Skip to content
Baker Capital StrategiesMARKETS. FILINGS. PERSPECTIVE.
Powered by THEMA

BAKER CAPITAL STRATEGIES

Get the free weekly BCS email.

Selected company filings and market updates, delivered by email. Your first report will follow soon.

  • Your weekly BCS reportMarket updates and links to filings you can explore.
  • THEMA at launchWe’ll send directions for setting up your filing alerts when THEMA officially opens.

One signup for the weekly email and your free THEMA Basic account at launch.

Already registered or a CSW member?Log in to THEMA →

At least 8 characters. This also creates your free THEMA account for launch.

You’re signing up for the weekly BCS email and THEMA launch/setup updates. Unsubscribe using the link in any email. Privacy policy · Terms

BCS

Current Report · Items 8.01 · 8-K

Ameren Corporation

AEENYSEEQUITYCurrent

Other Events

ITEM 8.01 Other Events. On September 28, 2026, Union Electric Company, doing business as Ameren Missouri (“Ameren Missouri”), filed its non-binding integrated resource plan (“2026 IRP”) with the Missouri Public Service Commission (“MoPSC”). The 2026 IRP includes Ameren Missouri’s preferred plan for reliably meeting customers’ projected long-term energy needs in a least cost manner.…

Filed Sep 28, 2026Accepted Sep 28, 2026, 5:25 PM EDTCIK 1002910Accession 0001104659-26-111420
Share

Company context

St. Louis-based Ameren Corporation powers the quality of life for 2.5 million electric customers and more than 900,000 natural gas customers in a 64,000-square-mile area through its Ameren Missouri and Ameren Illinois rate-regulated utility subsidiaries. Ameren Illinois provides electric transmission and distribution service and natural gas distribution service. Ameren Missouri provides electric generation, transmission and distribution service, as well as natural gas distribution service. Ameren Transmission Company of Illinois develops, owns and operates rate-regulated regional electric transmission projects in the Midcontinent Independent System Operator, Inc. For more information, visit Ameren.com, or follow us at @AmerenCorp, Facebook.com/AmerenCorp, or LinkedIn.com/company/Ameren.

Current securities

Recent company filings

  1. Results of Operations and Financial Condition · Other EventsNov 5, 2026
  2. Other EventsSep 18, 2026
  3. 424B2 filingSep 9, 2026
  4. FWP - filed by AMEREN CORP regarding AMEREN CORPSep 8, 2026
  5. 305B2 filingSep 8, 2026

Registered securities in this filing

Ameren Corporation · 8-K · Filed 2026-09-28

As filed in this accession. Current/historical status below comes from the governed listing record; the cover itself remains exact to this filing.

Common Stock, $0.01 par value per share

Symbol
AEE
Exchange
NYSE
Classification
COMMON
Status
Current
Filing context

Context: AsOf2026-09-28

Dimensions: Not supplied

Accession 000110465926111420 · 1 registered-security cover member

Read the exact SEC filing ↗

Disclosure sections

Items 8.01

Select an item to read the extracted section. The as-filed document remains the primary evidence.

Item 8.01Item 8.01 - Other Events
ITEM 8.01 Other Events. On September 28, 2026, Union Electric Company, doing business as Ameren Missouri (“Ameren Missouri”), filed its non-binding integrated resource plan (“2026 IRP”) with the Missouri Public Service Commission (“MoPSC”). The 2026 IRP includes Ameren Missouri’s preferred plan for reliably meeting customers’ projected long-term energy needs in a least cost manner. The 2026 IRP reflects forecasted energy demand growth assumptions for the preferred plan and high load growth scenarios ranging from approximately 2.9 to 3.9 gigawatts (“GW”) by 2030, 5 to 6 GW by 2035, and 6 to 9 GW by 2045. The preferred plan reflects significant investments in natural gas-fired generation, renewable resources, battery energy storage, and new nuclear generation while retiring coal and certain existing natural gas-fired energy centers, including: the addition of 2,100 megawatts (“MW”) of combined-cycle natural gas generation resources by 2031, an additional 2,800 MW by 2035 and a further 1,400 MW by 2042; the addition of 1,900 MW of simple-cycle natural gas generation resources by 2029 and an additional 2,400 MW by 2045; the addition of 500 MW of natural gas fuel cells by 2030; the addition of 1,300 MW of solar generation by 2030 and an additional 1,050 MW by 2035; the addition of 1,500 MW of wind generation by 2040; the addition of 2,400 MW of battery energy storage by 2030; the addition of 1,200 MW of new nuclear generation by 2040; extending the retirement date of two units at the Labadie coal-fired energy center from 2036 to 2042; retirement of approximately 1,800 MW of natural gas-fired energy centers by 2040; the continued implementation of customer energy efficiency and demand response programs; and the expectation that Ameren Missouri will seek and receive Nuclear Regulatory Commission approval for an extension of the operating license for the Callaway nuclear energy center beyond its current 2044 expiration date.

Privacy choices

BCS measures page use with Google Analytics using regional consent settings. You can change your preference here. Charts and market data remain available.

Essential functions — always available. Security, navigation, registration and remembering these choices.

Audience analytics

Analytics cookies are off by default for visitors Google identifies in the EEA, UK or Switzerland until allowed. Limited measurement without analytics cookies may still occur under those regional defaults.

TradingView charts, quotes and the economic calendar load automatically as page content. TradingView receives network and browser information and may collect its own usage analytics. This choice controls BCS’s Google Analytics only.

Google advertising is not enabled. Direct sponsor links do not load advertising trackers on BCS.

Turning analytics off stops future Google Analytics activity here. It does not erase information already received by the provider. Read the privacy policy.