing of 40 m. |
The geological nature of the gold mineralization in Domains 500 and 501 exhibits higher variability in grade then other domains and therefore was assigned a stricter classification criteria. The following classification criteria were defined:
· | Measured: Due to lower confidence, no blocks in these domains were assigned to the measured classification (the QP requires an area with 10m spaced drilling or visual mapping to confirm the geological model before considering the measured category). |
· | Indicated: Assigned to those continuous blocks within the mineralized Domains 500 and 501, informed by three or more drill holes, less than 10 m to the nearest drill hole, and within an average drill hole spacing of 25 m. |
· | Inferred: Assigned to those continuous blocks within the mineralized Domains 500 and 501, informed by two or more drill holes, less than 20 m to the nearest drill hole, and within an average drill hole spacing of 40 m. |
Blocks within the mineralized domains not meeting the above criteria were not classified. Blocks within the background envelope were not classified.
11.6.10Reasonable Prospects for Eventual Economic Extraction
For a Mineral Resource to be reported, the QP must determine that RPEEE has been established.
Due to the geometry and location of the Froome mineralization, the QP considers the deposit to be amenable to underground mining methods. A cut-off grade of 1.35 g/t Au was determined considering the costs and input parameters (Table 11-18) based on current rates and costs and benchmarked with similar projects.
Table 11-18: Froome Mineral Resource Cut-off Grade Parameters
Parameter | Unit | Value |
Mining Cost | $US/t | 62.66 |
G&A Cost | $US/t | 16.07 |
Milling Cost | $US/t | 32.21 |
Transport Cost | $US/oz | 1.52 |
Payable Gold | % | 99.95 |
Dilution | % | 15 |
Gold Price | $US/oz | 3,000 |
Exchange Rate (US$/C$) | - | 1.35 |
Royalty (NSR) | $US/t | 7.20 |
Mill Recovery | % | 89.5 |
| Project: 169525666 | 11-35 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
Reasonable prospects for eventual economic extraction were derived from potentially mineable shapes developed using Datamine’s MSO function. A stope size of 12 m vertical height by 6 m wide along strike by a minimum 3 m wide across strike was adopted. This size is consistent with current mining methods and was benchmarked against mined stopes at the nearby Black Fox underground mine. Sub stopes were developed at half height and half width along strike (6 m x 3 m) to account for local anisotropy of the grade continuity. Stopes with a width less than 3 m across strike were not considered RPEEE. Stope shapes were developed using the economic cut-off-grade of 1.35 g/t Au. All classified blocks were analyzed by the MSO with resulting stopes shown in Figure 11-17.
All classified blocks were flagged by the potentially mineable shapes including those below the 1.35 g/t Au cut-off grade, this is known as “must take material” and as a combined mineable shape they meet the necessary parameters, including the cut-off grade. Isolated, discontinuous stope shapes were not considered economic, and were therefore removed and not included in the Mineral Resource Statement.

Source: (McEwen, 2025)
Figure 11-17:Long Section Looking North of Potentially Mineable Stope Shapes at Froome
Figure 11-18 presents the experimental grade–tonnage sensitivities at various cut-off grades. The sensitivities were generated using raw block grades and include Measured, Indicated and Inferred blocks. Sensitivities include all classified blocks, not only those meeting RPEEE. These results are provided for comparative purposes only, to illustrate the potential effect of applying different cut-off grades on tonnage and grade. Sensitivity cases do not represent Mineral Resources and should not be interpreted as such.
| Project: 169525666 | 11-36 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2026)
Note: Sensitivities use raw block grades and include Measured, Indicated and Inferred blocks. These results are for comparison only and do not represent Mineral Resources.
Figure 11-18:Experimental Grade‑Tonnage Sensitivities at Various Cut‑Off Grades
11.6.11Mineral Resource Statement
Table 11-19 summarizes the Mineral Resource estimates for Froome, assuming underground stoping methods, reported in accordance with the 2014 CIM Definition Standards (2014). The Mineral Resource was limited to those parts of the gold mineralization for which there are reasonable prospects for eventual economic extraction via underground stope extraction.
Table 11-19: Froome Mineral Resource Statement, December 31, 2025
Classification | Tonnes (kt) | Au Grade (g/t) | Contained Au (koz) |
Measured | 212 | 2.45 | 17 |
Indicated | 440 | 2.94 | 42 |
Total Measured + Indicated | 651 | 2.78 | 58 |
Inferred | 302 | 2.93 | 28 |
Notes:
· | Effective date of the Mineral Resource estimate is December 31, 2025. The QP for the estimate is Mr. Carson Cybolsky, P.Geo, an employee of McEwen. |
| Project: 169525666 | 11-37 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
· | Mineral Resources are reported using Item 1300 of Regulation S-K. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
· | Mineral Resources are reported above an economic cut-off grade of 1.35 g/t Au assuming underground extraction methods and based on a mining cost of $62.66/t, process cost of $32.21/t, G&A cost of $16.07/t, metallurgical recovery of 89.5%, dilution of 15% and gold price of US$3,000/oz. |
· | Figures may not sum due to rounding. |
· | Informing sample database cut-off and mining depletion date is December 31, 2025. |
11.6.12Factors That Could Affect the Mineral Resource Estimate
Factors that may affect the Froome Mineral Resource estimate include:
· | Changes in the local geological interpretations and assumptions used to generate the estimation domains |
· | Changes in mineralization and geological geometry and continuity of mineralized zones |
· | Changes in assumptions of mineralization and grade continuity |
· | Changes in the grade interpolation methods and estimation parameter assumptions |
· | Changes in the confidence assumptions used in the resource classification |
· | Density assignments |
· | Changes in metal price and exchange rates and other economic assumptions used in the cut-off grade determination |
· | Changes in input and design parameter assumptions that pertain to the underground mining constraints |
· | Changes to assumptions as to the continued ability to access the mine site, retain mineral and surface rights titles, maintain the operation within environmental and other regulatory permits, and maintain the social license to operate. |
No other environmental, permitting, legal, title, taxation, socioeconomic, marketing, political or other relevant factors are known to the QP that would materially affect the estimation of Mineral Resources that are not discussed in this Report.
11.7Stock Property – West and Main Zone
11.7.1Mineral Resource Database
The close-out date for the Mineral Resource database is October 23, 2023 and consists of 567 core drill holes totalling 241,163.70 m of drill core and 73,148 intervals assayed for gold. Unsampled intervals were considered barren and assigned a background gold grade based on ¼ of the assay laboratory’s lower detection limit.
There has been only limited drilling activity at the property since the database close-out. Logging and assay results of the new data indicate the geological and mineralization model reported here continues to be valid. As new data arrives in future drilling campaigns, the estimation methods and parameters will be refined, which will affect the Mineral Resources dynamically.
| Project: 169525666 | 11-38 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
On importing the drill hole database from the central SQL database to Datamine Studio software in preparation for resource estimation, sample data were checked for missing and overlapping intervals in the assay and survey tables, and collar locations checked against the LiDAR topography surface.
Mining as-builds and remnant shapes were up-to-date as of December 31, 2025 and used to deplete the model.
11.7.2Geological Modeling
11.7.2.1Lithology
A lithology model was developed implicitly to capture the eight key deposit lithologies and the overburden as shown in Figure 11-19.
Using the logged lithology, an overburden volume was modeled to the top of the bedrock and was used to cap the lithology wireframes.

Source: (McEwen, 2023)
Figure 11-19: Isometric View of the Stock Project Lithology Model
| Project: 169525666 | 11-39 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.7.2.2Mineralized Domains
The Stock West and Main deposit contain five main zones of mineralization shown in Figure 11-20 and described below:
· | Domain 10 is a shear zone, hosted in highly altered ultramafic rocks. Coincident with the most intense mineralization within Domain 10 is the primary alteration carbonate mineral, fuchsite. Disseminated gold mineralization occurs in en-echelon quartz veins, quartz stockwork and matrix material. Domain 10 trends east-northeast and dips moderately to steeply southeast. |
· | Domains 10.2 and 10.3 form a mineralized zone near the Stock Portal, composed of conjugate sets of crosscutting quartz veins in fuchsite altered ultramafics; 10.2 veins are sub-horizontal; 10.3 veins form sub-vertical, north-south striking lenses. |
· | Domain 20 is a lower grade zone located in the HW of Domain 10 and is hosted primarily in a bleached altered mafic volcanic unit trending east-northeast and dipping moderately to steeply southeast. |
· | Domain 30 is generally HW to both Domain 10 and Domain 20, and hosted primarily in felsic porphyry and intrusive units, as well as mineralized mafic metavolcanic units. |
Mineralized lenses were interpreted (usually following a threshold grade of 0.5 g/t), flagged in the drill hole file and modeled using Datamine’s implicit Vein Modeling module with a minimum thickness of 0.5 m.

Source: (McEwen, 2023)
Note: Looking NNW
Figure 11-20:Long view of Stock West and Main Mineralized Zones and Background Envelope
| Project: 169525666 | 11-40 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.7.2.2.1Background Envelope
A background envelope (Domain 200) was constructed around the mineralized domains to capture mineralized samples outside the mineralized domains and to estimate adjacent dilution (Figure 11-20). It is approximately a 50m buffer around mineralized lenses, constructed from strings using sections spaced every 50m.
11.7.3Composites
More than 50% of the assays have a sample length of 1 m. The modal composite length of 1 m was applied to samples within the modeled domains which generated composites close to 1 m with a minimum composite length of 0.3 m.
11.7.4Capping
The impact of high-grade outlier populations was analyzed using histograms, log probability plots, mean and variance, and cumulative metal plots. Results are presented in Table 11-20 for each domain with metal removed ranging from 6.7% in Domain 10 to 51.3% in Domain 10.3.
Table 11-20: Stock West & Main – Metal Removed by Capping Composites
Domain | Raw Composites | Capped | Capped Composites | No. | Metal | ||
| Mean (g/t) | CV | Grade (g/t) | Mean (g/t) | CV | Capped | Removed (%) |
10 | 1.38 | 4.07 | 20.0 | 1.29 | 2.01 | 30 | 6.7 |
10.2 | 2.96 | 5.64 | 15.0 | 1.62 | 1.94 | 27 | 45.1 |
10.3 | 4.27 | 5.65 | 15.0 | 2.08 | 1.69 | 22 | 51.3 |
20 | 0.80 | 3.31 | 13.0 | 0.71 | 1.99 | 24 | 10.9 |
30 | 0.86 | 2.12 | 7.0 | 0.78 | 1.57 | 9 | 9.3 |
200 | 0.07 | 20.77 | 2.4 | 0.05 | 4.02 | 262 | 28.4 |
Note: CV = coefficient of variation
11.7.5Density
There are 2,124 density samples contained in the Mineral Resource database. Currently, one sample every 20 is collected by the assay laboratory for density analysis in the sample stream submitted for gold assay analysis. A study of all density data was conducted to determine an average density value for each of the host lithology units. Outliers were identified and removed resulting in the average density values listed in Table 11-21.
The block model was flagged by the major lithology wireframes and average densities were applied to the blocks accordingly. Any blocks outside the modelled lithologies were assigned overall average density value of 2.83 g/cm3. Blocks above the bedrock and below the topography were flagged as overburden and assigned a density of 2.0 g/cm3.
| Project: 169525666 | 11-41 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
Table 11-21: Stock West & Main – Density Values by Lithology
Lithology | | | | No. of Samples | Avg. Density |
Bleached Mafic Volcanics | | (AMV, BMV) | | 298 | 2.83 |
Fuchsite Altered Ultramafic Volcanics | | (CGR) | | 287 | 2.89 |
Diabase | | (DIA) | | 11 | 2.89 |
Felsic Intrusive | | (AFP, FP, FI, II, QFP) | | 251 | 2.70 |
Mafic Volcanics | | (MV, PMV) | | 129 | 2.84 |
Sediments | | (SED) | | 63 | 2.76 |
Ankerite Altered Ultramafic Volcanics | | (AUV, CGY) | | 532 | 2.86 |
Ultramafic Volcanics | | (TUV, CUV, UMV, UV) | | 244 | 2.84 |
All Lithologies Combined | | | | 1815 | 2.83 |
* 2124 Total samples. Lowest 5 and highest 5 values removed from evaluation as outliers | | | | ||
* Density measurements belonging to minor, unmodeled lithologies removed from density calculation. | | | | ||
* overburden given a specific gravity of 2.00 | | | | ||
11.7.6Variography
The spatial distribution (continuity) of gold within each mineralized domain was evaluated using variograms.
Primary directions of the variograms were modelled based on observed mineralization and structural orientations. These orientations were then examined statistically to ensure they represented the best possible fit with the variography. The stability of the variograms was evaluated by varying the direction specification and comparing the resulting experimental variograms. Variograms were modelled with spherical structures and two or three rotations to match the strike, dip and plunge of the mineralized zone. Nugget effects are 20% in all Domains.
11.7.7Grade Estimation
A block size of 3 m x 3 m x 3 m was selected based on drill hole spacing, composite length, the geometry of the modelled mineralized zones, and anticipated mining methods. Sub-cells down to 0.5 m x 0.5 m x 0.5 m were used to better reflect the shape and volume of the mineralized domains. No rotation was applied to the block model.
Ordinary kriging was used to estimate the blocks within the mineralized domains using a four-pass approach. For Domain 10, search neighborhoods are based on variography with ranges doubling in length for passes two and three with the maximum search length in pass four equal to one and one half the range of the maximum variogram structure. For Domains 10.2, 10.3, 20 and 30, search neighborhoods are based on variography with ranges doubling in length for all search ranges.
Data selection for mineralized domains remained the same for the first three passes using a minimum of 7 and a maximum of 15 composites from at least 3 drill holes to estimate a given block. These restrictions were reduced to a minimum of 4 composites from at least 2 drill holes to estimate a block in the fourth pass.
Blocks within the background envelope were estimated using inverse distance to the power of three with its ellipsoid guided by the general lithology contact orientation determined through variography. An initial estimation pass focused on estimating areas where high-grade composites were not captured in the
| Project: 169525666 | 11-42 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
mineralized domains. This estimation pass used uncapped composites with a tight search ellipse to limit the number of blocks estimated to one or two in each direction. Three subsequent passes were made with increasing search ranges and any blocks not estimated were assigned a background gold value of a one-quarter of detection limit, or 0.0005 g/t.
11.7.8Model Validation
In validating the estimated block model, a nearest neighbor model was constructed. This model mimics a declustered data set and was generated using 3 m capped composites (block dimension) following the same search ellipse as the ordinary kriged estimate.
The estimated block model was validated by visual inspection, comparing the global statistics of the estimated model with the nearest neighbor model, and with swath plots to determine whether any local bias exists.
Inspecting drill holes with block estimates in section (Figure 11-21) and plan (Figure 11-22) confirms gold grades of the model follow the grades of the informing samples.
Swath plots indicate the mean grades of the estimates follow the mean grades of the declustered informing samples relatively well with small local biases in areas with less informing sample data.
| Project: 169525666 | 11-43 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2025)
Note: Includes MSO outlines and planned development, ±25 m clipping
Figure 11-21:Section View Comparing Block Grades in Domains 10 and 20 with Drill Hole Data
| Project: 169525666 | 11-44 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2025)
Note: ± 20 m clipping, -100 m elevation, includes MSO outlines
Figure 11-22:Plan View Comparing Block Grades with Drill Hole Data
Block estimates were checked for global bias by comparing the average grade (at a zero g/t cut-off) of the estimated model with that obtained from nearest neighbor estimates. The QP considers the estimate to be globally unbiased if the comparison is within a ±5% tolerance. The global bias check was made on the classified Mineral Resource resulting in less than a 5% difference showing no global bias exists.
11.7.9Confidence Classification
The QP is confident that the Stock West & Main mineralization models honour the current informing data from the geological database. The location of the samples and the assay data are sufficiently reliable to support Mineral Resource evaluation. The Mineral Resource model is constrained by mineralized domains based on lithological, structural and grade criteria and is modelled from core holes drilled on an irregular grid, with a spacing between 15 m and 35 m. The controls on the distribution of the gold mineralization are understood, and the confidence in geological continuity is reasonable.
Classification criteria considers the confidence in the continuity of mineralization, average distance to the closest three drill holes, distance to the nearest drill hole, and search neighborhood. The following classification criteria were defined:
· | Indicated: assigned to those continuous blocks within mineralized domains 10, 10.2, 10.3, and 20, informed by three or more drill holes, within the first three search neighborhoods, less than 15 m to the nearest drill hole, and an average drill spacing less than 25 m. |
· | Inferred: assigned to those continuous blocks within the mineralized domains and within the first three search neighborhoods, informed by at least three drill holes, and an average drill spacing less than 40 m. Also assigned to those continuous blocks within the mineralized domains and within the |
| Project: 169525666 | 11-45 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
fourth search neighborhood, informed by at least three drill holes, less than 12.5 m to the nearest drill hole, and within an average drill spacing less than 40 m.
For Domain 30, lenses are small and discontinuous, it was concluded that more data is needed to increase the confidence therefore the classification for this domain was forced as inferred; any material that might have been classified as indicated using the above criteria was classified as inferred.
Blocks within the mineralized domains not meeting the above criteria were not classified. Blocks within the background envelope were not classified.
11.7.10Reasonable Prospects for Eventual Economic Extraction
For a Mineral Resource to be reported, the QP must determine that RPEEE has been established.
Due to the geological nature, geometry, and location of the Stock West mineralization, the QP considers the deposit to be amenable to underground mining methods. A cut-off grade of 1.30 g/t Au was determined considering the costs and input parameters (Table 11-22) based on recent quotations and benchmarked with similar projects.
Table 11-22: Stock West and Main Mineral Resource Cut-off Grade Parameters
Parameter | Unit | Value |
Mining Cost | $US/t | 62.66 |
G&A Cost | $US/t | 20.49 |
Milling Cost | $US/t | 32.21 |
Transport Cost | $US/oz | 1.52 |
Payable Gold | % | 99.95 |
Dilution | % | 15 |
Gold Price | $US/oz | 3,000 |
Exchange Rate (US$/C$) | - | 1.35 |
Royalty (NSR) | % | * |
Mill Recovery | % | 93 |
Note: *Franco Nevada retains a 1.0% NSR Royalty on a portion of Stock Main, calculated cut-off grade for that zone is 1.30g/t vs 1.29g/t for the remainder of the deposit, ultimately a rounded 1.30 g/t cut-off grade was used for all of Stock.
Reasonable prospects for eventual economic extraction were derived from potentially mineable shapes developed using Datamine’s Mineable Shape Optimizer function. A stope size of 12 m vertical height by 6 m wide along strike by a minimum 3 m wide across strike was adopted. This size was benchmarked against mined stopes at the nearby Black Fox underground mine. Sub stopes were developed at half height and half width along strike (6 m x 3 m) to account for local anisotropy of the grade continuity. Stopes with a width less than 3 m across strike were not considered potentially economical and excluded. Stope shapes were developed using the economic cut-off-grade of 1.30 g/t Au. All classified blocks were analyzed by the mineable shape optimizer with resulting stopes shown in Figure 11-23.
| Project: 169525666 | 11-46 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
All classified blocks were flagged by the potentially mineable shapes including those below the 1.30 g/t Au cut-off grade that were included in the MSO shapes calculated at the economic cut-off grade. This can be considered as internal dilution or “must-take” material. Isolated, discontinuous stope shapes were not considered economic, and were therefore removed and not included in the Mineral Resource Statement.

Source: (McEwen, 2026)
Note: Looking north
Figure 11-23:Long Section View of the Potentially Mineable Stope Shapes at Stock West & Main
Figure 11-24 presents the experimental grade–tonnage sensitivities at various cut-off grades. The sensitivities were generated using raw block grades and include both Indicated and Inferred classified blocks. Sensitivities include all classified blocks, not only those meeting RPEEE. These results are provided for comparative purposes only, to illustrate the potential effect of applying different cut-off grades on tonnage and grade. Sensitivity cases do not represent Mineral Resources and should not be interpreted as such.
| Project: 169525666 | 11-47 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2026)
Note: Sensitivities use raw block grades and include Indicated and Inferred blocks. These results are for comparison only and do not represent Mineral Resources.
Figure 11-24:Experimental grade‑tonnage sensitivities at Various Cut‑Off Grades
11.7.11Mineral Resource Statement
Table 11-23 summarizes the Mineral Resource estimates for Stock West and Main, assuming underground stoping methods. The Mineral Resource was limited to those parts of the gold mineralization for which there are RPEEEs via underground stope extraction.
Table 11-23: Stock Project - West & Main Mineral Resource Statement, December 31, 2025
Classification | Tonnes (kt) | Au Grade (g/t) | Contained Au (koz) |
Indicated | 3,179 | 2.63 | 268 |
Inferred | 2,468 | 2.31 | 184 |
Notes:
· | Effective date of the Mineral Resource estimate is December 31, 2025. Drill hole database cut-off date is October 23, 2023 and the effective depletion date is December 31, 2025. The QP for the estimate is Mr. Carson Cybolsky, P.Geo, an employee of McEwen. |
· | Mineral Resources are reported using Item 1300 of Regulation S-K. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
· | Mineral Resources are reported above an economic cut-off grade of 1.30 g/t gold assuming underground extraction methods and based on a mining cost of $62.66/t, process cost of $32.21/t, G&A cost of $20.49/t, metallurgical recovery of 93%, dilution of 15% and gold price of US$3,000/oz. |
· | Figures may not sum due to rounding. |
| Project: 169525666 | 11-48 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.7.12Factors That Could Affect the Mineral Resource Estimate
Factors that may affect the Stock West and Main Mineral Resource estimate include:
· | Changes in the local geological interpretations and assumptions used to generate the estimation domains |
· | Changes in mineralization and geological geometry and continuity of mineralized zones |
· | Changes in assumptions of mineralization and grade continuity |
· | Changes in the treatment of high-grade gold values |
· | Changes in the grade interpolation methods and estimation parameter assumptions |
· | Changes in the confidence assumptions and methods used in the mineral resource classification |
· | Changes in the density and the methods used in the density assignments |
· | Changes in metal price and exchange rates and other economic assumptions used in the cut-off grade determination |
· | Changes in input and design parameter assumptions that pertain to the underground mining constraints |
· | Changes to assumptions as to the continued ability to access the mine site, retain mineral and surface rights titles, maintain the operation within environmental and other regulatory permits, and maintain the social license to operate. |
No other environmental, permitting, legal, title, taxation, socioeconomic, marketing, political or other relevant factors are known to the QP that would materially affect the estimation of Mineral Resources that are not discussed in this Technical Report Summary.
11.8Stock Project – East Zone
11.8.1Mineral Resource Database
The Stock Project East Zone has been tested by diamond drilling over a cumulative strike length of approximately 1,100 m and down to a vertical depth of about 500 m. The close-out date for the Mineral Resource database is May 20, 2024 and consists of 257 surface diamond drill holes. The average drill hole spacing in the best drilled areas of the deposit is about 20 m; the spacing in the more poorly drilled areas is between 100 m and 150 m.
Mining as-builds and remnant shapes were up-to-date as of December 31, 2025 and used to deplete the model.
11.8.2Geological Modeling
11.8.2.1Lithology
A lithology model was developed implicitly to capture the 10 key deposit lithologies and the overburden as shown in Figure 11-25.
Using the logged lithology, an overburden volume was modeled to the top of the bedrock and was used to cap the lithology wireframes.
| Project: 169525666 | 11-49 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2024)
Figure 11-25:Isometric View of the Stock Project East Zone Lithology Model
11.8.2.2Mineralized Domains
Gold mineralization in the Stock East deposit occurs primarily in a quartz breccia (QBX) and generally follows the bleached/altered mafic volcanic lithological unit (BMV). Mineralization is bounded on the footwall by the interpreted Night Hawk Break regional fault structure. The Night Hawk Break is a splay off the regional Porcupine Destor fault zone.
Mineralized veins were interpreted (usually following a threshold grade of 0.5 g/t), flagged in the drill hole file and modeled using Datamine’s implicit Vein Modeling module with a minimum thickness of 0.5 m.
11.8.2.2.1Background Envelope
A background envelope (Domain 100) was constructed around the BMV Domain (Domain 1) to capture mineralized samples outside the mineralized domains and to estimate adjacent dilution. It is approximately a 50 m buffer around mineralized lenses, constructed from strings using sections spaced every 50 m.
The modelled domains for Stock’s East zone are shown in Figure 11-26.
| Project: 169525666 | 11-50 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.8.3Composites
A composite length of 1 m was selected based on the mode of the sample lengths. Any residual length was distributed equally to the 1 m composites to ensure that the entire length of each drill intersection within a domain was utilized. The rationale behind adopting a standard sample length of 1 m within zones perceived to be geologically similar was to maintain resolution in terms of the gold grade distribution. That resolution is maintained by adopting 1 m as the composite length.

Source: (McEwen, 2024)
Figure 11-26:Long View of Stock East Zone Showing Modelled Domains 1 & 100 (Background)
11.8.4Capping
Grade capping was conducted using population histograms and probability/log-probability plots to limit the influence of outlier values within each domain. Results are presented in Table 11-24 for each domain with 13.2% metal removed from the BMV Domain 1.
Table 11-24: Stock East – Metal Removed by Capping Composites
Domain | Raw Composites | Capped | Capped Composites | No. | Metal | ||
| Mean (g/t) | CV | Grade (g/t) | Mean (g/t) | CV | Capped | Removed (%) |
1 | 1.45 | 3.97 | 13.5 | 1.26 | 1.41 | 28 | 13.2 |
100 | 0.05 | 5.44 | 2.4 | 0.05 | 3.22 | 28 | 6.1 |
Note: CV = coefficient of variation
| Project: 169525666 | 11-51 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.8.5Density
There are 1,445 density samples contained in the Mineral Resource database for Stock’s East Zone. A study of all density data was conducted to determine an average density value for each of the host lithology units. Outliers were identified and removed resulting in the average density values listed in Table 11-25.
The block model was flagged by the major lithology wireframes and average densities were applied to the blocks accordingly. Any blocks outside the modelled lithologies were assigned the overall average density value of 2.80 g/cm3. Blocks above the bedrock and below the topography were flagged as overburden and assigned a density of 2.0 g/cm3.
Table 11-25: Stock Project – East Zone Density Averages for Host Lithologies
Lithology |
| | No. of Samples | Avg. Density |
Altered Ultramafic Volcanics | | AUV | 55 | 2.81 |
Bleached Mafic Volcanics | | BMV, AMV | 557 | 2.86 |
Fuchsite Altered Ultramafic Volcalics | | CGR | 35 | 2.88 |
Diabase | | DIA | 15 | 2.87 |
Felsic Porphyry | | FP, FI | 365 | 2.68 |
Mafic Volcanics | | MV, PMV | 329 | 2.82 |
Quartz Breccia | | QBX, QV | 11 | 2.77 |
Sediments | | SED | 14 | 2.74 |
Talc-Chlorite Altered Ultramafics | | TUV | 64 | 2.79 |
All Lithologies Combined | | | 1445 | 2.80 |
* 1445 Total samples. Lowest 3 and highest 3 values removed from evaluation as outliers (2 BMV, 1 MV, 2 AUV, and 1 TUV).
* overburden given a specific gravity of 2.0
* Intermediate Intrusives (II) given a specific gravity of 2.80 (avg density)
* Gabbro (GAB) given a specific gravity of 2.80 (avg density)
11.8.6Variography
The spatial distribution (continuity) of gold within each modeled domain was evaluated using variograms.
Precision in spatial analysis/variography is directly proportional to the quality of the sampling pattern. Due to the moderate- to steeply-dipping nature of the Stock East deposit, some of the drill holes from surface intersect the mineralization at oblique angles while some are at the desired right angles, culminating in a mixture of orientations. Thus, variography results are not perfectly representative of the spatial continuity/distribution patterns of the mineralization. Experimental variograms were modeled with two spherical structures and with a dip and strike. Nugget effects are 20% in the BMV domain and 0% in the background envelope.
| Project: 169525666 | 11-52 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.8.7Grade Estimation
A block size of 3 m x 3 m x 3 m was selected after comparing the kriging efficiency and slope of regression for various block sizes. The selected block size is supported by the average drill hole spacing of 20 to 30 m in well drilled areas of the deposit. Sub-cells down to 1 m x 1 m x 1 m were used to better reflect the shape and volume of the mineralized domains. No rotation was applied to the block model.
Ordinary kriging was used to estimate the blocks within the modelled domains using a four-pass approach. Search neighborhoods are based on variography with ranges doubling in length for the first three search ranges, with the fourth search range having a distance of 1.5x that of the third search range. The range of the third search range is based on the range of the second variogram structure.
Data selection for modeled domains require 11 composites from three drill holes to be estimated in passes 1 through 3. The fourth pass requires a minimum of 6 composites and a maximum of 18 from at least two drill holes.
11.8.8Model Validation
In validating the estimated block model, nearest neighbor and inverse distance cubed models were constructed. The nearest neighbor model mimics a declustered data set and was generated using 3 m composites.
The estimated block model was validated by visually comparing the drill holes with the block grades, and with swath plots to determine whether any local bias exists.
Inspecting drill holes with block estimates in section and plan confirms gold grades of the model follow the grades of the informing samples.
Swath plots indicate the mean grades of the estimates follow the mean grades of the declustered informing samples relatively well with small local biases in areas with less informing sample data.
11.8.9Confidence Classification
Classification criteria consider the confidence in the continuity of mineralization, average distance to informing samples (weighted on distance), and continuity of sample spacing. No material has been classified as a Measured Mineral Resource. The following classification criteria were defined:
· | Indicated: assigned to those contiguous blocks within the mineralized domain, within the first three search neighborhoods, informed by between 11 and 18 composites from three or more drill holes, less than 15 m to the nearest drill hole, and an average drill spacing less than 25 m. |
· | Inferred: assigned to those contiguous blocks within the mineralized domain, and within the first three search neighborhoods, informed by between 11 and 18 composites from at least three drill holes, and an average drill spacing less than 40 m. Also assigned to those continuous blocks within the mineralized domains and within the fourth search neighborhood, informed by between 6 and 18 composites from at least three drill holes, less than 12.5 m to the nearest drill hole, and within an average drill spacing less than 40 m. |
| Project: 169525666 | 11-53 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.8.10Reasonable Prospects for Eventual Economic Extraction
For a Mineral Resource to be reported, the QP must determine that RPEEE has been established.
The Stock East deposit area is proximal to the existing plant/mill infrastructure, and in the QP’s opinion, the small size of the deposit does not justify relocating the processing facilities to allow for extraction via an open pit. Thus, it seems more feasible to mine the deposit using underground mining methods. A cut-off grade of 1.30 g/t Au was determined considering the costs and input parameters summarized in Table 11-26.
Table 11-26: Stock East Mineral Resource Cut-off Grade Parameters
Parameter | Unit | Value |
Mining Cost | $US/t | 62.66 |
G&A Cost | $US/t | 20.49 |
Milling Cost | $US/t | 32.21 |
Transport Cost | $US/oz | 1.52 |
Payable Gold | % | 99.95 |
Dilution | % | 15 |
Gold Price | $US/oz | 3,000 |
Exchange Rate (US$/C$) | - | 1.35 |
Royalty (NSR) | % | 0 |
Mill Recovery | % | 93 |
RPEEEs were derived from potentially mineable shapes developed using Datamine’s MSO function. A stope size of 12 m vertical height by 6 m wide along strike by a minimum 3 m wide across strike was adopted. This size was benchmarked against mined stopes at the nearby Black Fox and Froome underground mines. Sub stopes were developed at half height and half width along strike (6 m x 3 m) to account for local anisotropy of the grade continuity. It should be noted that different stope dimensions will yield different resources at the same cut-off grade. Isolated, discontinuous stope shapes were not considered economic, and were therefore removed and not included in the Mineral Resource Statement.
Figure 11-27 presents the experimental grade–tonnage sensitivities at various cut-off grades. The sensitivities were generated using raw block grades and include both Indicated and Inferred classified blocks. Sensitivities include all classified blocks, not only those meeting RPEEE. These results are provided for comparative purposes only, to illustrate the potential effect of applying different cut-off grades on tonnage and grade. Sensitivity cases do not represent Mineral Resources and should not be interpreted as such.
| Project: 169525666 | 11-54 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2024)
Note: Sensitivities use raw block grades and include Indicated and Inferred blocks. These results are for comparison only and do not represent Mineral Resources.
Figure 11-27:Experimental Grade‑Tonnage Sensitivities at Various Cut‑Off Grades
11.8.11Mineral Resource Statement
Table 11-27 summarizes the Mineral Resource estimates for Stock East, assuming underground stoping methods. The Mineral Resource was limited to those parts of the gold mineralization for which there are RPEEEs via underground stope extraction.
Table 11-27: Stock Project – East Zone Mineral Resource Statement, December 31, 2025
Classification | Tonnes (kt) | Au Grade (g/t) | Contained Au (koz) |
Indicated | 1,790 | 2.12 | 122 |
Inferred | 1,350 | 2.02 | 87 |
Notes:
· | Effective date of the Mineral Resource estimate is December 31, 2025. Drill hole database cut-off date is May 20, 2024 and the effective depletion date is December 31, 2025. The QP for the estimate is Mr. Carson Cybolsky, P.Geo, an employee of McEwen. |
· | Mineral Resources are reported using Item 1300 of Regulation S-K and in accordance with the CIM Best Practice Guidelines (2019). Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
· | Mineral Resources are reported above an economic cut-off grade of 1.30 g/t gold assuming underground extraction methods and based on a mining cost of $62.66/t, process cost of $32.21/t, G&A cost of $20.49/t, metallurgical recovery of 93%, and gold price of US$3,000/oz. |
| Project: 169525666 | 11-55 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
· | Mineral Resources include the ‘must take’ minor material below cut-off grade which is interlocked with masses of blocks above the cut-off grade within the mineable shape optimizer stopes. |
· | Figures may not sum due to rounding. |
11.8.12Factors That Could Affect the Mineral Resource Estimate
Factors that may affect the Stock Project – East Zone Mineral Resource estimate include:
· | Changes in the local geological interpretations and assumptions used to generate the estimation domains |
· | Changes in mineralization and geological geometry and continuity of mineralized zones |
· | Changes in assumptions of mineralization and grade continuity |
· | Changes in the treatment of high-grade gold values |
· | Changes in the grade interpolation methods and estimation parameter assumptions |
· | Changes in the confidence assumptions and methods used in the mineral resource classification |
· | Changes in the density and the methods used in the density assignments |
· | Changes in metal price and exchange rates and other economic assumptions used in the cut-off grade determination |
· | Changes in input and design parameter assumptions that pertain to the underground mining constraints |
· | Changes to assumptions as to the continued ability to access the mine site, retain mineral and surface rights titles, maintain the operation within environmental and other regulatory permits, and maintain the social license to operate. |
No other environmental, permitting, legal, title, taxation, socioeconomic, marketing, political or other relevant factors are known to the QP that would materially affect the estimation of Mineral Resources that are not discussed in this Report.
11.9Davidson-Tisdale
In May 2017, SRK prepared and completed an internal Mineral Resource Estimate for the Davidson-Tisdale gold deposit under a commission by Lexam. After the acquisition of Lexam by McEwen, SRK was again commissioned to prepare a Mineral Resource statement for the 2021 IA for Davidson-Tisdale using updated economic parameters. In April 2026, McEwen (as QP) updated the Mineral Resource statement for Davidson-Tisdale using updated economic parameters. No additional resource drilling has been completed at Davidson-Tisdale recently, and the existing 2017 resource model was used as a basis for reporting purposes.
11.9.1Mineral Resource Database
The resource database comprises primarily samples from surface and underground core drilling. The database comprises 691 drill holes with a total length of 80,026 m. The total number of samples with gold assays is 24,162 (26,665 m). The database also includes 80,847 m of lithological, structural and alteration logging.
| Project: 169525666 | 11-56 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
Six level plans were digitised and used as well as the existing geological and structural maps to guide mineral resource modeling.
On importing the drill hole database to Datamine Studio and Leapfrog software several validation steps were performed and any errors revealed were corrected.
11.9.2Geological Modeling
11.9.2.1Mineralized Areas
Gold mineralization at Davidson-Tisdale belongs to the class of structurally controlled Archean lode gold deposits. The mineralization is associated with the quartz vein zones whose distribution and orientation generally corresponds with the structure of the faults.
Two main areas of mineralization were modelled. The north area comprises the most abundant and high-grade mineralization with a general strike of 060° and a dip of 30 to 50° northwest. Mineralization in the north area also has strike lengths up to 300 m and widths up to 20 m. The south area is lower grade, but with good continuity, an eastern strike of 060° and a dip of 10 to 20° north. Mineralization in the south area has strike lengths up to 700 m and widths up to 25 m.
11.9.2.1.1North Area
Three zones of mineralization were modelled within the north area: Zones A, B and C. The B Zone was split into Zones B1 and B2 by the Main fault.
A combination of lithological, alteration, structural and grade criteria were used to define the resource domains. The lithological criteria included the presence of foliation, shearing and quartz veins. The grade threshold was chosen as 0.4 g/t Au. The intervals were prioritized based on the satisfaction of one or more criteria as follows:
· | High priority intervals – lithological + grade criteria |
· | Medium priority intervals – only grade criteria |
· | Low priority intervals – only lithological criteria. |
The low priority intervals were used only to maintain the continuity of the mineralized zone and used with adjacent high and medium priority intervals.
Considering the good general continuity, but high variability on a smaller scale, the mineralized zone wireframes were modelled in two steps:
· | Generation of the external general wireframe manually containing some internal barren intervals within it (Figure 11-28). |
· | Generation of the internal wireframe within the external contour with semi-automatic wireframing (Figure 11-29) algorithms which excludes the barren intervals and follows the general trend of the mineralized zone. This wireframe was used to constrain grade estimation. |
| Project: 169525666 | 11-57 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (prepared by SRK, 2021; reissued by McEwen, 2026)
Note: A Zone – purple, B Zone – orange, C Zone – yellow
Figure 11-28:Isometric View of the Davidson-Tisdale North Area, External Contours
| Project: 169525666 | 11-58 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (prepared by SRK, 2021; reissued by McEwen, 2026)
Note: A Zone – purple, B Zone – orange, C Zone – yellow
Figure 11-29:Isometric View of the Davidson-Tisdale North Area, Internal Contours
11.9.2.1.1South Area
South Area wireframe (S Zone) was modelled based on quartz veins lithological criteria only. The S Zone is described as having very good continuity, but relatively low grades so no internal wireframe was constructed (Figure 11-30).
| Project: 169525666 | 11-59 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (prepared by SRK, 2021; reissued by McEwen, 2026)
Figure 11-30:Isometric View Looking South of the S Zone Wireframe
11.9.3Composites
Most of the analytical samples within the mineralized areas were collected at 0.5 m and 1 m intervals. A modal composite length of approximately 1 m was applied to all the data, generating composites as close to 1 m as possible, while creating residual intervals of up to 0.5 m in length.
11.9.4Capping
The impact of high-grade outlier populations was examined on composite data using log probability plots and cumulative statistics separately for all mineralized areas. A capping value of 110 g/t was applied for the B Zone and 100 g/t for the C and S Zones. No capping was used for the A Zone. Results are presented in Table 11-28 for each zone with metal removed, ranging from 6% in C Zone to 29% in B Zone.
Table 11-28: Davidson-Tisdale – Metal Removed by Capping Composites
Domain | | Raw Composites | | Capped | | Capped Composites | | No. | | Metal Removed | ||||
| | Mean (g/t) | | CV | | Grade (g/t) | | Mean (g/t) | | CV | | Capped | | (%) |
| | | | | | North Zone | | | | | | | ||
A Zone | | 5.54 | | 1.61 | | - | | 5.54 | | 1.61 | | - | | - |
B1+B2 Zone | | 5.59 | | 6.40 | | 110 | | 3.99 | | 3.16 | | 16 | | 29 |
C Zone | | 4.56 | | 3.44 | | 100 | | 4.29 | | 3.12 | | 5 | | 6 |
| | | | | | South Zone | | | | | | | ||
S Zone | | 1.71 | | 7.33 | | 100 | | 1.45 | | 6.01 | | 5 | | 15 |
Note: CV = coefficient of variation
| Project: 169525666 | 11-60 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
11.9.5Density
In 2012, a total of 55 core samples were taken and analyzed at AGAT (Altman et al., 2014). The average bulk density of 2.87 g/cm3 of the 55 samples was applied to this resource estimate for Zones A, B and C.
For Zone S, a more conservative density value of 2.70 g/cm3 was used on Lexam’s recommendation.
11.9.6Variography
The spatial distribution of gold in the North and South areas was evaluated using variograms and correlograms.
Variograms/correlograms were modelled using two spherical structures and three rotations to match the strike, dip and plunge of the modelled mineralization. Nugget effects are 40% for both areas.
11.9.7Grade Estimation
The criteria used in the selection of block size included the drill hole spacing, composite length, the geometry of the modelled zone, and the anticipated mining method. A block size of 5 m x 5 m x 5 m was selected. Sub-cells were used allowing a resolution of 0.5 m x 0.5 m x 0.5 m to better reflect the shape of the mineralized area. No rotation was applied to the block model.
Ordinary kriging was used to estimate the blocks within the mineralized zones using a three -pass approach in the North Area and four passes in the South Area. An initial pass in the S Zone focused on estimating areas where there were high-grade composite values. Capped composites with a tight isotropic search ellipse were used to limit the number of blocks estimated to one or two in each direction. Subsequent passes were made with composites capped to 10 g/t gold to minimize smearing of high-grade outliers in lower grade areas and increasing search ranges based on the variogram ranges. Datamine’s dynamic anisotropy function was implemented due to the anisotropic nature and widths of the mineralized zones.
Data selection for mineralized zones varied for each pass requiring a minimum number of composites between seven and four and a maximum number of composites between 10 and 16 for passes 1 to 3. Estimated blocks required at least three holes in pass 1, and two holes in pass 2 and 3.
11.9.8Model Validation
The block model was validated by visual comparison of informing sample data with resource blocks data (on plan and section, see Figure 11-31) and with swath plots (section by section) comparing the ordinary kriged blocks with the informing composite data.
The results of the validation show that the block model acceptably reflects the assay sample data. The deviations between the averages on swath plots appear within the areas of the low data density and within the S Zone where more restrictive capping was applied.
| Project: 169525666 | 11-61 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (prepared by SRK 2021; reissued by McEwen 2026)
Note: East-West at Y=9,920
Figure 11-31:Cross-Section Comparing B Zone Estimated Blocks and Composite Data
11.9.9Confidence Classification
Industry best practices suggest that classification should consider the confidence in the geological continuity of the mineralized structures, the quality and quantity of exploration data supporting the estimates, and the geostatistical confidence in the tonnage and grade estimates. Appropriate classification criteria should aim at integrating these concepts to delineate regular areas at similar resource classification as well as the continuity of the deposit at the reporting cut-off grade.
The QP is satisfied that the mineralization model honours the current informing data from the geological database. The location of the samples and the assay data are sufficiently reliable to support resource evaluation and do not present a risk that should be considered for block classification. The Mineral Resource model is constrained by mineralized zones based on lithological, structural and grade criteria and is modelled from drill holes on a somewhat irregular grid, with a spacing between 5 m and 40 m.
The QP considers the drill spacing to be sufficient to assume reasonable continuity of the gold mineralization. Accordingly, block estimates were classified using a combination of criteria, including confidence in the mineralization’s continuity, drilling spacing and estimation results. The following classification criteria were defined:
| Project: 169525666 | 11-62 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
· | Measured: Assigned to those continuous blocks located within Zones B and C of the North Area and informed by the data from at least three drill holes within a 15 m buffer. The wireframe surface, which limits and smooths the Measured category, was also developed. |
· | Indicated: Assigned to those continuous blocks informed by the data from at least three drill holes within one search radius (one variogram range). The wireframe surface, which limits and smooths the Indicated category, was also developed. |
· | Inferred: Assigned to all remaining blocks. |
11.9.10Reasonable Prospects for Eventual Economic Extraction
In accordance with the CIM Definition Standards on Mineral Resources and Reserves (CIM Definition Standards, 2014), the Mineral Resource statement must demonstrate RPEEE.
The requirement for RPEEE generally implies that the quantity and grade estimates meet certain economic thresholds and that the Mineral Resources are reported at an appropriate cut-off grade considering extraction scenarios and processing recoveries. The QP considers the mineralization is amenable to underground extraction. A cutoff grade of 1.30 g/t Au was determined considering the cost and input parameters summarized in Table 11-29.
The MSO algorithm within Datamine Studio RM software package was used to evaluate the profitability of each resource block based on its value (Figure 11-32). All classified blocks were flagged by the potentially mineable shapes including those below the 1.30 g/t Au cut-off grade. Isolated, discontinuous stope shapes were not considered economic and were therefore removed and not included in the Mineral Resource Statement.
Table 11-29: Davidson-Tisdale Optimization Parameters
Parameter | Unit | Value |
Mining Cost | $US/t | 67.72 |
G&A Cost | $US/t | 16.60 |
Milling Cost | $US/t | 30.77 |
Transport Cost | $US/oz | 1.52 |
Payable Gold | % | 99 |
Dilution | % | 15 |
Gold Price | $US/oz | 3,000 |
Exchange Rate (US$/C$) | - | 1.35 |
Mill Recovery | % | 92 |
| Project: 169525666 | 11-63 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2026)
Note: MSO shapes = green, Block model above1.30 g/t Au cut-off grade = grey
Figure 11-32:Plan View, Davidson-Tisdale MSO Shapes, Blocks >1.30 g/t Au
Figure 11-33 presents the experimental grade–tonnage sensitivities at various cut-off grades. The sensitivities were generated using raw block grades and include Measured, Indicated and Inferred classified blocks. Sensitivities include all classified blocks, not only those meeting RPEEE. These results are provided for comparative purposes only, to illustrate the potential effect of applying different cut-off grades on tonnage and grade. Sensitivity cases do not represent Mineral Resources and should not be interpreted as such.
| Project: 169525666 | 11-64 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates

Source: (McEwen, 2026)
Note: Sensitivities use raw block grades and include Indicated and Inferred blocks. These results are for comparison only and do not represent Mineral Resources.
Figure 11-33:Experimental Grade-Tonnage Sensitivities at Various Cut-off Grades
11.9.11Mineral Resource Statement
Table 11-30 summarizes the Mineral Resource estimates for Davidson-Tisdale assuming underground stoping mining methods, reported in accordance with the CIM Definition Standards on Mineral Resources and Reserves (2014). The Mineral Resource was limited to those parts of the gold mineralization for which there are RPEEEs via underground mining methods.
Table 11-30: Davidson-Tisdale Mineral Resource Statement April 9, 2026
Classification | Tonnes (kt) | Au Grade (g/t) | Contained Au (koz) |
Measured | 198 | 6.44 | 41 |
Indicated | 95 | 5.80 | 18 |
Total Measured + Indicated | 294 | 6.23 | 59 |
Inferred | 200 | 3.44 | 22 |
Notes:
· | Effective date of the Mineral Resource estimate is 9 April 2026. The QP for the estimate is Mr. Luke Willis, P.Geo, an employee of McEwen. |
· | Mineral Resources are reported according to Item 1300 of Regulation S-K. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. |
· | Mineral Resources are reported above an economic cut-off grade of 1.30 g/t gold assuming underground extraction methods and based on a mining cost of $67.72/t, process cost of $30.77/t, G&A cost of $16.60/t, metallurgical recovery of 92%, dilution of 15% and gold price of US$3,000/oz. |
| Project: 169525666 | 11-65 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
11 Mineral Resource Estimates
| ● | Figures may not sum due to rounding. |
11.9.12Factors That Could Affect the Mineral Resource Estimate
Factors that could materially affect the Mineral Resource Estimate results include:
· | Any new drilling and sampling information that potentially extend the mineralization zones down dip and along the strike. |
· | Metallurgical testwork results might affect the recovery assumptions of the gold and other metals. |
· | Changing gold prices may alter the mine optimization results. |
· | Changes in the local geological interpretations and assumptions used to generate the estimation domains |
· | Changes in mineralization and geological geometry and continuity of mineralized zones |
· | Changes in assumptions of mineralization and grade continuity |
· | Changes in the treatment of high-grade gold values |
· | Changes in the grade interpolation methods and estimation parameter assumptions |
· | Changes in the confidence assumptions and methods used in the mineral resource classification |
· | Changes in the density and the methods used in the density assignments |
· | Changes in metal price and exchange rates and other economic assumptions used in the cut-off grade determination |
· | Changes in input and design parameter assumptions that pertain to the underground mining constraints |
· | Changes to assumptions as to the continued ability to access the mine site, retain mineral and surface rights titles, maintain the operation within environmental and other regulatory permits, and maintain the social license to operate. |
| Project: 169525666 | 11-66 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
12 Mineral Reserve Estimates
12Mineral Reserve Estimates
12.1Forward-Looking Statement
The accuracy of the Mineral Reserve estimate depends, in part, on the quality and quantity of available data, geological interpretations, and professional judgment. Based on the data available at the time of preparation of this Technical Report Summary, the Mineral Reserve estimate presented herein is considered reasonable. However, these should be accepted with the understanding that additional data or analyses obtained subsequent to the date of the estimate may necessitate revision, and such revisions may be material. There is no guarantee that all or any part of the estimated mineral reserve will be recoverable. Estimates of mineralization and other technical information presented herein have been prepared in accordance with SEC Regulation S-K 1300 requirements and are based on information available to the QPs at the time of preparation of this Technical Report Summary.
12.2Risks
The Mineral Reserve estimate has been prepared using definitions and categories applicable under SEC Regulation S-K 1300.
Factors that could materially affect the Mineral Reserve estimate include, but are not limited to, the following.
| ● | Commodity price assumptions. |
| ● | Changes in interpretations of mineralization geometry and continuity of mineralization zones. |
| ● | The presence of unrecognized fault structures that could affect mine design, ground control costs, and/or ore dilution. |
| ● | Changes to geotechnical/geomechanical, hydrogeological, and metallurgical recovery assumptions. |
| ● | Input parameters used to assess dilution and recoveries. |
| ● | Assumptions that all required permits to operate can be obtained. |
| ● | Assumptions regarding social, permitting, and environmental conditions. |
| ● | Infill and/or definition diamond drilling. |
The QP has reviewed the risks, opportunities, conclusions, and recommendations presented in this Technical Report Summary and is not aware of any conditions that would put the Mineral Reserve estimate at a high-risk level.
12.3Mineral Reserve Estimate
12.3.1Underground Mineral Reserve Estimation
The Grey Fox Mineral Reserve estimate, prepared by Stantec on March 27, 2026, is based on Indicated Mineral Resources identified in the block model provided by McEwen (rm_gf_1p5_0725_streamlined.dm, issued on September 10, 2025). All Mineral Resource material in the block model that was not classified as Measured or Indicated was removed prior to use. Table 12-1 outlines the estimated Mineral Reserve.
| Project: 169525666 | 12-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
12 Mineral Reserve Estimates
Table 12-1:Mineral Reserve Estimate, March 27, 2026
Classification | Ore Tonnes (t) | Au (g/t) | Gold Ounces (Oz) |
Proven | 0 | 0.00 | 0 |
Probable | 9,405,829 | 3.24 | 980,303 |
Total Reserve | 9,405,829 | 3.24 | 980,303 |
Notes:
| ● | The Mineral Reserves for this project have been defined, classified, and reported by the Qualified Person (QP) in strict accordance with the U.S. Securities and Exchange Commission (SEC) Regulation S-K 1300 mining property disclosure requirements (17 CFR § 229.1300) |
| ● | Mineral reserve includes longitudinal stopes, overhand cut-and-fill stoping, ore development, as well as marginal longitudinal stopes, and marginal development all factored with external dilution (including host waste rock and estimated backfill tonnes) and mining recovery. |
| ● | Longitudinal stopes were estimated at an undiluted cut-off value of 2.40 g/t. |
| ● | Marginal longitudinal stopes were estimated at an undiluted cut-off value of 2.00 g/t. |
| ● | Cut-and-fill stopes were estimated at an undiluted cut-off value of 2.70 g/t. |
| ● | A minimum mining width of 3.0 m was applied for all stoping. |
| ● | Total dilution is 46.5%, consisting of 11.6% external dilution and 34.9% internal dilution. |
| ● | Total mineable recovery is 91.2%. |
| ● | Some numbers may not sum due to rounding. |
Table 12-2 presents the Mineral Reserve estimate, categorized by mining method.
Table 12-2:Mineral Reserve Estimate by Mining Method
Mining Method | Ore Tonnes (t) | Au (g/t) | Gold Ounces (Oz) |
Longitudinal Longhole Stoping | 6,812,141 | 3.55 | 777,042 |
Marginal Longitudinal Longhole Stoping | 910,806 | 1.85 | 54,090 |
Cut-and-Fill Stoping | 117,984 | 3.94 | 14,959 |
Development Ore | 1,564,899 | 2.67 | 134,212 |
Total Reserve | 9,405,829 | 3.24 | 980,303 |
Table 12-3 presents the Mineral Reserve estimate, categorized by mining zones.
Table 12-3:Mineral Reserve Estimate by Zone
Zone | Ore Tonnes (t) | Au (g/t) | Gold Ounces (Oz) |
Whiskey Jack | 692,256 | 4.37 | 97,165 |
Remaining Grey Fox North | 4,997,799 | 2.95 | 473,751 |
Grey Fox South (147 and South) | 3,715,774 | 3.43 | 409,387 |
Total Reserve | 9,405,829 | 3.24 | 980,303 |
| Project: 169525666 | 12-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
12 Mineral Reserve Estimates
12.3.2Cut-off Grade
The Grey Fox mineral resource is gold. The cut-off grade will be based on the gold grade field (AU_C) within the block model, expressed in grams per tonne (g/t). To determine a mineral reserve for Grey Fox, a preliminary cut-off grade was estimated prior to preparing the mine design. The cost parameters used to estimate the cut-off grade were provided by McEwen in September 2025. The mining cost for cut-and-fill was estimated using data from McEwen’s Black Fox and Froome deposits, as well as other benchmarks. The surface trucking cost was estimated from the provided mining cost.
The marginal cut-off grades for longhole stoping exclude sustaining capital costs. A processing-and-trucking-only cut-off grade was used to evaluate ore development, with other costs considered sunk, as the development would be required as waste regardless. Final cut-off grade values were rounded up to the nearest tenth of a gram.
Table 12-4 presents the gold revenue assumptions, modifiers, and unit costs used in the cut-off grade calculation. Table 12-5 presents the resulting cut-off grade calculations, adjusted for mill recovery and estimated mining dilution.
For longhole stoping, the mill feed cut-off grade is 2.1 g/t, with a marginal mill feed cut-off grade of 1.7 g/t. The undiluted target stope shape cut-off grade is 2.4 g/t, with a marginal undiluted target stope shape cut-off grade of 2.0 g/t.
For cut-and-fill mining, the mill feed cut-off grade is 2.4 g/t. The undiluted target stope shape cut-off grade is 2.7 g/t.
For development material, the mill feed cut-off grade is 0.5 g/t. The undiluted target development cut-off grade is also 0.5 g/t.
| Project: 169525666 | 12-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
12 Mineral Reserve Estimates
Table 12-4:Gold Revenue Assumptions, Modifiers, Unit Costs Used in cut-off grade Calculations
Item | Value | Unit |
Gold Revenue & Modifiers | | |
Gold Price | 2,200 | $USD/oz |
Refining Cost | 0.55 | $USD/oz |
Transport and Insurance | 2.05 | $USD/oz |
Excess Liability | 0.92 | $USD/oz |
Payable Gold | 99.95 | % |
Penalties | 0.00 | % |
Royalties | 2.50-3.00 | % |
Revenue per Ounce after fees and royalties | 2,140.54 | $USD/oz |
Revenue per Gram after fees and royalties | 68.82 | $USD/g |
Unit Costs | | |
Mine Operating Cost (Longhole) | $62.72 | $USD/t |
Mine Operating Cost (Cut-and-Fill) | $83.03 | $USD/t |
Surface Trucking Cost | $5.00 | $USD/t |
Mill Operating Cost (Processing) | $23.43 | $USD/t |
General and Administration Operating Costs | $16.60 | $USD/t |
Sustaining Capital Cost (including reclamation and exploration) | $20.91 | $USD/t |
Table 12-5:Cut-off Grade Calculations
Cut-off Grade | Longhole | Marginal | Cut-and-Fill | Ore | | |
| | Longhole | | Development | | |
Item | Value | Value | Value | Value | Unit | |
Total Cost per Tonne | 128.65 | 107.75 | 148.97 | 28.43 | $USD/t | |
Grams Gold per Total Cost | 1.87 | 1.57 | 2.16 | 0.41 | g/t | |
Mill Recovery | 90 | 90 | 90 | 90 | % | |
Mill Feed Cut-off Grade | 2.1 | 1.7 | 2.4 | 0.5 | g/t | |
Estimated Mining Dilution | 15 | 15 | 10 | 10 | % | |
Undiluted Cut-off Grade | 2.4 | 2.0 | 2.7 | 0.5 | g/t | |
| Project: 169525666 | 12-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
12 Mineral Reserve Estimates
12.3.2.1Consideration of Marginal Cut-off Grade and Low-Grade Material
Marginal material is below the planned break-even cut-off value but can still be processed economically. Marginal stoping occurs where gaps between stopes, in planned stoping sequences can be filled by stopes mined at a lower cut-off grade. The cut-off grade calculation for marginal stoping excludes sustaining capital and infrastructure costs, as this stoping occurs in areas where development is already planned for break-even stoping and the associated development costs are therefore considered sunk.
Ore development material is generated typically in operating crosscuts and sill development. It can be stockpiled separately on a per-round basis as low-grade material and used to fill gaps in the mill schedule without displacing higher-grade material.
12.3.3Modifying Factors
Modifying factors include dilution and mining recovery, both of which were applied in the estimation of Mineral Reserve. The following sub-sections describe these modifying factors and the application to the mine design.
12.3.3.1Internal Dilution
Internal dilution comprises of low-grade material and/or waste rock contained within the stope shape or development shape that will be mined along with the mineralized resource. This internal dilution is included within the mining shapes and reported as part of the reserve. Internal dilution will be defined as material below the mining method’s cut-off grade as determined by the block model. Where no grade is assigned in the block model, the grade will be assumed to be 0.0 g/t.
Stoping-only internal dilution is estimated to be 35.3%, while overall internal dilution, including development, is estimated at 34.9%.
12.3.3.2External Dilution and Backfill Dilution
External dilution includes low-grade material, waste rock, and/or backfill from the HW, FW, and/or end walls that will overbreak into the stope and be mined with the stope resource. External dilution will be calculated during the mine scheduling process, and the methodology is presented in Table 12-6.
Stope-only external dilution is estimated at 14.2%, of which stope backfill dilution accounts for 0.7%. Overall external dilution, including development, is estimated at 11.6%, with stope backfill dilution accounting for 0.5% of the total.
Table 12-6:Stope Dilution Methodology
Dilution Source | Methodology | |
External Dilution | Equivalent Linear Overbreak and Sloughage | |
| Project: 169525666 | 12-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
12 Mineral Reserve Estimates
Dilution Source | Methodology | |
| Dilution grade 0.0 g/t | |
Backfill Dilution | 0.3 m of overbreak for each exposed adjacent surface at Stope End Walls (Ribs). Dilution grade 0.0 g/t | |
12.3.3.3Mining Recovery
A mining recovery factor has been applied to all stopes to account for losses incurred during the stoping process. These losses reflect material that is not recovered during extraction of blasted ore. Mining losses from longhole stopes were estimated based on the mining method and average stope size. Factors influencing mining losses include mucking line of sight, depth of sight, possible hang-ups on the footwall, and blast-related complications, especially with up-hole stopes. In some instances, rib pillars may also be required for up-hole stopes, as these stopes cannot be backfilled, and these losses are accounted for in the recovery factors. The mining recovery factors are summarized in Table 12-7.
Stope-only mining recovery is estimated at 89.5%, while overall mining recovery, including development, is estimated at 91.2%.
Table 12-7:Mining Recovery Factors
Ore Source | Mining Recovery Factor |
Longitudinal Longhole Stope | 95% |
Up-hole only Stope (<20 m high) | 75% |
Up-hole only Stope (20 to 30 m high) | 65% |
Cut-and-Fill Stope | 98% |
Ore Development* | 100% |
Note: * Assumed unrecovered ore development tonnes are expected to be recovered during stoping.
| Project: 169525666 | 12-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13Mining Methods
Grey Fox will be a combination of two underground operations accessed from two separate portals: Grey Fox North, to be excavated from the existing Gibson Ramp and Portal, which includes the Whiskey Jack, Gibson, Contact, and 147NE zones, and Grey Fox South, which includes the 147 and South zones. The zones are portrayed in Figure 13-1.
The Fox Complex is a group of gold properties in Ontario extending eastward from Timmins along Provincial Highway 101. Located 11 km east of Matheson is the Eastern Fox Complex, which include Black Fox open pit mine and the Froome underground mine. Grey Fox is located approximately 3 km southeast of the Black Fox Mine which is approximately 9 km east of Matheson in Hislop Township. Access to the site is via Tamarack Road off Highway 101 East.

Figure 13-1:Grey Fox Mine Zones in Plan View with Google Maps Surface
These zones will be mined using a longitudinal retreat longhole mining method supplemented with overhand cut-and-fill mining. Ore will be hauled on surface to the existing Stock Mill at McEwen’s Stock Property as part of a “hub and spoke” asset strategy for the McEwen Assets along Highway 101.
Project Period development will initiate at the existing Grey Fox North portal in August 2027 where the existing Gibson ramp will be rehabilitated and expanded to 4.0 m W x 4.3 m H approximately 75 m down the ramp. From the Gibson ramp, a new 4.0 m W x 4.3 m H ramp will be excavated northwards towards
| Project: 169525666 | 13-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Whiskey Jack which will begin mining at a target of 650 t/d. The existing Gibson ramp will be rehabilitated to approximately 130 m in length total concurrent with development towards Whiskey Jack.
The Whiskey Jack Zone has 9 levels, split into two blocks, at 30 m vertical intervals (except the upper two levels which are 25 m). Figure13-2 presents a longitudinal projection of the Whiskey Jack Zone.

Figure 13-2:Whiskey Jack Zone looking South
In August 2028, as capital development comes to completion in Whiskey Jack, a second, new 4.0 m W x 4.3 m H ramp will be excavated southwards from the existing Gibson ramp towards the remaining Grey Fox North zones (Gibson, Contact, and 147NE). In January 2030, there will be multiple mining fronts in the Grey Fox North first mining block to support a target of 1,500 t/d marking the end of the project period and beginning of the operating period.
The remaining Grey Fox North has a total of 17 levels at 25 m vertical intervals and will be split into four blocks. Figure 13-3 presents a longitudinal projection of Grey Fox North excluding the Whiskey Jack Zone. The mine life of Grey Fox North will be approximately 14.5 years, including an initial ramp up period of approximately 2.5 years.
| Project: 169525666 | 13-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-3:Grey Fox North looking North
As mining at Grey Fox North progresses into the second mining block, in April 2033, Grey Fox South underground development commences to establish the infrastructure for the first mining block in preparation for the first Grey Fox South stoping in January 2035. In January 2035, Grey Fox South mining will proceed concurrently with Grey Fox North at a target of 2,700 t/d until 2040, when the ramp down period starts until December 2041.
The Grey Fox South has 12 levels at 25 m intervals and will be split into three blocks. The mine life of Grey Fox South will be approximately 8.5 years, including an initial ramp up period of 1.5 years. Figure 13-4 presents a longitudinal projection of Grey Fox South.
| Project: 169525666 | 13-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-4:Grey Fox South Looking North
To achieve these phased production targets, the mine plan includes production from multiple mining blocks, with multiple stopes available per block. The aforementioned overall production profile and tonnage targets are expected to be complimentary with production from other assets, notably the stock mine, in maximizing the throughput of the Stock Mill.
Conventional trackless mining equipment will be used for the lateral development required to access the zones. Longhole stopes will be drilled using a combination of ITH (primarily for slot drilling) and top hammer longhole drills, blasted using ANFO with some packaged emulsion explosives, and mucked using conventional LHD vehicles. Ore will be hauled to a primary crusher on surface using trucks and waste rock will be hauled either to a surface waste dump or to an active production level for use as stope backfill.
Mine dewatering will be achieved using a multi-level dirty water system. Main sump and pump stations for Grey Fox North will be located on the ramp at 40 Level, 145 and 265 Levels in the Whiskey Jack Zone, and on the 140, 265, 365, and 465 Levels in the Gibson Zone. An additional sump will be placed at the portal entrance to collect surface run-off water that enters the mine via the ramp or portal. For Grey Fox South, main sump and pump stations will be located on the 140, 240, and 340 Levels. A network of borehole sumps and level sumps feed to these main sumps. All sumps will collect any groundwater and any service water used during mining activities. The main sumps are staged up to the next main sump in that zone to surface. Any residual solids in the sumps will be mucked using an LHD and placed into a nearby stope for disposal.
The stopes will be backfilled with a combination of cemented rock fill and unconsolidated rock fill to reduce the use of cement while still minimizing backfill dilution in adjacent stopes. For uppers stopes, backfilling is
| Project: 169525666 | 13-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
not planned and rib pillars may be left in place during mining to support the voids. A cement slurry will be hopper fed from surface through boreholes to an underground slurry receiving station. The slurry receiving station will be used to distribute the slurry to each level, and spray bars will be used to add the slurry to waste rock in LHD buckets for placement in open stopes. When possible, waste rock will be sourced directly from active development underground.
Design criteria and parameters specific to each aspect of the mining method are presented in subsequent sections. The following were considered when determining the criteria and parameters during the mine design process:
| ● | Health and safety for the workers, local communities, and the environment |
| ● | Develop and design the mine to achieve regulatory approvals |
| ● | Achieve buy-in from local stakeholders |
| ● | Company standards and specifications (or industry best practices where company standards and specifications were not available) |
| ● | Prevention through design concepts |
| ● | Minimizing risk to production |
| ● | Use of proven industry technology, equipment, and processes |
| ● | Operational flexibility |
| ● | Minimizing operating costs |
| ● | Mineral resource recovery (extraction rate) |
13.1Geomechanical
13.1.1Geology
Grey Fox is characterized by complex geology featuring stacked epithermal gold veins, with similarities to other major Canadian Shield gold deposits. Individual vein lens lengths are most commonly 200 m to 300 m long in strike, and the total deposit exists along an approximate 750 m in strike length. The typical thickness HW to FW is 2 m to 10 m. The deposit typically extends from surface to approximately 300 m deep below ground surface (BGS) from the current topography at the Grey Fox North portal, the maximum depth BGS is approximately 800 m, for indicated material in the Gibson Zone.
13.1.2Data
The 2025 drill core logging records provided Rock Quality Designation (RQD) data for Grey Fox, where RQD is generally regarded as excellent with a majority of measured RQD, weighted by core run length, exceeding 90% (Figure 13-5). Data indicates the first quartile of the cumulative RQD distribution is approximately 88%, and the median and third quartiles are closer to 95%. The first quartile RQD value is used for geotechnical design in this study, for 75% reliability.
| Project: 169525666 | 13-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-5:Grey Fox Length-Weighted and Cumulative RQD Distribution
Grey Fox 2025 drill core samples were selected and brought to Queen’s University for rock strength testing, including unconfined compressive strength (UCS), intact elastic modulus (Ei), Poisson’s Ratio (γ), and specific gravity (Gs).
Additional data for rock mass characterization is provided by previous geotechnical studies for the nearby Froome project pre-scoping studies, by Mine Design Engineering (MDEng) and Golder Associates. Froome data is assumed applicable to Grey Fox due to proximity and geologic similarity.
Grey Fox 2025 oriented drill core logging records provide structural orientation data of discrete and systemic geologic structure.
The regional strike of the deposit is N44°W and the dip is 72.8°SW (azimuth 136° Right Hand Rule). The mine plan proposed stope dimensions are 20 m length along the deposit strike with a vertical height or sublevel standoff of 25 m and a width of 5 m. Backs on the drill/extraction levels are flat and end walls are vertical. Stope FW and HW dips are 63° for Whiskey Jack and 60° for the remainder of the Grey Fox deposit.
Core logging and testing data were used for Q-System rock mass classification. The rock mass quality Q is the product of the rock mass inherent strength and applied stress:
Q = (RQD / Jn) x (Jr / Ja) x (Jw / SRF)
The joint property Jn is the joint density and RQD / Jn is a measure of block size. Grey Fox 2025 oriented core logging is summarized (Figure 13-6) and indicates two main joint sets plus random joint orientations,
| Project: 169525666 | 13-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
so Jn = 6. The critical joint 197°/65° is identified and plotted in relation to mineralized orientations at Grey Fox.

Figure 13-6:Grey Fox Joint Orientations and Critical Joint
Joint surface roughness is Jr, and joint alteration is Ja. The ratio Jr / Ja is a measure of joint surface strength and stiffness. Golder Associate’s core logging for the 2017 pre-scoping studies indicate Jr / Ja is typically 1.
The joint water factor Jw represents hydraulic pressure due to rates of water flow within the rock mass and the strength reduction factor SRF accounts for loosening of the rock mass at excavation boundaries during and after mining, due to stress, strength, and elasticity of the rock. The modified rock mass quality Q’ considers inherent (logged) properties of the rock mass only and isolated from the impacts of stress, where the terms Jw and SRF drop out:
Q’ = (RQD / Jn) x (Jr / Ja)
13.1.3Analysis and Results
Stability analysis of open stopes and arrays of adjacent open stopes follows the Modified (Mathews-Potvin) Stability Graph Method. This method considers the inherent competence of the rock mass due to joint frequency, orientations, and properties, represented by the modified stability number N’. Stability is determined by plotting the excavation’s face hydraulic radius versus N’ and evaluated in terms of where the excavation face’s hydraulic radius versus N’ plots in relation to the empirically derived graph stability curves.
| Project: 169525666 | 13-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Hydraulic Radius (HR) is a shape factor representing the exposure of the excavation face, such as the back, end walls, or FW/HW, for individual stopes or arrays of adjacent open stopes. HR is defined as the area to perimeter ratio of the exposed face.
Base stope geometries for Grey Fox are longitudinal 20 m long stopes following the strike of the deposit, minimum 3 m horizontal width and 25-30 m vertical sublevels. The approximate FW/HW dip angles are 63° for Whiskey Jack and 60° for the remainder of Grey Fox. Stope backs are assumed horizontal, and end walls vertical (Table 13-1).
Table 13-1: Grey Fox Stope HR
Zone | HW and FW | Back | End Walls |
Whiskey Jack | 5.8 | 1.3 | 1.4 |
Remainder of Grey Fox | 5.9 | 1.3 | 1.4 |
N’ is based on Q’ combined with terms representing stress acting on the rock mass (A), joint orientation relative to the excavation surface (B), and gravity adjustment due to excavation geometry (C):
N’ = Q’ x A x B x C
Combining a 25th percentile (75% reliability) RQD of 88% (90% “typical”) with Jn = 6 and Jr / Ja =1, Q’ of the rock mass is 14.67.
To estimate A, it is assumed in-situ ground stress is due to gravity self-loading, and vertical stress σv is the product of rock/overburden Gs and depth BGS. The average Gs is 2.75 and the maximum (worst case in terms of stress) depth of each zone’s indicated material is approximately 300 m BGS for Whiskey Jack, and 800 m BGS for the remainder of Grey Fox. The stress ratio κ defines horizontal stress σh and is a function of Ei and depth BGS:
κ = σh:σv = 0.25 + 7 x Ei x (0.001+1/depth(m))
Due to the resolution of σh and σv stress trajectories around excavation boundaries, stress magnitudes acting directly at the stope faces are determined by applying a methodology to estimate stress magnitudes at open stope boundaries. These stresses along with intact UCS of the rock are used to determine A (Figure 13-7 and Table 13-2).
| Project: 169525666 | 13-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-7: | Rock stress factor “A” |
Table 13-2: | Grey Fox “A” factors |
| UCSavg | Depth | κ | σv (MPa) | σh (MPa) | Asidewall | Aback | Aendwall |
| (MPa) | (m) | | | | | | |
Whiskey Jack | 118.48 | 300 | 1.26 | 8.1 | 10.2 | 1.00 | 0.44 | 1.00 |
Remaining Grey Fox | 118.48 | 800 | 0.78 | 21.6 | 16.8 | 1.00 | 0.18 | 1.00 |
The factor “B” is determined by identifying the critical joint, which is most likely to impact the stability of an exposed stope face, then measuring the angle α between the critical joint orientation and the stope face orientation (Figure 13-8). The most critical stope face is the HW, which is typically parallel to mineralization for longitudinal stoping methods.
| Project: 169525666 | 13-9 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-8:Joint Orientation Factor “B”
Factor “C” is the gravity adjustment factor, which depends on the likely failure mechanism at each stope face. Kinematic analysis identifies the failure mechanism is statistically most likely to impact stope faces, based on the orientations in relation to critical geologic structure, and is based on cumulative kinematic failure probability of each failure mechanism. Kinematic analysis of critical joint 197°/65°, versus stope face orientations, indicate gravity failure is the most likely mechanism of each stope face. The HW is presumed parallel to mineralization dip. For Whiskey Jack (63° dip), C is 5.28 and for the remaining Grey Fox (60° dip), C is 5.0 (Figure 13-9).
| Project: 169525666 | 13-10 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-9:Gravity Adjustment Factor “C”
Stope design HW/FW, back, and end wall HR are plotted with respective N’ of the HW/FW, backs, and end walls on the stability graph for Whiskey Jack (Figure 13-10) and remaining Grey Fox (Figure 13-11), indicating at which exposed HR ground support is required or where stopes must be expediently backfilled. For the proposed stope dimensions and deposit dip, stope faces are regarded as “stable-unsupported.” Up to six open longitudinal stopes, adjacent along strike, are possible at Whiskey Jack, and for the deeper Grey Fox deposit (e.g., accounting for deepest stoping in Grey Fox), before the HW/FW is regarded as “transitional-unsupported,” where HW support or very expedient stope cycling and dilution tolerance are required.
| Project: 169525666 | 13-11 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-10:Whiskey Jack Stability Graph
| Project: 169525666 | 13-12 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-11:Remainder of Grey Fox Stability Graph
13.1.4Waste Pillar Stability
Mineralization, particularly at Whiskey Jack, places recoverable grades of the deposit along the FW/HW closer to the host rock contact, with lesser grades in the center. This may result in stoping along two parallel headings along strike, with lower grade “waste” material left in situ between each heading, resulting in a “waste pillar.” A required waste pillar thickness Wp at increasing depth BGS is calculated, to maintain a pillar factor of safety Fs of 1.3.
The proposed waste pillar thickness for the mine design is 3 m minimum required pillar thicknesses at increasing depth, maintaining a 1.3 Fs, are determined using Lunder-Pakalnis pillar strength methods:
PS = (K x UCS) x (C1 + C2 x kappa)
Where PS is the pillar strength in MPa, intact rock strength UCS is in MPa, and K, C1, and C2 are empirical constants from a case history database and equal to 0.44, 0.68, and 0.52 respectively. The average pillar confinement Cpav is a function of pillar geometry and is used to determine kappa:
Cpav = 0.46 x {log[(Wp / H)+0.75]}1.4/(Wp / H)
| Project: 169525666 | 13-13 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
kappa = tan{arcos[(1-Cpav)/(1+Cpav)]}
Where Wp and the pillar height H are in metres. A geometric correction factor σɵc accounts for the effects of pillar inclination ɵ, since pillars are not vertical but governed by the dip of the deposit:
σɵc = (1-sinɸ)/(1-sin(ɸ-arctan(tan(ɵ/(2(1+γ))))))
Where ɸ is the internal friction angle of an intact rock sample and γ is Poisson’s Ratio. Inclined PS is generally less than that of vertical pillars since shear strength has a greater role in the overall PS.
Backfill reinforces adjacent pillars through the “arching” effect, where backfill, as it settles, exerts a normal force on pillars which translates to frictional forces, along the backfill/pillar contact surface, providing additional pillar support. The vertical and horizontal components of pillar stress reduction due to arching are functions of cemented rock fill material properties and volume:
σvh = (ρbfB’/2Kbf tanδ’) x {1 – exp(-2 Kbf D/B’tanδ’)}
σhh = Kbf σvh
Kbf = 1 – sinɸbf
δ ≈ (2/3) x ɸbf
Where:
σvh = vertical stress component of the arching effect (MPa)
σhh = horizontal stress component of the arching effect (MPa)
Kbf = horizontal to vertical stress ratio of the backfill
ɸbf = backfill internal friction angle, assumed 30°
δ’ = effective friction angle between the pillar and the backfill
B’ = stope width (m)
D = depth below ground surface (m)
ρbf = backfill density, assumed 1.95 t/m3 = 0.01911 MN/m3
The analysis assumes that the stope on the FW side of the deposit is mined first, so “B” is the width of the stope on the FW side. If mining and backfilling the HW side first, the waste pillar support must be considered, particularly at lower elevations.
For inclined pillars, pillar stress reductions due to arching are calculated based on arching components σvh and σhh in relation to the deposit dip angle (or pillar inclination), and the total stress reduction due to arching is assumed intermediate to σvh and σhh, with frictional support coplanar to the pillar surface.
The pillar Fs is expressed as a ratio of PS to total pillar stress:
Fs = PS/(σind – σred)
| Project: 169525666 | 13-14 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Where the induced pillar stress σind is the product of the rock supported rock unit weight and the pillar’s tributary area, concentrated on the pillar area, and σred are pillar stress reductions due to counteracting backfill frictional support from arching.
Required Wp at increasing depths BGS, at Fs = 1.3, are presented for Whiskey Jack (Figure 13-12) and the rest of Grey Fox (Figure 13-13). The maximum depth of mineral resource at Whiskey Jack is approximately 300 m BGS, and 800 m BGS at Gibson. At these depths, a 3 m Wp is possible at Whiskey Jack, the main area of concern. For the remaining Grey Fox, 3 m for Wp is possible up to 375 m BGS, though at greater depths the pillars must be supported to maintain a 3 m Wp at Fs = 1.3, particularly if mining along the HW side first.
Cable bolts installed in a fan pattern into the waste pillar, from one of the ore drives at drilling or mucking levels, may provide the necessary waste pillar support.
Additional arching pillar support from backfill is negligible at Grey Fox. The stope geometries dictate low backfill volume, generating insufficient normal and frictional forces due to arching against the pillars to provide any additional support.

Figure 13-12:Wp versus depth BGS, Whiskey Jack
| Project: 169525666 | 13-15 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-13: Wp versus depth BGS, Remainder of Grey Fox
13.1.5Sill Pillar
A proposed 4 vertical metre thick sill pillar is evaluated for stability, between stoping areas at Grey Fox. Limit equilibrium methods described by Hoek are used. The sill pillar factor of safety Fs,sil is expressed as:
Fs,sill = (2/ρ) ([τxz/y] + [τyz/x]
Where ρ is the rock density constituting the sill pillar. Figure 13-14 illustrates sill pillar dimensions, resisting shear forces (τxz and τyz), and normal in-situ stresses (σx and σy).
| Project: 169525666 | 13-16 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Source: (Hoek, 1989)
Figure 13-14: Sill Pillar Dimensions, Resisting Stress and Normal Stress Vectors
Resisting shear stresses are assumed equal in the xz and yz planes (τxz = τyz = τ), and are defined by the rock mass Unconfined Compressive Strength UCSrm, the rock mass angle of internal friction ɸrm (32.678°, and the Hoek-Brown parameter m:
τ = ([cotɸrm - cosɸrm] m UCS) / 8
Where:
ɸrm = arctan(1/((4hxzcos²θxz) - 1)0.5)
θxz = (1/3)(90°+arctan(1/((hxz³-1)0.5))
hxz = 1+ (16(mσh + s UCS)/(3 m² UCS)
m = mi ∙ exp([GSI - 100] / 14)
s = exp([GSI - 100] / [9 - 3D])
Assume:
GSI = 9 ln(Q’) + 44 where RQD is assumed 88%, Jn is 6, an Jr / Ja is 1
mi = 19.0 for quartz/quartz-carbonate veins
The disturbance factor D is zero, assuming good blasting practice.
Due to high rock strength properties in the mineralized zone and the narrowness of the stope designs, frictional forces supporting a small sill pillar are much greater than the weight of the pillar and a 4 m surcharge of cemented rock fill on top of the sill pillar, resulting in elevated Fs, sill for Grey Fox. Sill pillars are evaluated for 3 m horizontal widths versus 20 m length on strike, then for 9 m horizontal widths for scenarios where a 3 m waste pillar between two parallel stopes is mined.
The waste rock or ore sill pillar could be eliminated entirely, with sill construction by placement of cemented rock fill with a higher cement content into an empty stope. A cemented rock fill pilot program consisting of
| Project: 169525666 | 13-17 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
mixing and testing trial cemented rock fill batches will identify cemented rock fill batch specifications for creating a cemented rock fill sill which may be safely mined underneath.
13.1.6Backfill
Backfill will consist of cemented rock fill or unconsolidated rock fill. Due to relatively small stope sizes and backfill volumes, very limited arching support is anticipated so cemented rock fill and rock fill are expected to behave similarly for taking weight from the waste pillars. One disadvantage with rock fill is it will run if a waste pillar fails.
For twin stopes where the interim waste pillar Wp is 3 m, cemented rock fill is placed on the HW side if this side is mined first, with rock fill on FW side of the waste pillar. If the FW side is mined first, rock fill may be placed on both sides of the waste pillar. Refer to Figure 13-31.
A cemented rock fill pilot program consisting of mixing and testing trial cemented rock fill batches will identify cemented rock fill batch specifications which satisfy general and specialized strength requirements. For the cemented rock fill strength, Mitchell’s Method is used to identify strength requirements based on cemented rock fill vertical exposure, then cement contents are determined based on strength testing trial batches of cemented rock fill at different strength contents and adjusting the cement content to get to the target strength identified by Mitchell’s Method.
13.1.7Crown Pillar
The crown pillar provides ground surface stability over an underground mine. Crown pillar stability analysis considers open stopes or other large underground voids, in proximity to the surface. An appropriate crown pillar thickness determination is based on ground conditions, crown pillar geometry, purpose/expectancy, and risk tolerance.
The Carter Method for scaled span analysis is the application of a scaling factor to the proposed design dimensions to account for geometric influences and ground conditions and applied to sizing / modifying the design span. This method assumes a caving or unraveling failure mechanism, with design geometry and rock parameters as input to determine reliability of pillar integrity at decreasing thickness and increasing span due to mining. Caving is an appropriate assumption since it takes weathering of the bedrock near the surface into account. The method assumes backfilling is not used underground.
The critical span Sc is the maximum self-supporting span due to rock mass conditions:
Sc = 3.3 (Q0.43) x sinh0.0016 (Q)
Where Q is the product of Q’ and (Jw/SRF), Jw is assumed 1.0 (dry), and SRF of the rock is a function of k, UCS, and crown pillar thickness or depth in metres BGS:
SRF = 0.244(depth/UCS)1.322 + 0.176(UCS/depth)1.413
The Scaled Span Cs is the product of the design span and a scaling factor accounting for geometric influences and ground conditions:
| Project: 169525666 | 13-18 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Cs = S {Gs / [T (1+SR) ∙ (1 - 0.4cosɵcp)]}0.5”
S = crown pillar design span (m)
ɵcp = orientation of the crown pillar-wall interface (assumed equal to deposit dip)
T = crown pillar thickness (m)
SR = span ratio = S/L
L = crown pillar strike length (m)
The Probability of Failure (PF,crown) of the crown pillar is a function of the crown pillar Factor of Safety
(FS,crown):
PF,crown = 1 – erf [(2.9 FS,crown - 1) / 4]
FS,crown = Sc / Cs
With PF,crown and the equivalent FS,crown of the crown pillar known, the crown pillar may be assigned to a risk class which provides additional guidance on the expected service life of the crown pillar, accessibility and level of concern post-mine closure, and degree of stability monitoring. Table 13-3 presents Carter’s Crown Pillar Acceptable Risk Exposure Guidelines.
Table 13-3: Crown Pillar Acceptable Risk Exposure Guidelines

The crown pillar consists of approximately 31 m of rock from the back of the Whiskey Jack 65 Level top cut to the bedrock/soil overburden contact, then 22 m of overburden to the surface. The soil overburden is assumed glacial till. Rock is assumed to have a minimum RQD of 10%. At less than 10%, particle sizes are at a scale that the laws of soil mechanics apply. Assuming a worst-case scenario, soils may be represented with a Q value equal to zero. For the rock, Q is the product of Q’ (=15 at 88% RQD for 75% reliability) and strength reductions due to hydraulic stress, rock strength, and depth (=Jw / SRF), where Jw is assumed 1.0
| Project: 169525666 | 13-19 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
for dry conditions or negligible inflows. The rock Gs is 2.75 and the glacial till Gs is assumed 2.6, and the crown pillar Gs and Q at increasing total thickness are a weighted average of the glacial till and rock components, with Fs,crown (Figure13-15) and Pf,crown (Figure 13-16) calculated at increasing total thickness, for a 9 m W x 60 m L crown pillar footprint, or three sets of 20 m long parallel stopes with the central barrier pillar removed and mined along strike.

Figure 13-15: Fs,crown at increasing Total Thickness
| Project: 169525666 | 13-20 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-16: PF,crown at increasing Total Thickness
Surface elevation directly over the Whiskey Jack 65 Level is 288 m above sea level, and the total crown pillar thickness is 53 m, consisting of 22 m overburden and 31 m rock, given a 5 m vertical top cut at 65 Level. At this total thickness, Fs,crown is 5.22 and Pf,crown is virtually 0%. This classifies the crown pillar as Class G, with a very long-term to permanent service life, minimal post-closure stability concerns, and no anticipated monitoring requirements.
13.1.8Ground Support Standards
First-pass pattern (primary) support for Grey Fox consists of 1.5 m long #6 grouted rebar bolts, on a 1.5 m “dice” pattern, where the nearest distance of the patterned bolts to the “5-spot” bolt is 1 m. The bolts pin 3.3 m x 1.8 m welded wire mesh sheets to the ribs and back for “skin” support. The welded wire mesh sheets are 6-gauge, 10 cm aperture wire mesh sheets, overlapping 3 “squares.” Shotcrete and heavy support may be added, to be determined by encountered ground conditions. Long (secondary) support is added in the back at slashes and intersections (Table 13-4 and Table 13-5). Support classes are defined by the rock mass quality Q or equivalent Rock Mass Rating (RMR, = 9lnQ + 44).
Bolting typically does not extend below the survey reference line (approximately 1.5 m to 1.8 m above the floor) to protect mobile equipment from tire damage. Galvanized bolts and welded wire mesh are recommended for ramp and level development, and non-galvanized for development in ore.
| Project: 169525666 | 13-21 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Table 13-4: Ground Support Standards, Ramp and Level Development
Support | criteria: | criteria: | Bolting and Mesh | Shotcrete | Steel Sets |
RA | I - Very good rock | 4.3 m high x 4 m wide | 1.5 m long #6 grouted rebar on 1.5 m | None | None |
RB | II - Good rock | ||||
RC | III - Fair rock RMR: | 5 cm to 10 cm across the | |||
RD | IV - Poor rock | 10 cm to 15 cm across | 3.7 m PM24 inflatable | ||
RE | V - Very poor rock | 15 cm minimum across | Medium to heavy steel | ||
RF | VI - Intersections, | 4.3 m high x (4.0 m to 8.0 m) | 1.5 m long #6 grouted rebar on 1.5 m | Where required based on | Avoid placing slashes and |
| Project: 169525666 | 13-22 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Table 13-5: Ground Support Standards, Ore Development
Support | criteria: | criteria: | Bolting and Mesh | Long Support | Notes |
SA | I - Very good rock | 5.0 m high x 4.5 m wide | 1.5 m long #6 grouted rebar on 1.5 m | None | N/A |
SB | II - Good rock | ||||
SC | III - Fair rock RMR: | 3.7 m PM24 coated | |||
SD* | IV - Poor rock | Minimum length 6.1 m | Reduce stope size or select | ||
SE | V - Very poor rock | N/A | Stoping not possible, select | ||
At 75% reliability in design, 75% of mine development may be in Classes RC/SC or better (blocky to massive), based on a 25th RQD percentile of 88%, Jn = 6, Jr / Ja and Jw assumed 1.0, and SRF assumed 2.5 for competent, mainly massive rock under low stress and near the surface.
Support requirements are not anticipated for stope HW’s at the majority of Grey Fox. At depth greater than 375 m BGS, waste pillar support may be needed to maintain a 3 m horizontal waste pillar. This may consist of variable length cable bolts, connectable premium inflatable bolts, or connectable hollow bar injectable resin bolts, installed in a fan pattern from the drilling or mucking levels.
13.2 Hydrogeological Considerations
A hydrogeological model was prepared in 2021 by Wood. An updated model was prepared in 2025 by WSP. The memo describes modifications made to the previously developed (Wood, 2021) site groundwater flow model to accommodate the updated mine plan and presents results of new predictive simulations of potential groundwater inflows and impacts to the shallow groundwater flow system from mine dewatering. At the time the model was updated, an open pit was planned for the Grey Fox Project. For this technical report the open pit was eliminated as an option. The following section summarizes the hydrogeological model updates assuming the open pit was still in the plan, although it has been assumed the underground inflows will not be impacted by eliminating the open pit.
13.2.1Model Predicted Seepage Rates
The model predicted groundwater inflow rate to the open pit/underground mine workings (UMWs) for the Base Case model input parameters is 930 m3/d, which represents an increase of 260 m3/d relative to the 2022 model predictions. Model simulation results presented in 2021 indicated that the model predicted
| Project: 169525666 | 13-23 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
groundwater seepage rates were most sensitive to changes in the assumed properties of the glacial till unit (sensitivity variant 3, Wood, 2021) and also to the bedrock hydraulic conductivity (sensitivity variant 6, Wood, 2021). To provide upper estimates on the predicted groundwater seepage rate into the open pit/UMW’s for the current model, these sensitivity variants were also run for the current model build. Model predicted groundwater seepage rates for these runs are presented below in Table 13-6.
Table 13-6: Predicted Groundwater Seepage into Open Pit and Underground Mine Workings
Predicted Groundwater Seepage Rate (m3/d) | ||
Model Variant | 2022 Model Predicted Seepage rate into | 2025 Model Update Predicted Seepage |
Base Case | 670 | 930 |
Till k x3 | 735 | 1,000 |
Bedrock k x3 | 1,500 | 1,700 |
13.2.2Model Limitations
Limitations associated with the development and application of this numerical groundwater model for this Project site include:
| ● | Steady-state conditions: The groundwater was simulated assuming steady-state (i.e., long-term, constant) conditions, which represents the long-term dewatering rate after the initial drawdown period. It is expected that short-term dewatering rates during the initial drawdown period and seasonal inflows following the spring freshet will be greater than the long-term rate as storage is released from the surrounding overburden. |
| ● | Data Gaps: Several assumptions were made during model development due to the site-specific data availability: |
o | Equivalent Porous Media: This approach was implanted which is deemed sufficient for characterizing the overall groundwater flow regime at the scale of this analysis. Local faults may be indicated by a bedrock low that passes northwest through the proposed underground workings to the Pike River; however, as there is a considerable thickness of overburden sediments above the bedrock low even where it passes under the river, the prospect of significant groundwater and surface water interaction appears to be low. |
o | Pike River: The riverbed is assumed to be located within the glaciolacustrine deposits across most of the model domain, except at a few locations where bedrock outcrops have been noted from the available surficial geological mapping. Bedrock outcrops along the Pike River may act as “windows” which allow greater hydraulic connection between the bedrock and surficial water features. Presence/absence of bedrock outcrops along the Pike River, within the predicted Zone of Influence is recommended. |
o | Average annual conditions: The model simulates average annual conditions, and not seasonal conditions. Seasonal variations in stream flows, which may result in small tributaries being dry during late summer and late winter conditions, will not be captured by the model. |
| Project: 169525666 | 13-24 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13.2.3Conclusions
The calibrated 3D groundwater flow model developed for the Grey Fox 2022 model build was modified with the updated open pit mine plan and then used in predictive mode to provide new estimates of groundwater seepage inflow rate to the previously proposed open pit and underground mine workings as well as the Zone of Influence relating from mine dewatering and to estimate changes in groundwater-surface water interaction near the mine site. This open pit model was used as a conservative proxy for the drawdown of results for this underground only mining method across a similar footprint.
For the Base Case model input parameters the simulation results indicate the simulated groundwater inflow rate into the fully developed open pit and underground mine workings is 930 m3/d and the Zone of Influence is predicted to extend approximately 2,800 m from the center of the previously proposed open pit to the south and 1,300 m to the north, east and west of the mine site, which are limited by the presence of Pike River. Model sensitivity results indicate that the long-term groundwater seepage rates into the open pit and UMW’s may be 1,700 m3/d. The model results indicated that the Pike River and the three tributaries near the mine site experience an overall reduction in baseflow contribution, with the baseflow reduction to the Pike River constituting approximately 1.3% of the 7Q20 value for the Pike River.
For the Grey Fox Project, the assumed underground inflows are an average of 670 m3/d and a peak of 1500 m3/day per portal. It is recommended to update the model to reflect the current proposed Grey Fox Project mine plan, excluding the previously planned open pit and its influence on the model.
13.3Mine Design and Mining Methods
13.3.1Supporting Assumptions and Background Data
13.3.1.1 Design Codes, Regulations, and Standards
The health and safety of workers will be at the forefront of the mine design. The design will consider industry best practices and will comply with safety codes and regulations.
The following practices and codes will be followed:
| ● | Minimize risk to worker health and safety, including prevention through design concepts. |
| ● | Minimize the impact to the environment and local communities. |
| ● | Occupational Health and Safety Act, R.R.O. 1990, Regulation 854, Mines and Mining Plants. |
| ● | Minimize risk to production. Use proven industry technology, equipment, and processes suitable for worker skill sets. |
13.3.1.2 Units of Measure
The SI system will be used except where specifically indicated otherwise.
| Project: 169525666 | 13-25 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13.3.1.3 Rock Densities
The ore and waste rock densities are included in the resource model. For calculations where data is not directly taken from the model, average in-situ and blasted densities will be used and are presented in Table 13-7.
Table 13-7: Rock Densities
Zone | In-situ Density | Swell Factor (broken) | Broken Density |
Gibson | 2.76 t/m3 | 40% | 1.97 t/m3 |
All other Zones | 2.88 t/m3 | 40% | 2.06 t/m3 |
13.3.2Development
13.3.2.1 Overbreak and Design Allowance
Overbreak and design allowance factors will be applied to the neat quantities from the design solids. Overbreak accounts for the excavation area exceeding the planned dimensions. The design allowance accounts for development that will be required but will not be included in the details of the mine design (intersection slashes, safety bays, etc.). Table 13-8 lists design factors that will be applied to the neat quantities.
Table 13-8: Development Allowances
Item | Allowance |
Design Allowance | |
Ramp and lateral capital development | 10% |
Lateral operating development | 0% |
Raise development | 5% |
Overbreak Allowance | |
Ramp and lateral development in waste | 10% |
Lateral development in ore | 0% |
Raisebored raises | 0% |
Other raises | 10% |
13.3.2.2 Lateral Development
Lateral development includes ramp and level development. The development equipment will include:
| ● | Drill – 2 boom electric hydraulic jumbo |
| ● | Blast – mobile explosives loader |
| ● | Muck – 7-t class LHD |
| ● | Ground Support – mechanized bolter |
| Project: 169525666 | 13-26 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
| ● | Truck Haul – 20-t class underground haul truck |
The drift profiles will have a flat back with 1 m arch corners.
13.3.2.2.1Mine Access
The primary access to Grey Fox North will be excavated from the existing Gibson portal and ramp, which will be rehabilitated and expanded to 4.0 m W x 4.3 m H with the portal boxcut to suit, to be known as the Grey Fox North portal, hereafter. Two separate access ramps for Whiskey Jack and the remaining Grey Fox North (Gibson, Contact, and 147NE zones) will be developed from the existing Gibson Ramp. A separate portal will be developed for Grey Fox South with a single access ramp throughout.
The design criteria for the ramps are summarized in Table 13-9.
Table 13-9: Ramp Design Criteria
Item | Criteria |
Profile | 4.0 m W x 4.3 m H to accommodate: |
| Maximum 6 m/s ventilation velocity |
| a 1.1 m (42”) diameter or twin 0.91 m (36”) diameter, semi-rigid ventilation ducting during |
| development |
| 150 mm roadbed ballast |
| 20 t Haul Truck |
| Service water and dewatering pipes |
| Compressed air pipe |
| Electrical and communications cables |
Gradient | Maximum 17% |
Turning Radius | Minimum 20.0 m |
Remuck Bays | Distance between Remuck Bays: 150 m |
| Dimensions: 4.0 m W x 5.0 m H x 15.0 m L |
Truck Loadouts | Distance between Truck Loadouts: 150 m (with remucks) |
| Dimensions: Take Down Back in ramp 4.0 m W x 5.0 m H x 8.0 m L at the remuck area |
Safety Bays | 1.5 m W x 2.0 m H x 0.6 m L, spaced minimum 30 m apart |
13.3.2.2.2Typical Level Development
Levels will be named according to their depth from surface (surface assumed at 295 m elevation). In practice, level development will be at 1% to 2% gradient as required for water drainage but will be designed at 0% gradient for the PFS. Unless otherwise stated, drift size will be 4.0 m W x 4.3 m H with 1 m arch corners for capital development and 3.5 m W x 4.0 m H with 1m arch corners for operating development. Development excavations will target a 4:1 pillar to excavation ratio with a minimum of 3:1 where required. Capital development will be designed in waste rock outside of the mineralization where possible to avoid sterilizing potential future stoping. The criteria for typical level development are summarized in Table 13-10.
| Project: 169525666 | 13-27 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Table 13-10: Typical Level Development Drift Profiles and Criteria
Drift Description | Criteria |
Level Access | 4.0 m W × 4.3 m H |
Ventilation Access | 4.0 m W × 4.3 m H |
Remucks | 4.0 m W × 5.0 m H x 15 m L |
Stope Access | 4.0 m W × 4.3 m H |
Stope Sills | 3.0 m - 5.0 m W x 4.0 m H |
Backfill Access | 4.0 m W × 5.0 m H x 15/25 m L |
Electrical Cut-out | 5.0 m W × 4.3 m H x 10/20 m L |
Sump | 4.0 m W × 4.3 m H x 10 m L, max. Gradient -20% |
Explosive Storage | 7.0 m W x 4.3 m H x 20 m L |
Detonator Storage | 5.0 m W x 4.3 m H x 10 m L |
Underground Workshop | 6.5 m W x 4.3 m H x 44 m L |
Satellite Fuel Bay | 5.0 m W x 4.3 m H x 23 m L |
Wash Bay | 5.0 m W × 4.3 m H x 20 m L |
Permanent Refuge Station (12-person) | 4.0 m W × 4.3 m H x 18 m L |
Levels will be developed every 30 vertical metres in the Whiskey Jack Zone (except the first two levels are 25 m). Whiskey Jack Zone is relatively small and uniform throughout. Figure 13-17 presents the Whiskey Jack Zone typical level development.
| Project: 169525666 | 13-28 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-17: Typical Level Development Whiskey Jack Zone 115 Level
The remaining levels in Grey Fox North and Grey Fox South will be developed every 25 m. These zones are more spread out and will have more variance in development level-to-level.
Figure 13-18 presents the typical level development in the second block of Grey Fox North excluding Whiskey Jack Zone. Figure 13-19 presents the typical level development in the first block of Grey Fox South.
| Project: 169525666 | 13-29 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-18: Typical Level Development Grey Fox North Zone Block 2 165 Level
| Project: 169525666 | 13-30 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-19: Typical Level Development Grey Fox South Block 1 115 Level
13.3.2.2.3Lateral Development Quantities
All lateral development quantities are expressed in equivalent lateral metres to the dimensions as per below:
| ● | Existing Gibson Ramp Capital – Rehabilitation and Expansion to 4.0 m W x 4.3 m H |
| ● | Capital Development – 4.0 m W x 4.3 m H |
| ● | Whiskey Jack Operating Development – 4.0 m W x 4.0 m H |
| ● | Remaining Operating Development – 3.5 m W x 4.0 m H |
The lateral development quantities include cut-and-fill stope access but not cut-and-fill stoping. The lateral development quantities are present in Table 13-11.
Table 13-11: Lateral Development Quantities
Item | Grey Fox North | Grey Fox South | Total |
Capital – Existing Gibson Expansion and Rehabilitation | 156 | - | 156 |
Capital – Ramp and Ramp Remucks | 5,791 | 2,686 | 8,477 |
Capital – Level and Infrastructure Development | 8,668 | 4,485 | 13.153 |
Operating – Stope Access and Sill Development | 40,532 | 26,310 | 66,842 |
Total | 55,147 | 33,481 | 88,628 |
| Project: 169525666 | 13-31 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13.3.2.3 Vertical Development and Quantities
Vertical development assumptions are summarized in Table 13-12.
Table 13-12: Vertical Development
Raise Type | Raise Size | Dip | Excavation Method |
Ventilation Raise | 2.7 m - 3.5 m square | Vertical (to Surface) | Alimak |
Ventilation Raise | 2.7 m - 3.5 m square | minimum 60° | Drop Raise |
Dedicated Escapeway Raise | 1.2 m diameter | minimum 60° | Raisebore |
The vertical development quantities are present in Table 13-13.
Table 13-13: Vertical Development Quantities
Item | Grey Fox North (m) | Grey Fox South (m) | Total (m) |
Escapeway Raise - Raisebore | 604 | 249 | 853 |
Ventilation Raises - Alimak | 211 | 127 | 338 |
Ventilation Raises - Drop Raise | 1,115 | 482 | 1,597 |
Total | 1,930 | 858 | 2,788 |
13.3.3Primary Development and Intersection Ground Support
The primary ground support for lateral excavations is summarized in Table 13-14.
Table 13-14: Primary Ground Support
Excavation Surface | Bolt | Screen |
Back (<5m span) | 1.5 m long #6 rebar bolts | #6 Gauge Screen |
| 1.5 m x 1.5 m dice pattern | |
Back (5-7m span) | 1.8 - 2.4 m long #6 rebar bolts | #6 Gauge Screen |
| 1.2 m x 1.2 m dice pattern | |
Walls | 1.5 m long split sets | #6 Gauge Screen |
| 1.5 m x 1.5 m dice pattern | Down walls from back to within 2.1 m of |
The larger spans at intersections will require secondary ground support. The intersection ground support is summarized in Table 13-15.
| Project: 169525666 | 13-32 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Table 13-15: Intersection Ground Support
Rock Type | Support |
Good Ground (spans > 7 m) | Center 9 cables - 3.65 m long spin cable 1.5 m spacing |
13.3.4Production Stoping
For production mining, longitudinal longhole stoping and overhand cut-and-fill methods will be used.
Longhole stoping requires developing mining levels to access the stopes and facilitate drilling, blasting, and extraction of the material. Once extraction of material within a stope is completed, the stope will be filled with a combination of cemented rock fill or unconsolidated rock fill as required. Longhole is a non-entry mining method (I.e., during mining, personnel will be prohibited from entering the open portion of a stope). Material from within the stope will be mucked remotely using LHDs to reduce worker exposure to potential ground hazards.
The longhole stoping equipment will include:
| ● | Drill - Slot Drill Rig (with V30 Reamer) and Production Drill Rig |
| ● | Blast - Explosive Loader |
| ● | Muck - 10 t class LHD |
| ● | Fill - 10 or 7 t class LHD |
Cut-and-fill requires dividing targeted mineral resource into stacked development drifts. The bottom most drift will be extracted first followed by the next drift above once the previous lower drift is filled with cemented rock fill. The final cut will not require any filing. The cut-and-fill mining method follows the same principles as conventional lateral development otherwise. The cut-and-fill equipment will be the same equipment used for development. Table 13-16 presents the recovered ore tonnes by mining method. Most of the mineral resource will be extracted via the longitudinal longhole method.
Table 13-16: Ore Tonnes by Mining Method
Mining Method | Grey Fox North | Grey Fox South | Total | |
| ||||
| ||||
Longitudinal Longhole | 4,713651 | 3,009,295 | 7,722,946 | |
Cut and Fill | 55,165 | 62,819 | 117,984 | |
Development | 921,239 | 643,660 | 1,564,899 | |
Total | 5,690,055 | 3,715,774 | 9,405,829 | |
13.3.4.1 Mining Blocks
To achieve the planned production rate and allow flexibility in the schedule, production will be required concurrently from multiple fronts. To achieve this, and limit congestion, the mine will be split into mining blocks, and where possible the infrastructure will be grouped by mining block. The mining block divisions
| Project: 169525666 | 13-33 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
attempt to minimize the occurrence of mining under backfill, and the divisions are not strictly from one level to the next but change per ore lens based on the local geometry. Each mining block will use a bottom-up approach where possible.
The main vertical mining blocks are as follows and presented in Figure 13-20, Figure 13-21, and Figure 13-22 for the Whiskey Jack Zone, the remaining Grey Fox North, and Grey Fox South, respectively:
| ● | Whiskey Jack Zone Mining Block 1: 145 Level to 65 Level |
| ● | Whiskey Jack Zone Mining Block 2: 295 Level to 145 Level |
| ● | Grey Fox North Mining Block 1: 140 Level to 40 Level |
| ● | Grey Fox North Mining Block 2: 265 Level to 140 Level |
| ● | Grey Fox North Mining Block 3: 365 Level to 265 Level |
| ● | Grey Fox North Mining Block 4: 465 Level to 365 Level |
| ● | Grey Fox South Mining Block 1: 140 Level to 40 Level |
| ● | Grey Fox South Mining Block 2: 240 Level to 140 Level |
| ● | Grey Fox South Mining Block 3: 340 Level to 240 Level |

Figure 13-20: Whiskey Jack Zone Mining Blocks Looking South
| Project: 169525666 | 13-34 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-21: Remaining Grey Fox North Mining Blocks Looking North

Figure 13-22: Grey Fox South Mining Blocks Looking North
| Project: 169525666 | 13-35 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13.3.5Longhole and Cut-and-Fill Stoping Design
Longitudinal longhole stoping will be the primary recovery method. Some stopes will be mined with up-holes only when a drill overcut is not suitable or unavailable. Where suitable, shorter length sub-stopes are merged with adjacent stopes not exceeding 40 m. The longhole stope design criteria are summarized in Table 13-17.
Table 13-17: Longhole Stope Design Criteria
Description | Whiskey Jack | All Other | Range | |
| ||||
| ||||
Level Interval (floor to floor) | 30 m | 25 m | 25 to 30 m | |
Stope Length (along strike) | 20 m | 25 m | 10 to 40 m | |
Stope Width (HW to FW) | 5.0 m | 3.5 m | Minimum 3.0 m | |
Stope Footwall dip | 70o | 70o | Minimum 45o | |
Minimum Pillar Width from filled stopes (between | Minimum 3 m <300 m below surface, 6 m otherwise | | ||
Minimum Pillar Width from unfilled uphole stopes | Minimum 10 m <300 m below surface, 15 m | | ||
Overhand cut-and-fill will be used to supplement the longhole stopes with up to 5 m H cuts. The cut-and-fill stope design criteria are presented in Table 13-18.
Table 13-18: Cut-and-Fill Stope Design Criteria
Description | Base | Range |
Cut Width (HW to FW) | 3.0 m | 3.0 to 5.0 m |
Cut Height (floor to floor) | 5.0 m | 3.0 to 5.0 m |
Number of Cuts per Sequence | 2 | 1 to 3 |
13.3.5.1 Stope Sequencing
Stopes will be sequenced to minimize equipment interaction between stopes and maintain overall ground stability. Constraints will be placed on the sequence when two stopes share an access (e.g., the drill horizon for one stope and mucking horizon for the stope above) such that activities do not occur concurrently. In the cases of multiple lenses, there will be a preference to mine the footwall stope prior to the hanging wall stope for ground control purposes. Where possible, up-hole stopes will be sequenced last as these will not be backfilled.
The longitudinal (L) stopes will be sequenced using a bottom-up retreat approach back to an access. Stopes in a longitudinal sequence are dependent on the stopes adjacent and below. Stopes are accessed via a center access (Figure 13-23) or an access on one of the strike ends (Figure 13-24).
| Project: 169525666 | 13-36 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Cut-and-fill stopes will be mined overhand (bottom-up) where multiple cuts are mined in sequence via one attack ramp.

Figure 13-23: Typical Longitudinal Stope Sequence with Center Access (Long Section View)

Figure 13-24: Typical Longitudinal Stope Sequence with End Access (Long Section View)
| Project: 169525666 | 13-37 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13.4 Productivities
13.4.1Annual Working Days and Shift Schedule
The annual working days and shift schedule are listed in Table 13-19.
Table 13-19: Working Days and Shift Schedule
Item | Value |
Days per Year | 360 |
Project Period Shift Schedule | 2 × 12 hours |
Operating Period Shift Schedule | 2 × 10 hours |
13.4.2Effective Hours
The underground operations will consist of two 12-hour shifts per day, seven days per week for contractor personnel and two 10-hour shifts per day, seven days a week for the McEwen personnel. Time worked during these shifts is expected to fall into one of two categories: effective or non-effective.
Non-effective time may result from necessary parts of the job (e.g., travel to the workplace, equipment refueling, and shift safety meetings) during which workers are not actively conducting mining work.
The effective time calculation presented in Table 13-20 represents the available time underground that a worker will be able to complete tasks.
Table 13-20: Effective Time Calculations
Item | Zone | | | | | Unit |
| Priority | Whiskey | Remaining | Whiskey | Remaining | |
| Ramp | Jack | Grey Fox | Jack | Grey Fox | |
Personnel | Contractor | Contractor | Contractor | McEwen | McEwen | |
Shifts per Day | 2 | 2 | 2 | 2 | 2 | shift/day |
Work Week | 7 | 7 | 7 | 7 | 7 | days |
Planned Hours per Shift | 12 | 12 | 12 | 10 | 10 | hour/shift |
Planned Minutes per Shift | 720 | 720 | 720 | 600 | 600 | min/shift |
Rotation | 7 on / 7 off | 7 on / 7 off | 7 on / 7 off | 7 on / 7 off | 7 on / 7 off | day |
Non-Productive Activities | ||||||
Shift Line-up | 15.0 | 15.0 | 15.0 | 15.0 | 15.0 | min/shift |
Daily Safety Toolbox Huddle | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | min/shift |
Monthly Safety Meeting | 2.1 | 2.1 | 2.1 | 2.1 | 2.1 | min/shift |
| Project: 169525666 | 13-38 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Item | Zone | | | | | Unit |
Transportation to Work Area | 14.8 | 19.4 | 18.9 | 19.4 | 18.9 | min/shift |
Field Level Risk Assessment / | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | min/shift |
Equipment Servicing/Refuelling | 15.0 | 15.0 | 15.0 | 15.0 | 15.0 | min/shift |
Break 1 | 0.0 | 0.0 | 0.0 | 15.0 | 15.0 | min/shift |
Lunch | 0.0 | 30.0 | 30.0 | 30.0 | 30.0 | min/shift |
Break 2 | 0.0 | 0.0 | 0.0 | 15.0 | 15.0 | min/shift |
Supervisory/Survey/Engineering | 15.0 | 15.0 | 15.0 | 15.0 | 15.0 | min/shift |
Transportation from Work Area | 15.5 | 24.1 | 23.1 | 24.1 | 23.1 | min/shift |
Miscellaneous Delays | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | min/shift |
Blast Delays | 20.0 | 30.0 | 30.0 | 5.0 | 5.0 | min/shift |
Total Non-Productive Time per Shift | 117.4 | 170.6 | 169.1 | 175.6 | 174.1 | min/shift |
Total Effective time per shift | 10.04 | 9.16 | 9.18 | 7.07 | 7.10 | hours |
13.4.3Labor
The majority of the underground development and construction will be completed by McEwen personnel. Contractors will be mostly utilized for the initial year of development activities, underground infrastructure construction and maintenance and replaced by McEwen personnel where required. Contactors will also be used for ongoing Alimak raising and raise bored escapeways throughout the LOM.
The underground labor will peak at 327 personnel on-site payroll. The total underground related labor (peak) by year is presented in Table 13-21.
| Project: 169525666 | 13-39 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Table 13-21: Total On-site Labor
Labor Type | 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 | 2035 | 2036 | 2037 | 2038 | 2039 | 2040 | 2041 |
Contractor | | | | | | | | | | | | | | | |
Integrated Project | 16 | 17 | 17 | 1 | | | | | | | | | | | |
Mine | | 1 | 1 | 1 | 1 | 1 | | | | | | | | | |
Mine Operations | 26 | 50 | | | | | | | | | | | | | |
Mine | 20 | 30 | | | | | | | | | | | | | |
McEwen | | | | | | | | | | | | | | | |
Integrated Project | 25 | 29 | 29 | 2 | | | | | | | | | | | |
Mine | | 5 | 5 | 29 | 31 | 33 | 38 | 38 | 40 | 39 | 39 | 38 | 35 | 26 | 15 |
Mine Operations | 4 | 27 | 85 | 97 | 109 | 113 | 147 | 177 | 209 | 205 | 209 | 215 | 207 | 185 | 37 |
Mine | 2 | 28 | 40 | 50 | 52 | 52 | 60 | 70 | 78 | 78 | 74 | 74 | 73 | 64 | 20 |
Total On-Site | 93 | 187 | 177 | 180 | 193 | 199 | 245 | 285 | 327 | 322 | 322 | 327 | 315 | 275 | 72 |
Note: Numbers may not sum due to rounding.
| Project: 169525666 | 13-40 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13.4.4Lateral Development
The lateral development advance rates were divided into the components of the drill-blast-muck-bolt cycle and estimated from first principles. Advance rates were developed for single and multiple heading scenarios. The rates reflect the advance each drill jumbo crew and its associated gear will achieve over extended periods of operation. The rates reflect long-term averages and include an efficiency allowance. The efficiency allowance accounts for interferences from other activities and conflicting priorities that occur during the operating period.
The priority ramp development rate is estimated with all breaks or interruptions to affect secondary headings and blast at will practices shall be employed before production begins. It is only used while establishing the main ramp and initial levels of the Whiskey Jack Zone with contractors in the first year of development.
The Gibson Ramp rehabilitation will be handled within the first year of development with only contractors on site. Different ore development rates were estimated for the Whiskey Jack Zone as there is generally wider development. The estimated development productivities used in the schedule are summarized in Table13-22.
Table 13-22: Lateral Development Productivity
Item | | | | | Unit |
Personnel | Contractor | Contractor | McEwen | McEwen | |
Development Type | Single Heading | Multi-Heading | Single Heading | Multi-Heading | |
Priority Ramp Development | 6.8 | 9.1 | N/A | N/A | m/d |
Gibson Ramp Rehabilitation | 8.2 | 13.5 | N/A | N/A | m/d |
Ramp Development | 5.5 | 9.1 | 4.2 | 7.0 | m/d |
Lateral Waste Development | 5.4 | 8.9 | 4.2 | 6.9 | m/d |
Ore Development Whiskey Jack | 5.7 | 9.4 | 4.4 | 7.3 | m/d |
Ore Development | 6.1 | 10.1 | 4.7 | 7.8 | m/d |
The time for each element of the development cycle (4.0 m average round length) for a 4.0 m W × 4.3 m H ramp heading is presented in Table 13-23.
Table 13-23: Development Cycle for the Ramp (4.0 m W × 4.3 m H)
Item | Value | Unit |
Drill | 2.9 | hours |
Load/Blast | 1.2 | hours |
Muck | 2.1 | hours |
Ground Support | 3.4 | hours |
Services Install (Critical Path) | 0.2 | hours |
Total Cycle Time | 9.8 | hours |
| Project: 169525666 | 13-41 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13.4.1Vertical Development
The vertical development advance rate using the drop raise method includes setup and teardown, pilot and reaming of a V30 762mm (30”), and drilling and blasting of the raise. All drop raise activities will be completed by McEwen personnel. Table 13-24 presents drop raise productivities.
Table 13-24: Drop Raise Development Productivity
Drop Raise Dimensions | Rate | Unit |
3.1 m x 3.1 m | 1.8 | m/d |
2.7 m x 2.7 m | 2.2 | m/d |
The vertical development advance rate using the raise boring method includes setup and teardown, pilot hole drilling, and reaming of the raise. The only planned raisebore development is for the dedicated escapeways. All raisebore activities will be completed by a contractor. Table 13-25 presents the raise bore productivity.
Table 13-25: Raise Bore Development Productivity
Raise Bore Dimensions | Rate | Unit |
1.1 m (42”) Diameter | 6.3 | m/d |
The vertical development advance rate using the Alimak method includes drilling, blasting, mucking, bolting, and installation of rails. Set-up and teardown are a single lag of 10 days in schedule. The 3.5 m x 3.5 m raises will require two passes. All Alimak raise activities will be completed by a contractor.
The raise development rates are summarized in Table 13-26.
Table 13-26: Alimak Raise Development Productivity
Alimak Raise Dimensions | Rate | Unit |
2.7 m x 2.7 m | 3.6 | m/d |
3.1 m x 3.1 m | 3.2 | m/d |
3.5 m x 3.5 m | 1.9 | m/d |
13.4.2Stope Productivity
Stope production rates were divided into the components of the drill-blast-muck and backfill cycle and estimated from first principles. Stope cycles were estimated for the average longitudinal stope sizes. The cycle includes slot raise drilling, production drilling, blasting, mucking, and backfill. Slot raise drilling will be performed by a drill rig equipped with a V30 762 mm (30”) reamer bit and includes a pilot hole and reaming. Production drilling utilizes 89 mm (3.5 in) holes. All stoping activities are to be completed by McEwen personnel. The stope productivities are summarized in Table 13-27.
| Project: 169525666 | 13-42 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Table 13-27: Longhole Stope Productivities
Item | Whiskey Jack | All Other Zones | Unit |
Slot Raise | 3.5 | 4.0 | m/d |
Production Drilling | 129 | 148 | m/d |
Blasting | 2 | 2 | days |
Mucking (including loading trucks) | 493 | 463 | t/d |
Backfilling | 571 | 432 | t/d |
Average Stope Size | 8,100 | 5,300 | t |
Average Total Tonnes per Day | 167 | 141 | t/d |
Average Total Tonnes per Day Excluding | 210 | 189 | t/d |
The stope average cycle times are summarized in Table 13-28.
Table 13-28: Longhole Stope Average Cycle Times
Item | Whiskey Jack | All Other Zones | Unit |
Slot Raise | 8 | 6 | days |
Production Drilling | 12 | 9 | days |
Blasting | 2 | 2 | days |
Mucking (including loading trucks) | 17 | 12 | days |
Backfilling | 10 | 10 | days |
Average Stope Size | 8,100 | 5,300 | t |
Average Cycle Time | 49 | 38 | days |
Average Cycle Time Excluding Backfill | 39 | 28 | days |
13.5 Mine Production Schedule
13.5.1Underground Development Scheduling
All mine development and production scheduling has been prepared using Deswik scheduling software. The schedule is interactively linked to the 3D mine model. All development and production scheduled is based on dependencies linked within the mine model. All data are contained within the mine model and schedule.
The primary development focus will be the ramp to Whiskey Jack Zone and establish the ventilation system. Whiskey Jack is the first focus for production as it is of the highest-grade resource and requires less development per ore tonne. On each level, priority will be to establish the sump, electrical cut-out, and ventilation access followed by the rest of the infrastructure while ore development will be planned as late as possible without delaying stoping activities. The total lateral development is separated into Capital and Operating and summarized annually in Table 13-29, and Figure 13-25 presents a graph of this data
| Project: 169525666 | 13-43 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Table 13-29: Summary of Annual Lateral Development Metres Profile
Development Type | 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 | 2035 | 2036 | 2037 | 2038 | 2039 | 2040 | 2041 |
Operating Lateral | 14 | 2,095 | 3,725 | 5,124 | 3,943 | 4,871 | 4,813 | 8,938 | 10,383 | 4,048 | 6,452 | 5,629 | 6,075 | 730 | - |
Capital Lateral | 1,417 | 3,756 | 1,294 | 94 | 1,387 | 441 | 2,954 | 1,843 | 172 | 3,245 | 1,501 | 2,380 | 1,178 | 125 | - |
Total Lateral | 1,431 | 5,851 | 5,020 | 5,218 | 5,330 | 5,313 | 7,767 | 10,781 | 10,555 | 7,293 | 7,953 | 8,009 | 7,253 | 855 | - |

Figure 13-25: Annual Lateral Development Metres Profile
| Project: 169525666 | 13-44 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13.5.2Underground Production Scheduling
The focus at Grey Fox will be to extract the higher-grade Whiskey Jack Zone first. Mining will then ramp-up to 1,500 t/d with the rest of Grey Fox North and then to 2,700 t/d with the addition of Grey Fox South in 2035. The process plant is located on McEwen’s Stock Property. The overall production profile and tonnage targets aforementioned are expected to be complimentary with production from other assets, notably the Stock mine, in maximizing the throughput of the Stock Mill. This is part of a “hub and spoke” asset strategy for the McEwen Assets along Highway 101.
13.5.1Production Profile
Table 13-30 and Figure 13-26 present the LOM production tonnes and profile.
| Project: 169525666 | 13-45 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Table 13-30:Summary of Production Profile by Mining Method
Ore Type | 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 | 2035 | 2036 | 2037 | 2038 | 2039 | 2040 | 2041 |
Stoping Ore | - | 63,378 | 230,630 | 375,495 | 385,333 | 399,603 | 407,400 | 297,073 | 652,813 | 761,885 | 674,422 | 731,355 | 773,894 | 731,689 | 327,171 |
Tonnes | |||||||||||||||
Development | - | 65,079 | 85,918 | 111,472 | 90,869 | 122,508 | 104,410 | 196,130 | 238,568 | 82,550 | 178,309 | 135,939 | 135,207 | 17,941 | - |
Ore Tonnes | |||||||||||||||
Cut and Fill | - | 8,083 | 10,082 | 3,995 | 2,048 | 8,444 | 5,058 | 3,552 | 19,758 | 28,920 | 9,765 | 1,137 | 15,101 | 2,041 | - |
Ore Tonnes | |||||||||||||||
Marginal | | | | | | | | | | | | | | | |
Stoping Ore | - | - | 27,534 | 38,266 | 83,375 | 27,826 | 43,532 | 52,901 | 72,357 | 108,139 | 121,820 | 119,798 | 50,124 | 95,471 | 69,661 |
Tonnes | | | | | | | | | | | | | | | |
Total Ore | - | 136,540 | 354,164 | 529,227 | 561,625 | 558,380 | 560,400 | 549,657 | 983,496 | 981,494 | 984,316 | 988,229 | 974,325 | 847,143 | 396,832 |
Tonnes | |||||||||||||||
Average t/d | - | 374 | 970 | 1,450 | 1,539 | 1,530 | 1,535 | 1,506 | 2,695 | 2,689 | 2,697 | 2,707 | 2,669 | 2,321 | 1,087 |

Figure 13-26:Production Profile by Mining Method
| Project: 169525666 | 13-46 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13.6 | Blasting |
13.6.1Development
Development rounds will be loaded using a mechanical explosives loader. ANFO products will be used for all primary development blasting. Specialty blasting such as lifters will be performed with package emulsion products as required.
13.6.2Stoping
ANFO and packaged emulsion products will be used for all longitudinal stope blasting. Non-electronic detonators will be used to control blast timing.
Cut-and-fill stoping will be loaded using a mechanical explosives loader. ANFO products will be used for all cut-and-fill blasting.
13.7 | Mobile Equipment Selection |
Grey Fox will be developed using a high degree of automated equipment. The main production equipment will be capable of remote operation. Mobile equipment was selected that will be appropriate for the mining methods and to support the production rate.
Equipment fleet costs and performance are supported by information from the original equipment manufacturers (OEMs) and only commercially available products were considered. The mine development contractor will use and maintain equipment provided by McEwen and will return the equipment to McEwen in proper working condition. The Alimak and raise boring raising equipment is excluded from the equipment lists as they will be provided by contractors.
Key elements considered in the ultimate equipment selection included:
· | Mine design |
· | Mining methods |
· | Productivities |
· | Fleet standardization of key components |
· | Maintainability |
· | Economics |
The diesel equipment fleet includes the main development and production gear as well as auxiliary gear to support operations.
The makes and models in the following equipment lists were used for pricing estimates at this time, similar equipment could be used.
Table 13-31 presents the complete equipment list including type, function, make, model, and total peak units for Grey Fox North.
| Project: 169525666 | 13-47 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Table 13-31:Grey Fox North Underground Mobile Equipment List
| | |
Equipment Type | Primary Function | Units |
10 t LHD | Transferring muck from draw point to remuck or remuck to truck. | 5 |
7 t LHD | Transferring muck from development headings or raise undercuts to remuck or remuck to truck or to open stopes. | 2 |
20 t Truck | Transport material to surface or remuck | 6 |
2-Boom Jumbo | Development drilling and face ground support installation | 2 |
Mechanized Bolter | Ground support installation | 3 |
Explosive Loader | Development and production explosive loading | 1 |
Scissor Lift | Construction support | 2 |
Production Drill Rig | Production drilling, miscellaneous boreholes | 2 |
Slot Drill Rig | Stope Slot Production Drilling, Drop Raises, miscellaneous boreholes | 2 |
Forklift/Tractor | Material Handling | 3 |
Boom Truck | Material Handling and Transport | 2 |
Motor Grader | Ramp maintenance | 1 |
Small Personnel Carrier | Crew / personnel transportation | 3 |
Small Carrier (Mech/Elec) | Maintenance personnel access to equipment outside of the shop | 2 |
Fuel and Lubrication Truck | Provide fuel and lubricants to production equipment | 1 |
Table 13-32 presents the complete equipment list including type, function, make, model, and total peak units for Grey Fox South.
Table 13-32:Grey Fox South Underground Mobile Equipment List
Equipment Type | Primary Function | Units |
10 t LHD | Transferring muck from draw point to remuck or remuck to truck. | 5 |
7 t LHD | Transferring muck from development headings or raise undercuts to remuck or remuck to truck or to open stopes. | 2 |
20 t Truck | Transport material to surface or remuck | 6 |
2-Boom Jumbo | Development drilling and face ground support installation | 2 |
Mechanized Bolter | Ground support installation | 3 |
Explosive Loader | Development and Production explosive loading | 1 |
Scissor Lift | Construction support | 2 |
Production Drill Rig | Production drilling, miscellaneous boreholes | 3 |
Slot Drill Rig | Stope Slot Production Drilling, Drop Raises, miscellaneous boreholes | 2 |
Forklift/Tractor | Material Handling | 3 |
Boom Truck | Material Handling and Transport | 2 |
| Project: 169525666 | 13-48 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Equipment Type | Primary Function | Units |
Motor Grader | Ramp maintenance | 1 |
Small Personnel Carrier | Crew / personnel transportation | 3 |
Small Carrier (Mech/Elec) | Maintenance personnel access to equipment outside of the shop | 2 |
Fuel and Lubrication Truck | Provide fuel and lubricants to production equipment | 1 |
For Grey Fox North, beginning in August 2027, a single crew will advance the main ramp down to Whiskey Jack and establish the fresh air ventilation. Once flow through ventilation is established in January 2028, a second development crew will be introduced. This second crew will remain until January 2036, and the remainder of mine life will require only one crew to support mining operations.
For Grey Fox South, beginning April 2033, a single crew will advance the main ramp to establish the flow through ventilation. Once established in October 2033, a second development crew will be introduced. This second crew will remain until January 2040, and the remainder of mine life will require only one crew to support mining operations.
Each development crew will have a two-boom drill jumbo for face drilling and installing ground support, access to a shared ANFO loader for development headings, a 7-t LHD to muck the face and load trucks, and a scissor lift for installing services. The development crew will be supported by the haulage truck fleet.
Vertical development will be a combination of drop raises, Alimak raises and raise boring. Drop raising will be completed using the slot drill unit as required. Alimak and escapeway raise boring will be completed by contractors providing the equipment as required.
Production will be largely completed by longitudinal longhole mining. Longhole ITH and top hammer drills will be used to drill the blastholes, the blastholes will be loaded using a shared explosive loader, and an LHD will muck the stope to the nearest remuck or to a waiting truck.
The fleet for each of Grey Fox North and Grey Fox South includes three mechanical bolters for cable bolt drilling and other secondary ground support installation when required.
For loading and transport, Grey Fox North and Grey Fox South, each include up to six haulage trucks with one unit being shared during peak production years for a total of 11 units. These will be accompanied by up to five 10-t LHDs for stoping, for Grey Fox North and Grey Fox South, with one unit being shared between them for a total of nine units.
There will be a peak of 37 and 38 pieces of equipment operating in Grey Fox North and Grey Fox South, respectively. This results in an overall peak of 68 total pieces of equipment operating on site, as some units are shared or permanently transferred between the two ramp networks.
The number of jumbos used for the overall peak (3) is different then the jumbo peak (4), as the overall peak does not coincide jumbo peak. There are six shared or transferred units which are one LHD, one truck, one mechanical bolter, one grader, one fuel truck, and one slot drill rig.
The mobile equipment fleet operating each year is summarized in Table 13-33.
| Project: 169525666 | 13-49 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Table 13-33:Total Operating Equipment by Year for Grey Fox Site
Equipment Type | 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 | 2035 | 2036 | 2037 | 2038 | 2039 | 2040 | 2041 |
10-t LHD | 0 | 1 | 3 | 5 | 5 | 5 | 5 | 5 | 9 | 9 | 9 | 9 | 9 | 9 | 2 |
7-t LHD | 1 | 2 | 2 | 2 | 2 | 2 | 3 | 4 | 4 | 4 | 4 | 4 | 4 | 3 | 1 |
20-t Truck | 1 | 3 | 3 | 4 | 4 | 5 | 7 | 8 | 9 | 10 | 11 | 11 | 11 | 11 | 4 |
2-Boom Jumbo | 1 | 2 | 2 | 2 | 2 | 2 | 3 | 4 | 4 | 3 | 3 | 3 | 3 | 2 | 0 |
Mechanized Bolter | 2 | 3 | 3 | 3 | 3 | 3 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 4 | 0 |
Explosive Loader | 1 | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 |
Scissor Lift | 1 | 2 | 2 | 2 | 2 | 2 | 3 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 1 |
Production Drill Rig | 0 | 1 | 2 | 2 | 2 | 2 | 2 | 3 | 4 | 4 | 5 | 5 | 5 | 5 | 2 |
Slot Drill Rig | 0 | 1 | 1 | 1 | 2 | 2 | 2 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 2 |
Forklift/Tractor | 1 | 3 | 3 | 3 | 3 | 3 | 4 | 6 | 6 | 6 | 6 | 6 | 6 | 5 | 2 |
Boom Truck | 0 | 2 | 2 | 2 | 2 | 2 | 2 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 1 |
Motor Grader | 0 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
Small Personnel Carrier | 1 | 3 | 3 | 3 | 3 | 3 | 4 | 6 | 6 | 6 | 6 | 6 | 6 | 6 | 3 |
Small Carrier (Mech/Elec) | 0 | 2 | 2 | 2 | 2 | 2 | 2 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 1 |
Fuel and Lubrication | 0 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
Total | 9 | 28 | 31 | 34 | 35 | 36 | 46 | 60 | 66 | 66 | 68 | 68 | 68 | 64 | 23 |
| Project: 169525666 | 13-50 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Equipment operating hours have been estimated from first principles. The requirement for equipment specific to development or production will fluctuate with changes to annual throughput, while some equipment will operate at a certain rate regardless of the tonnage or metres being developed.
A mobile equipment rebuilds and replacements schedule was developed based on the operating hours required and the available equipment. These rebuilds and replacements are determined by the life of the engine on the units. The total number of rebuild and replacement quantities are presented in Table 13-34.
Table 13-34:Total Number of Rebuilds and Replacements by Equipment Type
| | |
Equipment Type | Rebuilds | Replacements |
10 t LHD | 14 | 7 |
7 t LHD | 6 | 5 |
20 t Truck | 12 | 5 |
2-Boom Jumbo | 0 | 0 |
Mechanized Bolter | 0 | 0 |
Explosive Loader | 1 | 1 |
Scissor Lift | 3 | 2 |
Production Drill Rig | 0 | 0 |
Slot Drill Rig | 0 | 0 |
Forklift/Tractor | 6 | 3 |
Boom Truck | 4 | 2 |
Motor Grader | 1 | 1 |
Small Personnel Carrier | 3 | 0 |
Small Carrier (Mech/Elec) | 2 | 0 |
Fuel and Lubrication Truck | 1 | 0 |
Total | 53 | 26 |
13.8 | Ventilation |
The underground mine ventilation system is designed to be a “push-pull” system, with fans at the top of the fresh air raise and at the portals pushing fresh air into the mine and fans at the top of the return air raise pulling exhaust and contaminated air out of the mine. Heaters will be operated as required on surface at the fresh air raise in conjunction with the fresh air fans to prevent freezing in winter.
The intake ventilation fans will have a maximum design capacity of 50 m3/s each with parallel fans providing up to 250m3/s of intake air at the intake raise and portal, and the exhaust fans will provide 250 m3/s at each exhaust fan station to support development and production activities for the LOM. This ventilation capacity is based on the requirement to provide airflow for diesel particulate matter dilution, dust control, and to maintain adequate airflow through all active areas.
| Project: 169525666 | 13-51 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13.8.1Airflow Requirements
To determine the ventilation requirements for the operating equipment at Grey Fox North and Grey Fox South, full production activities were considered with Whiskey Jack and Gibson/Contact/147NE evaluated separately due to a difference in the mobile fleet requirements and therefore the ventilation requirement in those zones.
A utilization factor was applied to estimate the operating engine power for each type of equipment, and to estimate the ventilation required (0.063 m3/s of ventilation air was provided for each kW of engine power operating). The full production ventilation required for Whiskey Jack, Grey Fox North, and Grey Fox South are provided in Table 13-35, Table 13-36, and Table 13-37, respectively. This is calculated to be 131 m3/s for Whiskey Jack, and ~237 m3/s for each of the Grey Fox North and Grey Fox South. With identical ventilation infrastructure assumed, due to the similar ventilation requirements.
Table 13-35:Whiskey Jack Full Production Ventilation Required
Equipment Type | Units | Utilization | Engine | Vent |
10 t LHD | 2 | 80% | 202 | 20 |
7 t LHD | 2 | 80% | 117 | 12 |
20 t Truck | 2 | 80% | 242 | 24 |
2-Boom Jumbo | 2 | 15% | 120 | 2 |
Mechanized Bolter | 3 | 15% | 119 | 3 |
Explosive Loader | 1 | 40% | 99 | 2 |
Scissor Lift | 2 | 40% | 110 | 6 |
Production Drill Rig | 2 | 15% | 80 | 2 |
Slot Drill Rig | 1 | 15% | 100 | 1 |
Forklift/Tractor | 3 | 40% | 74 | 6 |
Boom Truck | 2 | 40% | 110 | 6 |
Motor Grader | 1 | 40% | 97 | 2 |
Fuel and Lubrication Truck | 1 | 80% | 110 | 6 |
Small Personnel Carrier | 3 | 40% | 74 | 6 |
Small Carrier (Mech/Elec) | 2 | 40% | 74 | 4 |
Sub-Total Equipment | | | | 101 |
Leakage / Contingency | | 30% | | 30 |
Total Vent Requirements | 29 | | | 131 |
| Project: 169525666 | 13-52 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Table 13-36:Grey Fox North Full Production Ventilation Required
Equipment Type | Units | Utilization | Engine | Vent |
10 t LHD | 5 | 80% | 202 | 51 |
7 t LHD | 2 | 80% | 117 | 12 |
20 t Truck | 6 | 80% | 242 | 73 |
2-Boom Jumbo | 2 | 15% | 120 | 2 |
Mechanized Bolter | 3 | 15% | 119 | 3 |
Explosive Loader | 1 | 40% | 99 | 2 |
Scissor Lift | 2 | 40% | 110 | 6 |
Production Drill Rig | 2 | 15% | 80 | 2 |
Slot Drill Rig | 2 | 15% | 100 | 2 |
Forklift/Tractor | 3 | 40% | 74 | 6 |
Boom Truck | 2 | 40% | 110 | 6 |
Motor Grader | 1 | 40% | 97 | 2 |
Fuel and Lubrication Truck | 1 | 80% | 110 | 6 |
Small Personnel Carrier | 3 | 40% | 74 | 6 |
Small Carrier (Mech/Elec) | 2 | 40% | 74 | 4 |
Sub-Total Equipment Ventilation | | | | 181 |
Leakage / Contingency | | 30% | | 54 |
Total Vent Requirements | 37 | | | 236 |
Table 13-37:Grey Fox South Full Production Ventilation Required
Equipment Type | Units | Utilization | Engine | Vent |
10 t LHD | 5 | 80% | 202 | 51 |
7 t LHD | 2 | 80% | 117 | 12 |
20 t Truck | 6 | 80% | 242 | 73 |
2-Boom Jumbo | 2 | 15% | 120 | 2 |
Mechanized Bolter | 3 | 15% | 119 | 3 |
Explosive Loader | 1 | 40% | 99 | 2 |
Scissor Lift | 2 | 40% | 110 | 6 |
Production Drill Rig | 3 | 15% | 80 | 3 |
Slot Drill Rig | 2 | 15% | 100 | 2 |
Forklift/Tractor | 3 | 40% | 74 | 6 |
| Project: 169525666 | 13-53 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Equipment Type | Units | Utilization | Engine | Vent |
Boom Truck | 2 | 40% | 110 | 6 |
Motor Grader | 1 | 40% | 97 | 2 |
Fuel and Lubrication Truck | 1 | 80% | 110 | 6 |
Small Personnel Carrier | 3 | 40% | 74 | 6 |
Small Carrier (Mech/Elec) | 2 | 40% | 74 | 4 |
Sub-Total Equipment Ventilation | | | | 182 |
Leakage / Contingency | | 30% | | 55 |
Total Vent Requirements | 38 | | | 237 |
13.8.2Overall Ventilation
13.8.2.1Stage 1: Initial Development
The initial development for Whiskey Jack (Grey Fox North) and Grey Fox South from the respective portals will be supported with twin semi-rigid 0.9 m (36 ft) oval ducting from surface, until the first raise is established. Two development fans in series will be installed in each duct to support approximately 700 m of development (with the second series fan required at the midway mark). Each fan is rated at 112 kW (150 HP) and will provide 47 m3/s at the length to the first fresh air raise. To prevent freezing in the winter months, a rental 11 MMBTU/h heater will be installed at the portal, with the twin fans/ducts installed downstream of the heater. This heater will be maintained through the LOM. A schematic outlining the ventilation system for the initial ramp development at Whiskey Jack is presented in Figure 13-27.

Figure 13-27:Ventilation Schematic Initial Ramp Development
Once the first fresh air ventilation raise is established at Whiskey Jack, the existing 20 MMBTU/hr heater from Froome will be relocated to the top of the raise along with 2 x 112 kW (150 HP) intake fans pushing a
| Project: 169525666 | 13-54 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
maximum of 100 m3/s to support production and development activities. This will allow for flow through ventilation to be established, with fresh air through the raises and return air through the ramp. A schematic of this stage is provided in Figure 13-28.

Figure 13-28:Whiskey Jack Initial Flowthrough Ventilation Established
Production development fans will be installed in the fresh air bulkheads, with the duct running to the headings providing ventilation air to support the production activities.
13.8.2.1Stage 2: Transition from Whiskey Jack to Gibson
The full production ventilation system for Whiskey Jack features a second raise, for exhaust, to maintain velocity limits in the ramp and to aid in smoke clearance after blasting. The exhaust fan installed on surface on top of the exhaust raise will be a single 373 kW (500 HP) fan. Once the exhaust fan is commissioned, a second heater identical to the one installed in Stage 1 will be installed in parallel at the surface intake raise collar, with an additional two 112 kW fans.
Similar to the previous stage, bulkheads will be installed on each production level and production fans will be installed in the bulkheads to support the production activities. A schematic of the ventilation system is provided in Figure 13-29.
| Project: 169525666 | 13-55 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-29:Whiskey Jack Full Production Ventilation System
This stage also indicates the exhaust raise at Gibson is established to provide flow through ventilation, with the development to the raise supported by the flowthrough ventilation in the ramp. For the exhaust raise, fans identical to the Whiskey Jack exhaust fan will be installed at Gibson, with the fan from Whiskey Jack being relocated to Gibson as production in Whiskey Jack is complete.
13.8.2.2Stage 3: Life of Mine
Once production in Whiskey Jack is complete, the ramp to Whiskey Jack will be dedicated to transfer the fresh air to Gibson. The exhaust fan at Whiskey Jack, as previously noted will be moved at the Gibson exhaust raise, and Gibson will operate with 3 x 373 kW (500 HP) fans at its peak. A 10 MMBTU heater with a 112 kW (150 HP) intake fan will be installed at the ramp to provide additional intake ventilation with the heater air ducted to the portal entrance. Bulkheads and regulators will be used to push air to the bottom of Gibson. Production fans will be ducted from the closest flowthrough location on the level.
A similar ventilation system is planned for Grey Fox South, with two raises: one for fresh air and the other for exhaust air with initial development until the first raise is established and supported by the portal development fans/heaters. A schematic of the ventilation system for Gibson and Grey Fox South is outlined in Figure 13-30.
| Project: 169525666 | 13-56 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-30:Grey Fox North and Grey Fox South at Full Production Ventilation System
13.8.3Ventilation Infrastructure
13.8.3.1 Main Fans
The main fan motor power requirements were estimated from the ventilation model and system capabilities that are summarized in Table 13-38. These are to be verified by the vendor. The exhaust fans are to be equipped with variable frequency drives (VFDs) and will be installed as a single fan for Whiskey Jack and in a trifurcated arrangement at Gibson/Grey Fox South. The intake fans will be installed in parallel, downstream of the heaters, with ducting to the raise house which will allow for access to the secondary escapeway. All main fans are to be a four-fan arrangement and equipped with dampers to prevent re-circulation in the event of one or more fans not being in operation.
Table 13-38:Main Fan Ventilation Requirements
Location | Installation | Type | No. Fans | Airflow per | Collar Total | Estimated |
Whiskey Jack | Surface | Intake | 4 (at raise) | 50 | 1,050 | 112 |
Whiskey Jack | Surface | Intake | 1 (at portal) | 50 | 1,050 | 112 |
| Project: 169525666 | 13-57 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Location | Installation | Type | No. Fans | Airflow per | Collar Total | Estimated |
Whiskey Jack | Surface | Exhaust | 1 | 130 | 685 | 373 |
Gibson | Surface | Exhaust | 3* | 92 | 2,600 | 373 |
Grey Fox South | Surface | Intake | 4 (at raise) | 50 | 1,050 | 112 |
Grey Fox South | Surface | Intake | 1 (at portal) | 50 | 1,050 | 112 |
Grey Fox South | Surface | Exhaust | 3 | 92 | 2,600 | 373 |
Note: * The second of three fans will be relocated from Whiskey Jack.
13.8.3.1Auxiliary Ventilation
The auxiliary fan systems were sized to provide sufficient airflow taking into consideration mobile equipment use and minimum velocity thresholds. Table 13-39 outlines the fans’ requirements for the development and production auxiliary ventilation based on the development and production activities in the mining schedule.
Table 13-39:Auxiliary Fan Ventilation Requirements
Description | Quantity | Airflow per | Fan Total | Estimated | Fan Size |
Development Fans | 8 | 25 | 2,500 | 112 | 1.07 (42”) |
Production Fans (Short Levels) | 10 | 19 | 1,900 | 75 | 0.91 (36”) |
Production Fans (Long Levels) | 20 | 19 | 2,900 | 112 | 0.91 (36”) |
Short development or production headings less than 300 m long will use flexible ducting (or layflat), while longer development or production headings will use semi-rigid PVC ducting.
13.8.3.2Ventilation Controls
Ventilation controls will be used to control the flow throughout the mine, to optimize the ventilation system performance, and reduce health and safety risks from recirculation and air short circuiting. These controls will primarily include bulkheads (including bulkheads with doors) and drop-board regulators.
Bulkheads will be used to isolate areas of the mine to prevent short-circuiting, and several types of bulkheads are planned to be utilized. Installations such as plain bulkhead with fan inserts, drop-board regulator bulkheads, and a mobile access/personnel door will be used.
For the ventilation emergency alert system, ethyl mercaptan is planned to be used as a stench gas; this will be used together with R134a as a propellant to form a gas and then introduced into the ventilation stream. The system will be located at the portal intakes and other strategic locations to ensure timely warning to all personnel in remote working areas. It will have redundancy injection and a cylinder package complete with enclosures, and the system will be sized to a capacity suitable for the air flow intake and required concentrations through the mine workings.
| Project: 169525666 | 13-58 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13.9 Ore and Waste Handling System
The ore and waste handling system will use truck haulage consisting of up to six 20-t trucks to be loaded at designated remucks at both Grey Fox North and Grey Fox South. One truck will be shared for a total of 11 units. These will be loaded with up to five 10-t LHDs and two 7-t LHDs in each of Grey Fox North and Grey Fox South. Waste will be stockpiled on surface during initial development. During production, waste will be deposited into the stopes along with the surface stockpile and supplemented with waste rock from McEwen’s Black Fox site.
13.10 Mine Dewatering
The underground dewatering facilities at Grey Fox North and Grey Fox South are designed to receive water from two sources: groundwater seepage and underground operations. The planned backfill activities will not require flush water, nor will there be any decant water from backfill.
Groundwater seepage will contribute approximately 62.5 m3/h to each mine. While it is likely that most of this water will report to the upper levels of the mine, for the purposes of designing the mine dewatering infrastructure, it was assumed that this flow could report at depth. Service water from operations which includes drilling, dust control, washing equipment, etc. will produce an average of 19.6 m3/h of water. Water will be directed to the sumps located in the underground mine workings for a total combined average rate of 82.1 m3/h as presented in Table 13-40. Daily volumes will vary depending on the level of activities, mining sequence, etc.
Table 13-40:Estimate Water Source Flows
Mine Source | Average Flow (m3/h) |
Groundwater | 62.5 |
Service Water | 20 |
Backfill Flush/ Decant | 0 |
Total | 82 |
For each mine, a target pumping rate of 136 m3/h (600 gpm, 2,270 L/min) was selected taking into consideration the average flowrates, peak flows, and a reasonable water velocity in the pipe to maintain solids in suspension during pumping.
The dewatering system will be a cascading design that includes borehole sumps, “pocket” or “hole in the wall” sumps and decline sumps. Borehole sumps will collect and drain water to the next level below, offering no storage capacity and not equipped with a pump. The hole in wall sumps will be short decline sumps with minimal storage capacity and equipped with a single 22 to 37 kW (30 to 50 HP) submersible pump which will deliver water to another sump on the same level, or to the next level above. The decline sumps will be the major pumping stations, offering some water storage capacity (nominal 35 m3 of live capacity, depending on pump selection), and equipped with operating and standby 112 kW (150 HP) submersible pumps accessed via steel walkway and monorail/trolley,
| Project: 169525666 | 13-59 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
At Grey Fox North, main pump stations (decline sumps) will be located on 465, 365, 265, and 140 Levels in Gibson and 265 and 145 Levels in Whiskey Jack. Hole in the wall sumps will be located 315 and 215 Levels in Gibson, 295 Level in Whiskey Jack, and one located inside the portal to capture immediate ground water. Borehole sumps will be located on all other mining levels; some levels may have more than one borehole sump, depending on strike length and mine layout. Ultimately, all water will report through the main decline sump located on 115 Level and be pumped to the holding pond on surface.
At Grey Fox South, main pump stations will be located on 340, 240, 140, and 40 Levels. The uppermost main station (40 Level) will pump water to the portal and overland (approximately 2,000 m) to the collection pond on surface. Borehole sumps will be used on other mine levels to drain water to the next main station. There will also be a small sump located inside the portal to capture immediate groundwater.
13.11Backfill Distribution
The stopes will be backfilled with a combination of unconsolidated rock fill plus cemented rock fill to prevent backfill dilution in subsequent stopes while also minimizing the use of cement.
Primary method will be cemented or uncemented rock fill.
1. | Slurry delivery - Slurry will be mixed on surface in a hopper and distributed underground via borehole to an underground receiving station. |
2. | Waste Rock Mixing for cemented rock fill – The underground receiving station will be connected to a pump and spray curtain. An LHD will drive under the curtain with a load of waste rock and slurry will be sprayed over the rock. The slurry loading cutout on the levels will be developed slightly down gradient to collect any spillage. |
3. | Stope Placement – The LHD will tram and dump the cemented rock fill into the stope. |
The backfill placement is presented in Figure 13-31.
| Project: 169525666 | 13-60 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-31: Backfill Placement
The cemented rock fill against future stope placed first, uncemented rock fill placed second, and cemented mucking floor placed last. If stopes were being mined below there will need to be complete coverage of cemented backfill on the floor. If stopes are not being mined adjacent to or above the stope it could be filled completely with uncemented rock fill. If stopes were being mined above but not adjacent a cemented mucking floor will still be required. If stopes are not planned above a cemented muck floor will not be required. The cure time used to work on top of cemented rock fill will be 7 days and to blast a stope adjacent to cemented rock fill a 21-day cure time will be required.
The amount of cemented rock fill used in a stope compared to uncemented rock fill is summarized Table 13-41. The annual fill schedule is presented in Table 13-42.
Table 13-41:Cemented Rock Fill Backfill Factors
Stope Description | Cemented Rock Backfill % |
Longhole Stope with Stope Adjacent and/or Below and Above | 65% |
Longhole Stope with Stope Adjacent Only | 55% |
Longhole Stope with Stope Above Only | 10% |
Longhole Stope with No Stope above, below or adjacent | 0% |
Uphole Stope | 0% |
Cut and Fill Stope | 100% |
| Project: 169525666 | 13-61 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Table 13-42:Underground Backfill Schedule
Year | Waste | Fill Required - | Development | Surface Waste | Additional Waste |
2027 | 71,581 | 0 | 0 | 0 | 0 |
2028 | 238,009 | 45,415 | 45,415 | 0 | 0 |
2029 | 147,150 | 189,588 | 147,150 | 42,438 | 0 |
2030 | 110,303 | 297,440 | 110,303 | 187,137 | 0 |
2031 | 156,252 | 322,485 | 156,252 | 34,600 | 131,633 |
2032 | 101,199 | 304,097 | 101,199 | 0 | 202,898 |
2033 | 265,146 | 329,126 | 265,146 | 0 | 63,980 |
2034 | 291,467 | 259,530 | 259,530 | 0 | 0 |
2035 | 209,397 | 495,057 | 209,397 | 31,937 | 253,723 |
2036 | 270,102 | 569,525 | 270,102 | 0 | 299,423 |
2037 | 166,025 | 535,390 | 166,025 | 0 | 369,365 |
2038 | 226,084 | 511,162 | 226,084 | 0 | 285,078 |
2039 | 185,047 | 462,944 | 185,047 | 0 | 277,897 |
2040 | 18,344 | 490,223 | 18,344 | 0 | 471,879 |
2041 | 0 | 176,497 | 0 | 0 | 176,497 |
Total | 2,456,106 | 4,988,479 | 2,159,994 | 296,112 | 2,532,373 |
13.12 | General Underground Infrastructure |
There are numerous underground facilities proposed for the Grey Fox Project. The facilities are described in this section, the total quantities of facility is presented in Table 13-43.
Table 13-43:Underground Infrastructure Matrix
Item | | Qty |
| Wash Bay | 2 |
| Fuel and Lube Storage | 5 |
Underground Facilities | Satellite Garage | 5 |
| Detonator Storage | 7 |
| Explosive Storage | 7 |
| Refuge Station/Lunchroom (permanent - 12 person) | 4 |
Refuge Station | Refuge Station (portable - 12 Person) | 8 |
| Latrine | 12 |
| Project: 169525666 | 13-62 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Item | | Qty |
Power | Typical Electrical Room Type 1 | 12 |
Typical Electrical Room Type 2 | 27 | |
| ||
| Slurry Surface Hopper | 3 |
Rockfill | Slurry Distribution Station | 5 |
| Slurry Receiving Station | 28 |
| Hole in Wall Sump (with Pump) | 8 |
Mine Water | Borehole Sump/ Slash | 31 |
Decline Sump | 11 | |
| ||
| Pressure Regulating Valve Station | 21 |
13.12.1Personnel and Material Movement
All personnel and materials will be transferred to and from the underground workings via a mine ramp.
During full mine production an additional means of emergency egress from the mine will be a ladder system located in the fresh air raise to surface of each mine exiting through an airlock in the fan ducting on surface. A series of dedicated internal escapeways will lead to this emergency egress through both mines. For Grey Fox North, personnel will have to travel across 65 Level in the Gibson Zone and down the Whiskey Jack Ramp to the fresh air raise.
13.12.1.1Personnel Movement
Personnel carriers will be used to move workers between surface and the underground workplaces at the start and end of each shift. Workers that operate mobile equipment will park in a designated area (in some cases on surface) at the end of each shift.
13.12.1.2Material Movement
Consumable materials, equipment, and maintenance parts will be delivered to designated underground storage locations via the mine ramp using boom trucks.
13.12.2Refuge Stations
Refuge stations will be located throughout the mine in the fresh air circuit, and the vertical interval between stations will not exceed 100 m. To achieve this a refuge station will be placed every third level at a minimum. Therefore, every working level will have access to a refuge either on that level or up/down a single vertical level.
The refuge stations will serve the development, production, maintenance, and construction crews working in the area. Portable refuge stations will primarily be used and will be moved when areas of the mine cease production. Permanent Refuge Stations will accompany the underground maintenance shops except in the
| Project: 169525666 | 13-63 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Whiskey Jack Zone and serve dual purpose as lunchrooms. A latrine or portable sanitary system will be provided near each refuge station location.
13.12.2.1Permanent Refuge Stations
Permanent refuge stations will be used primarily as an employee lunchroom but are designed for use during emergency situations located on the same levels as the underground workshops except in the Whiskey Jack Zone. Whiskey Jack will not have a permanent refuge station due to its relatively short production life.
Each refuge station will be constructed with materials that have at least a one-hour fire resistance rating, and will be equipped with the following:
· | Boot and hand-washing facilities for use prior to entering the refuge station |
· | Racks to hang outer work gear prior to entering the refuge station |
· | Thirty-six hours of potable water and bottled respirable air |
· | Emergency food |
· | Lights |
· | First aid supplies |
· | Sanitation facilities |
· | Service water line |
· | Suitable firefighting equipment |
· | Sufficient seating for each worker |
· | Multiple means of communication with the surface |
· | A double door that creates an air lock when closed |
· | Means of tight sealing the door to prevent gases from entering |
13.12.2.2Portable Refuge Stations
Portable refuge stations will be strategically purchased throughout the LOM. As mine development and production advances into new mining areas, these portable refuge stations will be placed in appropriate existing cutouts. As mining ceases in areas the stations will be moved to alternate locations.
13.12.3Explosives and Detonators Storage Facilities
Underground storage magazines for explosives, detonators, and blasting accessories will be located on the 90 Level in the Whiskey Jack Zone, 140, 265, and 390 Levels in the Gibson Zone, and 140 and 240 Levels in Grey Fox South. These will be set a safe distance from the underground infrastructure and work areas. There will be separate magazines for explosives and detonators.
Explosive products used for development and production mining will be securely handled and stored in the magazines, including ANFO, packaged emulsion explosives, and detonators.
All explosives will be stored, stacked, and labeled to facilitate a first-in / first-out inventory control system. Each magazine will be designed with a locking gate. The location of the explosive or detonator facility will be at least 25 m from the main travel way.
| Project: 169525666 | 13-64 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Explosive and detonator materials will be transported via truck from the surface via the ramp to the underground magazines. Special trucks operated by trained and authorized individuals will be used to transport explosive materials from the underground magazines to the workplace.
13.12.4Maintenance Shop
The main workshop for the mine will be located on surface and mobile equipment will be driven up ramp for maintenance and repair. Underground workshops will be constructed on the 175 Level in the Whiskey Jack Zone, 140 and 315 Levels in the Gibson Zone, and 140 and 240 Levels in Grey Fox South.
These underground workshops will be used for minor repairs and maintenance to supplement the main workshop on surface. The underground workshops will be a single-bay facility that can service up to two pieces of mobile equipment.
13.12.5Fuel and Lubricants
The underground mine will have a fuel and lube storage accompanying each of the underground workshops on 175 Level in the Whiskey Jack Zone, 140 and 315 Levels in the Gibson Zone, and 140 and 240 levels in Grey Fox South. A fuel and lube truck will be the primary delivery vehicle.
Fuel bladders will be transported via truck from surface via the mine ramp to the fuel bays. Lubricants will be transported in bladders and pails via truck from surface via the mine ramp to the lube storage bays.
A fire door will be installed at the entrance to the fuel and lubricant bay. This door will close in the event of a fire to prevent any potential fires and noxious gases from spreading into the mine. Fire detection and suppression equipment that interfaces with the mine’s emergency alarm system will be included in the fuel and lubricant storage bays. All mobile equipment will have onboard fire suppression systems.
13.13General Underground Services
13.13.1Compressed Air
Permanent compressors will be located in a building on surface at each portal for Grey Fox North and Grey Fox South to provide compressed air for the mine development and operating phases. Each compressor house will have three compressors installed, with two normally operating and the third typically on standby, but occasionally able to provide additional capacity if required.
Compressed air will be used by the drills (production and jumbos), bolters, face pumps, miscellaneous hand tools, garage facilities, Alimaks, and a source of emergency air for the refuge stations. Compressed air usage underground was estimated as approximately 1.1 m3/s or 2,350 cubic feet per minute (cfm), with peak flows of approximately 1.4 m3/s (3,000 cfm).
The compressors are sized to deliver nominally 0.7 m3/s (1,500 cfm) each, with motor size of 220 to 260 kW (300 to 350 HP), final flow and related motor size will depend on the compressor manufacturer’s standard offerings. An air receiver will be located at each compressor plant. At each mine, a DN150 (6” diameter)
| Project: 169525666 | 13-65 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
pipe will be installed from the air receiver to the portal and in the ramp. Branches to the mine levels will be DN100 (4” diameter) pipe.
13.13.2Service Water
Service water will be required for use in exploration, development, production drilling, dust control, washing floors and equipment, preparing shotcrete and concrete mixes, fire protection, and other miscellaneous processes. The underground water distribution system will be supplied from a surface holding pond (the same holding pond to which the underground mine dewatering pumps report).
Pumps will be installed in a pumphouse near the surface holding pond to provide service water to each underground mine. The pumps will use variable frequency drives and/or a pressure tank to maintain pressure and flow under varying conditions. Table 13-44 outlines the primary service water usage underground at each mine (common fleets, quantities, and usage profiles at each).
Table 13-44:Service Water required by Equipment Type
Equipment | Qty | Water | Utilization | Operating | Total | Peak | |
| |||||||
| |||||||
| |||||||
| |||||||
2-Boom Jumbo | 2 | 200 | 50% | 7.5 | 90,000 | 400 | |
Mechanized Bolter | 3 | 100 | 15% | 7.5 | 20,250 | 300 | |
Production Drill Rig | 3 | 49 | 80% | 7.5 | 53,352 | 148 | |
Slot Drill Rig | 1 | 35 | 80% | 4.0 | 6,739 | 35 | |
Dust Control | 4 | 30 | 5% | 2.0 | 720 | 120 | |
Handheld Drill | 4 | 28 | 25% | 6.0 | 10,080 | 112 | |
Diamond Drill | 1 | 130 | 50% | 8.5 | 33,150 | 130 | |
Subtotal | | | | | 214,291 | 1,245 | |
Allowance – leaks, misc. | 10% | | | | 21,429 | 125 | |
| | | | Average | 327 | | |
| |||||||
| |||||||
| | | | Peak (L/min) | | 1,370 | |
At each mine, the average flow is estimated to be 327 L/min, with peaks to 1,370 L/min. The distribution pipe will be sized to deliver peak flows. A DN150 (6 in diameter) pipe will be installed in each main ramp with smaller branches on each level. Pressure reducing stations will be installed every second level to maintain the pressure suitable for use.
13.13.3Potable Water
Potable water will be delivered underground via large plastic bottles. Potable water will be provided in underground workshops, permanent refuge stations, and dedicated bottle filling stations.
| Project: 169525666 | 13-66 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Personnel must fill appropriate water containers on surface or at a designated bottle filling station and carry a water supply to the work areas.
13.13.4Fire Water
Underground fire-related services are required to meet National Fire Protection Association requirements including fire water, fire detection and suppression systems, and dedicated reservoirs.
Fire water must be available for underground fire suppression, hose reels, and sprinkler systems.
Fire detection and suppression systems will interface with the emergency alarm system and will be included in areas at high risk of fires. These areas include the underground workshops. Individual operating systems, such self-contained fuel and lube units and hydraulic power units, will be equipped with integral fire-suppression and will not require fire water.
Dedicated reservoirs will be excavated a level above the underground workshops, approximately 12 m long to contain sufficient volumes of water to provide sufficient water for the fire suppression requirements.
13.14Underground Electrical and Power Distribution
The power distribution system for Grey Fox North will be four feeders from the surface substation to the Grey Fox North portal and down the ramp. Power will be distributed from the ramp electrical room via the ramp to the levels. Power will be distributed throughout the mines via ramp and boreholes, maximizing the use of boreholes wherever possible to reduce the cable lengths and voltage drop. Power feeders will also alternate powering levels in Gibson to provide redundancy.
The power distribution system for Grey Fox South will be four feeders from the surface substation to the Grey Fox South portal and down the ramp. Power will be distributed from the 40 Level electrical room via ramp and boreholes, maximizing the use of boreholes wherever possible to reduce the cable lengths and voltage drop. Power feeders will also alternate powering levels in the to provide redundancy.
13.14.1Underground Electrical Distribution
Power for the Grey Fox North mine will be provided via four 5 kV feeders. Feeders will land in the ramp electrical room. On the secondary side of the switchgear, one feeder will provide power to Whiskey Jack and four feeders will provide power to the remaining Grey Fox South areas to support mining activities, as well as development, underground infrastructure, dewatering and ventilation.
Power for the Grey Fox South mine will be provided via four 5 kV feeders. Feeders will land in the 40 Level electrical room, then distribute to support mining activities, as well as development, underground infrastructure, dewatering and ventilation.
The main ventilation fans for both mines are powered on the surface from separate feeders from the surface substation.
| Project: 169525666 | 13-67 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
The power distribution system is designed to have a main (Type 1) electrical room every three to four levels to provide power to three to four smaller (Type 2) electrical rooms. From the electrical room on each level, 5 kV power will be fed to development and production equipment, while a 600 V power distribution panel or splitter will feed power to infrastructure facilities (ventilation, dewatering, shops, etc.).
Boreholes will be used to route both 5 kV and 600 V power between levels to minimize voltage drop and to protect cabling.
Figure 13-32 presents the underground power distribution system and the locations of the types of electrical rooms.
| Project: 169525666 | 13-68 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods

Figure 13-32:Underground Power Distribution Routing
| Project: 169525666 | 13-69 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Figure 13-33 presents the layout of a typical Type 1 electrical room. Type 1 electrical rooms will consist of metal enclosed switchgear, underground substation or a mine power center, 600 V power distribution panel or splitters, lighting transformer and panel, remote I/O cabinet (as required), network cabinet and medium and/or low voltage junction boxes (as required).

Figure 13-33:Type 1 Electrical Room Layout
| Project: 169525666 | 13-70 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
Figure 13-34 presents the layout of a typical Type 2 electrical room. Type 2 electrical rooms will consist of a 600 V power distribution panel or splitters, lighting transformer and panel, remote I/O cabinet (as required), network cabinet and medium and/or low voltage junction boxes (as required). The Type 2 electrical rooms are designed to have the space for an underground substation (a mine power center) for mine development purposes.

Figure 13-34:Type 2 Electrical Room Layout
| Project: 169525666 | 13-71 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13.14.2Load List and Schedule for Mining Facilities
Table 13-45 provides a load summary by area for underground and surface mining facilities, while
Table 13-46 and Table 13-47 provide power schedules broken down by quarter and by year, respectively.
Table 13-45: Grey Fox Mining Load Summary (for peak year – 2038)
Area | Demand Load (kVA) | % of Total |
Surface Infrastructure | 1,091 | 5% |
Surface Dewatering | 590 | 3% |
Surface Ventilation | 4,295 | 21% |
Surface Compressors | 1,746 | 9% |
Underground Mining Equipment | 926 | 5% |
Underground Infrastructure | 3,921 | 19% |
Underground Dewatering | 2,362 | 11% |
Underground Ventilation | 5,658 | 27% |
Total | 20,589 | |
Table 13-46:Power Schedule by Quarter
| 2027 | 2028 | ||||||
| Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
Load (kVA) | 0 | 0 | 2,118 | 2,825 | 5,008 | 7,496 | 8,029 | 8,446 |
Table 13-47:Power Schedule by Year
| 2029 | 2030 | 2031 | 2032 | 2033 | 2034 | 2035 | 2036 | 2037 | 2038 | 2039 | 2040 | 2041 |
Load | 9,751 | 9,891 | 10,689 | 10,916 | 15,489 | 18,124 | 19,645 | 19,975 | 20,117 | 20,589 | 20,135 | 18,958 | 17,670 |
13.15Underground Communication and IT
The underground communication between levels will be routed using a combination of ramp, drift and/or boreholes (for fiber optic and analog telephone systems) to minimize cable lengths or routed in the ramps (Leaky Feeder system) to ensure coverage to every underground area. Communication cables installed in boreholes will be kept separate from power cables.
The following systems are planned as part of the underground communication and IT package:
· | Fibre optic network |
· | Underground wireless network (5G) |
· | Leaky feeder system (radio) |
· | Analog telephone |
| Project: 169525666 | 13-72 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
13 Mining Methods
13.15.1Fibre Optic Network
The underground fiber optic network will be used for transmitting information for business networks, process control networks, and other dedicated systems (as required). The design for the fiber optic network will be a star topology, with the backbone connecting all underground Type 1 network cabinets, located in each electrical room.
13.15.2Underground Wireless Network (5G)
The underground wireless network will be 5G using dedicated fibers from the fiber optic backbone to connect hardware throughout the mine. The 5G network will be the primary communication system underground to be used with telephones, tablets, and other peripheral devices. The 5G network will also be used for data collection (e.g., mobile equipment telemetry, equipment/personnel tracking), and tele-remote operation.
13.15.3Leaky Feeder System (Radio Communication)
The leaky feeder system will be the primary method of communication in the ramp during development activities until the fiber optic backbone and 5G system is installed. The system’s head end will be in the surface substation, and it will be connected to the local network cabinet.
Underground, the leaky feeder system will be routed along the main ramp and will split into the main level access drift of each level.
13.15.4Analog Telephone
Analog telephones will be used for underground communications and will be in each electrical room and refuge station.
| Project: 169525666 | 13-73 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
14 Processing and Recovery Methods
14 | Processing and Recovery Methods |
The Project involves the processing of Grey Fox underground material through the existing Stock Mill. Ore is sourced from underground mining operations only, crushed to -120 mm at the Grey Fox portals using a new modular jaw crushing plant, and then trucked to stockpiles at the Stock Mill. The crushing plant at Grey Fox and the trucking of crushed rock to the Stock Mill operates for 8 hours daily during daylight hours only.
Primary crushed material is loaded from stockpiles at the Stock Mill through the existing load-in to the two-stage crushing circuit. The -12 mm product from the crushing circuit is stored in the fine ore bin and is nominally 80% passing approximately 8 mm. Finely crushed ore is reclaimed from the fine ore bin and fed to the existing two-stage grinding circuit, which comprises a primary ball mill followed by two parallel ball mills. Ore is ground to a P80 of 75 µm and then pumped to the existing thickener for densification ahead of treatment in the existing leach- carbon-in-leach (CIL) circuit.
The existing 3-t elution circuit and smelting operation are used to produce dorè bars. Tailings are deposited in the existing Stock Mill tailings management facility.
Metallurgical testwork demonstrated variable ore characteristics, with whole-ore cyanidation recoveries ranging from 70% to 95%, with an average of approximately 88%. Mineralogical analysis confirmed that gold is primarily associated with pyrite.
Testwork also indicated that flotation followed by fine grinding of the flotation concentrate could improve overall recoveries for certain portions of the orebody. However, retrofitting flotation and regrinding into the existing Stock Mill flowsheet would be costly and operationally disruptive and was therefore not considered economical. As a result, the existing whole-ore cyanidation flowsheet was adopted unchanged for the Project.
Comminution testing indicated a hard and competent ore requiring significant grinding energy. Consequently, the installed grinding power available at the Stock Mill represents the primary processing bottleneck and determines the overall achievable throughput.
The process flowsheet incorporates the following main unit operations:
· | Primary crushing (at Grey Fox) |
· | Transportation to Stock Mill |
· | Secondary and tertiary crushing |
· | Two-stage grinding and classification |
· | Densification |
· | Cyanidation |
· | Recovery of gold onto activated carbon |
· | Elution, electrowinning and smelting to produce doré |
Detailed descriptions of each unit operation are provided in Section 14.3.
| Project: 169525666 | 14-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
14 Processing and Recovery Methods
14.1 | Process Flowsheet |
The Grey Fox process flowsheet was developed based on metallurgical testwork results and industry best practice guidelines. The proposed flowsheet, as shown in Figure 14-1 below, incorporates crushing, grinding, and cyanidation stages tailored to the ore characteristics determined during testwork.

Figure 14-1:Block Flow Diagram for the Treatment of Grey Fox Ore
| Project: 169525666 | 14-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
14 Processing and Recovery Methods
14.2 | Process Design Criteria |
Table 14-1 below summarises the key design criteria for the treatment of Grey Fox ore from underground mining operations through the existing Stock Mill. Note that the “Nominal” and “Design” cases refer to the average (50th percentile) and design (85th percentile) ore hardnesses, respectively. The expected average throughput for each case reflects the maximum throughput at which the installed grinding equipment can deliver the targeted grind size of 80% passing 75 µm.
Table 14-1: Process Design Criteria
Description | Units | Nominal | Design |
General: | | | |
Expected throughput | t/d | 1,470 | 1,123 |
ROM Feed Grade | g Au/t | 3.42 | 3.42 |
Gold Extraction (Overall) | % | 88 | 88 |
ROM Feed Specific Gravity | | 2.91 | 2.91 |
JKTech Axb Parameter (50th and 85th Percentiles) | | 33 | 30 |
Bond Ball Mill Work Index (50th and 85th Percentiles) | kWh/t | 23.2 | 27.2 |
Primary Crushing: | | | |
Primary Crushing Section Utilization | % | 33.3 | 33.3 |
ROM Feed Grizzly Square Aperture | mm | 350 | 350 |
Primary Crushed Product P80 | mm | 100 | 100 |
Moisture | % | 3.0 | 3.0 |
Throughput Rate | tph | 183.8 | 140.4 |
Secondary and Tertiary Crushing: | | | |
Sec and Tertiary Crushing Section Utilization | % | 70 | 70 |
Tertiary Crushing Circuit Product P80 | mm | 7.3 | 7.3 |
Throughput Rate | tph | 87.5 | 66.8 |
Grinding: | | | |
Grinding Section Utilization | % | 92 | 92 |
Throughput Rate | tph | 66.6 | 50.9 |
Grinding Section Product P80 | µm | 75 | 75 |
Total power available (3 motors’ nameplate) | kW | 2,034 | 2,034 |
Total pinion power available (after 8% losses) | kW | 1,871 | 1,871 |
Total pinion power required | kW | 1,871 | 1,871 |
Leaching and Adsorption: | | | |
NaCN consumption (Testwork) | kg/t | 0.42 | 0.42 |
Hydrated Lime Consumption (Testwork) | kg/t | 2.35 | 2.35 |
| Project: 169525666 | 14-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
14 Processing and Recovery Methods
Description | Units | Nominal | Design |
Number of large Leach tanks | # | 2 | 2 |
Number of CIL tanks used for leaching | # | 2 | 2 |
Number of CIL tanks used as CIL tanks | # | 4 | 4 |
Slurry Residence Time Required | h | 34 | 34 |
Slurry Residence Time Provided | h | 45 | 57 |
Targeted Solution Tails Concentration | mg/L | 0.01 | 0.01 |
Carbon Concentration | g/L | 10 | 10 |
Loaded Carbon Grade | g/t | 3,700 | 3,700 |
Eluted Carbon Grade | g/t | 100 | 100 |
Cyanide Detoxification: | | | |
Total Residence Time Required | h | 2.5 | 2.5 |
SO2: WAD requirement | kg/kg | 4.6 | 4.6 |
Cu: WAD requirement | kg/kg | 0.1 | 0.1 |
CIL terminal WAD CN | ppm | 100 | 100 |
Reclaim Return Solution WAD CN conc. | ppm | 50 | 50 |
Target WAD CN concentration | ppm | 0.1 | 0.1 |
Elution and Regeneration: | | | |
Available carbon batch size | t | 3 | 3 |
Expected number of strips (calculated) | per week | 2.5 | 1.9 |
Max Strips per Day | # | 2 | 2 |
Carbon regeneration kiln energy | kWh/kg | 2 | 2 |
Elution heater benchmarked energy cons. | kW/t carbon | 230 | 230 |
Carbon regeneration kiln run time | h/d | 20 | 20 |
Note: WAD CN = Weak Acid Dissociable cyanide
14.3 | Process Description |
14.3.1Crushing
The proposed Grey Fox underground material will be processed through the existing Stock Mill facility at an average rate of 536,550 dry tonnes per year (1,470 t/d), with a ROM ore head grade of 3.42 g/t Au. When treating ore blocks of above-average hardness, the average throughput is expected to decrease to as low as 1,123 t/d at the 85th percentile of hardness.
The primary crushing section at the Grey Fox site is staffed for 12 h/d but operates for 8 h/d. This operating schedule avoids nighttime transportation of ore and allows 4 h/d for delays and maintenance. Ore is fed to a modular primary crushing plant consisting of a ROM feed bin, a vibrating grizzly feeder, a fixed rockbreaker, a C106 jaw crusher, and a crushed product conveyor. Crushed rock is loaded by front-end loader onto road
| Project: 169525666 | 14-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
14 Processing and Recovery Methods
trucks and transported to the Stock Mill, where it is dumped onto stockpiles. This primary crushing front end consists of new equipment that has been specifically purchased for the Project. All subsequent processing is conducted through the existing facilities at the Stock Mill, as described below.
Primary crushed ore is reclaimed from stockpiles by front-end loader and fed into the load-in bin. The material is conveyed via a dedicated conveyor to an open-circuit Sandvik CH430 secondary cone crusher. Secondary crushed product (-40 mm) is conveyed by two conveyors to a double-deck banana screen measuring 6.1 m in length by 2.05 m in width. Screen oversize (+10 mm) reports to a Metso Nordberg HP300 tertiary cone crusher. Screen undersize (-10 mm) is conveyed to the fine ore bin. Tertiary crushed product is recycled via the screen feed conveyor back to the banana screen. The fine ore bin has a capacity of 1,360 tonnes, providing approximately one day of surge capacity between the three-stage crushing front end and the downstream grinding circuit.
14.3.2Grinding
Two reclaim belt feeders extract finely crushed ore from the fine ore bin and discharge onto the primary ball mill feed conveyor.
The primary ball mill has a diameter of 3.66 m and an effective grinding length (EGL) of 5.49 m and is driven by a 1,250 kW motor. The mill discharges into a dedicated cyclone feed pumpbox, from which slurry is pumped to a dedicated 4-way cyclopack fitted with 380 mm diameter hydrocyclones. Cyclone underflow returns to the primary ball mill feed chute, while cyclone overflow reports to the secondary grinding cyclone feed pumpbox.
The primary ball mill circuit product is subjected to further grinding in two parallel ball mills, designated as Secondary Ball Mill #1 and Secondary Ball Mill #2. The two secondary ball mills are similarly sized but not identical. Secondary Ball Mill #1 has a diameter of 2.89 m and an EGL of 3.66 m, while Secondary Ball Mill #2 has a diameter of 2.74 m and an EGL of 3.48 m. These mills are driven by 448 kW and 336 kW motors, respectively.
The secondary ball mills operate in closed circuit with a common secondary grinding cyclone cluster, which ensures that coarse particles are returned to the mills, while fine slurry proceeds to downstream processing. The cyclone cluster consists of six ports, with three 250 mm diameter cyclones in operation, two installed standbys, and one blanked port.
Cyclone overflow is directed to a trash screen to remove wood chips, plastics, and similar foreign objects. Screen underflow flows by gravity to the thickener feed pumpbox, from which it is pumped to the 19.8 m diameter high-rate thickener. Cyclone underflow is split into two streams that recycle back to the feed chutes of the two secondary ball mills.
14.3.3Sedimentation, Leaching and Carbon-In-Leach
Flocculant is added at a rate of approximately 15 g/t solids to promote settling and clarification in the thickener. Thickener underflow, at a density of approximately 50% w/w solids, is pumped to the first of two leach tanks, while thickener overflow flows by gravity to the process water storage tank for re-use.
| Project: 169525666 | 14-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
14 Processing and Recovery Methods
Sodium cyanide and lime are added to extract gold from the finely ground ore. Most of the sodium cyanide and lime, approximately 0.42 kg/t NaCN and 2.35 kg/t lime, are added into the first leach tank. The two large leach tanks have a live capacity of 1,166 m3 each, providing approximately 27 h of leach residence time at the nominal throughput rate. Additional lime and cyanide are added downstream to maintain a minimum level of free cyanide concentration and to ensure the slurry pH remains above a minimum of 10.7. Compressed air is bubbled through all leach and CIL tanks to provide oxygen for the oxidation reactions occurring during cyanidation.
Slurry from the second leach tank flows by gravity to the six CIL tanks (277 m3 live capacity each). The first two tanks operate as leach tanks only, with no carbon addition. The remaining four tanks are equipped with carbon advance pumps and carbon retention screens, allowing them to operate as CIL tanks.
The combined residence time for the two leach tanks and six CIL tanks is 45 h, which exceeds the required residence time of 34 h by a significant margin.
Activated carbon is added to the four CIL tanks to adsorb dissolved gold to a target solution concentration of approximately 0.01 mg/L. A minimum carbon concentration of 10 g/L is maintained in the four CIL tanks to limit the amount of pumping required to move 1.24 t/d of carbon. At this advancement rate, the loaded carbon has a grade of approximately 3,700 g/t Au.
A carbon safety screen is installed as a final safeguard against gold loss. This vibrating screen intercepts any gold-bearing carbon that may pass through the carbon retention screen or broken carbon particles, preventing loss of gold to the tailings management facility.
14.3.4Acid-Washing, Elution and Regeneration
Loaded carbon, extracted from the first CIL tank, is stripped using the pressure Zadra process in 3-t batches. With the 3-t circuit and an expected gold loading of 3,700 g/t, approximately 2.5 strips per week would be required under nominal operating conditions. This is again well below the typical industry practice, which generally ranges from 5 to 6 strips per week.
Following washing on the loaded carbon screen, the washed carbon flows by gravity from the screen to the acid wash column, where it is contacted with dilute nitric acid at a concentration of 3% w/w. The purpose of the acid wash step is to remove any calcite buildup from the carbon in preparation for the subsequent elution step. The acid wash cycle employs sequential soak and rinse steps, using 0.60 bed volumes of dilute acid followed by rinsing with two bed volumes of clean water. The total acid wash cycle duration is typically 10 h.
Following acid washing and neutralization, the carbon is transferred to the elution column. The elution cycle lasts approximately 15 h and includes carbon transfer from the acid wash, solution preheating, elution, carbon cooling, and transfer from the elution column to regeneration. The resultant loaded solution (eluate) is processed by electrowinning to produce a gold sludge for smelting.
Stripped carbon from the elution process is first dewatered on a screen and then flows by gravity into a storage bin, from which it is fed at a controlled rate into the regeneration kiln.
| Project: 169525666 | 14-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
14 Processing and Recovery Methods
Carbon regeneration is performed in a horizontal, electrically heated kiln with a minimum power rating of 143 kW and a capacity of 100 kg/h. The kiln operates at temperatures ranging from 650°C to 700°C. Reactivated carbon discharges into a quench tank, with the discharge pipe terminating below the water surface to prevent combustion of the carbon. From the quench tank, regenerated carbon is pumped to a horizontal vibrating sizing screen for removal of carbon fines before being returned to the adsorption circuit.
14.3.5Smelting
The pregnant solution (gold-rich eluate) is collected in a dedicated pregnant solution tank and pumped to two operating electrowinning cells. Each electrowinning cell contains 30 stainless steel cathodes onto which gold is plated. Once loaded, the metals sludge is dislodged from the cathodes using a high-pressure washer and then dewatered using a small pressure filter. The filtered sludge is dried in an oven and smelted in a furnace to produce doré bars.
On average, approximately one smelt is required per week. The furnace has significant spare capacity to accommodate short-term grade peaks.
14.3.6Tailings Detoxification and Disposal
CIP tailings are directed through the carbon safety screen to a tailings pumpbox, from which they are pumped to the tailings management facility. A dam lift is planned for the 2026-2027 period to expand tailings management facility capacity as required for continued deposition. Supernatant solution is reclaimed and returned to the Stock Mill to replenish the process water system. Prior to reuse or discharge, the reclaimed solution is treated in dedicated detoxification tanks to destroy residual CNWAD.
Chemical oxidation using the SO2/air process is employed to convert cyanide into environmentally safe compounds. Sodium metabisulphite is used as the sulphur dioxide source, while hydrated lime is added to neutralize acid generated during the detoxification reactions. Air is bubbled through the tanks to supply oxygen for the oxidation process.
14.3.7Reagent Systems
Reagents used in the process plant include hydrated lime, sodium cyanide (NaCN), activated carbon, caustic soda (NaOH), nitric acid (HNO3), flocculant, smelting fluxes (borax, silica sand, and nitre), antiscalant, copper sulphate (CuSO4), and sulphur dioxide (SO2).
Reagent mixing is carried out in a dedicated area of the plant specifically designed with appropriate safety features, including air extraction systems and bunded containment equipped with dedicated sump pumps. Reagents are typically prepared in batches. Once mixed, each batch is transferred from the mixing tank to a storage tank, from which it is delivered to end-use points at controlled rates. Dosing is generally achieved using positive displacement pumps to ensure accuracy and consistency.
One of the decommissioned CIP tanks is used for hydrated lime mixing.
| Project: 169525666 | 14-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
14 Processing and Recovery Methods
14.3.8Water Services
Reclaimed water is recovered from the tailings management facility supernatant pond and is detoxified prior to being returned to replenish the Stock Mill process water inventory. Due to the hardness of the Grey Fox ore, throughput is reduced and all water services are therefore operated at reduced capacity.
14.3.9Air Services
Existing compressors are used to supply compressed air for leaching and detoxification aeration, as well as for operation of filter presses and all pneumatic equipment.
14.4 Conclusions
Due to the hardness of the Grey Fox ore, the Stock Mill will continue to operate at a reduced throughput relative to its current capacity. This provides the benefit of longer cyanidation residence time, which has been shown to be required for some of the samples tested.
| Project: 169525666 | 14-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
15Infrastructure
The Grey Fox infrastructure (Figure 15-1) will include ore and waste stockpiles, primary crushing facility, water collection ponds, two underground portals (North and South Portals) with associated ventilation plants, and supporting buildings including administration and dry facilities, gatehouse, compressor facilities, and maintenance shop.
Site access is provided via Tamarack Road, a public road connected to Ontario Highway 101 near the town of Matheson. Ore produced at the site will be trucked via Highway 101 to the Stock Mill, located approximately 34 km west. Electrical power will be supplied through a tie-in to the existing grid infrastructure along Tamarack Road.

Figure 15-1: Grey Fox Site Plan
| Project: 169525666 | 15-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
15.1 Existing Infrastructure
The Grey Fox Project is located approximately 3 km south of the Black Fox site, which includes the currently operating Froome underground mine. As a result, the Project can leverage selected existing infrastructure at the Black Fox site to support early development and construction activities at Grey Fox (Figure 15-2).
Facilities that can be used to support early works include:
| ● | 27.6 kV Grid Electricity |
| ● | Security office and parking |
| ● | Office and dry facilities |
| ● | Surface maintenance shop |
| ● | Fuel storage tanks |
| ● | Water collection pond |
| ● | Clean waste rock stockpiles |
| ● | Available capacity within existing overburden stockpiles |
| Project: 169525666 | 15-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure

Figure 15-2: Grey Fox and Existing Black Fox Site Plan
| Project: 169525666 | 15-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
15.2 Project Site Preparation
The Grey Fox site layout is presented in Figure 15-1. The site is designed to be compact and centralized around the two mine portals. Prior to construction, a significant portion of the site, particularly around the Grey Fox North Portal and areas north of the river designated for the office and dry area, will be cleared and grubbed. Soil and organics will be stockpiled for future surface reclamation. The remainder of the site will be cleared prior to the development of the Grey Fox South Portal and related surface facilities.
Contractor and mine laydown areas will be established and utilized for site establishment activities. The existing maintenance shop at the Black Fox site will be used for early equipment commissioning and maintenance until the Grey Fox surface maintenance shop is constructed.
Clearing and grubbing activities will include disposal of brush, roots, and stumps. Cutting and disposal of trees have already been completed. The area surrounding the Grey Fox North Portal will be roughly graded prior to construction.
15.2.1Soil Storage
Topsoil removed from the site will be stored in the designated soil storage area for reclamation at Black Fox site. The actual volume of stripped topsoil stored for reclamation will be determined with a complete site investigation and geotechnical assessment.
15.3 Project Access
15.3.1Mine Road
The existing gravel road, Tamarack Road, provides access south of Highway 101 and will be used for transportation of mine personnel and general supplies, as well as for hauling ore to the Stock Mill (Figure 15-3). The road is in good condition and will require minimal maintenance. An existing bridge crossing the Pike River is located approximately 2.5 km south of Highway 101 and will require a field inspection prior to commencement of underground construction to confirm suitability for its intended use without restriction. McEwen Inc. has begun discussions with the Township of Black River-Matheson regarding the care and custody of this infrastructure.
| Project: 169525666 | 15-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure

Source: (Google Earth 2026; Site Visit 2025)
Figure 15-3: Grey Fox Site Access Road
15.3.2Highway 101
Traffic on public Highway 101, including the segment near the Tamarack Road intersection and the town of Matheson, is under the jurisdiction of the Government of Ontario and is maintained accordingly, including winter snow removal. New turn-in and turn-out lanes, along with road lighting, are recommended at the intersection of Tamarack Road and Highway 101 to improve visibility and safety, given the anticipated increase in traffic movements during nighttime operations.
15.3.3Existing Tamarack Road Bridge
The Tamarack Road Bridge is a 42 m long single-span, 30° skewed steel plate girder structure with a cast-in-place concrete deck supported on elastomeric bearings. It carries a single lane of two-way traffic.
Using the Canadian Highway Bridge Design Code (CSA S6:19), Section 14, a desktop assessment was completed of the bridge superstructure under permanent loads, including steel, deck and barriers, and asphalt wearing surface. Transitory loads were assessed as well, including normal traffic loading (CL1, CL2, CL3 625 Ontario truck and lane loads) and permit bulk mining trucks, including CAT777G, CAT773G, CAT745C, and CAT770.
Assessment results indicate the steel girders have adequate capacity for both normal traffic loading and the assessed permit bulk mining vehicles; however, the existing concrete deck does not. Load posting is not
| Project: 169525666 | 15-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
recommended for normal traffic, provided the bridge continues to exhibit no signs of distress. Annual visual inspections are advised to confirm ongoing deck performance.
To enable mining operations involving heavier vehicles in a future mining scenario, deck strengthening would be required. Options include bonded fibre reinforced polymer sheets applied to the deck surface, or partial-depth deck replacement with modern stainless-steel reinforcement and steel traffic barriers, which would provide sufficient capacity for CAT745C and CAT770 vehicles or equivalent. Full-depth deck replacement and thickening, using either cast-in-place or precast panels, would be required to accommodate larger CAT777G and CAT773G trucks, as well as CAT745C and CAT770 vehicles.
If deck replacement proceeds, ancillary rehabilitation works should also be integrated, including replacement or elimination of expansion joints, assessment of elastomeric bearings for condition and capacity, development of a bearing replacement strategy if needed, and upgrading of approach slabs to accommodate heavier mining loads.
Further hydrotechnical and geotechnical investigations are needed to confirm the capacity and performance of the bridge substructure.
15.3.4Mine Service Roads and Site Parking
A light vehicle parking lot will be located adjacent to the administration and dry complex. The parking area will be located inside the gatehouse perimeter and separated from haul truck traffic. The parking lot will be equipped with receptacles for engine block heaters.
15.4 Buildings and Ancillary Items
15.4.1Temporary Construction Facilities
Mobilization, demobilization, temporary construction facilities, and selected mobile equipment required during the construction phase will be contractor supplied. McEwen will provide underground mobile equipment, power, and water.
15.4.2Surface Maintenance Shop
The surface maintenance shop will be designed to maintain the underground and surface fleet, and will be housed in a pre-engineered building measuring 22 m wide x 30 m long x 12 m high. The building will be complete with metal cladding, insulation, HVAC, and snow guards. The ground floor will contain four (4) bays with overhead doors designed to accommodate mining mobile equipment. The remaining ground floor area will include an electrical bay, tool rooms, welding stations, vehicle wash area, and warehouse space for spare parts.
A 10-tonne crane will be installed above the vehicle maintenance bays.
The pre‑engineered building will be installed on a concrete perimeter wall with footings under each structural column. The foundation will be backfilled and compacted on both the interior and exterior of the building. The slab-on-grade, which will be sloped in the maintenance area, is designed to contain and direct
| Project: 169525666 | 15-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
spills toward in-ground sumps equipped with pumps. The wash area will be isolated by low curb walls and will include dedicated in-floor sump pumps fitted with an oil and water separator.
A layout of the truck shop and warehouse are presented in Figure 15-4.

Figure 15-4: Surface Maintenance Shop – Section View
15.4.3Warehouse
Two warehouses will be installed for Grey Fox, one near the administration office and mine dry, and a second installed near the surface maintenance shop. The warehouses will be new manufactured fabric buildings, each approximately 20 m wide x 25 m long, and will be equipped with power and HVAC.
Figure 15-5 provides an example of a typical warehouse.
| Project: 169525666 | 15-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure

Figure 15-5: Example of Typical Warehouse
15.4.4Administration Office and Mine Dry
15.4.4.1 Mine Dry
The mine dry will be a single-story, prefabricated building composed of multiple connected trailers. Separate female and male dry areas will be provided and sized to accommodate approximately 350 workers. The trailers will be fitted with lockers, washrooms, and shower facilities.
15.4.4.2 Administration Office
The administration office will consist of multiple prefabricated building trailers set on cribbing foundations and combined to form a single complex. The facility will include office and cubicle spaces, two meeting rooms, training room, storage areas, washrooms, and a kitchen and lunchroom. A mine rescue office will be incorporated into the administration office.
The Mine Dry and Administration Office will come furnished with the following:
| ● | HVAC units and internal ducting |
| ● | Interior finishes including flooring, painting, lighting and emergency lighting, internal partition walls, and interior and exterior doors and glazing |
| ● | Fire detection and protection systems |
| ● | Internal plumbing and water filtration systems |
| ● | Electrical and communications wiring |
| Project: 169525666 | 15-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
15.4.5Security/Reception
A security gatehouse will be located at the entrance to the mine site and will control access to and from the site. All personnel, including operations staff, management, and visitors will be required to report to security prior to accessing the site.
A first aid office will be incorporated into the mine dry complex.
15.4.6Fuel Storage and Distribution
Fuel storage and distribution facilities will be located adjacent to the security/reception and near the surface maintenance shop. The facility near the security/reception will store gasoline and diesel, while the facility near the maintenance shop will store diesel and low-sulphur diesel.
Storage and dispensing equipment for low-sulphur diesel will be constructed for use by underground mobile equipment. Low-sulphur diesel will be delivered to site via tanker trucks. The storage facility will be equipped with a high-flow pump to fill the service truck used to refuel underground mobile equipment.
Storage and dispensing equipment for gasoline and regular diesel will be constructed for use by surface generators, water pumps, and mobile surface equipment.
15.4.7Waste Disposal
Site waste including plastic, paper, cardboard, food scraps, and rubber will be collected and stored in a designated garbage disposal area. Waste will be removed on a set schedule and transported offsite for disposal.
Hazardous materials such as spent oil, batteries, paint, compressed gas cylinders, and corrosive products will be managed and disposed of in accordance with McEwen’s Standard Operating Procedures. McEwen’s Health and Safety Department will ensure that appropriate signage, safety data sheets, and standard operating procedures are available and kept current for all hazardous materials used on site.
Hazardous materials will be transported to and from the site by qualified contractors.
15.4.8Mine Laydown Area
Mine laydown areas will be constructed of compacted granular material. A laydown area will be located near the administration office and mine dry complex. Additional laydown areas will be constructed near the North Portal and will serve as the construction staging area during the surface infrastructure and portal construction phases.
15.4.9Concrete/Shotcrete Receiving Stations
Multiple concrete / shotcrete receiving station will be constructed for the Grey Fox Project. The receiving stations will be located near the Whiskey Jack ventilation raises, near the Gibson Return Air Fan and near the Grey Fox South ventilation raises.
| Project: 169525666 | 15-9 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
Concrete/shotcrete will be delivered to site as wet ready-mix.
The receiving stations will include the following:
| ● | a cased borehole from surface to the initial production level at each station |
| ● | weatherproof enclosure |
| ● | borehole inserts on surface |
| ● | receiving hopper |
| ● | washout and pumping equipment and |
| ● | related electrical, automation and IT equipment. |
The underground receiving stations are defined in Section 13.10
15.4.10 Surface Pumphouse
A surface pumphouse will be located adjacent to the surface collection pond.
The pumphouse will be equipped with a pumping system to deliver recycled service water to Grey Fox North and Grey Fox South portals. The system will consist of both operating and standby pumps equipped with variable speed drives.
The pumphouse will also include an operating pump and standby pump to deliver excess water to the Black Fox site holding pond for treatment.
15.5 Ventilation Collars
The Grey Fox Project will include multiple ventilation collars: two near the Whiskey Jack deposit, one at the existing Gibson portal, and two in the South Portal area.
Geotechnical assessments at Whiskey Jack indicate that the permanent vent raise collars intersect unconsolidated soils above bedrock. To mitigate this risk and ensure safe, stable access, vertical collars will be constructed. This approach will require crane mobilization and preparation of a properly compacted subgrade.
Each collar will have a finished inside diameter of 4.3 m and extend approximately 30 m below grade. Construction will proceed in controlled 2 m lifts using formed concrete sections with 400 mm wall thickness. Each lift will incorporate a reinforced rebar mat with dowels extending into the subsequent pour. Following curing, material beneath each section will be excavated, allowing the collar to be advanced incrementally to the next elevation. This method will continue until bedrock is reached.
At bedrock, perimeter anchors will be installed to secure the structure, followed by a socket pour to control groundwater ingress. If required, supplementary well drilling may be implemented to manage groundwater conditions. Upon completion and final curing, the vertical development contractor will break into the collar to commence raise excavation.
The remaining collars are located in areas with minimal overburden. These will be constructed by removing overburden, installing a concrete pad, and completing raise excavation from underground using an Alimak
| Project: 169525666 | 15-10 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
system in a two-pass sequence. All raises will maintain the same finished diameter for consistency across the project.
15.6 Power Distribution
The initial power distribution system for the Grey Fox surface substation will be supplied from an existing 27.6 kV distribution line located on the eastern side of Tamarack Road. The final power configuration will require updates to the overall incoming utilities, to be finalized by McEwen. In both cases, a 27.6 kV tap will feed a new 35 kV disconnect switch and two 27.6 kV to 4.16 kV transformers located outside the substation. From the substation, 4.16 kV and 600 V power will be distributed to the remainder of the Grey Fox site through new switchgear.
To distribute power to the various surface facilities, 5 kV and 1 kV cables will be buried in trenches and routed where required. This is intended to minimize the risk of encounters with overhead power lines. The substation switchgear will provide 4.16 kV power to the ventilation facilities, compressor houses, administration office, crusher, pumphouse, and the portals for Grey Fox North and Grey Fox South.
The remaining surface facilities will be supplied with 600 V power via a 4.16 kV to 600 V transformer and 600 V power distribution panel located inside either the substation, administration office, or the Grey Fox South compressor house. Figure 15-6 illustrates the surface routing of buried electrical cables.

Figure 15-6: Surface Routing of Buried Cables
| Project: 169525666 | 15-11 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
In the event of a utility outage, the generator located at the substation will provide sufficient power for all critical surface infrastructure, including ventilation systems and compressor house. The generator will be configured in a main-tie-main-tie-main arrangement with the two 27.6 kV to 4.16 kV transformers.
15.7 Communications and IT
Communication between surface facilities will be routed using buried conduits to ensure coverage to every area of the surface site. Communication cables installed in conduit will be kept separate from power cables.
The following systems are part of the planned surface communication and IT package:
| ● | Fibre optic network |
| ● | Radio communications |
For surface facilities, communication infrastructure will be installed in each building using either Type 1 or Type 2 network cabinets. Servers and core network switches will be located within the administration office.
15.7.1Fibre Optic Network
The surface fibre optic network will be used for transmitting information for business networks, process control networks, and other dedicated systems as required, including fire alarm and power management systems.
The fibre optic network will connect with the 5G network infrastructure through network cabinets and will support systems such as tele-remote equipment operation and wireless network access. It will also connect to VoIP phones, which will be installed in surface facilities, as required.
15.7.2Radio Communications
To allow for site-wide radio communications, repeater units will be installed throughout the Grey Fox site. These repeaters will have an overlapping radius and communicate with the existing Black Fox radio system. Figure 15-7 outlines the radio repeater locations across the Grey Fox site to achieve site-wide surface radio communication.
| Project: 169525666 | 15-12 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure

Figure 15-7: Locations of Radio Repeaters at the Grey Fox Site
15.8 Ore and Waste Rock Management
Separate ore and waste pads will be established between the Grey Fox North and South portals and will be constructed of compacted granular material.
A primary crusher with a stacking conveyor will be located on the ore pad. ROM ore will be trucked from either the North or South Portal and deposited near the primary crusher. A loader will be used to feed the crusher. Once crushed, the ore will be loaded into surface haulage trucks and hauled to the Stock Mill for processing.
The waste pad will be designed to accommodate approximately 300,000 tonnes of waste at peak accumulation prior to the start of underground production. Once production commences, stopes will be backfilled with ROM waste, and supplemented as required with material reclaimed from the surface waste stockpile. Waste rock from the Black Fox site will also be hauled to the Grey Fox waste stockpile as backfill demand exceeds the waste produced from Grey Fox underground operations.
| Project: 169525666 | 15-13 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
15.9 Water Management
The water management plan for the Grey Fox site is to collect and store on-site contact water and then transfer that contact water to the Black Fox mine for treatment and discharge. To reduce the mine water inventory, non-contact runoff at Grey Fox will be diverted using perimeter berms, allowing runoff to drain naturally offsite. Existing watersheds within the Grey Fox site include tributaries that drain to the Pike River, which bisects the Grey Fox property boundary west to east.
Two water management ponds will be constructed at Grey Fox to contain contact water from the existing 1:100-year annual exceedance probability (AEP) storm event. Each pond will have an emergency spillway sized to attenuate the 1:100-year AEP storm with climate change while maintaining a minimum freeboard of 0.5 m. The ponds will target a minimum length-to-width ratio of 2:1 to reduce short-circuiting. The Grey Fox holding pond will have a permanent pool to promote settling and provide extended detention and storage of settled material.
Contact water collection ditches will drain by gravity where practicable to reduce pumping requirements. In areas where gravity drainage to a sedimentation pond is not feasible due to site topography or stockpile geometry, excavated sumps and pumps will be installed to direct water to the water management ponds. Electric pumps will be used in areas where electrical service is available, with diesel pumps used elsewhere as required. Water discharged from excavated sumps will be released into the same perimeter ditch further downstream once gravity drainage toward a pond or closest downstream sump resumes.
The conceptual water management arrangement is provided in Figure 15-8 and detailed in Section 15.9 below.
| Project: 169525666 | 15-14 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure

Source: (Stantec 2026)
Figure 15-8: Grey Fox Conceptual Water Management General Arrangement
| Project: 169525666 | 15-15 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
15.9.1Water Management Overview
Contact water management will be required for the waste rock stockpile and ore stockpile areas, dewatering from the underground workings, and areas where fuel storage or handling occurs, including the north fuel depot, laydown area, North and South Portal areas, and fuel depot. A minimum 15 m setback from watercourses and waterbodies will be maintained to limit potential interactions with the natural environment.
Runoff and seepage generated from the Project will be managed through a stockpile collection pond and a holding pond. The stockpile collection pond will receive contact water from the waste rock stockpile and South Portal area, and will be designed to convey collected water to the Grey Fox holding pond, with drawdown occurring over an estimated period of five days following the 1:100 AEP, 24-hour precipitation event.
The Grey Fox holding pond will be designed to receive direct runoff from the ore stockpile, North Portal area, south fuel depot, and laydown area, in addition to pumped inflows from underground dewatering and the stockpile pond. The Grey Fox holding pond will also serve as a source of water for underground service water requirements and surface site needs, such as dust suppression.
The Grey Fox holding pond will function as a throughput pond and pumping station for Project infrastructure located south of the Pike River, conveying water via pipeline at a maximum rate of approximately 130 L/s to the Black Fox water management system for treatment. The holding pond will be sized to manage inflows associated with the 1:100 AEP, 24-hour precipitation event, with discharge occurring over an estimated period of five days.
Water collected from the administration fuel depot located north of the Pike River will be managed separately and conveyed to the main discharge pipeline at an approximate rate of 0.5 L/s for transfer to the Black Fox site for treatment.
15.9.2Water Balance
A site-wide water balance was completed to estimate the quantity of mine site contact water expected to be managed during the operational phase of the Project to support water management design and feasibility studies. As presented in Figure 15-9, the Grey Fox water balance accounts for precipitation, runoff, evaporation, and infiltration flows at each identified mine site component. The water balance represents the mine site components at full development during operation.
To reduce the mine water inventory, non-contact runoff is proposed to be diverted using perimeter berming and ditching to allow runoff to naturally flow offsite. Contact water collected on site will be pumped via pipelines to the Black Fox site.
The site-wide water balance was developed using an average climate scenario based on Climate Normals precipitation data for the 1981-2010 period (Class A climate data) from the Environment and Climate Change Canada (ECCC) Victor M. Power Airport climate station (Station ID 6078285). A portion of precipitation during colder months, from October to March, was assumed to be stored as snow with partial
| Project: 169525666 | 15-16 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
melt occurring in October, November, and March, and a larger snowmelt event occurring in April during the spring freshet.
The percentage of precipitation that results in runoff from the stockpile areas was accounted for in the water balance model by balancing precipitation less evaporation and net infiltration losses for each catchment. Net infiltration represents the sum of groundwater infiltration and toe seepage, less any soil moisture losses. This proportion of net infiltration reports to perimeter seepage collection ditches and is diverted to the water management ponds.
Figure 15-9 presents the water balance transfer rates, identified in cubic metres per day (m3/d), to the Black Fox site under average climate conditions. Actual instantaneous flow rates are expected to vary seasonally and annually depending on climate conditions. The water balance model was used to analyze the volume of excess water that will be transferred via pipeline to the Black Fox site.

Figure 15-9: Conceptual Water Balance Schematic
15.9.3Mine Dewatering
The underground mine dewatering system is described in Section 13.10 of this report. The peak underground net flow at full mine development is expected to be approximately 3,270 m3/d from each underground area, for a combined total of approximately 6,540 m3/d.
| Project: 169525666 | 15-17 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
15.9.4Sewage Handling
Domestic wastewater from the administration office and mine dry, and process washroom facilities will be discharged to an on-site septic bed located to the northwest of the facilities.
15.9.5Domestic Water
A fully enclosed and climate-controlled domestic water treatment plant will be installed to treat water from an on-site well for non-potable uses (showers, toilets, and sinks in the mine dry, and office complexes). Potable water for consumption will be provided as bottled water.
15.10 Tailings Storage Facilities
15.10.1 Stock Mill Complex Tailings Management Area
The McEwen Stock Mill complex is located approximately 34 km west of the Black Fox mine and proposed Grey Fox mine, along Highway 101 (Figure 15-10). Ore from Grey Fox will be transported to the existing Stock Mill for processing, and the produced tailings will be stored within the existing tailings facility and a planned western expansion of the Stock Mill Tailings Management Area (TMA), currently referred to as the Western Expansion Area (WEA). Haul distance from Grey Fox to the Stock Mill is approximately 39 km.

Figure 15-10: Grey Fox to Stock Mill Haul Route
As of April 2026, the Stock Mill has a currently permitted design capacity of 3,200 t/d, with current mill production ranging from approximately 900 t/d to 1,500 t/d. At the start of Grey Fox mining, mill production is planned to comprise approximately 50% from Grey Fox and 50% from the Stock West underground (located at the Stock Mill site) and other sources (e.g., custom milling). As mining progresses, the Grey Fox feed will gradually ramp up to approximately 100% of the Stock Mill feed.
15.10.2 Stock Mill Complex TMA Western Expansion
McEwen-leased lands to the west and north of the existing Stock Mill TMA and northern water management pond provide room for expansion of the facility. A planned western expansion of the Stock Mill complex
| Project: 169525666 | 15-18 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
TMA (i.e., the WEA) is projected to provide approximately 3 Mm3 (4.2 Mt) of additional tailings storage capacity. This estimate assumes an in-place tailings density of approximately 1.38 t/m3 based on historical operational data for slurry tailings placement, at approximately 39-40% solids by weight, and a full buildout dam crest elevation similar to the Stock Mill TMA of 285.0 m. Similar to the existing Stock Mill TMA, decant water and stormwater from the expansion will be routed through the water management pond for recirculation and treatment, as needed.
At a planned tailings placement rate of 3,000 t/d, the WEA is expected to provide approximately 3.8 years of operational storage capacity, necessitating additional future expansions to accommodate the full projected tailings volumes from Grey Fox Mine and other tailings sources. The footprint of the WEA is limited to less than 50% of the existing TMA footprint in accordance with SOR/2019-285, Schedule (Section 2), part 19(c) of the Government of Canada Physical Activities Regulations.
The projected operational life and capacity of the TMA expansion is currently less than the total projected mine life and tailings storage needs for Grey Fox. However, additional McEwen-leased lands located to the northwest and north of the currently planned expansion area can accommodate additional expansion stages. Alternate tailings storage methods are also actively being explored, including dry stacking, to largely eliminate the need for a dam and allow for additional storage capacity within a similar footprint, and tailings storage within the open pit at the Black Fox Mine site, located immediately north of Grey Fox. These alternatives are being further evaluated as the Project progresses toward Feasibility.
The current expansion concept (Figure 15-11) includes approximately 2,600 linear meters of dam construction comprising a 2H:1V upstream slope, 3H:1V downstream slope, and 4-m top width (similar to the current TMA). With an average dam height of approximately 9.8 m (reaching a maximum height of approximately 14 m), the total embankment volume is estimated at approximately 730,000 m3. The dam would be raised in stages to allow for consolidation of the underlying soft clays in between raises, with a currently estimated one-third of the required borrow material to be sourced from the upper firm silty clay layer within the expansion footprint. This borrow volume is therefore added to the available tailings storage capacity estimate.
| Project: 169525666 | 15-19 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure

Figure 15-11: Stock Mill TMA and Conceptual Western Expansion Area
Tailings generated at the existing milling facility will be pumped to the TMA expansion via extension of the tailings pipeline servicing the existing Stock Mill TMA. Based on historical operational data, the tailings slurry is characterized by an average solids content of 39.5% by weight, with a solids specific gravity of 2.89 t/m3. At a maximum permitted production rate for the Stock Mill of 3,200 t/d, the system will be designed to manage a nominal slurry flow rate of approximately 250 m3/h and is projected to comprise approximately 4,500 m (total length) of 8-inch (219-mm) diameter SDR 11 HDPE fusion-welded pipeline.
A distribution system will be designed to promote uniform beach development and geotechnical stability through controlled deposition. At this conceptual stage, the main line is planned to run the perimeter of the TMA expansion, with tee-offs spaced at 20-m intervals extending into the impoundment area. Similar to the current Stock Mill operation, for summer operations, each tee is planned to be equipped with a removable manifold consisting of three 3-inch (90-mm) diameter cyclone spigot lines to facilitate thin-layer beaching. In winter months, the spigot lines would be disconnected to allow for direct end-of-pipe discharge, mitigating the risk of freezing. A series of isolation and bypass valves will be installed at each tee location to allow operators to effectively cycle discharge points and manage the tailings pond elevation and beach development.
| Project: 169525666 | 15-20 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
15.10.3 Water Management and Recirculation
The Stock Mill utilizes a recirculating water management system designed to prioritize the reuse of process water. Tailings decant water is directed to the existing on-site water management pond for recirculation to the mill. To maintain a sustainable site water balance, treated volumes in excess of mill requirements are directed to a dedicated polishing pond for final clarification. This treated water is subsequently discharged to the environment in compliance with the site’s Environmental Compliance Approval (ECA).
A new engineered spillway will be constructed along the adjoining edge of the new expansion dam and the existing water management pond to convey decant water from the TMA expansion into the water management pond. From there, water will be recirculated for treatment and mill use or discharged to the environment using the Stock Mill’s existing recirculation system.
15.10.4 Subsurface Conditions and Foundation Design
Geotechnical investigations within the TMA expansion footprint (Golder, 2015) indicate a typical Northern Ontario glaciolacustrine profile.
The stratigraphy consists of:
| ● | 0 to 0.15 m BGS: Topsoil/Peat (to be removed prior to dam construction; thicker in low-lying areas) |
| ● | 0.15 m to 3.0 m BGS: Firm silty clay |
| ● | 3.0 m to 18.0 m BGS: Very soft varved clays and silts |
| ● | 18.0 m+ BGS: Very dense glacial till (silty sand to sandy silt) |
Due to the thickness of the underlying soft clay unit, the dam design is projected to include an additional 15% overbuild volume to address settlement during its operational life. Borrow material for dam construction will be sourced on-site, primarily utilizing the upper firm silty clay layer and waste rock generated from the on-site underground mining operation.
15.10.5 Seepage Control and Stabilization
As a component of the WEA dam construction, a seepage cutoff wall will be constructed along the dam alignment, approximately 2 m into the underlying varved clay (i.e., layered lenses of clay and silty sand that represent seasonal deposition in the historical lake that once covered the area), to cut off near-surface varves (i.e., the silty sand lenses) from lateral seepage out of the impoundment.
Additionally, because the expansion will share an adjoining dam with the existing TMA, a waste rock toe berm will be included to mitigate phreatic surface mounding in the existing dam’s outer toe during new tailings placement. The design of the new dam will also incorporate internal chimney and blanket drains, as needed, to mitigate the risk of piping. Additionally, due to the soft varved clays underlying the WEA, wick drains will be installed under the dam footprint to accelerate pore-pressure dissipation and foundation consolidation.
| Project: 169525666 | 15-21 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
15.10.6 Future Tailings Storage Facility Expansion
The Stock Mill Complex has existing access to leased lands immediately adjacent to the existing tailings facility that are estimated to provide at least 193 ha of additional tailings containment, conceivably accommodating up to approximately 24 Mt of additional storage capacity. Following the initial western expansion of the Stock Mill TMA by 41 ha and 4 Mt (comprising Stock Mill and Grey Fox tailings), Grey Fox is anticipated to provide an additional 7.4 Mt of tailings to the Stock Mill site.
Additionally, the existing open pit at Black Fox mine (located immediately north of Grey Fox) provides a potential opportunity for future storage of Grey Fox tailings, with an anticipated lower environmental-risk profile and lower cost than Stock Mill. This alternative is currently under evaluation, in addition to alternative methods of tailings management at Stock Mill, as the project approaches feasibility.
15.10.7 Geotechnical and Operational Risks
The primary risk to the conceptual layout of the TMA expansion and its maximum tailings storage capacity is the interplay between the underlying soft clay stratigraphy and the fixed regulatory footprint.
Capacity Reduction Risk: Because the footprint is limited by the 50% regulatory objective, any side-slope flattening required to address geotechnical concerns would need to be accommodated within the approved footprint, reducing the estimated storage capacity. Mitigation measures include using prefabricated vertical drains (PVDs) or wick drains to improve foundation pore-pressure dissipation and strength gain.
Settlement and Staged Construction: The underlying soft clay is expected to cause notable settlement and elevated pore pressures during construction and operation, depending on the rate and magnitude of dam raises and corresponding tailings placement. Accordingly, a staged construction approach will be used to allow pore-pressure dissipation and strength gain in between raises, which will impact the timing of available storage. Methods and rates of pore-pressure dissipation and construction staging will be further evaluated as the Project approaches feasibility.
Foundation Seepage Management: To accelerate the timeline for subgrade consolidation and dam construction, the design includes installation of PVDs and a granular drainage blanket to increase the rate of pore-pressure dissipation and strength gain in the foundation soils. Additionally, to reduce the potential for infiltration of tailings pore waters into near-surface silt lenses (varves) in the underlying varved clay, which could provide a horizontal seepage pathway out of the impoundment, a slurry or in-situ stabilization cutoff wall is envisioned to disrupt the near-surface varves. The design of the PVDs, drainage blanket, and the seepage-cutoff wall will be explored in greater detail as the Project approaches Feasibility, in addition to exploring alternative tailings placement methods (e.g., dry-stack tailings) that could potentially reduce cost and risk.
Regulated TMA Footprint: The current ECA for the Stock Mill (ECA #4371-B2KHZT) lists a footprint area of 56 ha. However, aerial imagery of the site and past design documents show an outer footprint of approximately 82 ha. The actual regulated footprint of the existing TMA will need to be verified with the Ministry of Environment and Mines (MEM) and the Ministry of the Environment, Conservation and Parks (MECP) prior to detailed design of the western expansion, as the 56 ha listed in the current ECA appears to either be in error or representative of a condition other than the outermost TMA footprint. Additionally, it has
| Project: 169525666 | 15-22 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
been confirmed verbally with the MEM that future expansions of the TMA would be held to a similar rule based on the active footprint of the facility at that time, allowing additional future expansions to proceed similarly, without the need for a full federal environmental assessment, assuming adherence to the 50% rule. Changes to this interpretation could alter the timeline and feasibility of future facility expansions.
15.10.8 Supporting Information
The following tables summarize the geometric parameters and characteristics associated with the conceptual layout of the WEA storage facility. The grading design for the conceptual layout was developed in Autodesk Civil 3D, with dam and tailings volumes calculated as volumetric comparisons between the conceptual-grading design surfaces and an existing-grade surface represented by 2025 aerial drone LiDAR data gathered by Arcadis combined with the 2016 COOP 2-m DEM for areas outside of the modified portions of the Stock Mill tailings storage facility.
Table 15-1 presents the design parameters for the conceptual WEA layout used in preliminary tailings storage cost estimation. Table 15-2 and Table 15-3 provide WEA storage capacity and operational life, and tailings slurry design parameters, respectively.
Table 15-1: WEA Geometric Design Criteria
Dam Component | Value | Unit | Source/Notes |
Total Dam Length | 2,632 | m | Concept Layout |
Upstream Slope | 2H:1V | Horizontal:Vertical | Existing Dams |
Downstream Slope | 3H:1V | Horizontal:Vertical | Planning Assumption |
Crest Width | 4.0 | m | Existing Dams |
Average Dam Height | 9.2 | m | Local Topography |
Maximum Dam Height | 14.0 | m | Local Topography |
Dam Embankment Footprint | 131,269 | m2 | Concept Layout |
Foundation Key-in Depth | 2.0 to 3.0 | m | Historical Borings |
Spillway Type | Sheet pile weir with | - | Existing Dams |
Maximum Footprint | 41 | ha | 50% of Existing TMA (82 |
Key-in Depth (slurry or in-situ | 4 to 5 | m | Subsurface Stratigraphy |
Additional Stabilization of | 37,772 | m3 | Concept Grading Design |
| Project: 169525666 | 15-23 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
Table 15-2: WEA Storage Capacity and Operational Life
Dam Component | Value | Unit | Source/Notes |
Total Available Storage Volume | 3.0 | Million m3 | Concept Grading |
Average Deposited Dry Density | 1.38 | tonnes/m3 | Historical Data |
Total Storage Tonnage | 4.2 | Million tonnes | Combined Grey Fox |
Daily Tailings Production | 3,000 | t/d | Mine plan |
Annual Tailings Production | 1.10 | Million tonnes | Calculation |
Projected Life for the Western | 3.8+ | years | Calculation; additional |
Supplemental Capacity | Additional Expansion | - | Viable options based |
Table 15-3: Tailings Slurry Design Parameters
Parameter | Value | Unit | Source/Notes |
Maximum Throughput | 3,200 | t/d | Peak permitted capacity of the Stock |
Solids Content by Weight | 39.5 | % | Historical Data |
Density (Solids) | 2.89 | t/m3 | Historical Data |
Slurry Flow Rate (Nominal) | 250.4 | m3/h | Calculated |
Pipeline Material | HDPE SDR 11 | - | Fusion-welded |
Pipeline Diameter (OD) | 8 (219) | in (mm) | Recommended |
Pipeline Length | 4,500 | m | Site Layout |
Static Elevation Head | +13 | m | Survey Data |
| Project: 169525666 | 15-24 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
15.11 Sitewide Water and Mass Balance Model
Arcadis constructed a water and solute mass balance model to evaluate flow rates and water quality for mine water potentially requiring water treatment as part of development of the Grey Fox mine. Since water generated at the Grey Fox mine is to be sent to Black Fox for handling and treatment prior to discharge, the water balance model includes the Grey Fox underground mining features, the Black Fox Pit, and surrounding water-management facilities.
The water/mass balance model was constructed using the GoldSim model platform. The GoldSim model represents an expansion and refinement of the previous water balance developed for Black Fox Mine by Wood (2021) to include the simulation of Black Fox pit filling and Grey Fox underground mining. Model development assumptions and results are provided below.
15.11.1 Model Development and Assumptions
The GoldSim model was constructed to couple water flows and water quality and allow for evaluation of water management scenarios. A schematic of the overall water balance is provided in Figure 15-12.

Figure 15-12: Water Balance Schematic
A brief overview of key model components and assumptions is provided below.
| ● | The site-wide water and mass balance model uses historical daily precipitation for past periods and long-term monthly average precipitation from the Timmins Climate Station for future periods to represent seasonal conditions at the site. With the use of monthly-average precipitation, it was effectively run for a climate normal year, and since the model usage was for a relatively short period of 15 years during mine operation, potential climate change effects were not considered. Only the climate normal model results (without wet or dry years) is provided here, but buffering of |
| Project: 169525666 | 15-25 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
wet year flows is discussed further below. Open-water evaporation losses are included using monthly evaporation rates from the Timmins Victor Power A Weather Station and exposed water surface areas for each modeled subunit
· | Surface runoff is estimated using monthly precipitation, catchment areas, and representative runoff coefficients for key mine features and disturbed areas at both Black Fox and Grey Fox. The model also accounts for snow accumulation, sublimation, and snowmelt, with rainfall contributing immediate runoff while snow is carried forward and released according to monthly melt assumptions. |
· | The Black Fox portion of the model includes major mine water features such as the open pit, southwest pond, southeast pond, holding pond, and treatment pond. Black Fox pit filling is controlled by direct precipitation, runoff, and groundwater inflow, with the largest groundwater contribution coming from overburden and an additional smaller contribution from bedrock. Model simulations indicate that following Black Fox mine operations, the pit will fill with water and has water storage capacity until at least 2043. As such, water flows from the Black Fox Pit do not enter the Grey Fox water balance during the project period from 2027 through 2041. As a conservative assumption, the model simulation does not include any other potential mine reclamation and closure activities that could occur at Black Fox before 2043. |
· | The Grey Fox portion of the model includes the underground mine, process area, process area pond, waste rock stockpile, and waste rock pond, as described further in Section 15.9. During Grey Fox operations, runoff and underground dewatering water are collected in the Grey Fox Process Area Pond and then pumped to the Black Fox holding pond, where Grey Fox and Black Fox waters are blended for treatment and discharge. |
Solute mass balance was added to the water balance model for the following analytes of interest:
· | Major cations: Calcium, magnesium, potassium, and sodium. |
· | Major and minor anions: Alkalinity, sulphate, chloride, nitrate. |
· | Metals, oxyanions, and other water quality constituents: Arsenic, antimony, cobalt, copper, iron, lead, nickel, zinc, selenium, molybdenum, vanadium, cadmium, and ammonia. |
Cyanide was not included as a model parameter, since the Grey Fox and Black Fox units do not include mill tailings contact water. Water management associated with the Stock Mill Complex is summarized in Section 15.10.3.
Although pH is not directly modeled in GoldSim, pH was calculated based on the mass balance of acidity and alkalinity. For calculation of pH, carbon dioxide and calcite are both assumed to sustain a slight supersaturation, with an assumed log (pCO2) of -3.0 and a calcite saturation index of 0.3.
Development of the solute mass balance required determination of water quality for each flow input to the model. Table 15-4 summarizes the water quality data used in developing the geochemical water quality source terms for each flow term in the model. Additional details on the available test data for Grey Fox used in the development of geochemical source terms are provided in Section 17.2.
| Project: 169525666 | 15-26 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
Table 15-4: Summary of Water Quality Geochemical Source Terms and Data Sources
Water Flow | Description/Source | |
Direct precipitation | Major ion contents for typical rainwater in North America; concentrations assumed zero for metals. | |
| ||
Natural runoff | Water quality from the Pike River monitoring station, median of data collected from 01/2020 through 10/2020. | |
| ||
West Waste Rock Stockpile drainage | Average of 2024 monthly water quality results from West Waste Rock Stockpile monitoring location. | |
| ||
East Waste Rock Stockpile drainage | Average of 2024 monthly water quality results from East Waste Rock Stockpile monitoring location. | |
| ||
Black Fox Pit groundwater inflow | Average of 2024 quarterly water quality results from Interceptor Well 147125. | |
Black Fox Pit wall runoff | Calculated as flow-weighted difference between Black Fox Pit/underground mine sump water quality and groundwater inflow. | |
| ||
Grey Fox waste rock stockpile | Developed from Grey Fox Week 0 humidity cell test results (see Section 17.2), scaled based on comparison with Black Fox Waste Rock Stockpile drainage. | |
Grey Fox Underground Mine dewatering | Assumed the same chemistry as the Grey Fox waste rock stockpile source term, based on similar geologic rock types intersected during mining. | |
15.11.2Model Scenario and Results
The water and solute mass balance model was used to simulate future water management associated with Grey Fox underground mining with water management at Black Fox.
The model was set to run from January 1, 2027 through December 31, 2041. The Grey Fox underground dewatering rate was assumed to increase to 1,500 m3/day within the first year, up to an operational rate of 1,938 m3/day by the second year. For simplicity, the full operational footprint of the Grey Fox site features, including the process area and waste rock stockpile, were assumed to be present at the start of the modeling period. Model outputs include flow rates and estimated water quality over the modeled timeframe. This evaluation informs the water treatment requirements as described in Section 15.12.
The model simulation results indicate that with pumping of Grey Fox contact water to Black Fox, the average flow to the holding pond varies seasonally between 2,200 and 4,700 m3/day with an annual average of approximately 3,300 m3/day which was the rate used in sizing of a potential water treatment system in Section 15. Importantly, this value is an annual average, and the actual flow at any given time will likely exceed this average. Although the various holding ponds at Black Fox and Grey Fox were designed to buffer short-term storm and runoff events, the ponds are not large enough to retain water during the spring snowmelt period (average flow rates of 4,700 m3/day) for a water treatment plant designed to handle the annual average flow rate (3,300 m3/day). However, for the purposes of this evaluation, it is assumed that treatment of annual-average flow rates based on average annual precipitation is reasonable. In practice, it is likely that the Black Fox open pit itself can be used for seasonal water storage to buffer flows to the holding pond.
| Project: 169525666 | 15-27 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
The holding pond/treatment pond water quality was compared to water quality standards to understand potential treatment requirements. For this evaluation, simulated water quality is compared to the existing ECA values issued in 2019, understanding that these values may no longer be applicable when the ECA is revised following incorporation of Grey Fox. Specifically, the values included in the 2019 ECA were based on criteria in Ontario Regulation (O. Reg.) 560/94, which McEwen understands was revoked in June 2021 with O. Reg. 462/21. Updated effluent criteria will need to be developed based on MECP Procedure B-1-5 1. This development will likely include consideration of the more recent Canadian Metal and Diamond Mining Effluent Regulations (MDMER) 2, Canadian Council of Ministers of the Environment Canadian Environmental Quality Guidelines for the Protection of Aquatic Life 3, Federal Environmental Quality Guidelines for freshwater 4, and British Columbia Ministry of Environment and Parks Water Quality Guidelines 5. However, Procedure B-1-5 specifically refers to the use of Ontario PWQO 6 values for surface water. For preliminary identification of parameters of potential concern and evaluation of potential water treatment requirements, the water quality predictions are compared with PWQOs. A comparison to MDMER monthly mean concentrations is also provided purely for comparison purposes.
Results for key water quality constituents, including those exceeding potentially relevant water quality standards, are summarized in Table 15-5. Parameters of potential concern include arsenic, cobalt, copper, iron, nickel, molybdenum, vanadium, and zinc. Antimony, cadmium, and lead were evaluated based on their elevated levels in specific geochemical sources, but simulation results do not predict an exceedance of PWQOs in the holding pond. Observations from the analysis relevant to water treatment demands include the following:
| ● | The alkalinity of the water reporting to the holding pond is simulated to be between 130 and 150 mg/L as calcium carbonate (CaCO3). The pH of the water in the holding pond is predicted to be between 7.9 and 8.1, with a tendency to precipitate calcite with carbon dioxide off-gassing. |
| ● | Arsenic, cobalt, copper, iron, nickel, molybdenum, and zinc are predicted to exceed PWQO values throughout the year. |
| ● | There is a chance that vanadium may slightly exceed the PWQO seasonally. |
1https://www.ontario.ca/page/b-1-5-deriving-receiving-water-based-point-source-effluent-requirements-ontario-waters; last accessed on 7/2/2026.
2https://www.canada.ca/en/environment-climate-change/services/managing-pollution/sources-industry/mining-effluent/metal-diamond-mining-effluent/metal-diamond-mining-effluent-regulation.html; last accessed on 4/9/2026.
3 | https://ccme.ca/en/resources/water-aquatic-life; last accessed on 7/2/2026. |
4https://www.canada.ca/en/health-canada/services/chemical-substances/fact-sheets/federal-environmental-quality-guidelines.html; last accessed on 7/2/2026.
5https://www2.gov.bc.ca/gov/content/environment/air-land-water/water/water-quality/water-quality-guidelines/approved-water-quality-guidelines; last accessed on 7/2/2026.
6https://www.ontario.ca/page/water-management-policies-guidelines-provincial-water-quality-objectives; last accessed on 4/9/2026.
| Project: 169525666 | 15-28 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
Table 15-5: Holding Pond Water Quality during the Project Period
Analyte | Result | | | 2019 ECA | | MDMER |
| | | | (Monthly | PWQO | (Monthly Mean |
| Min | Max | Average | Concentration | (mg/L) | Concentration; |
| | | | Limit; mg/L) | | mg/L) |
Arsenic | 0.026 | 0.173 | 0.108 | 0.5 | 0.005 | 0.10 |
Antimony | 0.0053 | 0.0091 | 0.0072 | - | 0.02 | - |
Cadmium | 0.00018 | 0.00028 | 0.00023 | - | 0.0001-0.0005 a | - |
Cobalt | 0.106 | 0.206 | 0.156 | - | 0.0009 | - |
Copper | 0.0094 | 0.0167 | 0.0131 | 0.3 | 0.005 a | 0.10 |
Lead | 0.00052 | 0.00083 | 0.00068 | 0.2 | 0.003-0.005 a | 0.08 |
Iron | 0.56 | 0.70 | 0.63 | 1.0 | 0.3 | - |
Nickel | 0.072 | 0.122 | 0.097 | 0.5 | 0.025 | 0.25 |
Molybdenum | 0.108 | 0.134 | 0.121 | - | 0.04 | - |
Vanadium | 0.0050 | 0.0073 | 0.0062 | - | 0.006 | - |
Zinc | 0.046 | 0.087 | 0.066 | 0.5 | 0.02 | 0.40 |
Notes:
BOLD – exceeds the MDMER Monthly Mean Concentration
Underline – exceeds the PWQO
a PWQOs for cadmium, copper, and lead are hardness based. Water quality simulations predict an average hardness of 146 mg/L as CaCO3 (seasonal range of 45 to 194 mg/L). For copper, the PWQO of 0.005 mg/L (applicable above 20 mg/L hardness) is assumed to apply throughout the year. For cadmium and lead, the ranges in values applicable within the simulated hardness range are shown.
15.12Water Treatment Plant Infrastructure
The Grey Fox water treatment requirements are informed by the water and mass balance evaluation as described in Section 15.11. The annual average discharge flow rate and water quality were used as the basis for the conceptual water treatment process design, capital cost estimate, and annual operating cost estimate.
15.12.1Flow Rate
The Black Fox holding pond outflow is predicted to vary between 2,200 and 4,700 m3/day with an annual average of approximately 3,300 m3/day. The nominal hydraulic capacity of the water treatment plant would be based on this annual average flow rate. Over the course of a year, variability in water inputs to the site is largely dependent on precipitation, evaporation, and snowmelt levels. Although the available water storage capacity within the holding and treatment ponds is designed for wet weather events and not anticipated to be sufficient to accommodate storage during extended high-water input periods (e.g., during snowmelt), the excess during spring snowmelt can be accommodated in the Black Fox pit. As such, the average discharge rate of 3,300 m3/day can be maintained throughout the year.
| Project: 169525666 | 15-29 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
15.12.2Target Constituents
Target constituents for treatment were identified in the water and mass balance evaluation as described in Section 15.12. Water quality predictions were compared with potentially relevant water quality standards to determine potential exceedances. The following constituents were identified as potentially requiring treatment based on comparison of average and maximum annual values against the site’s 2019 ECA and PWQOs.
| ● | Arsenic |
| ● | Cobalt |
| ● | Copper |
| ● | Iron |
| ● | Nickel |
| ● | Molybdenum |
| ● | Vanadium |
| ● | Zinc |
The average and maximum concentrations in the holding pond water are summarized in Table 15-5 above.
All of the listed constituents exceed at least one of the applicable standards listed above. In addition to the constituents listed above, discharge water quality is expected to be subject to limits for total suspended solids and pH. The conceptual water treatment system design will consider these additional limits in configuring the treatment process.
Any changes to the regulatory framework that impact the target constituent list or discharge requirements would be reflected in the water treatment process design as it advances through design and permitting.
15.12.3Conceptual Design
The conceptual water treatment process consists of two primary stages to address the target constituents listed above. The proposed treatment technology is based on precipitation, primarily to remove iron and associated constituents through a two-step process as described below.
Step 1 will consist of iron oxidation and greensand filtration. This step would oxidize any ferrous iron to ferric iron to induce precipitation at the circumneutral pH. Minor amounts of arsenic and molybdenum may co-precipitate with iron during this step. The precipitated solids would be removed using a greensand filter, producing a low total suspended solids (e.g., < 10 mg/L). This would require continuous injection of an oxidizer, typically sodium hypochlorite or oxygen, into the feed stream to oxidize the reduced iron and other metals. The filters would require periodic backwash to remove accumulated solids and maintain permeability. Backwash solids would require thickening and dewatering prior to final disposal.
Step 2 will consist of ion exchange to remove the residual low-level metals and meet discharge requirements. Given the range of potential constituents, the ion exchange step would include a strong base anion (SBA) resin to remove the oxyanion species (arsenic, molybdenum, and vanadium) and a strong acid cation (SAC) resin to remove trace metals (copper, cobalt, iron, nickel, and zinc). Both resin types may be regenerated using a sodium chloride brine, which represents the primary input to this stage of the treatment
| Project: 169525666 | 15-30 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
process. Brine may be made up directly from solid sodium chloride (NaCl) salt at the site. Spent regenerant solution would require treatment or offsite disposal as a waste brine. As an alternative, non-regenerable specialty resins could be used, in which case the primary residual would be exhausted resin rather than spent regenerant. At this stage of the conceptual process development, it is assumed that spent brine will be disposed of offsite. If onsite treatment is required due to cost or limited availability of offsite brine treatment, it may be evaluated at a later time.
These two steps are not anticipated to substantially affect discharge pH or total suspended solids. If additional conditioning is required to meet applicable discharge requirements, additional steps such as pH adjustment and alkalization may be included.
Waste residuals collected from steps 1 and 2 would require temporary storage prior to onsite treatment or offsite disposal. Solids are expected to be thickened and dewatered prior to disposal. Sludge will first be thickened using a high-rate plate clarifier, followed by dewatering using a filter press. Dewatered sludge can then be disposed at a designated land repository at the site subject to assessment, design considerations, and approval, as may be required.
And overall conceptual design is provided in Figure 15-13.

Figure 15-13:Water Treatment Plant Conceptual Design
15.12.4Implementation and Operations
The water treatment plant will operate under a series of treatment trains.
The water treatment plant will consist of two parallel treatment trains for greensand filtration followed by ion exchange. Each train will have a capacity of approximately 1,650 m3/day to accommodate the design flow
| Project: 169525666 | 15-31 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
15 Infrastructure
rate of 3,300 m3/day. Constructing the system in two 1,650 m3/day trains would allow for more flexible operation during low flow periods.
Filtration will consist of pressurized filter vessels with the appropriate chemical storage and injection pumps, as well as water pumps for backwashing. Backwash solids will be separated from the backwash water in a dedicated tank using a dewatering polymer to aid solids separation. Supernatant liquid may be returned to the head of the filtration units, and solids will be dewatered using either a screw press or filter press. Dewatered solids are expected to consist primarily of iron solids and may be disposed of in a suitable on-site or offsite repository.
The ion exchange step would be completed through a series of pressurized SBA and SAC resin beds. The ion exchange system would include a brine solution makeup tank and supply pump to regenerate the resin beds. Spent regenerant brine would be stored in a separate tank for offsite disposal. A single storage tank would be used to store brine from both treatment trains.
Each train will consist of a dedicated containerized treatment system for each step in the treatment process (i.e., one container for greensand filtration and a second for ion exchange). Each container will house the primary filters as well as the chemical injection, backwash, and resin regeneration equipment. Treatment residuals will be managed, processed, and temporarily stored either in separate containers or in an external insulated and heat-traced tank.
Containerized treatment systems offer the advantage of off-site fabrication and delivery of complete systems, requiring minimal on-site mechanical and electrical assembly beyond service connections for water and power. Each individual container can be climate-controlled to account for temperature extremes at the site, if required; though, a climate-controlled building enclosure has been assumed for conceptual design purposes. Additional heat tracing and insulation of connection lines and external infrastructure (e.g., brine storage tank) would be completed on-site, as needed.
Ongoing operations would require the following inputs:
| ● | Sodium hypochlorite – continuous injection to concentration of approximately 10 mg/L based on the influent iron concentration. |
| ● | Sodium chloride – used as a regenerant for the SBA and SAC resins. |
| ● | Dewatering polymer – used to thicken solids removed from the greensand filters during backwashing. |
| ● | Power (480 V - 3-phase service) – Process and backwash water pumps, chemical feed pumps and mixers, dewatering equipment, building HVAC and lighting, heat trace, instrumentation and controls. |
| Project: 169525666 | 15-32 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
16 Market Studies and Contracts
16Market Studies and Contracts
16.1Market Studies
Gold is traded freely at widely known prices, consequently, the prospects for the sale of any production of the metal are virtually assured. A market study for the saleability of gold products or for the expected price of gold was not undertaken.
Based on monthly closing data from April 2024 to April 2026, the approximate two-year trailing average gold price is US$3,000 per ounce. This period reflects a rapid rise in gold prices, starting from approximately $2,285 in April 2024 and exceeding $4,700 by April 2026. A two-year time frame (April 2024 to April 2026) is standard for this type of disclosure because it balances long-term stability with recent market momentum. Since gold experienced a price surge during this period. A shorter window (e.g., 6 months) would artificially inflate the baseline price projection, while a longer window (e.g., 5 years) would heavily weigh outdated, lower-priced data.
Note: The calculation is based on monthly spot closing prices available as of April 2026.
16.2Contracts
The terms contained within any future sales contracts are expected to be typical and consistent with standard industry practice and contracts for the supply of doré. Currently there are no contracts in place for the Grey Fox Project.
The selling costs related to the refining of the doré to produce saleable gold and to the doré shipping cost estimates used in this analysis were benchmarked based on existing McEwen contracts in the same region as Grey Fox. Refer to Table 16-1.
Table 16-1: Selling Costs for Gold Doré
Description | Unit | Value |
Refining Cost (Au) | US$/oz | $0.41 |
Gold Payable | % | 99.95 |
Doré Shipping Charge | US$/oz | $2 |
16.3QP Opinion on Markets and Contracts
The QPs note the following:
| ● | McEwen can market the doré products produced from the Grey Fox Project; and |
| ● | The terms contained within the sales contracts are based on existing McEwen contracts. |
| Project: 169525666 | 16-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
17 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups
17 | Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups |
17.1Existing Environment
17.1.1Location and Land Use
The Eastern Properties of the Fox Complex is located in Hislop Township, approximately 10 km east of Matheson, Ontario, within the District of Timiskaming. The site falls within the geological setting of the Porcupine-Destor fault zone, a region recognized for its gold deposits with considerable current and historical mineral exploration and mining activity.
Land use is governed by the Township of Black River-Matheson Official Plan (MMM Group 2017), which zones the broader area as “rural” with the Black Fox Mine site designated as an active mining area. The Froome and Grey Fox deposits fall within a mineral aggregate resource area centered on Highway 101. Prior to the 1990s, predominant land uses were hay production, pasturing, and forestry. The site lies within the Abitibi River Forest (Management Unit No. 110) and Wildlife Management Unit 28.
17.1.2Climate
The site climate is typical of the northern boreal forest. Extended sub-zero temperatures occur from November through March; July is the warmest month and January the coldest. Maximum rainfall occurs in July and maximum snowfall in December. Prevailing winds are from the south and northwest in winter, and from the south and west in summer. Mean annual precipitation is approximately 840 mm/yr based on long-term records (1956-2019) from the Timmins Climate Station (Wood 2022a), with roughly equal contributions from rain and snow.
17.1.3Soils and Surficial Geology
The region is characterized by flat glaciolacustrine clay plains interspersed with rock knobs, ancient raised beaches, eskers, and other outwash deposits. Overburden in the Fox Complex area ranges from 10 to 60 m in thickness (averaging approximately 20 m) and consists of silty clay at surface, underlain by variable silty sand and till, with a basal till resting on weathered bedrock. Flat topography, low permeability, and cool climate have contributed to the formation of an overlying peat layer over much of the clay plain east of the site. A series of north-south trending esker complexes, composed of sorted sands, gravels, cobbles, and boulders, are present throughout the region; an esker formation intersected during open pit mining at Black Fox is a significant contributor to groundwater inflow to the pit.
| Project: 169525666 | 17-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
17 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups
17.1.4Surface Water
The Fox Complex sits at the northern end of the Black River watershed (total drainage area 1,372 km²). Two sub-catchments are directly associated with the Fox Complex: the Pike River (westward flow through lacustrine plains and an esker ridge) and Salve Creek (southern portion of the Fox Mine property). Surface water quality is monitored at multiple stations in accordance with site ECAs and MDMER; treated effluent currently meets all applicable discharge requirements. Long-term background data is available for the Pike River, Froome Lake, Lawlar Lake, Leach Lake, and several tributary stations.
17.1.5Groundwater
The hydrogeological setting of the Fox Complex is dominated by the overburden sequence described in Section 17.1.3 (clay, silt, sand/till, basal till) and underlying weathered and competent bedrock. Hydraulic conductivities are lowest in the silty clay unit and highest in the esker/alluvial formation. Regional groundwater flow is controlled by topography, with flow generally towards local surface water features. Active dewatering of the Black Fox open pit and underground workings has modified local groundwater gradients; monitoring indicates that nearby Froome Lake is hydraulically separated from the mine workings by low-permeability basal sediments.
A comprehensive groundwater monitoring program (monitoring wells at Black Fox, Froome, and Grey Fox) confirms all groundwater quality consistently below permitted limits with no adverse temporal trends identified. Local groundwater users within approximately 1 km of mine workings have been identified; none rely on groundwater from within the modelled zone of mining influence.
17.1.6Ecological Setting
Vegetation and wildlife communities at the Fox Complex are typical of the mixed-boreal forest region of northeastern Ontario. Upland communities include deciduous, mixed-wood, and coniferous forest in various stages of succession, with trembling aspen and balsam poplar as dominant species. Wetland communities include swamp, fen, and marsh-type habitats. The majority of flora and fauna species are rated common to very common (provincial and global rarity rank 4 or 5, per NatureServe) within their respective habitats.
Baseline surveys documented 88 breeding bird species typical of the southern boreal forest. Thirteen avian Species at Risk are known to occur within the broader Kirkland Lake District; no species listed under the federal Species at Risk Act were detected during field surveys at the time. Candidate significant wildlife habitats present at the project include bat hibernacula, bat maternity colony roost habitat, amphibian breeding habitats (wetlands), mast-producing areas, and amphibian movement corridors. The surrounding landscape supports moose, black bear, white-tailed deer, beaver, and common furbearers. Appropriate surveys and registration / mitigation measures will be completed prior to development.
17.1.7Aquatic Setting
The Fox Complex discharges surface effluent to the Pike River through a 2.4 km pipeline, with the river serving as the receiving aquatic environment. The Pike River is a naturally mineral-rich, turbid, moderately hard, circumneutral northern watercourse with elevated background aluminium, ammonia, and iron, and
| Project: 169525666 | 17-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
17 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups
sediments naturally above the LEL for chromium, iron, manganese, and nickel across both upstream and downstream areas. Effluent disperses rapidly—an estimated 2.4% of end-of-pipe concentration within 250 m downstream—and six phases of MDMER Environmental Effects Monitoring have found no ecologically significant mine-related effects on water quality, sediment, the benthic community, or fish, with arsenic the only constituent showing a modest, localized exposure-area signal that remains below applicable guidelines.
17.2Site Water Quality and Geochemistry
Static and kinetic tests were conducted to evaluate the chemistry of Grey Fox mine materials and the potential for release of metals and acidity from development rock. Shake flask tests were conducted as part of a geochemical characterization static testing program conducted on Grey Fox drill cuttings (Wood 2022b, references therein). Although the method used was not specified, this test typically involves reacting solids in deionized water in a 3-parts water to 1-part solid ratio for 24 hours, per Mine Environment Neutral Drainage (MEND) guidance (Price, 2009). Tests were conducted on 84 samples covering the seven major geologic rock types encountered at Grey Fox. The sample results were averaged within geologic unit, and then a geologic-unit-weighted average was calculated to represent mixed/ROM rock at Grey Fox.
In addition to the shake flask tests, humidity cell tests were conducted on Grey Fox drill cuttings collected from exploration boreholes (Wood, 2022b; WSP, 2024). A total of 11 humidity cell tests were conducted representing the four most abundant geologic rock types, including Massive Mafic Volcanic, Pillowed Mafic Volcanic (PMV), Variolitic Mafic Volcanic, and Sedimentary (SED).
One of the key objectives of the humidity cell tests was to evaluate potential for mine materials to become acid generating. Of the geologic rock types at the site, acid-base accounting results indicated that the presence of potentially acid-generating (PAG) material was particularly associated with SED and PMV geologic units, although all units primarily contained non-PAG (NPAG) material (Wood 2022b). For this reason, the humidity cell tests for SED and PMV material included both PAG and NPAG material to evaluate the potential for PAG materials to go acidic over time. The humidity cell tests were run for between 84 and 131 weeks. Over this time, two humidity cells (SED cell HC-02 and PMV cell HC-03) went acidic; however, based on a comparison of acidity generated in these two cells relative to the alkalinity generated in other cells, coupled with a material mass balance based on acid-base accounting results and anticipated waste rock tonnages for different geologic units, it was determined that the mixed ROM material would maintain net-alkaline. Further, the humidity cell test results indicated that all materials regardless of their potential to go acidic exhibited similar constituent leaching behavior (particularly for oxyanions including arsenic and molybdenum).
Per MEND guidance (Price 2009), humidity cell tests are typically run until constituent concentrations are stable for at least five weeks, noting that at least 40 weeks may be required. The humidity cell tests conducted for Grey Fox (between 84 and 131 weeks) were run until constituent concentrations stabilized. This long timeframe is often required to evaluate depletion of acid neutralization potential, noting that many sulfidic rock types start out acid neutralizing but become acid generating after acid neutralization potential is depleted. Because of this, concentrations of several constituents (including acid soluble metals) can increase as humidity cells progress, and the long-term stabilized concentrations are used to develop geochemical source terms. However, for the rock types at Grey Fox, several constituents were higher in the
| Project: 169525666 | 17-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
17 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups
first few weeks of the humidity cell tests due to the washout of soluble constituents from freshly exposed rock surfaces. This “first flush” of constituents is anticipated to be an important influence on Grey Fox contact water quality during operations, and therefore both the Week 0 and average of post-Week 30 humidity cell test concentrations were considered in developing geochemical source terms. Additional details are provided in Section 15.11.1.
17.3Environmental Setting
Environmental baseline (pre-development) investigations were completed for a number of the Fox Complex properties prior to mine development and provide a basis for future closure comparison. These studies establish background conditions for surface water, groundwater, aquatic ecology, and terrestrial ecology. Key baseline investigations completed include the following:
| ● | Pre-development environmental baseline investigations were completed for all Fox Complex properties covering surface water, groundwater, aquatic ecology, and terrestrial ecology (AMEC, 2008, 2012, 2014; Golder, 2015; BZ Environmental, 2006; supplementary data ongoing at Fox West properties). These studies establish background conditions for future closure comparison. All relevant baseline references are listed in Section 24. |
As required by existing permits and approvals, McEwen operates a comprehensive environmental monitoring program at the Fox Complex. Information collected supports current compliance and future permitting application requirements. Currently, all McEwen Fox Complex properties are in compliance with all applicable regulatory requirements, including Ontario Regulation 35/24 – Mine Development and Closure and the Mine Rehabilitation Code of Ontario. Financial assurance, as set out in Part VII of the Mining Act and Ontario Regulation 35/24, has been provided for required closure activities. Refer to Section 17.5 for further details on closure cost estimates and financial assurance.
17.4Regulatory Framework
17.4.1Impact and Environmental Assessment
Mining projects in Canada can be reviewed under one or more Environmental Assessment (EA) or Impact Assessment processes, whereby design choices, environmental impacts, and proposed mitigation measures are reviewed to determine how best to proceed through the approvals and permitting process. Entities involved in the review process normally include government agencies, Indigenous communities, interested parties, and the general public.
Based on proposed activities at the Grey Fox, Stock, and Western Properties, a Federal Impact Assessment process under the Impact Assessment Act is not required as per Sections 18 and 19 (Mine and Metal Mills) of the Physical Activities Regulations (SOR/2019-285). The Ontario Environmental Assessment Act regulates the environmental assessment process for mining projects in Ontario and requires that potential environmental impacts be assessed before a project begins. Mining projects and infrastructure developments on Crown land or using Crown resources may be required to complete a Class EA assessment with the Ontario Ministry of Mines.
| Project: 169525666 | 17-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
17 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups
17.4.2Environmental Approvals
Federal environmental approvals associated with mine site developments generally correlate to the Fisheries Act and the Canadian Navigable Waters Act. Based on current information, federal environmental approvals under these Acts are not expected to be required. Environment and Climate Change Canada regulates the mine effluent under the federal MDMER under the Fisheries Act.
A large number of active environmental approvals are currently held for individual Western Properties. A comprehensive listing of existing active approvals is provided in Table 17-1. Amendments to existing approvals, or new approvals, will be required depending on final project designs for Grey Fox and associated infrastructure. Table 17-2 provides a preliminary listing of applicable approvals and amendments that may be required as the Grey Fox, Stock, and Western Properties progress.
Table 17-1: Existing Environmental Approvals
Site | Regulatory | Reference No. | Type | Issue Date | Expiration | Status / Notes |
| Agency | | | | | |
Black Fox | MECP | 0328-8XVPXT | ECA-ISW | January 23, 2019 | N/A | Active – |
| | | | | | Amendment |
| | | | | | required for |
| | | | | | effluent transfer to |
| | | | | | Black Fox holding |
| | | | | | pond for Grey Fox |
| | | | | | mine water |
Black Fox | MECP | 2126-DRUJZW | ECA-Air | April 27, 2026 | N/A | Active – |
| | | | | | Amendment |
| | | | | | completed for |
| | | | | | Grey Fox |
| | | | | | Operations |
Black Fox | MECP | 6824-9VCNXB | PTTW | October 26, 2020 | October 26, | Active – No |
| | | | | 2030 | change |
| | | | | | anticipated |
Black Fox | MEM | N/A | Closure | June 2018 | N/A | Active – |
| | | Plan | | | Amendment |
| | | | | | required for Grey |
| | | | | | Fox closure costs |
| | | | | | (Black Fox |
| | | | | | Closure Plan |
| | | | | | Amendment 2026 |
| | | | | | filed) |
Grey Fox | MECP | Pending | PTTW | Pending | TBD | Pending – New |
| | | | | | permit required for |
| | | | | | underground mine |
| | | | | | dewatering |
Stock Mill | MECP | 4371B2KHZT | ECA-ISW | August 2, 2018 | N/A | Active |
Stock Mill | MECP | 1357-A4KKFS | ECA-Air | December 11, | N/A | Active |
| | | | 2015 | | |
Stock Mill | MECP | 6377-88UJE5 | PTTW | September 18, | September | Active |
| | | | 2018 | 18, 2028 | |
| Project: 169525666 | 17-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
17 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups
Site | Regulatory | Reference No. | Type | Issue Date | Expiration | Status / Notes |
Stock Mill | NDMNRF | N/A | Closure | June 2018 | N/A | Active |
Notes: ECA-ISW: Environmental Compliance Approval – Industrial Sewage Works; ECA-Air: Environmental Compliance Approval – Air and Noise; MECP: Ministry of Environment, Conservation and Parks; MEM: Ministry of Energy and Mines; PTTW: Permit to Take Water; N/A: not applicable (no expiry date); NP: not provided.
Table 17-2: Anticipated Provincial Approval/Amendment Requirements
Approval | Responsible | Description |
| Ministry | |
Closure Plan Amendment | MEM | Mine construction / production and closure for |
| | Grey Fox / Stock, including updated financial |
| | assurance. Offline dams above the high-water |
| | mark of local watercourses (e.g., TMA). |
Environmental Compliance Approval(s) – | MECP | Release of air emissions and noise from haul |
Air and Noise | | trucks, process plant, refuelling / oil / lubrication |
| | areas, administration complex, and onsite |
| | laboratory. |
Environmental Compliance Approval – | MECP | Operation of a waste transfer site; transportation |
Waste Disposal Site / Waste Management | | of waste materials offsite and onto Provincial |
| | highways. |
Environmental Compliance Approval – | MECP | Domestic sewage treatment plant. Not expected |
Domestic Sewage | | to be required if pre-approved mobile sewage |
| | treatment systems are used. |
Environmental Compliance Approval(s) – | MECP | Construction of mine / mill water treatment |
Industrial Sewage Works | | system(s) discharging to the environment; |
| | includes TMA, ponds, mine water, stormwater, |
| | stockpile runoff, and fuelling areas. |
Permit(s) to Take Water – Ontario Water | MECP | Taking of groundwater or surface water (>50,000 |
Resources Act | | L/day) for process water balance and mine |
| | dewatering. May also be required for construction |
| | dewatering. |
Forest Resource License(s) – Crown | MNRF | Cutting of Crown merchantable timber for site |
Forest Sustainability Act | | development or transmission line construction. |
Work Permit(s) – Lakes and Rivers | MNRF | Work / construction on Crown land. Dam |
Improvement Act / Public Lands Act | | construction on any lake or river requires written |
| | approval for location and plans and specifications. |
Township of Black-River Matheson | Municipality | Construction-related building permits as required. |
| Project: 169525666 | 17-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
17 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups
17.4.3Permitting Critical Path and Schedule
The critical path for commencement of Grey Fox underground development is anticipated to be the Closure Plan Amendment, the Grey Fox PTTW for dewatering of underground workings and ISW-ECA amendment to the Black Fox mine effluent discharge (0328-8XVPXT). The Grey Fox PTTW will be a Category 3 application under Ontario Regulation 387/04, requiring a full hydrogeological study prepared by a QP given the scale of anticipated dewatering (estimated at up to 1,938 m³/d, equivalent to approximately 1.94 million L/d) and determination of influence to nearby Pike River and Salve Creek. Category 3 PTTW applications are technically complex and typically require a minimum of 6 to 9 months from application submission to permit issuance, exclusive of the time required for data collection, hydrogeological modeling, and supporting report preparation. The Closure Plan Amendment, to incorporate Grey Fox mine production and associated updated closure costs, requires filing with MEM and confirmation of updated financial assurance—typically a 3-to-6-month review period following submission of a complete application.
ECA-ISW amendments at Black Fox (for effluent transfer, treatment and discharge to handle Grey Fox mine water) will be required prior to commencement of mine operations; this application should be submitted in parallel with the PTTW process. The key requirement for the ISW-ECA related to Grey Fox transfer, treatment and discharge will be the establishment of new effluent criteria for the Black Fox water treatment plant in accordance with MECP Procedure B-1-5 and the development of an acceptable surface and groundwater monitoring plan(s) to MECP. Both these pre-application components must be developed and accepted by MECP before the ISW-ECA application is submitted. MECPs service standard for complete and acceptable ISW-ECA applications is 12 months after submission. McEwen’s intent is to progress all key permit applications concurrently and as soon as necessary project design information is available. McEwen has an established regulatory record at the Fox Complex that supports efficient permit processing.
17.5Environmental Aspects and Sensitivities
17.5.1Water Discharge
Contact water from the Grey Fox site will be collected and stored on-site and then transferred to the Black Fox mine for treatment and discharge into the Pike River following treatment at the currently permitted discharge point in accordance with an MECP amended industrial sewage works Environmental Compliance Approval. Treatment within the holding pond prior to discharge involves sulphuric acid addition to lower pH, and ferric sulphate dosing to precipitate arsenic. A coagulant (e.g., poly-aluminum chloride) may also be used to enhance the settling of suspended solids in the Holding Pond, if required. Additional treatment options are being considered to meet anticipated approval limits, including arsenic, zinc, nickel, molybdenum and copper. Loading values are dependant on seasonal fluctuations and assimilative capacity of the Pike River. Modeling and discussions with stakeholders is on-going.
To reduce the mine water inventory, non-contact runoff at the Grey Fox site will be diverted using perimeter berms to allow runoff to naturally flow off site. Contact water collection ditches to collect runoff and toe seepage will be constructed around the perimeters of project components, including the waste rock stockpile, ore stockpile, and laydown area. Areas where fuel storage or handling may occur will be isolated to avoid potential cross-contamination of petroleum hydrocarbons. Contact water collection ditches will
| Project: 169525666 | 17-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
17 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups
drain by gravity to the extent practicable to reduce pumping requirements. Excavated sumps and pumps will be used where site topography is not conducive to draining by gravity. The contact water collection ditches will discharge the collected water to water management ponds.
The water management ponds and collection ditches will be designed to contain water from a 1 in 100-year AEP of a 24-h duration storm event, considering snowmelt. The spillways of the ponds will be designed for the climate change adjusted 1 in 100-year annual exceedance probability of a 24-h duration storm event. Two ponds are anticipated to be required for water management, a stockpile pond and a holding pond. The holding pond will have a permanent pool to promote settling and provide extended detention and storage of settled materials. The holding pond will be designed to receive pumped inflows from the underground dewatering in addition to site contact water and will serve as a source of water for service underground water requirements and site surface water needs (e.g., dust suppression).
Ore will be processed, and tailings disposed of at existing processing and tailings storage facilities at the Stock Mill site.
17.5.2Site Plan Layout
The Grey Fox mine works including waste rock piles and water management infrastructure will be designed to avoid watercourses and waterbodies to address concerns with a Fisheries Act MDMER Schedule 2 prohibition regarding the deposition of mine waste in waterbodies frequented by fish.
17.6Social and Community
The McEwen Fox Complex is located within territories traditionally used by Indigenous peoples. Consultation and engagement activities with Indigenous Nations regarding the Fox Complex have been ongoing since 2006. Nations consulted include:
| ● | Apitipi Anicinapek Nation (formerly Wahgoshig First Nation) – Reserve located approximately 23 km east of the Fox Complex and the closest Indigenous community to the Site; |
| ● | Matachewan First Nation – Reserve located approximately 60 km southwest; |
| ● | Métis Nation of Ontario – Timmins Community Council; |
| ● | Métis Nation of Ontario – Northern Lights Council; and |
| ● | Temiskaming Métis Council. |
An Impact Benefit Agreement (IBA) is currently in place with the Apitipi Anicinapek Nation, the Indigenous community in closest proximity to the Black Fox Complex. The IBA includes a pathway for discussing approval amendments, considerations and related potential impacts prior to submission. Concerns or questions raised are addressed within this process. In accordance with the IBA, the filed Closure Plan Amendment for the Black Fox Complex was provided to Apitipi Anicinapek Nation for review prior to submission.
McEwen continues to discuss all projects that require government permits or approvals with First Nations in advance of submission. Details of the agreements and discussions with local Indigenous communities are provided in Section 3.3.2 of this TRS.
| Project: 169525666 | 17-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
17 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups
Consultation and engagement will also be required with other stakeholders, including regulatory agencies, local communities, and residential and industrial neighbors where development is proposed in proximity to existing properties or operations. Community members will be engaged as appropriate.
17.7Mine Closure
McEwen has prepared and filed a Closure Plan Amendment for the Fox Complex, which was filed with the Ministry of Energy and Mines (Formerly Ministry of Northern Development, Mines, Natural Resources and Forestry) in 2026. The Closure Plan Amendment supersedes all previously submitted closure plan amendments and is to be considered in its entirety. The overall objectives of site rehabilitation and closure measures are to stabilize the site and to reduce, mitigate, and/or eliminate risks of hazards and the release of mine-related constituents into the surrounding environment.
Site reclamation work will be fulfilled progressively during active operations as practicable, consistent with industry best practice and the filed Closure Plan Amendment. The closure plan addresses three phases: Temporary Suspension, State of Inactivity, and Close Out. The post-closure land use for the site is forest and wildlife habitat, with potential for forestry operations, mineral exploration, agriculture, and recreational uses.
17.7.1Conceptual Closure
Table 17-3 summarizes preliminary closure concepts for major infrastructure and site features at the Fox Complex per the filed Closure Plan Amendment.
Table 17-3: Closure Approaches
Feature | Concept Summary |
Open Pit (Black Fox) | Remove all infrastructure and equipment from within the open pit. |
| Reshape if needed and revegetate overburden slopes to a stable |
| condition. Allow pit to fill naturally with water via seepage and runoff. |
| Ramps will be barricaded and a safety berm established around the |
| perimeter. Construct overflow channel from the open pit to a tributary |
| of Salve Creek to the north. Batch treatment of pit water as |
| appropriate. |
Underground Mine (Black Fox, Froome, | Remove all infrastructure and equipment presenting environmental |
Grey Fox, Stock) | hazard or with salvage value. Allow workings to flood naturally via |
| groundwater seepage. Seal all entrances to underground workings. |
Buildings, Machinery, Equipment and | Salvageable machinery and equipment dismantled and removed from |
Infrastructure (All Sites) | site. Remaining items managed in accordance with regulatory |
| requirements at an approved onsite landfill or licensed offsite facility. |
| Above-grade concrete structures broken to near-grade; rebar cut flush |
| with surface; concrete structures infilled with clean mine rock if |
| required. |
Chemicals, Petroleum Products and | All petroleum products, chemicals, and explosives removed from site |
Explosives (All Sites) | and transported to a licensed disposal facility. Contaminated soil |
| handled in accordance with regulatory requirements. |
| Project: 169525666 | 17-9 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
17 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups
Feature | Concept Summary |
Onsite Infrastructure – Roads and Power | Roads not needed in the long term scarified and seeded. Onsite power |
(All Sites) | distribution lines and associated materials dismantled and deposited in |
| an approved landfill if unable to be sold or re-used. |
Tailings Management Area (Stock) | Tailings surface progressively covered with soil and revegetated. |
| Tailings pond drained; water treated prior to discharge. |
Waste Rock (Black Fox) | Progressive reclamation during operations. Regrading of slopes to 3:1 |
| (overall) where required. Placement of overburden cover followed by |
| revegetation. Pumping of stockpile runoff / seepage to open pit during |
| State of Inactivity. |
Waste Rock (Grey Fox, Stock) | Regrading of stockpiles to acceptable slopes. Waste rock stockpile |
| surfaces will be covered and revegetated with material that meets the |
| long term cover requirements for reactive material as per the Ontario |
| Mine Rehabilitation Code. |
Rehabilitation measures will include:
| ● | The waste rock pile will be built with overall embankment slopes that are adequate for long-term physical stability so that no re-contouring is required at closure. Available stockpiled soil will be used to vegetate waste rock piles as practical to conform to the local landscape. Mine rock types that pose a chemical stability risk will be managed in accordance with the management plan that will be developed as part of the closure plan. |
| ● | Final removal of the water management infrastructure will be conducted once no longer required. |
| Project: 169525666 | 17-10 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
18Capital and Operating Costs
18.1Methodology
The capital and operating cost estimate meets the criteria to be classified as a Class-3 estimate, as defined by AACE International with an approximate accuracy of +20%/-15%. All costs included in the estimate are reported in Q1 2026 US dollars (US$).
The cost estimates reflect a detailed bottom-up approach based on key engineering deliverables that define the project scope. This scope is described and quantified within material takeoffs in a series of line items. The costs have been compared against project benchmarking, along with McEwen existing operations in the area.
18.2Total Capital Cost Estimates
The total combined capital cost estimates was prepared by Stantec, DRA, and Arcadis, with contributions from McEwen. The total pre-production capital expenditure (CAPEX) is estimated at $180.8 million, followed by $173.8 million in sustaining capital costs (SUSEX), and $7.4 million for closure. The capital cost estimate is divided into three broad scope areas:
| ● | Mining |
| ● | Processing |
| ● | Other |
A summary of the estimated LOM CAPEX is presented in Table 18-1, with detailed cost breakdowns summarized in the sub-sections that follow.
The project period CAPEX is defined as all costs incurred from 2026 to the end of 2029, while SUSEX is incurred from 2030 through to the end of mine life. Pre-production CAPEX has been divided into the following:
| ● | Engineering and procurement services. |
| ● | Non-development mining cost (e.g., equipment, construction, underground infrastructure). |
| ● | Mining development cost (including vertical development). |
| ● | Surface infrastructure. |
| ● | Pre-production operating costs (operating costs that occur during the project period). |
| ● | Contingency. |
SUSEX are related to the following:
| ● | The initial equipment fleet is planned to be leased by McEwen and included in the operating cost (refer to Section 18.3.1.5). The new equipment required for Grey Fox South, plus the planned rebuild and replacement equipment, is included in the sustaining capital cost. |
| ● | Mining development cost (including vertical development). |
| ● | Underground infrastructure construction. |
| Project: 169525666 | 18-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
| ● | Surface construction. |
| ● | Mine closure. |
The cost presented in this technical report outlines an initial pre-production capital cost estimate of $180.8 million, which includes a contingency of $27.11 million and pre-production operating costs of $4.2 million. Estimated LOM capital costs are presented in Table 18-1.
Table 18-1: Capital Cost Estimate ($ millions)
Description | Project Period | Sustaining Capital | Total Capital Cost | |
| ||||
Mining | | | | |
Engineering | $5.8 | $0.0 | $5.8 | |
Procurement | $4.4 | $48.0 | $52.4 | |
Construction / Excavations | $98.5 | $125.6 | $224.1 | |
Indirects | $31.8 | $0.2 | $32.0 | |
Contingency | $25.9 | $0.0 | $25.9 | |
Total Mining | $166.4 | $173.7 | $340.1 | |
Surface Crusher Facility | | | | |
Engineering | $0.3 | $0.0 | $0.3 | |
Mechanical Equipment Supply + Install | $1.7 | $0.0 | $1.7 | |
Commodities | $1.0 | $0.0 | $1.0 | |
Indirects | $1.0 | $0.0 | $1.0 | |
Contingency | $0.5 | $0.0 | $0.5 | |
Total Surface Crusher Facility | $4.4 | $0.0 | $4.4 | |
Water Treatment Plant | | | | |
Engineering | $0.7 | $0.0 | $0.7 | |
Procurement | $3.6 | $0.0 | $3.6 | |
Construction | $0.2 | $0.0 | $0.2 | |
Indirects | $0.4 | $0.0 | $0.4 | |
Contingency | $0.7 | $0.0 | $0.7 | |
Total Water Treatment Plant | $5.7 | $0.0 | $5.7 | |
Total | $176.5 | $173.7 | $350.3 | |
Pre-Production Costs | $4.2 | $0.0 | $4.2 | |
Closure | $0.0 | $7.4 | $7.4 | |
Net Capital Costs | $180.8 | $181.1 | $361.9 | |
Notes:
| ● | All figures are rounded to reflect the relative accuracy of the estimate. |
| ● | Totals may not sum due to rounding as required by reporting guidelines. |
| ● | Pre-production costs include operating costs incurred prior to any profits. |
| Project: 169525666 | 18-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
18.2.1Mining Capital Costs
The total project period mining capital of $166.4 million primarily includes surface construction, lateral and vertical mine development, underground infrastructure construction, as well as the purchase and installation of stationary mine equipment. The cost excludes the pre-production OPEX, estimated at $4.2 million.
The total mining sustaining capital of $173.7 million primarily includes lateral and vertical mine development, underground infrastructure construction, and mobile fleet rebuilds and replacement.
The estimated LOM CAPEX and SUSEX for mining-related activities are presented in Table 18-2.
Table 18-2: Mining Preproduction Capital and Sustaining Costs ($ millions)
| Preproduction Capital | Sustaining Capital | |
Item | ($ millions) | ($ millions) | |
Detailed Engineering | $5.8 | $0.0 | |
Procurement | | | |
Contractor Mob/Demob | $1.4 | $0.1 | |
Mobile Equipment Rental | $0.6 | $0.0 | |
Mobile Equipment Rebuilds/Replacement | $0.0 | $47.9 | |
Packaged Equipment and Bulks | $2.5 | $0.0 | |
Total Procurement | $4.4 | $48.0 | |
Mine Construction / Excavations | | | |
Underground Mine | $45.6 | $117.3 | |
Surface | $42.3 | $6.7 | |
Pre-Commissioning | $0.8 | $1.1 | |
Contractor Indirects | $9.8 | $0.5 | |
Total Underground Mine Construction | $98.5 | $125.6 | |
Construction Indirects | | | |
Logistics and Freight | $3.0 | $0.0 | |
Capital/Commissioning/Operating Spares | $2.0 | $0.0 | |
Vendor Support | $2.0 | $0.0 | |
Total Construction Indirects | $7.1 | $0.0 | |
Project Indirects | | | |
EPCM | $24.7 | $0.2 | |
Total Project Indirects | $24.7 | $0.2 | |
Contingency | $25.9 | $0.0 | |
Mining Totals | $166.4 | $173.7 | |
| Project: 169525666 | 18-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
18.2.1.1 Underground Mine Construction / Excavations
Detailed Engineering
Summarizes the cost estimate to complete the detailed engineering for the following:
| ● | Mine design and scheduling |
| ● | Underground facilities |
| ● | Backfill |
| ● | Ventilation |
| ● | Surface facilities |
| ● | Geomechanical modelling |
Procurement
The procurement includes the costs associated with the contractor indirects, short term equipment rental for early mine development, and package equipment, which equipment that isn’t specific to a single construction activity, for example underground subs that would be moved, jumbo cable etc.
The initial mobile equipment fleet is included in the operating cost estimate as a lease. The procurement of fixed plant equipment, such as fans, pumps, compressors, are included in the facility cost under underground or surface construction.
Underground Construction / Excavations
The underground mine construction consists of all project period lateral and vertical excavations, and any underground facilities constructed. The underground lateral development and installations contractor will be responsible for the initial underground ramp, lateral and vertical (raising) development (in waste rock only) starting from the construction of the north access portal to the initial ore access at Whiskey Jack, and construction/installation of stationary mine infrastructure. Once the deposit is accessed at Whiskey Jack, McEwen’s labor workforce will assume all underground development and construction activities.
The project period cost for the underground construction and excavations are presented in Table 18-3. See Table 13-43 for list of underground facilities included in the cost estimate.
Table 18-3: Underground Construction and Excavation during Project Period
Item | Cost ($ millions) |
Definition Drilling | $9.9 |
Mine Development - Ramp/Lateral | $17.9 |
Mine Development - Vertical | $2.7 |
Underground Construction | $15.1 |
Total | $45.6 |
| Project: 169525666 | 18-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operopating Costs
Surface Construction
Surface infrastructure construction capital is estimated to be $42.3 million, and is exclusive of indirect and contingency costs. The surface construction costs during the project period include a portal, administration building, dry and security facility, surface maintenance shop, ventilation/heating plants, electrical substation, water collection ponds, access roads, and all earth works related to excavating and levelling the site. The project period cost for the surface construction activities are presented in Table 18-4.
Table 18-4: Surface Construction During the Project Period
Item | Cost ($ millions) |
Site Clearing, Roads, Bridges, Ponds, etc. | $12.7 |
Surface Facilities | $15.8 |
Surface Utilities | $3.7 |
Portals with Fans | $1.3 |
Ventilation Collars | $1.4 |
Main Ventilation Fans | $3.8 |
Pipeline from Grey Fox to Black Fox | $3.7 |
Total | $42.3 |
18.2.1.2 Construction Indirects
Indirect construction costs include freight and logistics for the delivery of equipment and materials to site, spare parts for fixed plant equipment, and vendor commissioning support for fixed plant equipment. Costs are estimated as a percentage of the total fixed plant equipment capital estimate, with the percentages applied as follows:
| ● | Freight – 3% |
| ● | Spare parts – 2% |
| ● | Vendor support – 2% |
18.2.1.3 Project Indirects
Indirect project costs account for all labor and expenses, and required indirect fleet and vehicle operating costs, associated with the execution of the project. The project team organization chart, labor forecasts, and fleet requirements are developed based on the project execution plan, and the costs are then developed from first principles.
18.2.1.4 Mining Sustaining Capital Costs
Sustaining Capital is associated with of the remaining lateral and vertical excavations, underground and surface infrastructure, equipment rebuilds and replacement, along with all indirects costs associated with the work completed during the project period. The annual sustaining capital costs are presented in Table 18-5.
| Project: 169525666 | 18-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
Table 18-5: Annual Sustaining Capital Costs ($ million)
Item | Cost | 2030 | 2031 | 2032 | 2033 | 2034 | 2035 | 2036 | 2037 | 2038 | 2039 | 2040 | 2041 | |
Procurement | | |||||||||||||
Contractor Mob/Demob | $0.1 | $0.1 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | |
Mobile Equipment | $47.9 | $0.0 | $2.4 | $2.6 | $6.1 | $4.9 | $4.4 | $3.3 | $7.3 | $9.9 | $6.9 | $0.0 | $0.0 | |
Underground Construction and Excavations | | |||||||||||||
Definition Drilling | $29.7 | $1.0 | $3.1 | $1.2 | $5.1 | $4.4 | $1.0 | $5.2 | $2.8 | $3.9 | $1.9 | $0.1 | $0.0 | |
Mine Development - Ramp/Lateral | $44.9 | $1.4 | $4.7 | $1.8 | $7.7 | $6.6 | $1.6 | $7.8 | $4.2 | $6.0 | $2.9 | $0.1 | $0.0 | |
Mine Development - Vertical | $3.5 | $0.1 | $0.4 | $0.1 | $0.6 | $0.5 | $0.1 | $0.6 | $0.3 | $0.5 | $0.2 | $0.0 | $0.0 | |
Underground Construction | $39.2 | $1.3 | $4.1 | $1.6 | $6.7 | $5.8 | $1.4 | $6.8 | $3.7 | $5.2 | $2.5 | $0.1 | $0.0 | |
Surface Construction | | |||||||||||||
Ventilation Collars | $1.4 | $1.4 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | |
Main Ventilation Fans | $5.3 | $5.3 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | |
Pre-Commissioning | $1.1 | $0.0 | $0.2 | $0.0 | $0.2 | $0.2 | $0.0 | $0.2 | $0.1 | $0.1 | $0.1 | $0.0 | $0.0 | |
Contractor Indirects | $0.5 | $0.1 | $0.1 | $0.1 | $0.1 | $0.1 | $0.1 | $0.1 | $0.1 | $0.1 | $0.1 | $0.0 | $0.0 | |
Project Indirects | $0.2 | $0.2 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | $0.0 | |
Total | $173.7 | $10.8 | $15.0 | $7.5 | $26.5 | $22.5 | $8.5 | $23.9 | $18.5 | $25.6 | $14.5 | $0.4 | $0.0 | |
| Project: 169525666 | 18-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
18.2.2Surface Crushing Facility
A primary crusher with a stacking conveyor will be located on the ore pad at the Grey Fox site. ROM ore will be trucked from either the North or South Portal and deposited near the primary crusher. A loader will be used to feed the crusher. Crushed ore will be placed in temporary stockpiles with the stacking conveyor, and then loaded into surface haulage trucks and hauled to the Stock Mill for processing.
Bulk earthworks costs are included with the surface construction costs presented in Table 18-2.
The estimate presented in Table 18-6 includes the cost of crusher, conveyor, and related equipment, engineering, indirect costs, and contingency.
Table 18-6: Surface Crusher Costs ($ millions)
Item | LOM Total |
Mechanical Equipment Supply and Install | $1.7 |
Commodities | $1.0 |
Contractor Indirects | $0.4 |
Freight and Land Transport Cost | $0.3 |
Spares and Inventory | $0.1 |
EPCM | $0.3 |
Commissioning and Vendor Representative | $0.3 |
Contingency | $0.5 |
Total Capital Costs | $4.5 |
18.2.3Water Treatment Plant Capital Costs
The capital cost estimate for the Grey Fox water treatment plant has been developed based on several key assumptions. The treatment system is assumed to be housed within a new 24 m x 46 m industrial metal featuring insulated metal panels, an HVAC system, and a concrete foundation designed to withstand anticipated site temperature extremes. The process configuration, as described in Section 15, is based on projected holding pond water chemistry and is designed to meet Ontario PWQO discharge limits. Allowances for design and engineering have been estimated at 20% of capital equipment costs, while project management and QA/QC have been estimated at 10% of the combined capital equipment and construction costs. Table 18-7 summarizes the water treatment plan costs.
| Project: 169525666 | 18-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
Table 18-7: Water Treatment Plant Costs
Description | Cost ($ millions) | Notes |
Direct Costs | | |
Building | $2.8 | 80’ x 150’ Industrial metal building and foundation |
Filtration System | $0.4 | Includes initial filtration media |
Containerized IX System | $0.4 | Includes initial resin load |
Containerized Dewatering System | $0.1 | |
Field Installation | $0.2 | Site civil, electrical connection, and piping |
| | interconnect |
Indirect Costs | | |
Design and Engineering | $0.7 | See assumptions |
Project Management, Procurement, | $0.4 | See assumptions |
and QA/QC | | |
Contingency | $0.7 | See assumptions |
Total | $5.7 | |
18.2.4Contingencies
A contingency factor was applied against all project capital, excluding engineering and indirect labor costs, resulting in a total estimated contingency of $27.1 million.
18.2.5Pre-Production Operating Costs
The pre-production costs include operating costs incurred within the project period associated with operating waste development and ore development/production, mine operating indirect costs, fixed plant maintenance, processing, and utilities. The pre-production cost total is $4.2 million.
18.2.6Closure
Closure costs have been estimated in the 2026 Closure Plan Amendment. The total estimated cost of closure activities, as described in the Closure Plan Amendment and reflected in the LOM financial model, is $7.40 million. This estimate includes active care, passive care (long-term monitoring), and provision for periodic in-situ batch treatment of open pit water, post-closure.
It is noted that current closure cost estimates reflect the Black Fox Mine Closure as currently configured, including the Grey Fox deposit at its current advanced exploration footprint (the Grey Fox Advanced Exploration Closure Plan costs are included). This estimate does not yet incorporate the full mine production infrastructure associated with the Grey Fox mine as described in this technical report. A further Closure Plan Amendment will be required once Grey Fox mine design is finalized at future design study
| Project: 169525666 | 18-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
stages, and this amendment will include updated closure cost estimates and a corresponding update to financial assurance.
18.3 Total Operating Cost Estimates
Stantec, DRA, and Arcadis, with contributions from McEwen, developed operating cost estimates to determine the annual production costs. Unit costs are expressed in total LOM and $/tonne processed. All costs included in the estimate are reported in Q1 2026 US dollars.
Total LOM OPEX is estimated at $1,398 million, exclusive of pre-production operating costs, refining and shipping and royalties. Expenditures that are non‑ capital costs that occur during the project period are classified as Pre-production operating costs. Pre-production operating costs incurred in 2028 only have been capitalized in the economic models (refer to Section 18.2.5).
The operating cost estimate is divided into the following broad areas:
| ● | Mining |
| ● | Processing |
| ● | Tailings |
| ● | Wastewater Treatment |
The operating costs detailed herein are based on mine and process plant design criteria and engineering and unit cost information derived from various sources.
A summary of the estimated LOM operating costs is presented in Table 18-8 and details of the cost breakdowns are summarized in the sub-sections that follow:
Table 18-8: Total Operating Cost Estimate
Operating Cost Item | LOM Total ($ millions) | Cost $/tonne Processed |
Mining | $1,013.3 | $107.7 |
Processing | $267.0 | $28.4 |
Tailings | $114.6 | $12.2 |
Water Treatment | $2.8 | $0.3 |
Total | $1,397.7 | $148.6 |
Note:
| ● | All figures are rounded to reflect the relative accuracy of the estimate. |
| ● | Totals may not sum due to rounding as required by reporting guidelines. |
| Project: 169525666 | 18-9 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
18.3.1Mining – Operating Costs
Mine operating costs have been built up from first principles, using detailed mine development and production schedules together with a variety of unit costs (quoted by suppliers, or using benchmark data and operational experience). The costs have been scheduled by period and built up by type for each basic mining activity (i.e. lateral development, stoping, fixed plant maintenance, utilities and general mine/indirect activities). Mine operating costs in the years prior to the processing of ore have been capitalized. A summary of overall mine OPEX is presented in Table 18-9.
Table 18-9: Summary of Mining OPEX
Operating Cost Item | LOM Total (US$ | Cost $/tonne Processed | |
| |||
Underground Production | $651 | $69.17 | |
Mine Operations Indirect | $145 | $15.40 | |
Utilities (Power/Gas) | $122 | $12.94 | |
Fixed Plant Operating | $22 | $2.34 | |
Leasing - Equipment & Infrastructure | $62 | $6.62 | |
Project Period Mining Direct | $12 | $1.26 | |
Total | $1,013 | $107.73 | |
Notes:
| ● | All figures are rounded to reflect the relative accuracy of the estimate. |
| ● | Totals may not sum due to rounding as required by reporting guidelines. |
18.3.1.1 Underground Production
The underground production costs have been developed from first principles for all ore development and production and ore haulage related activities. Unit costs for development and production activities, were calculated from first principles and include labor, materials/consumables and mobile equipment operating. The unit cost calculations are provided for direct costs only. Varying unit costs are calculated for both the project and operating periods.
The labor component is based upon the crew size and the calculated performance per day to determine the total hours per unit of measure, which are then applied to the crew labor rates. Materials costs are based on the quantity take offs per unit, derived from the mine design criteria. Equipment operating is based on the calculated performance per day to determine the total hours per unit of measure, which are then applied to the equipment operating costs per hour.
See Table 18-10 and Table 18-11 for operating development and stoping unit costs during the project period and operating period, respectively.
| Project: 169525666 | 18-10 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
Table 18-10: Operating Development Unit Costs
Description | Unit Cost | |
| ||
Contractor | | |
Stope Access - Single Heading (PP) - 4.0 x 4.3 m (WxH) | $3,265.68 | |
Stope Access - Multiple Heading (PP) - 4.0 x 4.3 m (WxH) | $3,201.48 | |
Sill Cut - Single Heading (PP) - 4.0 x 4.0 m (WxH) | $3,119.31 | |
Sill Cut - Multiple Heading (PP) - 4.0 x 4.0 m (WxH) | $3,053.77 | |
Sill Cut - Single Heading (PP) - 3.5 x 4.0 m (WxH) | $2,865.44 | |
Sill Cut - Multiple Heading (PP) - 3.5 x 4.0 m (WxH) | $2,501.15 | |
McEwen | | |
Stope Access - Single Heading (OP) - 4.0 x 4.3 m (WxH) | $3,275.49 | |
Stope Access - Multiple Heading (OP) - 4.0 x 4.3 m (WxH) | $2,770.69 | |
Sill Cut - Single Heading (OP) - 4.0 x 4.0 m (WxH) | $3,081.93 | |
Sill Cut - Multiple Heading (OP) - 4.0 x 4.0 m (WxH) | $2,661.16 | |
Sill Cut - Single Heading (OP) - 3.5 x 4.0 m (WxH) | $2,902.96 | |
Sill Cut - Multiple Heading (OP) - 3.5 x 4.0 m (WxH) | $2,481.89 | |
Note: PP = project period; OP = operating period
Table 18-11: Stoping Unit Cost by Deposit
Description | Unit Cost | |
| ||
Underground Mine Stoping - Whiskey Jack | $52.47 | |
Underground Mine Stoping – Gibson / Grey Fox South | $64.14 | |
18.3.1.2 Mine Operations Indirect
Owner’s Team
The Owner’s team operating cost listed in Table 18-9 includes personnel comprised of Management, Technical Services, Operating (non-direct), and Maintenance personnel. The non-direct operating includes underground general foreman, shift bosses, and grader operators, etc.
| Project: 169525666 | 18-11 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
Indirect Mobile Equipment
The operating cost for the indirect equipment is based on Stantec’s internal benchmarking and project experience, along with mining industry published standards aligned with the proposed equipment fleet.
18.3.1.3 Utilities
Power
The total power demand for the underground operations was calculated by considering the connected load and adjusting for utilization (operating hours), demand factor (percentage of nameplate draw), drive efficiency, and system losses. Power for the operating period will be provided by a 27.6 kV power line installed by Ontario Hydro, with an estimated cost of $0.085/kWh for steady-state power. Details of the power distribution are described in Section 15.6.
The estimated total power consumption for the operating period is 1,379 M kWh, with a total estimated cost of $86.7 million.
Compressed Natural Gas
The compressed natural gas operating costs are based on the following assumptions:
Heating of mine air takes place over an average period of 8 months per year.
Compressed natural gas supply costs will include the rental of all required infrastructure and delivery charges, and the all-in supply rate is assumed to be $0.79/standard cubic metre. This rate is based on current database costs for similar projects in Northern Ontario.
18.3.1.4 Fixed Plant Operating
Fixed plant maintenance costs have been estimated based on Stantec’s internal benchmarking and project experience, along with mining industry published standards aligned with the scope of work.
18.3.1.5 Leasing
McEwen will finance the initial purchase of all fleet, this leasing cost was carried as an operating cost. The estimate assumes that an interest payment of 6.99% will be applied to the repayment of each fleet unit, and that the repayment schedule will be three years per unit.
18.3.1.6 Project Period Mining Direct
The project period mining costs include all operating development, production and ore haulage related activities that occur during the project period.
| Project: 169525666 | 18-12 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
18.3.2Processing – Operating Costs
18.3.2.1 Basis of Estimate
The operating cost estimate for processing Grey Fox material through the Stock Mill has been developed based on defined operating parameters, metallurgical testwork, and industry benchmarks. The estimate assumes an annual plant throughput of 536,550 tonnes at a head grade of 3.4 g/t Au. Reagent consumption rates are based on metallurgical testwork results described in Section 10, supplemented where necessary with standard industry benchmarks in the absence of specific test data (e.g., cyanide detoxification). Comminution circuit power requirements were derived through process modeling using ore hardness parameters established during test programs. The overall process design reflects a combination of testwork outcomes and conventional industry best practices. Unit pricing for reagents and consumables was provided by McEwen based on current delivered costs to the Stock Mill, while costs for wear components such as polyurethane panels, cyclone parts, and screen cloths were estimated using DRA’s internal database of comparable projects.
18.3.2.2 Operating Cost Summary
Table 18-12 below summarizes the processing plant OPEX by cost element.
Table 18-12: Process Plant OPEX Summary ($ millions)
Element | $ per year | $ per tonne | Contribution% |
Personnel | $7.1 | 13.28 | 46.5% |
Electrical power | $1.4 | 2.65 | 9.3% |
Reagent consumption | $2.8 | 5.31 | 18.6% |
Consumables consumption | $2.2 | 4.04 | 14.1% |
Laboratory costs | $0.4 | 0.75 | 2.6% |
Contract maintenance | $0.1 | 0.23 | 0.8% |
Spare parts and miscellaneous | $1.2 | 2.33 | 8.2% |
Total Operating Cost | $15.3 | 28.58 | 100.0% |
| ● | Personnel costs include all salaried employees associated with the operating plant including the laboratory staff, water treatment plant operators and maintenance crews. |
| ● | Electrical power includes all electrical energy consumed by the site excluding the mining operation. |
| ● | Reagent consumption includes all reagents added to the slurry streams in the process plant including smelting fluxes, antiscalant, and water treatment chemicals. Sodium cyanide contributes $2.30 per tonne of ore treated which is close to half of the total reagent costs. |
| ● | Consumables include grinding media, crusher/mill liners, diesel, propane (for heating), compressed natural gas (smelting furnace), lubricants, cyclone wear parts, polyurethane screen panels, crucibles and stainless steel wool. |
| ● | Laboratory costs include consumables such as crucibles for fire assays, glass beakers, laboratory chemicals, etc. |
| Project: 169525666 | 18-13 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
| ● | Contract maintenance covers all contract services including annual mill relining, environmental monitoring services, safety audits and inspections, mobile equipment maintenance, etc. |
| ● | Spare parts and miscellaneous costs is an allowance for the replacement of equipment, as required, that may fail during operations. It also includes pipe fittings and platework replacement as required. |
| ● | A more detailed breakdown of each element is provided in the sections below. |
18.3.2.3 Personnel Costs Estimate
Table 18-13 below summarizes the estimated plant personnel costs.
Table 18-13: Personnel Costs Summary
Position | Schedule | Number | Total Costs ($/year) | Unit Costs |
| | | | ($/tonne) |
Mill Manager | Day | 1 | 191,932 | 0.36 |
Mill Superintendent | Day | 1 | 130,240 | 0.24 |
Administrative Clerk/Trainer | Day | 1 | 99,136 | 0.18 |
Maintenance Superintendent | Day | 1 | 130,240 | 0.24 |
Gold Room Supervisor | Day | 1 | 121,166 | 0.23 |
Chief Metallurgist | Day | 1 | 150,000 | 0.28 |
Junior Metallurgist (EIT) | Day | 1 | 99,136 | 0.18 |
Laboratory Supervisor | Day | 1 | 130,240 | 0.24 |
Laboratory Technician | Day | 6 | 594,813 | 1.11 |
Shift Operations Supervisor | Shift | 4 | 520,960 | 0.97 |
Control Room Operator | Shift | 4 | 520,959 | 0.97 |
Plant Operator | Shift | 24 | 2,379,253 | 4.43 |
Maintenance Planner | Day | 1 | 121,166 | 0.23 |
Instrumentation Technician | Shift | 4 | 484,663 | 0.90 |
Millwright | Shift | 6 | 726,994 | 1.35 |
Electrician | Shift | 4 | 484,663 | 0.90 |
Lube Technician | Day | 2 | 242,331 | 0.45 |
Totals | | | 7,127,892 | 13.26 |
There are six Plant Operators per shift crew covering all areas of the Plant. One or two of these also assist in the gold room with smelting duties (twice weekly) as there are no dedicated refiners in the personnel complement. Provision has not been made for a dedicated Relief Operator position to cover leave and training; the assumption is that the crew size is sufficient to cover these eventualities.
| Project: 169525666 | 18-14 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
A day shift is based on 2,080 hours per year (52 weeks of 40 hours per week). There are four shift crews which allows for a two-weeks-in and two-weeks-out rotation. Their total hours are 2,190 hours per year (12-hour days for 14 consecutive days each month). The costs include all benefits and bonuses.
18.3.2.4 Electrical Energy Costs Estimate
Table 18-14 summarizes the expected energy consumption costs. The total unit energy consumption is estimated at 44.5 kWh/t.
Table 18-14: Estimated Energy Consumption Costs
Area | Installed | Combined | Consumed | Total Costs | Unit Costs |
| Power (kW) | Factors | (kWh/yr) | ($/year) | ($/tonne) |
Air and water services | 349 | 90 | 1,993,845 | $118,634 | 0.22 |
Primary crushing | 55 | 70 | 235,550 | $14,015 | 0.03 |
Crushed ore handling | 48 | 92 | 303,895 | $18,082 | 0.03 |
Crushed ore reclaim | 34 | 88 | 224,445 | $13,355 | $0.02 |
Secondary and tertiary crushing | 130 | 71 | 787,141 | $46,835 | $0.09 |
Primary grinding circuit | 1,250 | 91 | 9,616,446 | $572,179 | $1.07 |
Secondary grinding circuit | 784 | 91 | 6,042,543 | $359,531 | $0.67 |
Leaching and adsorption | 405 | 86 | 2,337,392 | $139,075 | $0.26 |
Cyanide destruction and tailings disposal | 137 | 90 | 927,867 | $55,208 | $0.10 |
Acid washing, elution and regeneration | 255 | 24 | 459,422 | $27,336 | $0.05 |
Refinery | 120 | 37 | 365,081 | $21,722 | $0.04 |
Reagents | 44 | 39 | 87,674 | $5,217 | $0.01 |
Lime mixing | 16 | 22 | 24,660 | $1,467 | $0.00 |
Allowance for Site Overheads (water pumps, lighting, plugs, etc.) | 118 | 53 | 469,714 | $27,948 | $0.05 |
Total | 3,744 | | 23,875,675 | $1,420,603 | $2.65 |
Notes:
| ● | Installed power includes all standby motors |
| ● | “Combined factors” are the product of the load factor (i.e., how much of the installed power is used when the motor is running), the utilization factor (i.e., the total running hours as a fraction of the total hours in a calendar year), and the inverse of the efficiency factor (i.e., how efficiently is energy drawn from the grid). |
| ● | The utilization factor was applied to non-standby motors only so the product of the installed power and the combined factors number will not equate to the energy consumption presented in Table 21-3. The numbers shown in Table 21-3 are summaries of more detailed motor-by-motor calculations in the mechanical equipment list. |
| ● | The Allowance for Site Overheads cover all electricity users not pertinently listed in the Major Equipment List (e.g., site stormwater management pumps, sewage system, lighting, plugs). |
| Project: 169525666 | 18-15 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
18.3.2.5 Reagents Costs Estimate
Table 18-15 summarizes the reagent consumption and cost estimates.
Table 18-15: Reagent Consumption and Costs
Description | Consumed | Delivered Price | Total Costs | Unit Costs |
Sodium Cyanide Solution (30%w/v) | 0.56 | $4.13 | $1,240,933 | $2.31 |
Activated Carbon | 0.017 | $4.57 | $41,694 | $0.08 |
Hydrated Lime | 3.14 | $0.51 | $857,968 | $1.60 |
Nitric Acid Solution (68%) | 0.013 | $0.78 | $5,469 | $0.01 |
Caustic Soda | 0.02 | $2.01 | $18,325 | $0.03 |
SMBS Solution (38% w/w) | 1.02 | $0.73 | $398,382 | $0.74 |
Copper Sulphate | 0.040 | $3.83 | $82,208 | $0.15 |
Antiscalant | 0.02 | $5.08 | $54,460 | $0.10 |
Allowance for Water Treatment Plant Chemicals | | | $110,895 | $0.21 |
Flocculant | 0.015 | $4.60 | $37,014 | $0.07 |
Smelting Fluxes (combined) | | | $352 | $0.00 |
Total | | | $2,847,698 | $5.31 |
Notes:
| ● | The allowance for water treatment plant chemicals was calculated from an industry benchmark of $0.40/m3 treated and a preliminary water balance estimate of 277,200 m3 to be treated annually. |
| ● | All consumption numbers in the table are per tonne of ROM feed. |
18.3.2.6 Consumables Costs Estimate
Table 18-16 summarizes the consumption of consumable items not included in the mechanical equipment or reagents lists.
Table 18-16: Miscellaneous Consumables Costs
Description | Consumed | Delivered Price | Total Costs | Unit Costs |
Jaw crusher liners | 0.080 | $3.000 | $128,772 | $0.24 |
Cone crushers liners | 0.140 | $3.000 | $225,351 | $0.42 |
Ball Mills Media | 1.560 | $0.805 | $674,134 | $1.26 |
Ball Mills Liners | 0.156 | $6.730 | $563,313 | $1.05 |
Diesel | | | $40,425 | $0.07 |
Propane (Heating) | | | $257,600 | $0.48 |
| Project: 169525666 | 18-16 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
Description | Consumed | Delivered Price | Total Costs | Unit Costs |
Compressed Natural Gas | | | $504 | $0.00 |
| Sets/annum | USD/set | | |
Crucibles and SS Wool | | | $15,000 | $0.03 |
Lubricants | | | $30,000 | $0.06 |
Cyclone Body Parts | 8 | $17,000 | $136,000 | $0.25 |
ADR Circuit Screens Poly Panels | 1 | $12,000 | $12,000 | $0.02 |
Scalping Screens Poly Panels | 4 | $20,529 | $82,114 | $0.15 |
Total | | | $2,165,214 | $4.04 |
Notes:
| ● | Media and liner consumption rates for the tumbling mills are based on an assumed abrasion index and in-house empirical correlation calculating steel consumption based on the energy consumed by the mill and the abrasion index of the ore. The total steel consumption is estimated at 1.9 kg/t which aligns well with industry standards. |
| ● | Diesel consumption was estimated at 35,000 L/yr covering forklifts, bobcats and light vehicles used in the Plant and a diesel price of CAD 1.65/litre (USD 1.16/L). |
| ● | Propane consumption (heating) was benchmarked at USD 0.48/t against similar sites in Ontario. Note that this benchmark also includes the electrical energy consumed for heat tracing. |
| ● | An allowance of $15,000 was added for goldroom crucibles and stainless steel wool. |
| ● | An allowance of $30,000 was added for lubricants. |
| ● | For cyclones it was assumed that each operating cyclone (8 of) will be replaced once annually, i.e., 8 sets in total per year. |
| ● | Vibrating screen panels was assumed to have a life of 6 months. |
18.3.3Tailings - Operating Costs
Table 18-17 summarizes the costs associated with the Stock Mill WEA tailings storage.
| Project: 169525666 | 18-17 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
Table 18-17: Tailings Storage Costs for Stock Mill WEA
Cost Item | Quantity | Unit of | Unit Cost | Cost | Basis of Estimate |
Dam Construction | 724,350 | m³ | $28.80 | $20.9 | Concept Grading Design (2,632 m; 14 m max height; 9.2 m avg height; 4 m top width; 3H:1V ds slope; 2H:1V us slope; firm silty clay sourced from on-site; average 1 km round trip) |
Overbuild for Settlement | 108,653 | m³ | $28.80 | $3.1 | 15% Overbuild |
Adjoining Dam Stabilization | 37,772 | m³ | $9.72 | $0.4 | Waste Rock against adjoining West Dam (464 m; 10H:1V; 1 m avg thickness; waste rock available on-site (5 km round trip) |
HDPE-lined Emergency Spillway | 1 | LS | $720,000 | $0.7 | Sheet Pile Weir (5 m deep, 25 m wide, 1 m projecting above grade) and Engineered Riprap-Lined Channel (trapezoidal, 2H:1V sides, 20m base width, 0.5 m deep, D50=10” rock at 0.6 m thick; 50 m length) |
Tailings Pipeline (8” SDR11 HDPE & fittings, 3” SDR11 HDPE & fittings) | 1 | LS | N/A | $1.2 | 8” SDR11 HDPE (5 km). 8” fittings (22 tees, 44 shutoff valves) (assumes 10% of piping cost) 3” SDR11 HDPE (1.7 km) 3” fittings (44 tees, 44 elbows) (assumes 30% of piping cost) |
Slurry Pump Upgrades | 1 | LS | $720,000 | $0.7 | High-head slurry pump for 4.5 km 8” pipeline at 250 m3/h (1,100 gpm), +13m static head |
Slurry Wall Seepage Cutoff | 10,528 | m² | $187 | $2.0 | In-situ stabilization slurry cutoff wall (2,632 m x 4 m deep; assumes 2 m average depth of firm brown clay + 2 m penetration into soft gray varved clay) |
PVD Installation & Equipment Mobilization | 2,147,238 | m | $1.44 | $3.1 | PVDs (denser spacing under dam with transition zone beyond toe; 131,269 m2 at 1.2 m spacing + 109,350 m2 at 3.0 m spacing; 18 m depth) Mobilization of standard wick-drain installation rig |
| Project: 169525666 | 18-18 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
Cost Item | Quantity | Unit of | Unit Cost | Cost | Basis of Estimate |
PVD Granular Drainage Blanket | 120,310 | m³ | $28.80 | $3.5 | Assumes 0.5 m thick granular drainage blanket over full footprint of PVD placement |
Geotechnical Instrumentation | 1 | LS | $360,000 | $0.4 | VWPs/Inclinometers (assumed cost) |
Subtotal: Direct Costs | | | | $35.9 | |
Engineering and Permitting | 18% | | | $6.5 | ~18% of Direct Costs |
Indirects and Contingency | | | | $8.5 | Calculated against project capital |
Total TMA Expansion Cost | | | | $50.8 | |
Initial Tailings Storage Cost (Grey Fox representing ~50% of total tailings storage through 2034) | 2,087,619 | tonnes | | $12.18 | $/tonne mined |
Future Tailings Storage Cost (starting in 2035, Grey Fox represents 100% of total tailings storage) | 4,175,238 | tonnes | | $12.18 | $/tonne mined |
Notes:
| ● | LS = Lump Sum, PVD = Pre-Fabricated Vertical Drain |
| ● | Dam Construction and Adjoining Dam Stabilization quantities are based on conceptual earthwork grading designs in Autodesk Civil 3D compared to existing grade elevations that are based on a combination of drone-based aerial LiDAR survey conducted by Arcadis in 2025 and the 2016 COOP 2-m DEM obtained from the COOP GeoHub portal. |
| ● | Unit costs for Dam Construction (and overbuild), Adjoining Dam Stabilization, Tailings Pipeline & Distribution, PVD Equipment Mobilization, and PVD Granular Drainage Blanket have been estimated using the Reclaim 7.0 model developed by the Government of the Northwest Territories. These costs have been converted from March 2014 dollars to January 2026 dollars using a conversion rate of 1.32. |
| ● | Tailings storage costs assume that the full expansion cost would be recurring for every 4.2 million tonnes of tailings (total) stored at Stock Mill, which, at approximately 3,000 t/d, represents a recurrence interval of approximately every 3.8 years (~46 months). |
| ● | In calculating initial and future tailings storage costs, a percentage of the total expansion capital cost proportional to the percentage of Grey Fox tailings stored at the facility is divided by the respective quantity of Grey Fox tailings, resulting in a normalized unit rate of $12.18 US$/tonne over the LOM. |
| ● | TSF costs are conceptual and may vary as design advances, with potential cost impacts mitigated by contingency and procurement strategies. |
| ● | More economical tailings storage options may be available that are either currently under evaluation or have not yet been evaluated (e.g., thickened tailings with central deposition; dry-stack tailings; construction of a new mill at Black Fox to facilitate on-site ore processing and tailings storage in the Black Fox Open Pit). |
| Project: 169525666 | 18-19 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
18 Capital and Operating Costs
18.3.4Water Treatment Plant OPEX
The annual operating cost estimate for the Grey Fox water treatment plant is based on the following assumptions listed below as well as the operating summary described in Section 15.12.4:
| ● | Sodium hypochlorite dosed at 5 mg/L to the influent stream flow. |
| ● | 1% of flow through the greensand filter is used for backwash. |
| ● | Greensand backwash contains 1% solids. |
| ● | The backwash sludge volume was estimated by modeling the iron content as ferric chloride (FeCl3) assuming all iron in the influent stream, iron added as part of the greensand filtration process, and dewatering polymer, dosed at 5 mg/L, are captured as waste sludge. |
| ● | Greensand media replacement is completed every 4 years. |
| ● | IX resin replacement is completed every 10 years. |
| ● | Spent IX regenerant brine is disposed of at an offsite brine treatment facility. |
| ● | Ion exchange resins are regenerated once per week at a sodium chloride dose of 160 g/L. |
| ● | Weekly performance sampling for metals, total suspended solids, and pH at a third-party laboratory. |
The total annual estimated operating cost for the water treatment plant is $202,700.
| Project: 169525666 | 18-20 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
19 Economic Analysis
19Economic Analysis
An economic model was prepared for the Grey Fox Project to estimate annual cash flows and assess the sensitivity of the Project to certain economic parameters.
The Project indicates an after‑tax cash flow of $493.2 million, after‑tax NPV (5%) of $282.1 million, and after-tax IRR of 24.8%. The Project is most sensitive to the head grade and gold price.
The base case discount rate for the Project is 5%. The discounted present values of the cash flows are summed to determine the project’s NPV. In addition to the NPV, the IRR and the payback period are also calculated. The IRR is defined as the discount rate that results in an NPV equal to zero. The payback period is calculated as the time required to achieve positive cumulative cash flow for the Project from the start of mineral processing.
Tax assumptions were modelled using input from McEwen and its tax advisors.
19.1Financial Results
A summary of the economic parameters for the Project are illustrated in Table 19-1, Table 19-2, and Figure 19-1.
Table 19-1: Summary of Economic Metrics for the Project
Description | Units | Value |
Pre-Tax | | |
NPV at 5% | $ million | $428.6 |
Internal rate of return | % | 30.7% |
Payback period | Years | 3.9 |
After-Tax | | |
NPV at 5% | $ million | $282.1 |
Internal rate of return | % | 24.8% |
Payback period | Years | 4.6 |
Note: Payback period calculated from start of processing.
Table 19-2: Calculation of After-tax Cash Flow
Description | Units | Value |
Gross revenue | $ million | $2,573.0 |
NSR Royalties | $ million | -$73.3 |
Net Revenue | $ million | $2,499.7 |
OPEX & SUSEX | $ million | -$1,578.8 |
| Project: 169525666 | 19-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
19 Economic Analysis
Description | Units | Value |
Net Operating Income | $ million | $920.9 |
NPI Royalty | $ million | -$16.3 |
EBITDA (Net Revenue) | $ million | $902.4 |
Non Cash Costs | $ million | -$144.1 |
EBIT | $ million | $758.2 |
Taxes | $ million | -$228.4 |
After-Tax Income | $ million | $529.9 |
Non Cash Costs - Added Back in | $ million | $144.1 |
Operating Cash Flow | $ million | $674.0 |
Capital Costs | $ million | -$180.8 |
Total Free Cash Flow (After-Tax) | $ million | $493.2 |

Figure 19-1: Undiscounted After-Tax Cash Flow
19.2 Cautionary Statement
The economic analysis results are based on forward‑looking information that is subject to a number of known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those presented herein. Forward-looking statements in this section include, but are not limited to, statements with respect to:
· | Future gold prices. |
· | Currency exchange rate fluctuations, primarily the CAD:USD rate. |
· | Estimation of Mineral Reserves. |
· | Realization of Mineral Reserve estimates. |
· | Estimated costs and timing of CAPEX and OPEX, including labor, fuel, materials, consumables, supplies, and services. |
| Project: 169525666 | 19-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
19 Economic Analysis
19.3Assumptions
The economic model includes revenue, costs, taxes, and other factors applicable to the Project from the beginning of final design and construction through to the end of mine life. Corporate obligations, financing costs, and corporate-level taxes are excluded.
The model was prepared using mining schedules developed on an annual basis. The financial model is based on the following assumptions:
· | All costs are reported in US dollars (US$) and referenced as “$” unless otherwise stated. |
· | 100% equity ownership. |
· | Escalation and inflation have not been applied. |
· | Additional project development costs, including feasibility studies and permitting activities, are excluded. |
· | Annual gross revenue is determined by applying estimated metal prices to the annual payable metal estimated for each operating year. |
· | Constant commodity prices. |
· | A constant exchange rate of US$1.00 = C$1.35 (or C$1.00 = US$0.74) is applied. |
19.4Economic Model Parameters
19.4.1Mineral Resource, Mineral Reserve, and Mine Life
The mine plan presented in Section 13 of this report was used as the basis for revenue and cost estimates in the discounted cash flow, and also represents the current Mineral Reserve estimate. The mine plan excludes all material from the Inferred Resource category.
The stated Probable Mineral Reserve is 9.4 Mt at 3.24 g/t Au.
The mine plan considers a 15‑year LOM. The mill processing profile is presented in Figure 19-2.
| Project: 169525666 | 19-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
19 Economic Analysis

Figure 19-2: Life of Mine Processing Profile (tonnes)
The production profile for payable Au is presented in Figure 19-3.

Figure 19-3: Life of Mine Production Profile (Payable Au)
19.4.2Metallurgical Recoveries
The average metal recoveries for the different ore zones that have been used for the economic analysis are summarized in Table 19-3. Various grade versus recovery formulas were used to calculate recovery metrics on an annual basis within the financial model. A detailed review of metallurgical recoveries is provided in Section 10 of this report.
| Project: 169525666 | 19-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
19 Economic Analysis
Table 19-3: Life of Mine Average Metallurgical Recoveries
Zones | Gold |
Whiskey Jack | 91.8% |
Gibson | 85.7% |
Contact | 83.8% |
147NE + 147 + South | 88.8% |
Overall | 87.5% |
19.4.3Metal Prices
The metal price for Au used for the economic analysis was based on monthly closing data from April 2024 to April 2026; the approximate two-year trailing average gold price is US$3,000 per ounce. This period reflects a rapid rise in gold prices, starting from approximately $2,285 in April 2024 and exceeding $4,700 by April 2026. The metal price used is summarized in Table 19-4. A two-year time frame (April 2024 to April 2026) is standard for this type of disclosure because it balances long-term stability with recent market momentum. Since gold experienced a price surge during this period. A shorter window (e.g., 6 months) would artificially inflate the baseline price projection, while a longer window (e.g., 5 years) would heavily weigh outdated, lower-priced data.
Table 19-4: Metal Price Assumption
Metal | Units | Price |
Gold | US$ / oz | 3,000 |
Note: The calculation is based on monthly spot closing prices available as of April 2026.
A detailed review of metal prices is provided in Section 16 of this report.
19.4.4Capital Costs
A summary of pre‑production and sustaining capital costs is provided in Table 19-5. A detailed description of the capital costs is provided in Section 18.1 of this report.
Table 19-5: Capital Cost Summary (US$ millions)
Description | Total |
Detailed Engineering | $6.6 |
Physical Procurement | $10.8 |
Construction | $98.7 |
Project Indirects | $33.3 |
Capitalized OPEX | $4.3 |
Total capital before contingency | $153.7 |
| Project: 169525666 | 19-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
19 Economic Analysis
Contingency | $27.1 |
Sustaining | $173.7 |
Closure | $7.4 |
Total Capital Costs | $362.0 |
19.4.5Operating Costs
A summary of LOM operating costs is presented in Table 19-6 and Table 19-7. A detailed description of operating costs is provided in Section 18.3 of this report.
Table 19-6: Life of Mine Operating Cost Summary
Operating Cost Item | Cost | Cost |
Mining | $108.02 | $1,184.1 |
Processing | $28.4 | $311.2 |
Tailings | $12.2 | $133.5 |
Total | $148.6 | $1,628.8 |
Note: Mining costs include water treatment plant.
Table 19-7: Life of Mine Cash Costs C1 & All-In Sustaining Costs
Cash Cost | LOM Total | Unit/Tore | Unit/Oz |
Royalties | $90 | $9.53 | $104.43 |
Mining | $1,016 | $108.02 | $1,184.09 |
Processing / Tailings | $382 | $40.57 | $444.71 |
Selling | $22 | $2.33 | $25.50 |
Production Tax (Gov’t Royalty) | $64 | $6.80 | $74.56 |
Total C1 Costs | $1,573 | $167.25 | $1,833.29 |
DD&A | $144 | $15.32 | $167.98 |
Sustaining Capital | $181 | $19.26 | $211.11 |
All-in Sustaining Cost | $1,898 | $201.83 | $2,212.37 |
19.4.6Royalties
Three royalties have been included in the economic analysis, each calculated as a percentage of the NSR for portions of the ore zones, as summarized in Table 19-8.
| Project: 169525666 | 19-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
19 Economic Analysis
Table 19-8: Royalties as % of NSR & Percent of total Oz per Royalty
Name of Royalty | % of NSR | % of Total Oz |
Gray | 0.15% | 20% |
Newmont | 2.50% | 16% |
Schumacher | 3.00% | 64% |
A fourth royalty, calculated as a percentage of the NPI for portions of the ore zones, is presented in Table 19-9.
Table 19-9: Royalties as % of NPI & Percent of total Oz
Name of Royalty | % of NPI | % of Total Oz |
Parsons-Ginn | 5.0% | 36% |
19.4.7Working Capital
Allowances for working capital beyond metals in inventory at the mine and mill have been excluded for the purposes of this economic analysis.
19.4.8Taxes
A taxation model has been developed within the economic model with input from McEwen’s internal tax experts. Tax calculations for the Project are based on current federal and provincial tax rates and include the existing Mineral Property Tax Pools associated with the Project. McEwen internal tax experts reviewed the final tax calculations.
The tax inputs used in the economic model reflect current conditions; however, the actual taxes payable will depend on several factors, including, but not limited to, the timing of capital expenditures, changes in federal or provincial tax policy, and any investment incentives that may be available to McEwen.
19.4.9Closure Costs
Closure costs are estimated at $7.4 million and represent the cost of closure for the Grey Fox Project as well as the contiguous Black Fox site, which is under a single closure plan.
A bonding strategy has not been developed at this stage, and closure costs are assumed to be incurred during the last year of production.
19.4.10Financing
Project-level financing has not been considered in this economic analysis. 100% equity ownership is applied.
| Project: 169525666 | 19-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
19 Economic Analysis
The economic analysis does take into account financing terms offered by the vendor for‑ a ‑portion of the mining equipment fleet and certain surface facilities. These terms are based on a lease to own structure with a 15% down payment and an effective financing rate of 0.79% over a 36-month period.
19.5Sensitivity Analysis
A discounted cash flow calculation was prepared for the Project based on the various cost and revenue inputs. Sensitivity analysis was completed by applying ±30% variations to gold price, head grade, recovery, exchange rate, CAPEX, SUSEX, OPEX, fuel costs, and labor costs. The results are illustrated in
Figure 19-4.

Figure 19-4: Sensitivity Analysis
| Project: 169525666 | 19-8 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
19 Economic Analysis
For the press release Titled “Pre-Feasibility Study for Grey Fox at Fox Complex – High Returns, Manageable Capital, Mine Life Extended to 2041” and dated June 8, 2026 a gold price of $4500 per ounce (enhanced case) was used to understand the sensitivity of the project to gold price beyond the +30% presented in Figure 19-4. The results of the enhanced case are the following:
· | Cash costs and all-in sustaining costs per ounce over the LOM of $2,042 and $2,421, respectively, at a gold price of $4,500 per ounce. |
· | Pre-tax NPV (5%) increases to $1.25 billion, with an IRR of 70%, and payback of 2 years |
· | Post-tax NPV (5%) increases to $841 million, with IRR of 55% and payback of 2.3 years. |
| Project: 169525666 | 19-9 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
20 Adjacent Properties
20Adjacent Properties
The Grey Fox deposit is located proximal to the PDDZ in the Abitibi Greenstone Belt, a region with significant historical and current gold production. The Fox Complex, which includes Grey Fox, is located within an active exploration and mining district, surrounded by claims and leases held by exploration companies and operators including Onyx Gold Inc., STLLR Gold Inc., Mayfair Gold Corp., and Agnico Eagle Mines Ltd.
20.1Hislop
Located immediately south of Grey Fox is the formerly producing gold mine on the Hislop property, owned by Agnico Eagle Mines Ltd. (Figure 20-1). The Hislop property is also located immediately east and southwest of the Stroud deposit (100% McEwen ownership). McEwen has no ownership interest in the Hislop property, and information concerning this adjacent property has not been independently verified.
Current geological interpretations suggest that mineralization at Grey Fox may extend toward the northern portion of the Hislop property, however this has not been fully verified.
Gold mineralization at the Hislop property occurs in two principal settings associated with a syenite dyke complex:
· | To the south, in carbonate and carbonate breccia rocks separating the syenite dykes from the less altered ultramafic volcanic rocks; and |
· | To the north, in quartz veinlets, stockworks, and fractures within hematite-altered and syenitized mafic metavolcanic rocks (RPA, 2009). |
Mineralization north of the syenite dyke may be analogous to mineralization observed at the southern extent of the Grey Fox Project.
| Project: 169525666 | 20-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
20 Adjacent Properties

Figure 20-1: Plan View of Grey Fox and Stroud Projects in relation to Hislop Property
| Project: 169525666 | 20-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
21 Other Relevant Data and Information
21Other Relevant Data and Information
There is no other relevant data or information.
| Project: 169525666 | 21-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
22 Interpretation and Conclusions
22Interpretation and Conclusions
The QPs note the following interpretations and conclusions in their respective areas of expertise, based on the reviews and interpretations of data available for this TRS.
22.1Ownership
In the opinion of the Qualified Person, the ownership of the Grey Fox Project is well established, with McEwen holding a 100% interest in the mineral tenure covering the deposit area. The mineralized zones are situated on a contiguous group of patented and leased mining claims that collectively provide full control over the resource area. This ownership structure is sufficient to support the development and operation of the Project as contemplated in this Pre-Feasibility Study, and no material ownership constraints have been identified.
22.2Mineral Tenure, Surface Rights, Water Rights, Royalties and Agreements
In the opinion of the Qualified Person, the mineral tenure, surface rights, and associated agreements for the Grey Fox Project are well defined and provide a solid foundation for Project development. The deposit is located on a combination of patented claims and mining leases, with surface rights largely held or accessible for planned activities. The Project is subject to royalty agreements that are typical for the region and have been incorporated into the economic analysis. Existing agreements and ongoing engagement with Indigenous communities and other stakeholders are in place and support Project advancement. Overall, the tenure position, rights, and encumbrances are considered appropriate for the stage of study and do not present any material limitations to the Project as evaluated.
22.3Geology and Mineralization
The Grey Fox deposit is interpreted, based on the geological, structural, alteration, and mineralization relationships described above, to represent a structurally controlled gold system with characteristics consistent with an epizonal orogenic gold environment. Mineralization is hosted within a geologically complex package of mafic metavolcanic rocks, metasedimentary units, and the Gibson Syenite. The interpretation presented herein is considered appropriate for the current level of study and is intended to support geological modeling, Mineral Resource estimation, and PFS-level mine planning under S-K 1300 reporting frameworks.
The principal controls on gold mineralization are interpreted to be the interaction of favourable host lithologies, rheological contrasts, and multiple generations of veining and deformation. The dominant mineralized system comprises steeply dipping, northeast-southwest striking C1-vein arrays that are best developed in the 147, 147NE, Grey Fox South, and Gibson zones. Additional mineralization is localized along the Contact Fault and within the Whiskey Jack shear system. These domains are genetically and spatially related within the broader Grey Fox system, but they display sufficient geological, structural, and
| Project: 169525666 | 22-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
22 Interpretation and Conclusions
grade-continuity differences to warrant separate consideration during geological interpretation, domain modeling, estimation, and mine-design work.
The strongest and most laterally persistent mineralization is interpreted to occur where the C-vein system intersects chemically favourable iron-rich variolitic mafic metavolcanic flows and, in the Gibson area, where veins crosscut metasedimentary rocks proximal to the Gibson Syenite. These relationships indicate that both structure and host-rock composition exert first-order controls on gold deposition. In the volcanic-hosted zones, quartz-carbonate-albite veining, iron-rich host rocks, hematite-bearing alteration, and later sulphide-bearing alteration are interpreted to reflect fluid-rock reaction and changes in redox conditions that may have contributed to gold precipitation. In the Gibson zone, some mineralization is preferentially associated with quartz-sericite-sulphide alteration in metasedimentary rocks, localized brecciation, and stronger alteration near and below the syenite intrusion.
The structural architecture of the deposit is a material consideration for resource interpretation and mine planning. The Contact Fault, A-1 thrust fault, Gibson-Kelore Shear Zone, and Whiskey Jack shear define important geological boundaries and mineralized corridors. Variations in C-vein orientation across the Contact Fault are interpreted to reflect changes in host-rock competency between mafic metavolcanic rocks, metasedimentary rocks, and syenite. These variations should be reflected in geological modeling, domain definition, estimation strategy, and geotechnical assessment. The Whiskey Jack Zone is distinguished from the C-vein dominated zones by more continuous shear-hosted mineralization, higher average grades, and a deeper brittle-ductile style of deformation.
Overall, the geological setting and mineralization characteristics support the interpretation that Grey Fox comprises multiple related mineralized domains within a broader structurally controlled gold system. The primary opportunities for resource growth and refinement are expected along down-plunge and along-strike extensions of mineralized C-vein intersections with favourable metavolcanic and metasedimentary units, within structurally prepared zones adjacent to major faults and shears, and at depth in the Gibson area where drilling has indicated potential for higher-grade breccia-hosted mineralization below approximately 500 m. Further work should focus on refining structural controls, validating interpreted plunge continuity, assessing the extent and continuity of deeper Gibson mineralization, and integrating deportment results into metallurgical, sampling, reconciliation, and resource-modeling assumptions. These recommendations are intended to reduce geological uncertainty and support future updates to the Mineral Resource estimate and mine plan in accordance with applicable S-K 1300 disclosure requirements.
22.4Exploration
The Grey Fox deposit appears to be a combination of an epizonal and orogenic gold deposit made up of a network of sheeted vein sets present in multiple orientations. The drilling densities at the various zones that make up the Grey Fox deposit are good and in the QP’s opinion, the current geological and mineralization models are satisfactory.
Additional stripping for potential outcrops containing structures and mineralization is recommended to test against the validity of the current geological and mineralization models. It will be important to tighten the drill spacing for select areas at Grey Fox to improve the classification of mineral resources. Finally, the
| Project: 169525666 | 22-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
22 Interpretation and Conclusions
Exploration team should continue to update the lithological-structural models for local accuracy, control of density and resource domaining.
22.5Metallurgical Testwork
The principal conclusions arising from the metallurgical testwork completed on Grey Fox mineralized material are summarized below:
· | Comminution Characteristics |
Comminution testwork conducted on representative samples of Grey Fox mineralized material indicates that the material is relatively hard and competent compared with ores typically processed in conventional gold treatment facilities. The tested samples returned an average Bond Ball Mill Work Index (BWi) of 23.4 kWh/t, with the hardest sample, representing Domain 31, exhibiting a BWi of 27.1 kWh/t. These results indicate that the Grey Fox material will require relatively high grinding energy for comminution, and that installed grinding power is expected to be a key design consideration for process plant throughput and overall circuit performance.
· | Gravity Recoverable Gold Potential |
Gravity concentration testwork returned gold recoveries to gravity concentrate ranging from 4% to 32%, with average gravity recovery below 20%. These results indicate that the gravity recoverable gold component is generally modest, although certain samples exhibited recoveries that may justify consideration of gravity concentration within the process flowsheet. On the basis of the testwork completed to date, inclusion of a gravity recovery stage may provide incremental recovery benefit but is not considered fundamental to the overall metallurgical recovery strategy.
· | Whole-Ore Cyanidation Performance |
Whole-ore cyanidation testwork returned gold recoveries ranging from approximately 71% to 94%. The broad range of recoveries demonstrates significant metallurgical variability within the Grey Fox mineralized material. This variability is expected to have implications for recovery forecasting, geometallurgical domaining, and potential process optimization strategies, and should be considered in future metallurgical evaluation and mine planning.
22.6Mineral Resource Estimates
The Mineral Resources estimates are considered reliable and thorough, and based on quality data that has been evaluated and verified. In cases where historical data was unable to be fully validated, resources were restricted to the inferred classification. Geological interpretations and parameters used in the MREs were assessed and considered reasonable.
· | The Grey Fox deposit is estimated to contain (inclusive of mineral reserves) 18.8 Mt at 3.28 g/t for 2.0 Moz of gold at the indicated classification and 5.0 Mt at 2.69 g/t for 438 koz of gold at the inferred classification. |
· | The Grey Fox deposit is estimated to contain (exclusive of mineral reserves) 9.7 Mt at 2.25 g/t for 701 koz of gold at the indicated classification and 4.7 Mt at 2.57 g/t for 388 koz of gold at the inferred classification. |
· | The Stroud deposit is estimated to contain, in inferred classification, 1.9 Mt at 2.80g/t for 168 koz of gold. |
| Project: 169525666 | 22-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
22 Interpretation and Conclusions
· | The Black Fox deposit is estimated to contain, in the combined measured and indicated classification, 385 kt at 3.57 g/t for 44 koz of gold. At the inferred classification it is estimated to contain 385 kt at 2.90g/t for 36 koz of gold. |
· | The Froome deposit is estimated to contain, in the combined measured and indicated classification, 651 kt at 2.78 g/t for 58 koz of gold. At the inferred classification it is estimated to contain 302 kt at 2.93 g/t for 28 koz of gold. |
· | The Stock West and Main deposits are estimated to contain 3.2 Mt at 2.63 g/t for 268 koz of gold at the indicated classification and 2.5 Mt at 2.31g/t for 184 koz of gold at the inferred classification. |
· | The Stock East deposit is estimated to contain 1.8 Mt at 2.12 g/t for 122 koz of gold at the indicated classification and 1.4 Mt at 2.02g/t for 87 koz of gold at the inferred classification. |
· | The Davidson-Tisdale deposit is estimated to contain, in the combined measured and indicated classification, 294 kt at 6.23 g/t for 59 koz of gold. At the inferred classification it is estimated to contain 200 kt at 3.44 g/t for 22 koz of gold. |
22.7Mineral Reserve Estimate
The Mineral Reserves estimate for the Grey Fox Project has been completed in accordance with accepted practice and meets Item 1300 of Regulation S-K and the CIM Definition Standards for Mineral Resources and Reserves (2014).
Many factors may affect the mineral reserves estimate such as dilution, metal prices, metallurgical recoveries, geotechnical characteristics of the deposit and host rock, and the capital and operating cost assumptions. These factors have been taken into account subject to the information and means available to QPs at the time of this study, as described in this report.
The metal price used to estimate Mineral Reserves was $2,200 per ounce of gold. The QP considers this price to be reasonable based on historical three-year trailing averages. A three-year time frame for the reserve estimate is standard for this type of disclosure because it balances long-term stability with recent market momentum. A shorter window (e.g., 6 months) would artificially inflate the baseline price projection, while a longer window (e.g., 5 years) would heavily weigh outdated, lower-priced data.
The reserves were estimated by designing mineable stope shapes in Deswik using DSO. The dimensions of the shapes were determined using geotechnical modeling and modifying factors such as dilution and mining recovery were applied. The shapes were then interrogated against the resource block model and included in the mine plan where the Gold value exceeded the cut-off value. The result was the reserve estimate on which the mine plan was based.
The mineral reserve estimate is shown in Table 22-1.
Table 22-1: Mineral Reserve Estimate, March 27, 2026
Classification | Ore Tonnes (t) | Au (g/t) | Gold Ounces (Oz) |
Total Reserve | 9,405,829 | 3.24 | 980,303 |
| Project: 169525666 | 22-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
22 Interpretation and Conclusions
22.8Mining
McEwen has other existing mining properties (operating and shutdown) in the same area as the Grey Fox Project, and thus has significant experience in mining operations in the region. The planned production rates, modifying factors, and costs are benchmarked against other operations to ensure they are suitable. The project is planning to employ an underground mining method consisting primarily of longitudinal longhole open stoping, which is deemed suitable considering the geometry and quality of the orebody. A small portion of the tonnes will be recovered via cut-and-fill. Longhole open stoping provides operational flexibility and scalability. Given the steeply dipping orebody geometry and the competent hanging wall and footwall conditions, the project is proposed to use predominantly longhole stoping on 20 m to 30 m sublevels in ground conditions expected to range from fair to good. The stopes will be backfilled with a combination of unconsolidated rock fill plus cemented rock fill to prevent backfill dilution in subsequent stopes while also minimizing the use of cement.
All mining activities will be conducted using rubber-tired equipment. Ore will be hauled to surface via the ramp using underground haul trucks. An existing portal near the Whiskey Jack and Gibson deposits will provide initial access to the underground operations. The operation is targeting a steady-state production rate of approximately 1,500 t/d until 2035 then ramping up to 2,700 t/d until 2040, ramping down in 2041. The equipment fleet has been sized to deliver the scheduled mining volumes with fleet expansion and the rebuild and replacement of gear included in the capital spending schedule. Push-pull ventilation system using intake fans at raises/portals and exhaust fans at return raises, with heaters to prevent freezing delivering up to 250 m³/s of fresh air.
22.9Infrastructure
The Grey Fox Project will consist of a compact, centralized mining infrastructure supporting underground operations via North and South portals. Core site infrastructure includes ore and waste stockpiles, a primary crushing facility, water management systems, ventilation plants, and key support buildings such as administration offices, mine dry, maintenance shop, warehouses, and security gatehouse. Site access is provided via Tamarack Road connecting to Highway 101, with ore hauled ~34 km to the Stock Mill. Electrical power will be supplied through a 27.6 kV grid connection along Tamarack Road.
22.10Tailings Storage
Primary conclusions related to tailings storage are outlined below:
· | The planned western expansion of the Stock Mill TMA is anticipated to provide approximately |
4.2 Mt of storage capacity within an outer footprint of approximately 41 ha. Existing leased lands at the Stock Mill are anticipated to provide at least an additional 193 ha of future expansion potential, for an estimated total expansion capacity of approximately 24 Mt.
· | Due to the geotechnical challenges associated with the underlying, soft, varved clays at the Stock Mill site, foundation-dewatering and seepage-control measures, in the form of prefabricated vertical drains (PVDs; wick drains) and appurtenant dewatering measures, have been included in the costs for the Stock Mill western expansion. |
| Project: 169525666 | 22-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
22 Interpretation and Conclusions
· | Other tailings management and storage methods, including using the Black Fox open pit, are currently being evaluated that may provide more economical and safer alternatives to slurry placement. |
22.11Water/Solute Mass Balance and Water Treatment
A water and solute mass balance model was developed in GoldSim to quantify mine contact water flows and water quality that may require treatment prior to discharge. Details on methods and results of this water/solute mass balance model are provided in Section 15. These results were used as the basis for the concept-level design of a water treatment plant, as well as treatment plant capital and annual operation cost estimates (provided in Section 18). The water balance was constructed based on the proposed mine water management plan involving pumping of contact water from Grey Fox (including underground workings dewatering water and runoff from mine facilities) to the Black Fox Mine holding pond.
Key conclusions of the water/solute mass balance evaluation are summarized below.
· | Average flows to the Holding Pond are anticipated to vary seasonally between 2,200 and 4,700 m3/day, with an annual average of approximately 3,300 m3/day. This includes water pumped from Grey Fox, as well as contact runoff at Black Fox from the Waste Rock Stockpile. |
· | Although several analytes may be elevated in concentration in mine contact water, arsenic is the only analyte predicted to exceed Canadian MDMER water quality standards, and the exceedance is predicted to be minimal and potentially seasonal. |
· | Arsenic and other constituents (cobalt, copper, iron, nickel, molybdenum, and zinc) are predicted to exceed Provincial PWQO values. There is also a smaller chance that vanadium may exceed PWQO values. |
· | Importantly, model results are highly sensitive to uncertainties in development rock geochemical source terms. |
Based on these simulation results, the anticipated water treatment system will consist of iron oxidation (potentially using a chemical oxidant such as oxygen or sodium hypochlorite) and greensand filtration, followed by ion exchange for low level metals removal, including a SBA resin for oxyanion removal (arsenic, molybdenum, and vanadium) and a SAC resin for removal of divalent cation metals (copper, cobalt, nickel, and zinc).
22.12Market Studies and Contracts
Gold is traded freely at widely known prices, consequently, the prospects for the sale of any production of the metal are virtually assured. A market study for the saleability of gold products or for the expected price of gold was not undertaken.
22.13Capital and Operating Cost Estimates
The estimate meets the classification standard for a Class 3 estimate as defined by AACE International and has an intended accuracy of +20%/-15%. The estimate is reported in Q1 2026 US dollars.
| Project: 169525666 | 22-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
22 Interpretation and Conclusions
An all in project capital cost is estimated at $181 million. SUSEX are estimated at $174 million, and a closure cost of $7.4 million.
The total operating cost is estimated at $1,398 million or $149 per tonne of ore milled.
22.14Economic Analysis
The ‑Project indicates an after‑tax cash flow of $493.2 million, after‑tax NPV (5%) of $282.1 million, and after tax IRR of 24.8%. The Project is most sensitive to the head grade and gold price.
22.15Risks
The QPs have not identified any significant risks or uncertainties that would reasonably be expected to impact the reliability or confidence of the exploration data, mineral resource estimates, or projected results. They are also not aware of any metallurgical, environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other factors that could materially influence the Mineral Resource estimates. However, it should be noted that substantial fluctuations in metal prices could potentially affect the project’s economic viability.
| Project: 169525666 | 22-7 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
23 Recommendations
23Recommendations
The work completed as part of this Technical Report Summary indicates that the Grey Fox Project is economically feasible based on the stated inputs and assumptions. The authors recommend that McEwen advance development of the Grey Fox Project.
The following work programs are recommended by the QPs to further support project advancement and enhance project value. Estimated costs for the recommended work are provided in Table 23-1.
23.1Recommended Work Programs
23.1.1Early Works
An early works program is recommended to confirm assumptions related to surface geotechnical conditions, including surface overburden characteristics, the condition of the existing portal, and surface conditions at the planned locations of the ventilation raise collars and the south portal.
23.1.2Further Exploration
Future exploration drilling at Grey Fox should focus on:
· | The northwestern extent of the Gibson Zone, where there is evidence of repeating vein sets associated with the contact between the Gibson syenite and adjacent metasediments to the east. |
· | Areas below the 300 m elevation at the Whiskey Jack Zone, where mineralization remains open. |
· | Deeper drilling (>300 m elevation) at Grey Fox South and 147, where drill density is lower relative to other areas of the property. |
In addition to continued diamond drilling, recommended exploration activities include geochemical modeling, downhole televiewer surveys to refine vein orientation, and additional LIBS scanning to better characterize lithological and mineralized domains.
23.1.3Mining
23.1.3.1Geomechanical
The following geochemical work is recommended to support advancement beyond PFS-level studies:
· | Conduct cemented rock fill mix trials to identify designs that meet required strength criteria, including for conditions involving mining beneath cemented rock fill sills. |
· | Complete additional geotechnical core logging and sampling to support IFC design, including: |
oLaboratory testing (e.g., UCS testing by lithology).
oEnhanced characterization of joint conditions (e.g., roughness and alteration).
Further evaluation of crown pillar stability over the LOM is recommended, including:
| Project: 169525666 | 23-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
23 Recommendations
· | Drilling a minimum of two boreholes within the planned crown pillar to obtain oriented geotechnical core logging data, with packer testing in zones of low RQD. |
· | Collection of laboratory samples (e.g., UCS and Brazilian strength tests) from representative lithologies. |
· | Numerical modeling of crown pillar and upper stope stability, as required based on changes to design assumptions or geological conditions. |
23.1.3.2Mining Optimization
Opportunities have been identified to further improve project economics, including:
· | Optimization of mine plan and stope sequencing, evaluation of alternative mining methods, and assessment of overall mine development sequence (e.g., earlier development of the South Portal). |
· | Continued optimization of cut-off grades to improve resource conversion, extend mine life, and balance economic and sustainability objectives. |
· | Ongoing evaluation of methodologies for excavation and support of ventilation raise collars particularly in areas characterized by poor-quality overburden. |
· | Review stope excavation dimensions versus geomechanical recommendations. Confirm smaller stopes with less high cost per tonne vs. large tonnes, lower cost per tonne but dilution and recovery factors. |
· | Evaluation mining equipment for multiple purpose, i.e. slot raise machines can be use for escape raises, etc. |
· | Evaluation of emerging technologies to improve operational efficiency and safety, including increased use of automation and semi-autonomous production equipment. |
23.1.4Mineral Processing and Metallurgical Testwork
The following metallurgical testwork is recommended to further characterize processing response of mineralized material from the Grey Fox deposit and to evaluate opportunities for process optimization. As of the publication date of this Technical Report Summary, a metallurgical program is underway that is expected to address items outlined below:
· | Additional Flotation Testwork to evaluate recovery potential and assess concentrate upgrading through cleaner flotation stages. |
· | Preg-Robbing Assessment using cyanidation testwork with and without activated carbon to confirm potential impact on gold recovery. |
· | Sedimentation and Settling Testwork to establish settling rates, underflow density potential, and flocculant requirements, and to provide design criteria for thickening and tailings management infrastructure. |
· | Oxidation and Fine Grinding Evaluation to assess potential improvement in liberation of gold encapsulated within the pyrite matrix and downstream gold recovery. Future metallurgical programs should evaluate this treatment option to determine its technical effectiveness and economic viability relative to the base case processing flowsheet. |
| Project: 169525666 | 23-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
23 Recommendations
23.1.5Tailings Storage
Additional evaluation of tailings management alternatives is recommended to align with GISTM Best Available Practices and Best Available Technologies and to reduce risk. In particular, consideration should be given to avoiding tailings deposition at the Stock Mill by evaluating the use of the Black Fox open pit as a tailings management facility.
23.1.6Surface Infrastructure
Based on the current level of engineering, the following work is recommended:
| ● | Access and Transportation |
oInspection of the Tamarack Road Bridge prior to construction.
o | Completion of hydrotechnical and geotechnical investigations to confirm bridge substructure capacity. |
· | Infrastructure and Site Development |
o | Detailed site investigations to refine topsoil volume estimates and support reclamation planning. |
o | Investigate bringing increased line power to site for future expansion and electrification options. |
o | Confirmation of availability and integration of Black Fox infrastructure to support early works. |
23.1.7 | Hydrogeology |
The current hydrogeological model was developed based on an open pit mining scenario at Grey Fox. It is recommended that the model be updated to reflect the current underground-only mining approach in order to confirm the assumptions regarding groundwater inflows to the underground workings. Based on available data, additional drilling is not considered necessary to complete the model update.
23.2Estimated Costs
Estimated costs for the recommended work programs are summarized in Table 23-1.
Table 23-1: Estimated Costs for Recommended Work for the Grey Fox Project
Description | Amount ($ millions) |
Early Works | $6.0 |
Further Exploration | $5.0 |
Geotechnical and mining studies | $0.9 |
Mineral Processing and Metallurgical Testwork | $0.2 |
Tailings Storage | $0.1 |
Surface Infrastructure | $0.7 |
Hydrogeology | $0.6 |
Total | $13.5 |
| Project: 169525666 | 23-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
24 References
24References
Altman, K., Armstrong, T., Ciuculescu, T., Ehasoo, G., Ewert, W., Martin, J., Masun, K., Puritch, E., Routledge, R., Wu, Y., & Yassa, A. (2014). Technical report on the preliminary economic assessment of the Buffalo Ankerite, Fuller, Paymaster, and Davidson-Tisdale gold deposits, northeastern Ontario, Canada. Report prepared by Roscoe Postle Associates Inc. for Lexam VG Gold Inc.
AMEC Environment & Infrastructure (AMEC). 2008. Apollo Gold Corporation Black Fox Project Environmental Baseline Study. Prepared for Apollo Gold Corporation Black Fox Mine P.O. Box 605 Matheson, Ontario P0K 1N0. Report Number TC51500 August 2008.
AMEC Environment & Infrastructure. (2010). Geochemical Characterization Kinetic Testing of Waster Rock. Prepared for Apollo Gold Corporation. Report Number TC51502. June.
AMEC. (2014). Black Fox Mine Groundwater Flow Model Modification and Re-Calibration. TC133929. Submitted to Primero Gold Canada Inc., Black Fox Mine. April.
Armstrong, T., Ciuculescu, T., Ewert, W., Masun, K., Puritch, E., Routledge, R., Wu, Y., & Yassa, A. (2013). Technical report and updated resource estimate on the Buffalo Ankerite, Fuller, Paymaster, and Davidson-Tisdale gold deposits, Porcupine Mining Division, northeastern Ontario, Canada (Effective date June 1, 2013). Report prepared by P&E Mining Consultants Inc. and Roscoe Postle Associates Inc. for Lexam VG Gold Inc.
Atherton, P.G. (1981). Gibson option, Hislop project, Hislop Township, Matheson area, Ontario. H. E. Neal & Associates. Diamond drill hole logs. Assessment File 42A09SW0269.
Atherton, P.G. (1989). Operations report on the 1988 diamond drilling program, Hislop East property, Hislop Township, District of Cochrane, Ontario, for Goldpost Resources Inc. MMND Assessment File OM88-6-C-135 (63.5321).
Atkinson, B.T., Hailstone, M.H., Pressacco, R., Wilson, A.C., Draper, D.M., Hope, P., Morra, P.M., & Egerland, D.C. (1999). Report of activities 1998, Resident Geologist Program: Timmins and Sault Ste. Marie districts. Ontario Geological Survey.
Ayer, J.A., Trowell, N.F., Madon, Z., Kamo, S., Kwok, Y.Y., & Amelin, Y. (1999). Compilation of the Abitibi Greenstone Belt in the Timmins-Kirkland Lake area: Revisions to stratigraphy and new geochronological results. In Summary of field work and other activities 1999. (Open File Report 6000, pp. 4-1–4-14). Ontario Geological Survey.
Berger, B.R. (2002). Geological synthesis of the Highway 101 area, east of Matheson, Ontario (Open File Report 6091). Ontario Geological Survey.
Bloom, L. & Jolette, C. (2019). Quarterly quality control results review. Analytical Solutions Ltd.
| Project: 169525666 | 24-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
24 References
Buss, L. (2010). 43-101 mineral resource technical report on the Grey Fox-Pike River property of the Black Fox Complex, Hislop Township, Matheson, Ontario, Canada. Report prepared for Brigus Gold Corporation.
CIM. (2014). CIM definition standards for mineral resources and mineral reserves. Canadian Institute of Mining, Metallurgy and Petroleum.
CIM. (2019). CIM estimation of mineral resources and mineral reserves best practice guidelines. Canadian Institute of Mining, Metallurgy and Petroleum.
Corbett, G. (2007). Controls to low-sulphidation epithermal Au-Ag mineralization [Unpublished paper]. Corbett Geology
Corbett, G.J. (2002). Epithermal gold for explorationists. Australian Institute of Geoscientists. AIG News, 67.
Corbett, G.J. & Leach, T.M. (1998). Southwest Pacific rim gold-copper systems: Structure, alteration, and mineralisation (Special Publication No. 6). Society of Economic Geologists.
Daigle, P.J. (2012). Technical report on the 147 and Contact zones of the Black Fox Complex, Ontario, Canada (Effective date December 15, 2011). Tetra Tech. Prepared for Brigus Gold Corporation.
Dinel, E., Fowler, A.D., Ayer, J.A., Still, A.C., Tylee, K., & Barr, E. (2008). Lithogeochemical and Stratigraphic Controls on Gold Mineralization within the Metavolcanic Rocks of the Hoyle Pond Mine, Timmins, Ontario. Economic Geology, 103, 1341-1363.
Dubé, B. & Gosselin, P. (2007). Greenstone-hosted quartz-carbonate vein deposits. In W. D. Goodfellow (Ed.), Mineral deposits of Canada: A synthesis of major deposit types, district metallogeny, the evolution of geological provinces, and exploration methods (Special Publication No. 5, pp. 49–73). Geological Association of Canada.
Dubé, B., Poulsen, K.H., & Guha, J. (1989). The effects of layer anisotropy on auriferous shear zones: The Norbeau mine, Quebec. Economic Geology, 84, 871–878.
Dubé, B., Williamson, K., & Malo, M. (2003). Gold mineralization within the Red Lake Mine trend: Example from the Cochenour-Willans Mine area, Red Lake, Ontario, with new key information from the Red Lake Mine and potential analogy with the Timmins Camp (Current Research 2003-C21). Geological Survey of Canada.
Dyck, D. (2007). Apollo Gold Corporation Black Fox Project: Project description for small pit and mill operation update. AMEC Earth & Environmental.
Fenwick, K.G., Giblin, P.E., & Pitts, A.E. (1990). Report of activities 1989 resident geologists (MP147). Ontario Geological Survey, Ministry of Northern Development and Mines.
Ferguson, S. (1968). Geology and ore deposits of Tisdale Township. Ontario Department of Mines.
| Project: 169525666 | 24-2 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
24 References
Garber, J.A. (1997). Pike River summary: Hislop Township, Larder Lake Mining Division, Ontario (NTS 42A/9) [Unpublished report]. Battle Mountain Gold.
Gebre-Mariam, M., Hagemann, S.G., & Groves, D.I. (1995). A classification scheme for epigenetic Archean lode-gold deposits. Mineralium Deposita, 30, 408–410. https://doi.org/10.1007/BF00202283
Golder Associates. (2015). Summary of rock slope design recommendations for the 147 and Contact open pits, Black Fox Extension-Grey Fox Deposit Project: Technical memorandum (Draft Version, GAL-016-TM-RevA).
Goldfarb, R.J., & Groves, D.I. (2015). Orogenic gold: Common or evolving fluid and metal sources through time. Lithos, 233, 2–26.
Gow, N. & Roscoe, W. (2006). Technical report on the Taylor, Clavos, Hislop, and Stock projects in the Timmins area, northeastern Ontario, Canada (Effective date September 1, 2006). Scott Wilson Roscoe Postle Associates Inc. Prepared for SST Goldfields Ltd.
Groves, D. I., Goldfarb, R. J., Gebre-Mariam, M., Hagemann, S. G., & Robert, F. (1998). Orogenic gold deposits: A proposed classification in the context of their crustal distribution and relationship to other gold deposit types. Ore Geology Reviews, 13, 7–27.
Groves, D. I., Santosh, M., & Zhang, L. (2020). A scale-integrated exploration model for orogenic gold deposits based on a mineral system approach. Geoscience Frontiers, 11(3), 719–738. https://doi.org/10.1016/j.gsf.2019.12.007
Guy, K. & Puritch, E. (2007). Exploration report (2003-2005) and resource estimate technical report on the Tisdale Project.
Hagemann, S.G. & Cassidy, K.F. (2000). Archean orogenic lode gold deposits. In S. G. Hagemann & P. E. Brown (Eds.), Gold in 2000 (Reviews in Economic Geology, Vol. 13, pp. 9–68). Society of Economic Geologists.
Hodgson, C.J. (1989). The structure of shear-related, vein-type gold deposits: A review. Ore Geology Reviews, 4, 635–678.
Hodgson, C.J. (1993). Mesothermal lode-gold deposits. In R. V. Kirkham, W. D. Sinclair, R. I. Thorpe, & J. M. Duke (Eds.), Mineral deposit modeling (Special Paper 40, pp. 635–678). Geological Association of Canada.
Hoek, Dr. E. (1989). Surface Crown Pillar Stability (probability techniques for determining the factor of safety (FoS) and the probability of failure of crown pillars).
Jensen, L.S. (1985). Precambrian geology of the Ramore area, northwestern part, District of Cochrane, Ontario (Preliminary Map P.2860). Ontario Geological Survey.
Kelly, C. (2018). Characterizing the geochemistry and alteration present at the Archean Hislop and Grey Fox gold deposits in Matheson, Ontario.
| Project: 169525666 | 24-3 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
24 References
Kerrich, R., & Cassidy, K.F. (1994). Temporal relationships of lode gold mineralization to accretion, magmatism, metamorphism and deformation: Archean to present. Ore Geology Reviews, 9, 263–310.
Liu, Y., & Sloan, B. (2020). Metallurgical and environmental test work for the Grey Fox deposit, Timmins, Ontario (KM6034). Prepared for McEwen Mining. Internal report
Markham, B. and Gautrey, S. Grey Fox Groundwater Seepage Inflow Estimates to Open Pit and Underground Mine Workings – Draft. WSP prepared for McEwen.
Marchand, J. (2026). Grey Fox Project GTP validation/characterization/optimization study, Phase 1. Prepared for McEwen Inc.
McEwen Mining Inc. (2025). Technical Report Summary on the Initial Assessment of the Fox Complex, Ontario, Canada.
Mejía, J., & Aliakbari, E. (2024). Fraser Institute annual survey of mining companies, 2023. Fraser Institute. http://www.fraserinstitute.org
MMM Group (2017). (https://www.twpbrm.ca/media/zozbnigz/official-plan-2017.pdf).
Mueller, W., Daigneault, R., Mortensen, J., & Chown, E.H. (1996). Archean terrane docking: Upper crust collision tectonics, Abitibi Greenstone Belt, Québec, Canada. Tectonophysics, 265, 127– 150.
Ollila, H. (2015). Recommended Groundwater Quality and Level Monitoring – Grey Fox Deposit. Golder Associates prepared for Primero Mining Corp.
Ontario Ministry of Mines – Mining Lands Administration System (MLAS: Mining Lands Administration System | ontario.ca).
Parkhurst, D.L. and C.A.J. Appelo. (2013). Description of input and examples for PHREEQC version 3 – a computer program for speciation, batch-reaction, one-dimensional transport, and inverse geochemical calculations. U.S. Geological Survey Technical Methods, Book 6, 497.
Pelletier, C., Richard, P., & Turcotte, B. (2013). Technical report and mineral resource estimate for the Grey Fox Project (Effective date June 21, 2013). InnovExplo. Prepared for Brigus Gold Corporation.
Pope, P. (2000). Summary report on the Paymaster 36 Zone lithological model. Prepared for Placer Dome (CLA) Limited, Dome Mine.
Poulsen, K.H., Robert, F., & Dubé, B. (2000). Geological classification of Canadian gold deposits (Bulletin 540). Geological Survey of Canada.
| Project: 169525666 | 24-4 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
24 References
Price, W.A. 2009. Prediction Manual for Drainage Chemistry from Sulphidic Geologic Materials. Canadian Mine Environment Neutral Drainage (MEND) Report 1.20.1. Chapter 11. Prepared by CANMET Mining and Mineral Sciences Laboratories, Smithers, British Columbia. Prepared for MEND Program. December.
Rhys, D., & Ross, K. (2020). Review of mineralized intervals and petrography of selected drill core samples from the Stock West and Stock East areas [Internal report].
Robert, F. (1990). Structural setting and control of gold-quartz veins of the Val d’Or area, southeastern Abitibi Subprovince. In S. E. Ho, F. Robert, & D. I. Groves (Eds.), Gold and base-metal mineralization in the Abitibi Subprovince, Canada (Vol. 24, pp. 167–210). University of Western Australia.
Robert, F. (2000). World-class greenstone gold deposits and their exploration. 31st International Geological Congress, Rio de Janeiro, Brazil.
Robert, F. (2004). Geologic footprints of gold systems. In J. Muhling et al. (Eds.), SEG 2004: Predictive mineral discovery under cover (Publication 33, pp. 97–101). Centre for Global Metallogeny, University of Western Australia.
Robert, F., & Poulsen, K.H. (2001). Vein formation and deformation in greenstone gold deposits. In J. P. Richards & R. M. Tosdal (Eds.), Structural controls on ore genesis (Reviews in Economic Geology, Vol. 14, pp. 111–155). Society of Economic Geologists.
Robert, F., Poulsen, K.H., & Dubé, B. (1994). Structural analysis of lode gold deposits in deformed terranes and its application (Open File Report 2850). Geological Survey of Canada.
Robert, F., Poulsen, K.H., & Dubé, B. (1997). Gold deposits and their geological classification. In A. G. Gubins (Ed.), Proceedings of Exploration ’97 (pp. 209–220).
Robert, F., Poulsen, H., Cassidy, K.F., & Hodgson, C.J. (2005). Gold metallogeny of the Yilgarn and Superior cratons. In Economic Geology 100th Anniversary Volume (pp. 1001–1034). Society of Economic Geologists.
Roscoe, W.E., Evans, L., Rennie, D.W., & Brady, B.S. (2003). Report on the Clavos, Stock Mine, Taylor, Central Timmins, and Golden Reward properties in the Timmins area of northeastern Ontario.
Ross, K., & Rhys, D. (2011). Reconnaissance study of representative drill intercepts and petrographic samples from the Contact and 147 zones, southern Black Fox Complex, Abitibi Greenstone Belt. Panterra Geoservices Inc. Prepared for Brigus Gold Corporation.
Siragusa, G.M. (1994). Mineralization in the Stock and Taylor Townships area and Penhorwood Township, Abitibi Greenstone Belt (Open File Report 5905). Ontario Geological Survey.
SRK Consulting Canada (2018). Technical Report for the Black Fox Complex. Prepared by SRK for McEwen Mining Inc. under NI43-101 guidelines
| Project: 169525666 | 24-5 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
24 References
Taylor, B. E. (2007). Epithermal gold deposits. In W. D. Goodfellow (Ed.), Mineral deposits of Canada: A synthesis of major deposit types, district metallogeny, the evolution of geological provinces, and exploration methods. Geological Association of Canada. Special Publication No. 5, pp. 113–139.
Thurston, P.C., Ayer, J.A., Goutier, J. and Hamilton, M.A. (2008). Depositional Gaps in Abitibi Greenstone Belt Stratigraphy: A Key to Exploration for Syngenetic Mineralization. Economic Geology, v. 103, pp. 1097-1134.
Tim McBride, B.Sc., P.Geo. Hydrogeologist AMEC Environment & Infrastructure (AMEC). 2012. Hydrogeological Assessment Grey Fox Project Hislop Township, Timiskaming - Cochrane District, Ontario. Prepared for Brigus Gold Corp. Report Number TC111515. 8 March 2012.
Tuba, G. (2019). Fluid inclusion characteristics and implications for gold formation at the Grey Fox Deposit [Internal report]. McEwen Mining Ltd.
Wetmore, D.L. (2004). Hislop Township gold project, Matheson area, Ontario: Technical qualifying report. Behre Dolbear & Company Ltd. Prepared for Stroud Resources Ltd.
Wood. (2021). Technical Report Summary on the Initial Assessment of the Fox Complex Ontario, Canada. Prepared for McEwen Mining, Inc.
Wood. (2022a). Fox Complex GoldSim Model. McEwen Fox Complex Project, Project # OMGM2018S/246729, Document # 246279-0000-DV00-RPT-0001. Prepared for McEwen Mining, Inc. March 2022.
Wood. (2022b). Grey Fox and Stock – Geochemistry Static Data Report. McEwen Fox Complex Project. Document # 246279-0000-DV00-RPT-0002. Prepared for McEwen Mining, Inc. March 2022.
WSP. (2024). Grey Fox – Kinetic Testing Final Data Distribution – DRAFT. McEwen Fox Complex Project. Project Number OMGM2310A. October 2024.
| Project: 169525666 | 24-6 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
25 Reliance on Information Provided by the Registrant
25Reliance on Information Provided by the Registrant
25.1Mineral Tenure, Surface Rights, and Encumbrances
In this Technical Report Summary, information regarding mineral tenure, surface rights, royalties, permitting, taxation, and environmental matters is based on material provided by McEwen. The QPs are not qualified to provide legal opinions on such matters and have relied on information and documentation provided by McEwen.
Certain data used in this Report were provided by McEwen. The QPs have reviewed and analyzed these data and have drawn independent conclusions based on their professional judgment.
The QPs offer no legal opinion as to the validity of title to the mineral claims and mining leases and have relied on information provided by McEwen in that regard.
25.2Taxation
The QPs have relied upon, and disclaim responsibility for, taxation information provided by McEwen. Invoices were compiled, examined and cross-referenced for payment confirmation or account statements were requested by the governing body to ensure payment compliance.
The QPs believe it is reasonable to rely on this information because the corporate tax structures and local jurisdictional regulations applicable to this project fall outside the standard technical expertise of the QPs, requiring specialized legal and accounting counsel. The retained experts providing the data are reputable, licensed professionals in good standing within the relevant jurisdiction.
This information supports the economic analysis presented in Section 19 and Mineral Reserve estimate presented in Section 12.
25.3Royalties
The QPs have relied upon, and disclaim responsibility for, information provided by McEwen regarding royalties applicable to the Project, including:
· | Parsons Ginn Royalty (5% net profits interest (NPI)) |
· | Triple Flag Royalty (formerly Newmont Royalty) (2.5% NSR) |
· | Frederick W. Schumacher Royalty (3% NSR) |
· | Gray Royalty (0.15% NSR) |
The QPs believe it is entirely reasonable to rely on this information for the following reasons:
· | · Legal Ownership: Legal agreements, underlying deeds, and land titles are corporate or legal matters that fall outside the technical expertise of a QP. |
| Project: 169525666 | 25-1 |
Grey Fox Project Prefeasibility Study S-K 1300 Technical Report Summary
25 Reliance on Information Provided by the Registrant
· | · Client Verification: The client has provided formal confirmation that these specific royalty parameters represent the current legal encumbrances on the property. |
This information supports the economic analysis in Section 19 and the Mineral Reserve estimate presented in Section 12.
| Project: 169525666 | 25-2 |
With every community, we redefine what’s possible.
Stantec is a global leader in sustainable
engineering, architecture, and environmental
consulting. The diverse perspectives of our
partners and interested parties drive us to think
beyond what’s previously been done on critical
issues like climate change, digital transformation,
and future-proofing our cities and infrastructure.
We innovate at the intersection of community,
creativity, and client relationships to advance
communities everywhere, so that together we can
redefine what’s possible.
Stantec Consulting Ltd.
stantec.com
| | |