ITEM 8.01 Other Events. On September 28, 2026, Union Electric Company, doing business as Ameren Missouri (“Ameren Missouri”), filed its non-binding integrated resource plan (“2026 IRP”) with the Missouri Public Service Commission (“MoPSC”). The 2026 IRP includes Ameren Missouri’s preferred plan for reliably meeting customers’ projected long-term energy needs in a least cost manner.…
St. Louis-based Ameren Corporation powers the quality of life for 2.5 million electric customers and more than 900,000 natural gas customers in a 64,000-square-mile area through its Ameren Missouri and Ameren Illinois rate-regulated utility subsidiaries. Ameren Illinois provides electric transmission and distribution service and natural gas distribution service. Ameren Missouri provides electric generation, transmission and distribution service, as well as natural gas distribution service. Ameren Transmission Company of Illinois develops, owns and operates rate-regulated regional electric transmission projects in the Midcontinent Independent System Operator, Inc. For more information, visit Ameren.com, or follow us at @AmerenCorp, Facebook.com/AmerenCorp, or LinkedIn.com/company/Ameren.
Select an item to read the extracted section. The as-filed document remains the primary evidence.
Item 8.01Item 8.01 - Other Events
ITEM 8.01 Other Events.
On September 28, 2026, Union Electric Company, doing business as Ameren
Missouri (“Ameren Missouri”), filed its non-binding integrated resource plan (“2026 IRP”) with the Missouri Public
Service Commission (“MoPSC”). The 2026 IRP includes Ameren Missouri’s preferred plan for reliably meeting customers’
projected long-term energy needs in a least cost manner. The 2026 IRP reflects forecasted energy demand growth assumptions for the preferred
plan and high load growth scenarios ranging from approximately 2.9 to 3.9 gigawatts (“GW”) by 2030, 5 to 6 GW by 2035, and
6 to 9 GW by 2045. The preferred plan reflects significant investments in natural gas-fired generation, renewable resources, battery energy
storage, and new nuclear generation while retiring coal and certain existing natural gas-fired energy centers, including:
the addition of 2,100 megawatts (“MW”) of combined-cycle natural gas generation resources by 2031, an additional 2,800
MW by 2035 and a further 1,400 MW by 2042;
the addition of 1,900 MW of simple-cycle natural gas generation resources by 2029 and an additional 2,400 MW by 2045;
the addition of 500 MW of natural gas fuel cells by 2030;
the addition of 1,300 MW of solar generation by 2030 and an additional 1,050 MW by 2035;
the addition of 1,500 MW of wind generation by 2040;
the addition of 2,400 MW of battery energy storage by 2030;
the addition of 1,200 MW of new nuclear generation by 2040;
extending the retirement date of two units at the Labadie coal-fired energy center from 2036 to 2042;
retirement of approximately 1,800 MW of natural gas-fired energy centers by 2040;
the continued implementation of customer energy efficiency and demand response programs; and
the expectation that Ameren Missouri will seek and receive Nuclear Regulatory Commission approval for an extension of the operating
license for the Callaway nuclear energy center beyond its current 2044 expiration date.